Measurement: of Quantities
Construction Method
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
1) Site clearance
10.00
10.00
----------
100.00 100 m2
----------
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
2) Foundation
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
2) Foundation
2.2) Excavation for pile cap Size of pile cap = 1219 x 1219
Depth of excavation:
9/1.22 1524 + 50 (lean concrete) = 1574
1.22
1.57
----------
21.03 21 m3
----------
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
2) Foundation
2.3) Reinforced concrete Grade 30 for Size of pile cap:
pile cap Length = 1219
Width = 1219
9/1.22 Thickness = 305
1.22
0.31
----------
4.15 4 m3
----------
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
2) Foundation
2.4) 50mm thick lean concrete Grade Size of pile cap:
15 for pile cap Length = 1219
Width = 1219
9 / 1.22
1.22
----------
13.40 13 m2
----------
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
2) Foundation
9/2/1.50
0.31 8.37
15.18 15m2
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
2) Foundation
2.6) Reinforcement bar Y12 for pile cap Length:
a c
9/2/ 12/ 1.53
---------- b
No. of bars:
= (b/100) + 1
= ((1219 – 2(50)cover )/100 )+1
= 12 nos.
@100 c/c
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.1) Column stump Size of column stump:
3.1.2) Formwork for column stump Length = 229
Width = 229
9/4/0.23 Height = 1524 – 305 thickness of pile
1.04 cap – (351/2) Half of beam’s
---------- thickness
8.61 9 m2 = 1043.50
----------
@100 c/c
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.1) Column stump Length = a + half beam’s thickness –
3.1.3) Reinforcement bar Y12 for cover + 2 laps
column stump lap
9/4/2.97
---------- a
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.1) Column stump Length of link: (length of CS– 2cover) x
3.1.4) R6 link in for column stump 4 +hook Hook
9/6/0.62
----------
33.48m x 0.22kg/m = 7.36kg =(229-100)+(229-100)+(229-100)+(229-
---------- 100)+100=616
7kg
No. of link:
Height of column stump = 1043.50
=(1043.50/229)+1
= 6 nos.
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.2) Ground beam Size of ground beam:
3.2.1) Excavation for ground beam Length=3048+3048=6096
Width = 229
2/3/6.10 Thickness = 351
0.23
0.35
----------
2.95m3
----------
3m3
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.2) Ground beam Size of ground beam:
3.2.2) Reinforced concrete Grade 30 for Length=3048+3048=6096
ground beam Width = 229
Thickness = 351
2/3/6.10
0.23
0.35
----------
2.95m3
----------
3m3
@100 c/c
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.2) Ground beam Size of ground beam:
3.2.3) Formwork for ground beam Length=3048+3048=6096
Width = 229
Thickness = 351
2/3/2/6.10
0.35
----------
25.62 26m2
----------
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.2) Ground beam Length = (length–2cover)+(2bend-
3.2.4) Reinforcement bar Y10 for 2cover)
ground beam =(6096-(2x50))+(2x351)-(4x50)
= 6498
2/3/4/6.50
----------
156.00m x 0.62kg/m = 96.72kg
----------
97kg
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.2) Ground beam Length of stirrup:
3.2.5) R6 stirrup for ground beam Hook
2/3/28/0.86
---------- =(229-100)+(351-100)+(229-100)+(351-
144.48m x 0.22kg/m = 31.79kg 100)+100
---------- =860
32kg
No. of stirrup:
Length of grd beam= 6096
=(6096/229)+1
= 28 nos.
3) WBLFF
6.10
6.10 BRC A8
150mm thick
concrete slab
0.50
----------
18.61m3 19 m3
---------- 50mm thick
sand
300mm thick
hardcore
DPM
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.2) Reinforced concrete G30 in Depth of excavation = 500mm
ground slab
150mm thick
BRC A8
concrete slab
6.10
6.10
0.15 50mm thick
---------- sand
---------- 6 m3
DPM
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.3) Formwork for ground slab Depth of excavation = 500mm
4/6.10 BRC A8
150mm thick
concrete slab
0.15
----------
3.66m2 50mm thick
---------- sand
4 m2 300mm thick
hardcore
DPM
6.10
----------
50mm thick
37.21m2 sand
6.10
----------
50mm thick
37.21m2 sand
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.6) 50mm sand blinding for ground Depth of excavation = 500mm
slab
150mm thick
BRC A8
6.10 concrete slab
6.10
----------
50mm thick
37.21m2 sand
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.7) Hardcore for ground slab Depth of excavation = 500mm
6.10 BRC A8
150mm thick
concrete slab
6.10
0.30
---------- 50mm thick
11.16m3 sand
11 m3
DPM
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
4) FRAME
4.1) Column Size of column:
4.1.2) Formwork for column Length = 229
Width = 229
9/4/0.23 Height = 3000
3.00
----------
24.84 25 m2
----------
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
4) FRAME
4.1) Column Length = height of column + half of roof
4.1.3) Reinforcement bar Y12 for beam + 1 lap + bend
column
bend
9/4/4.50
---------- Height of wall
162.00m x 0.89kg/m = 144.18kg
----------
144kg
lap
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
4) FRAME
4.1) Column Length of link: (length of CS– 2cover) x
4.1.4) R6 link in for column 4 +hook
Hook
9/14/0.82
----------
103.32m x 0.22kg/m = 22.73kg =(229-50)+(229-50)+(229-50)+(229-
---------- 50)+100=816
23kg
No. of link:
Height of column = 3000
=(3000/229)+1
= 14 nos.
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
4) FRAME
4.2) Roof beam Size of roof beam:
4.2.1) Reinforced concrete Grade 30 for Length=3048+3048=6096
roof beam Width = 229
Thickness = 351
2/3/6.10
0.23
0.35
----------
2.95m3
----------
3m3
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
4) FRAME
4.2) Roof beam Size of roof beam:
4.2.2) Formwork for roof beam Length=3048+3048=6096
Width = 229 Side
Thickness = 351
2/3/6.10 Soffit
0.93
----------
34.04 34m2
----------
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
4) FRAME
4.2) Roof beam Length = (length–2cover)+(2bend-
4.2.3) Reinforcement bar Y10 for roof 2cover)
beam =(6096-(2x50))+(2x351)-(4x50)
= 6498
2/3/4/6.50
----------
156.00m x 0.62kg/m = 96.72kg
----------
97kg
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
4) FRAME
3.2) Roof beam Length of stirrup:
3.2.5) R6 stirrup for roof beam Hook
2/3/28/1.06
---------- =(229-50)+(351-50)+(229-50)+(351-
178.08m x 0.22kg/m = 39.18kg 50)+100
---------- =1060
39kg
No. of stirrup:
Length of beam= 6096
=(6096/229)+1
= 28 nos.
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
2/8.50
5.20 a = 42482 + 30002
----------
88.40m2 88 m2 Front and rear elevation
---------- a = 5200
b = 6096 +
1200 + b
1200
b = 8496
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
4/ 6.10
3.00 73.20
Less opening (e.g. door and window) Front and rear elevation
2/2.10
0.90 3.78 (door)
65 m2 b
6/1.20
0.60 4.32 (window)
Brickwall
65.10
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
37 m2
b
8.3) Ceiling 37m2
Brickwall
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
9) SUNDRIES
a 3m
9.1) Built-in counter size 1800mm x 900mm
x 725mm(h).
1
1 no. Front and rear elevation
Brickwall