Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

Material Requisition Slip Material Requisition Slip

DATE :- SHIFT :- DATE :- SHIFT :-

Run Cycle Time Production Production Total Article Material Material Material Material Material
Machine No. Product Name Shot/hour Cap. Require Grade BAGS BAGS
Cavity (Sec.) /hour (Nos) Weight(gm) (kg) Require Type Company Code

1 40-50 bottle 1 16.5 218 218 2618 13 33 INJECTION


2 1 0 0
3 1 0 0
4 intas 200 ml 1 20.4 176 176 2118 37 77
5 Yellow without hole pad bottle 1 19.6 184 184 2204 64 141 BLOW
6 cadila Pad bottle 1 18.6 194 194 2323 47 109
7 Intas 1 litre 1 27.3 132 132 1582 114 180
8 1 0

9 GCCS 600 ml 1 35.5 101 101 1217 111 135


10 Intas Handle 2 15.1 238 477 5722 13 37
11 0
12 Ipco Container 4 14.25 253 1011 12200 49 140

Store Incharge Received By Store Incharge Received By

Material Requisition Slip Material Requisition Slip


DATE :- SHIFT :- DATE :- SHIFT :-

Material Material Material Material Material


Material Type Company Code BAGS Type Company Code BAGS

INJECTION INJECTION

BLOW BLOW

Store Incharge Received By Store Incharge Received By


Material Requisition Slip Material Requisition Slip
DATE :- SHIFT :- DATE :- SHIFT :-

MATERIAL MATERIAL RAW MATERIAL MATERIAL RAW


GRINDING GRINDING
TYPE CODE MATERIAL TYPE CODE MATERIAL
INJECTION INJECTION

BLOW BLOW

Store Incharge Received By Store Incharge Received By

Material Requisition Slip Material Requisition Slip


DATE :- SHIFT :- DATE :- SHIFT :-

MATERIAL MATERIAL RAW MATERIAL MATERIAL RAW


GRINDING GRINDING
TYPE CODE MATERIAL TYPE CODE MATERIAL
INJECTION INJECTION

BLOW BLOW

Store Incharge Received By Store Incharge Received By

You might also like