PREVENTIVE MAINTENANCE
FOR
FLOWCHART OF SMP:
APPLY PTW
ISOLATION OF EQUIPMENT
ISSUING PTW
INSPECTION OF WORK
AREA/EQUIPMENT
NORMALIZATION OF EQUIPMENT
CANCELLATION OF PTW
CHECK LIST:
ACTIVITY TO BE DONE:-
1. Inspection of Oil Condition &
Level.
2. 'V'-Belt Tension/Condition
Inspection.
3. Inspection/Cleaning of Air
Breather Plug.
4. Inspection/Cleaning of Drain Plug.
5. Inspection of Pulley.
6. Checking/Cleaning of Suction
Filter.
Prepared by: Reviewed by: Approved by:
Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
Power from knowledge
KSK Mahanadi Power Company Ltd. KMPCL/MAINT/FBFAS/01
7. Checking of Fasteners/Mounting
tightness etc.
8. Checking of NRV.
9. Cleaning & Greasing of Safety
Valve.
10. Clearance Checking of Lobe.
11. Inspection of Oil Seal.
12. Observation.