LOADED

M/V Limnos LOADED AT FUJAIRAH


Shipper UNLOADED
dd/mm/yy hh:mm Day
VESSEL ARRIVED: 03-Jul-19 12:00 Wed
NOTICE OF READINESS TENDERED: 03-Jul-19 12:00 Wed
NOR ACCEPTED: As per CP
LOADING COMMENCED: 04-Jul-19 9:50 Thu
LOADING COMPLETED: 06-Jul-19 6:00 Sat
LAYTIME COMMENCED TO COUNT FROM: 04-Jul-19 0:00 Thu

BILL OF LADING TONNAGE LOADED 54,867.00 MT


DEMURRAGE RATE 11,000 USD as per agreement
DESPATCH RATE 5,500 USD
LOADING RATE AS PER AGREEMENT: 15,000 MT SHINC

TIME
FROM TO TO TIME TOTAL
DATE DAY DESCRIPTION % REMARKS
hh:mm hh:mm COUNT USED TIME
Y/N DD HH MM DD HH MM
04-Jul-19 Thu 0:00 6:08 Y waiting for berthing 100% 0.25554398 0.255543981
6:08 9:50 N Berthing + Initial draft Survey 0% 0 0.255543981
9:50 24:00 Y Loading start 100% 0.59027778 0.845821759
05-Jul-19 Fri 0:00 24:00 Y Loading 100% 1 1.255543981
06-Jul-19 Sat 0:00 6:00 Y Loading Completed 100% 0.25 0.505543981

TIME ALLOWED: 3.6578 TOTAL TIME USED: 2.0958217593

TIME SAVED 1.5619782407

DESPATCH DUE IN DAYS: 1.5620 at US$ 5,500 pdpr= 8,590.88 US$


M/V ORION BAY UNLOADED AT Dahej
Receiver UNLOADED
dd/mm/yy hh:mm Day
VESSEL ARRIVED: 11-May-19 8:30 Sat
NOTICE OF READINESS TENDERED: 11-May-19 9:20 Sat
NOR ACCEPTED: As per CP
UNLOADING COMMENCED: 17-May-19 22:55 Fri
UNLOADING COMPLETED: 21-May-19 01`:00:00 Tue
LAYTIME COMMENCED TO COUNT FROM: 12-May-19 9:20 Sun

BILL OF LADING TONNAGE UNLOADED 29,000.00 MT


DEMURRAGE RATE 14,000 USD as per agreement
DESPATCH RATE 7,000 USD
UNLOADING RATE AS PER AGREEMENT: 15,000 MT SHINC
TIME
FROM TIME TO USED TOTAL
TO
DATE DAY COUNT DESCRIPTION % DD HH TIME REMARKS
hh:mm
hh:mm Y/N MM DD HH MM
12-May-19 Sun 9:20 24:00 Y NOR TIME completed 100% 0.6111111 0.61111111
13-May-19 Mon 0:00 24:00 Y Waiting for berthing (berth congestion) 100% 1 1
14-May-19 Tue 0:00 24:00 Y Waiting for berthing (berth congestion) 100% 1 1
15-May-19 Wed 0:00 24:00 Y Waiting for berthing (berth congestion) 100% 1 1
16-May-19 Thu 0:00 24:00 Y Waiting for berthing (berth congestion) 100% 1 1
17-May-19 Fri 0:00 10:30 Y Waiting for berthing (berth congestion) 100% 0.4375 0.4375
  10:30 15:30 N Shifting 0% 0 0
  15:30 16:40 Y LTC 100% 0.0486111 0.04861111
16:40 17:40 N Initial drafdt Survey 0% 0 0
17:40 22:55 N Discharge Hampered 0% 0 0
22:55 24:00 Y unloading start 100% 0.0451389 0.04513889
18-May-19 Sat 0:00 24:00 Y Unloading 100% 1 1
19-May-19 Sun 0:00 24:00 Y Unloading 100% 1 1
20-May-19 Mon 0:00 24:00 Y Unloading 100% 1 1
21-May-19 Tue 0:00 1:00 Y Unloading completed 100% 0.0416667 0.65277778

TIME ALLOWED: 1.9333333333 TOTAL TIME USED: 8.1840277778

TIME LOST 6.2506944444


DEMURRAGE DUE IN DAYS: 6.2507 at US$ 14,000 pdpr= 87,509.72 US$