MEASUREMENT OF QUANTITIES

● Mat Naim bin Abdullah @ Mohd Asmoni


● Diploma QS (UTM), BSc. QS (Glasgow
Caledonian University), M.Eng. Construction
(UTM), PhD Facilities Management (UTM)
● matnaim@utm.my
● amn871969@yahoo.com
● C04-308
● 019-7573760

www.utm.my innovative ● entrepreneurial ● global 1


MEASUREMENT OF QUANTITIES

Assumption No. 1: Total land area = 10m x 10m

Project Title: Construction and completion of


guard house
Owner: Panicsonic Sdn Bhd
Architect: A to Z Sdn Bhd
Drawing Title: Ground beam and foundation plan
-------------------------------------------------------------------------
Drawn by: Sheila
Checked by: Aaron

www.utm.my innovative ● entrepreneurial ● global 2


MEASUREMENT OF QUANTITIES

www.utm.my innovative ● entrepreneurial ● global 3


MEASUREMENT OF QUANTITIES

Construction Method

1. Preliminaries (Initial site works) - % of total cost


2. Site clearance and earthwork
3. Foundation construction (E.g. Piling and footing)
4. Work below lowest floor finish
5. Frame
6. Staircase
7. Upper Floor
8. Roof
9. Wall and partition
10. Door and window
11. Finishes
12. Sundries (Built-in furniture)
13. Building services (M&E, ICT etc)
14. External works (Water reticulation, landscape etc)

www.utm.my innovative ● entrepreneurial ● global 4


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

1) Site clearance

1.1) Clear the site including grubbing of Area of the site:


trees, shrubs and demolish any 10 x 10 = 100m2
existing structure and cart away
and dump to the specified
location.

10.00
10.00
----------
100.00 100 m2
----------

www.utm.my innovative ● entrepreneurial ● global 5


MEASUREMENT OF QUANTITIES

www.utm.my innovative ● entrepreneurial ● global 6


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation

2.1) Piling including all related works Area of the building:


Length = 3048 + 3048 = 6096
6.10 Width = 3048 + 3048 = 6096
6.10
----------
37.21 37 m2
----------

www.utm.my innovative ● entrepreneurial ● global 7


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation

2.2) Excavation for pile cap Size of pile cap = 1219 x 1219
Depth of excavation:
9/1.22 1524 + 50 (lean concrete) = 1574
1.22
1.57
----------
21.03 21 m3
----------

Excavation and Lean concrete as base


for pile cap

www.utm.my innovative ● entrepreneurial ● global 8


MEASUREMENT OF QUANTITIES

www.utm.my innovative ● entrepreneurial ● global 9


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation
2.3) Reinforced concrete Grade 30 for Size of pile cap:
pile cap Length = 1219
Width = 1219
9/1.22 Thickness = 305
1.22
0.31
----------
4.15 4 m3
----------

Concrete for pile cap

www.utm.my innovative ● entrepreneurial ● global 10


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation
2.4) 50mm thick lean concrete Grade Size of pile cap:
15 for pile cap Length = 1219
Width = 1219
9 / 1.22
1.22
----------
13.40 13 m2
----------

Excavation and Lean concrete as base


for pile cap

www.utm.my innovative ● entrepreneurial ● global 11


MEASUREMENT OF QUANTITIES

www.utm.my innovative ● entrepreneurial ● global 12


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation

2.5) Formwork for pile cap Size of pile cap:


Length = 1219
9 / 4 /1.22 Width = 1219
0.31 Thickness = 305
----------
13.62 14 m2 9/2/1.22
---------- 0.31 6.81

9/2/1.50
0.31 8.37
15.18 15m2

Formwork for pile cap

www.utm.my innovative ● entrepreneurial ● global 13


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation
2.6) Reinforcement bar Y12 for pile cap Length:
a c
9/2/ 12/ 1.53
---------- b

330.48m x 0.89 kg/m = 294.13kg = a + b + c – cover


---------- = 305 + 1219 + 305 – 6(50)
= 294 kg = 1829 – 300
= 1529

No. of bars:
= (b/100) + 1
= ((1219 – 2(50)cover )/100 )+1
= 12 nos.

