Power from knowledge

KSK Mahanadi Power Company Ltd. KMPCL/MAINT/FBFAS/01

6 X 600 MW Power Plant


SMP FOR FLUIDIZING BLOWER OF FLY ASH SILO
Issue No: 1 Issue Date: Revision: 1 Revision Date: File no: Page 1 of 27

PREVENTIVE MAINTENANCE

FOR

FLUDIZING BLOWER OF FLY


ASH SILO

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
Power from knowledge
KSK Mahanadi Power Company Ltd. KMPCL/MAINT/FBFAS/01

6 X 600 MW Power Plant


SMP FOR FLUIDIZING BLOWER OF FLY ASH SILO
Issue No: 1 Issue Date: Revision: 1 Revision Date: File no: Page 2 of 27

FLOWCHART OF SMP:
APPLY PTW

ISOLATION OF EQUIPMENT

ISSUING PTW

INSPECTION OF WORK
AREA/EQUIPMENT

CARRYING OUT WORK AS PER


CHECKLIST

EQUIPMENT BOX-UP AREA


HOUSEKEEPING

SURRENDER OF PTW AND TRIAL RUN

NORMALIZATION OF EQUIPMENT

CANCELLATION OF PTW

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
Power from knowledge
KSK Mahanadi Power Company Ltd. KMPCL/MAINT/FBFAS/01

6 X 600 MW Power Plant


SMP FOR FLUIDIZING BLOWER OF FLY ASH SILO
Issue No: 1 Issue Date: Revision: 1 Revision Date: File no: Page 3 of 27

CHECK LIST:
ACTIVITY TO BE DONE:-
1. Inspection of Oil Condition &
Level.
2. 'V'-Belt Tension/Condition
Inspection.
3. Inspection/Cleaning of Air
Breather Plug.
4. Inspection/Cleaning of Drain Plug.
5. Inspection of Pulley.
6. Checking/Cleaning of Suction
Filter.
Prepared by: Reviewed by: Approved by:
Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
Power from knowledge
KSK Mahanadi Power Company Ltd. KMPCL/MAINT/FBFAS/01

6 X 600 MW Power Plant


SMP FOR FLUIDIZING BLOWER OF FLY ASH SILO
Issue No: 1 Issue Date: Revision: 1 Revision Date: File no: Page 4 of 27

7. Checking of Fasteners/Mounting
tightness etc.
8. Checking of NRV.
9. Cleaning & Greasing of Safety
Valve.
10. Clearance Checking of Lobe.
11. Inspection of Oil Seal.
12. Observation.

Prepared by: Reviewed by: Approved by: