KSK Mahanadi Power Company Ltd.

6 X 600 MW Power Plant KMPCL/OPR/BAHP/01 (R1)


Power from knowledge
SOP For BA HP Water Pump
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 1 of 6

STANDARD OPERATING INSTRUCTION

FOR

BA HP WATER PUMP

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.

6 X 600 MW Power Plant KMPCL/OPR/BAHP/01 (R1)


Power from knowledge
SOP For BA HP Water Pump
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 2 of 6

STANDARD OPERATING PROCEDURE FOR HP PUMP-1


OBJECTIVE: For Smooth Operation of HP water pump.

SCOPE: This SOP is applicable for 04 nos. of HP water pump.

INTRODUCTION: HP water pump is required to conveying the ash slurry from bottom ash hopper to slurry
sump. It is obtained by 04 nos of HP water pump for 06 units. For 03 units 01 nos HP water pump is running and
another one is standby).

PRE CHECKS:
HP WATER PUMP(BA) TECHNICAL DATA:-
Make Shijiazhuang Kingda Quantity 04 Nos
Pump Industry Group
Co. Ltd
Type M100KSSH-XA Discharge Capacity 385m³/h
Discharge 1.17mpa Rotating speed r/min
Pressure
Sealing fan’s motor
Type YKK400-4 Power 250kW
Voltage 11KV Current
Rotating speed r/min
RESPONSIBILITY: Unit Control Engineer, Field Engineer and Desk Engineer.
SAFTEY PRECAUTIONS:
1. Ensure no permit to work is pending on regarding this system by checking with EE/MRSE.

SAFTEY PPE’s: Ear Plugs, Safety Goggles, Hand Gloves, etc.


SPECIAL TOOLS/ EQUIPMENTS: NIL

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.

6 X 600 MW Power Plant KMPCL/OPR/BAHP/01 (R1)


Power from knowledge
SOP For BA HP Water Pump
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 3 of 6

PRECHECKS AND ACTION BY FIELD ENGINEER


S Description Ok Not Ok Remarks
No
1 All permits and cross permits have been returned.
2 Area is clear of any other materials.
3 Check all the foundation bolt should be tight properly.
4 Check the coupling bolt should be tight properly.
5 Check coupling guard is not touching with coupling.
6 Check Pump is not rotate in reverse direction.
7 Check seal water pump is ready for gland sealing of pump.
8 Check all pipe line flange & coupling nut bolt properly tight.
9 Check water tank discharge valve open.
10 Check pump suction & discharge valve close.

PRECHECKS AND ACTION BY DESK ENGINEER


S Description Ok Not Ok Remarks
No
1 Check MCC panel feeder is ready.
2 Check control supply is healthy.
3 Check seal water pressure is normal.
4 Check motor bearing & winding temperature normal.
5 Check local push button released.
6 Check water level in Sump is not’LOW’.

OPERATING PROCEDURE -
Description RESPONSIBILITY

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.

6 X 600 MW Power Plant KMPCL/OPR/BAHP/01 (R1)


Power from knowledge
SOP For BA HP Water Pump
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 4 of 6

Sr. UCE DE FE EE
No
.
PRE- START CHECKS:
1 All permits and cross permits have been returned.
2 Power supply and control power supply available.
3 Sealing water line pressure normal.
4 Check Pump suction & discharge valve close.

5 Water tank level normal.


START PERMISSIVE :
1 Motor bearing temp normal.
2 Motor winding temp normal.
3 Check pump suction & discharge valve close.
4 Emergency push button is in release condition.
BA-HP WATER PUMP START UP SEQUENCE :
1 Start seal water pump.
2 Sealing water line pressure normal.
3 Open the HP water pump suction valve.
4 Start the HP water pump.
5 Open the discharge valve.
6 Set the back-up seal water pump as "standby."
SHUTDOWN SEQUENCE:

1.PLANNED SHUTDOWN :

1 Insure that water tank level is low or any leakage is found in pipe line.
2 Stop the BA-HP water pump & closed the suction & discharge valve.
3 Rectify the probable problem, if any.

2. TRIPPING OF HP WATER PUMP :If suddenly pump trips


1 Closed the pump suction & discharge valve.
2 Try to start stand by BA-HP water pump.

3. EMERGENCY SHUT DOWN:

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.

6 X 600 MW Power Plant KMPCL/OPR/BAHP/01 (R1)


Power from knowledge
SOP For BA HP Water Pump
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 5 of 6

1 There is the apparent abnormal noise/Vibration after starting the pump.


2 The pump & motor bearing temperature is high.
3 When discharge line is leakage.
4 When endangering the safety of person and equipment.

INTERLOCKS : Remarks
1 Water tank level is danger low.
2 Seal water pump stopped.
3 Pump suction & discharge open feedback.

 ABRIVIATIONS / NOTATIONS:-
o SOP: Standard Operating Procedure
o UCE: Unit Control Engineer
o DE: Desk Engineer
o FE: Field Engineer
o DCS: Distributed Control System
o EE: Electrical Shift Engineer
o MFT: Main Fuel Trip.
o RB : Run Back

DO’s & DONT’s :

DO’s :
Prepared by: Reviewed by: Approved by:
Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.

6 X 600 MW Power Plant KMPCL/OPR/BAHP/01 (R1)


Power from knowledge
SOP For BA HP Water Pump
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 6 of 6

1. Ensure that Recycle Water Bin Make-up water is available.

2. Ensure that Seal Water Pump is running before starting the Pump.

3. Ensure Discharge is closed before stating of Pump.

4. Ensure that Jet Pump Suction/Discharge valves are open before stopping the Pump.

DONT’s :

1. Don’t run the Pump if Recycle Water Bin level is low.

2. Don’t run the Pump if Cooling Oil level is low.

3. Don’t run the Pump if Motor winding temperature is continuously high.

4. Don’t run the Pump if Motor draws high current continuously.

5. Don’t start/stop the Pump frequently.