www.utm.my innovative ● entrepreneurial ● global 14


MEASUREMENT OF QUANTITIES

@100 c/c

www.utm.my innovative ● entrepreneurial ● global 15


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF Taker off : Checked by:


3.1) Column stump Size of column stump:
3.1.1) Reinforced concrete Grade 30 Length = 229
for column stump Width = 229
Height = 1524 – 305 thickness of pile
9/0.23 cap – (351/2) Half of beam’s
0.23 thickness
1.04 = 1043.50
----------
0.50 1 m3
----------

www.utm.my innovative ● entrepreneurial ● global 16


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.1) Column stump Size of column stump:
3.1.2) Formwork for column stump Length = 229
Width = 229
9/4/0.23 Height = 1524 – 305 thickness of pile
1.04 cap – (351/2) Half of beam’s
---------- thickness
8.61 9 m2 = 1043.50
----------

www.utm.my innovative ● entrepreneurial ● global 17


MEASUREMENT OF QUANTITIES

Height of column stump

@100 c/c

www.utm.my innovative ● entrepreneurial ● global 18


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.1) Column stump Length = a + half beam’s thickness –
3.1.3) Reinforcement bar Y12 for cover + 2 laps
column stump lap

9/4/2.97
---------- a

106.92m x 0.89kg/m = 95.16kg


---------- lap
95kg
= 1524 + (351/2) – 50 + (660x2)
= 2969.50

www.utm.my innovative ● entrepreneurial ● global 19


MEASUREMENT OF QUANTITIES
General Notes

www.utm.my innovative ● entrepreneurial ● global 20


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.1) Column stump Length of link: (length of CS– 2cover) x
3.1.4) R6 link in for column stump 4 +hook Hook

9/6/0.62
----------
33.48m x 0.22kg/m = 7.36kg =(229-100)+(229-100)+(229-100)+(229-
---------- 100)+100=616
7kg
No. of link:
Height of column stump = 1043.50
=(1043.50/229)+1
= 6 nos.

www.utm.my innovative ● entrepreneurial ● global 21


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam Size of ground beam:
3.2.1) Excavation for ground beam Length=3048+3048=6096
Width = 229
2/3/6.10 Thickness = 351
0.23
0.35
----------
2.95m3
----------
3m3

Excavation for ground beam

www.utm.my innovative ● entrepreneurial ● global 22


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam Size of ground beam:
3.2.2) Reinforced concrete Grade 30 for Length=3048+3048=6096
ground beam Width = 229
Thickness = 351
2/3/6.10
0.23
0.35
----------
2.95m3
----------
3m3

RC for ground beam

www.utm.my innovative ● entrepreneurial ● global 23


MEASUREMENT OF QUANTITIES

Assumption No. 1: Total land area = 10m x 10m

Project Title: Construction and completion of


guard house
Owner: Panicsonic Sdn Bhd
Architect: A to Z Sdn Bhd
Drawing Title: Ground beam and foundation plan
-------------------------------------------------------------------------
Drawn by: Sheila
Checked by: Aaron

www.utm.my innovative ● entrepreneurial ● global 24


MEASUREMENT OF QUANTITIES

Height of column stump

@100 c/c

www.utm.my innovative ● entrepreneurial ● global 25


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam Size of ground beam:
3.2.3) Formwork for ground beam Length=3048+3048=6096
Width = 229
Thickness = 351
2/3/2/6.10
0.35
----------
25.62 26m2
----------

Installation of reinforcement bar and


formwork for ground beam

www.utm.my innovative ● entrepreneurial ● global 26


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam Length = (length–2cover)+(2bend-
3.2.4) Reinforcement bar Y10 for 2cover)
ground beam =(6096-(2x50))+(2x351)-(4x50)
= 6498
2/3/4/6.50
----------
156.00m x 0.62kg/m = 96.72kg
----------
97kg

www.utm.my innovative ● entrepreneurial ● global 27


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam Length of stirrup:
3.2.5) R6 stirrup for ground beam Hook

2/3/28/0.86
---------- =(229-100)+(351-100)+(229-100)+(351-
144.48m x 0.22kg/m = 31.79kg 100)+100
---------- =860
32kg
No. of stirrup:
Length of grd beam= 6096
=(6096/229)+1
= 28 nos.

www.utm.my innovative ● entrepreneurial ● global 28


MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF

3.3) Ground slab Area of slab = length x width


3.3.1) Excavation for ground slab Depth of excavation = 500mm

6.10
6.10 BRC A8
150mm thick
concrete slab
0.50
----------
18.61m3 19 m3
---------- 50mm thick
sand

300mm thick
hardcore

DPM

Installation of formwork,Damp Proof Membrane


(DPM) and BRC wire mesh for ground slab

www.utm.my innovative ● entrepreneurial ● global 29


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.2) Reinforced concrete G30 in Depth of excavation = 500mm
ground slab
150mm thick
BRC A8
concrete slab
6.10
6.10
0.15 50mm thick

---------- sand

5.58m3 300mm thick


hardcore

---------- 6 m3
DPM

www.utm.my innovative ● entrepreneurial ● global 30


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.3) Formwork for ground slab Depth of excavation = 500mm

4/6.10 BRC A8
150mm thick
concrete slab
0.15
----------
3.66m2 50mm thick

---------- sand

4 m2 300mm thick
hardcore

DPM

www.utm.my innovative ● entrepreneurial ● global 31


MEASUREMENT OF QUANTITIES

Project: Construction and completion of


Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.4) BRC A8 for ground slab Depth of excavation = 500mm
150mm thick
BRC A8
6.10 concrete slab

6.10
----------
50mm thick
37.21m2 sand

---------- 300mm thick


hardcore
37 m2
DPM

www.utm.my innovative ● entrepreneurial ● global 32


MEASUREMENT OF QUANTITIES

Project: Construction and completion of


Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.5) DPM for ground slab Depth of excavation = 500mm
150mm thick
BRC A8
6.10 concrete slab

6.10
----------
50mm thick
37.21m2 sand

---------- 300mm thick


hardcore
37 m2
DPM

www.utm.my innovative ● entrepreneurial ● global 33


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.6) 50mm sand blinding for ground Depth of excavation = 500mm
slab
150mm thick
BRC A8
6.10 concrete slab

6.10
----------
50mm thick
37.21m2 sand

---------- 300mm thick


hardcore
37 m2
DPM

www.utm.my innovative ● entrepreneurial ● global 34


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.7) Hardcore for ground slab Depth of excavation = 500mm

6.10 BRC A8
150mm thick
concrete slab
6.10
0.30
---------- 50mm thick

11.16m3 sand

---------- 300mm thick


hardcore

11 m3
DPM

www.utm.my innovative ● entrepreneurial ● global 35


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME Taker off : Checked by:


4.1) Column Size of column:
4.1.1) Reinforced concrete Grade 30 Length = 229
for column Width = 229
Height = Height of the wall
9/0.23 = 3000mm
0.23
3.00
----------
1.43 1 m3
----------

Installation of reinforcement bar and


formwork for column

www.utm.my innovative ● entrepreneurial ● global 36


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME
4.1) Column Size of column:
4.1.2) Formwork for column Length = 229
Width = 229
9/4/0.23 Height = 3000
3.00
----------
24.84 25 m2
----------

www.utm.my innovative ● entrepreneurial ● global 37


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME
4.1) Column Length = height of column + half of roof
4.1.3) Reinforcement bar Y12 for beam + 1 lap + bend
column
bend

9/4/4.50
---------- Height of wall
162.00m x 0.89kg/m = 144.18kg
----------
144kg
lap

= 3000+ (0.5x351) + 660 + 660


= 4495.5

www.utm.my innovative ● entrepreneurial ● global 38


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME
4.1) Column Length of link: (length of CS– 2cover) x
4.1.4) R6 link in for column 4 +hook
Hook

9/14/0.82
----------
103.32m x 0.22kg/m = 22.73kg =(229-50)+(229-50)+(229-50)+(229-
---------- 50)+100=816
23kg
No. of link:
Height of column = 3000
=(3000/229)+1
= 14 nos.

www.utm.my innovative ● entrepreneurial ● global 39


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME
4.2) Roof beam Size of roof beam:
4.2.1) Reinforced concrete Grade 30 for Length=3048+3048=6096
roof beam Width = 229
Thickness = 351
2/3/6.10
0.23
0.35
----------
2.95m3
----------
3m3

www.utm.my innovative ● entrepreneurial ● global 40


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME
4.2) Roof beam Size of roof beam:
4.2.2) Formwork for roof beam Length=3048+3048=6096
Width = 229 Side

Thickness = 351
2/3/6.10 Soffit
0.93
----------
34.04 34m2
----------

= 351 + 229 + 351


= 931
www.utm.my innovative ● entrepreneurial ● global 41
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME
4.2) Roof beam Length = (length–2cover)+(2bend-
4.2.3) Reinforcement bar Y10 for roof 2cover)
beam =(6096-(2x50))+(2x351)-(4x50)
= 6498
2/3/4/6.50
----------
156.00m x 0.62kg/m = 96.72kg
----------
97kg

www.utm.my innovative ● entrepreneurial ● global 42


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME
3.2) Roof beam Length of stirrup:
3.2.5) R6 stirrup for roof beam Hook

2/3/28/1.06
---------- =(229-50)+(351-50)+(229-50)+(351-
178.08m x 0.22kg/m = 39.18kg 50)+100
---------- =1060
39kg
No. of stirrup:
Length of beam= 6096
=(6096/229)+1
= 28 nos.

www.utm.my innovative ● entrepreneurial ● global 43


MEASUREMENT OF QUANTITIES

Assumption No. 1: Total land area = 10m x 10m

Project Title: Construction and completion of


guard house
Owner: Panicsonic Sdn Bhd
Architect: A to Z Sdn Bhd
Drawing Title: Ground beam and foundation plan
-------------------------------------------------------------------------
Drawn by: Sheila
Checked by: Aaron

www.utm.my innovative ● entrepreneurial ● global 44


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

5) ROOF = area of roof


=axbx2 a 3m
5.1) Roof trusses and covering

2/8.50
5.20 a = 42482 + 30002
----------
88.40m2 88 m2 Front and rear elevation
---------- a = 5200

b = 6096 +
1200 + b
1200
b = 8496

Right and left elevation

www.utm.my innovative ● entrepreneurial ● global 45


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

6) DOOR and WINDOW Door can be


measured either a 3m
6.1) Single leaf panel door size 2100 x 900 in m2 or
including frame and painting number. If
enumerated then
need to state
type and size
2 2 nos. Front and rear elevation
----------

Right and left elevation

www.utm.my innovative ● entrepreneurial ● global 46


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

6) DOOR and WINDOW Window can be


measured either a 3m
6.2) Adjustable louvres window 1200 x 600 in m2 or
including frame , painting and glass number. If
enumerated then
need to state
type and size
6 6 nos. Front and rear elevation
----------

Right and left elevation

www.utm.my innovative ● entrepreneurial ● global 47


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

7) WALL AND PARTITION


a 3m
7.1) Half brickwall in comon brick

4/ 6.10
3.00 73.20

Less opening (e.g. door and window) Front and rear elevation

2/2.10
0.90 3.78 (door)
65 m2 b
6/1.20
0.60 4.32 (window)
Brickwall
65.10

Right and left elevation

www.utm.my innovative ● entrepreneurial ● global 48


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

8) FINISHES Area of plastering


and panting = a 3m
8.1) Plastering and painting Area of wall x 2
2/ 65m2 130m2 Area of ceiling =
area of slab
8.2) Floor Finishes – cement render Front and rear elevation

37 m2

b
8.3) Ceiling 37m2

Brickwall

Right and left elevation

www.utm.my innovative ● entrepreneurial ● global 49


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

9) SUNDRIES
a 3m
9.1) Built-in counter size 1800mm x 900mm
x 725mm(h).

1
1 no. Front and rear elevation

Brickwall

Right and left elevation

www.utm.my innovative ● entrepreneurial ● global 50