COURT 2 PROGRESS (INSIDE BUILDING) ‫وادي الفرع‬

H.V.A.C

Item Types Ground Floor First Floor ROOF

Fan coil units installation (Indoor


1 100% 100% NON
units)

2 Duct works for Indoor units 0% 0% NON

3 Thermal insulation 0% 0% NON

Copper pipes and connection


4 0% 0% 0%
between them
Installation of condensate piping
5 0% 0% NON
for indoor units

6 Installation of Airoutlets 0% 0% NON

Installation of Compressors
7 NON NON 0%
(Outdoor units)
Installation of Toilet exhaust
8 0% 0% NON
ducts

9 Installation of Exhaust fans 0% 0% 0%

Installation of Fresh Air Handling


10 NON NON 0%
unit

11 Duct works for Fresh air supply 0% 0% 0%

FIRE FIGHTING

ITEM types GROUND FLOOR First Floor ROOF

1 MAIN LINE 0% 0% NON

2 CROSS LINE 0% 0% NON

3 BRANCHES 2% 2% NON

4 Z.C.V 0% 0% NON

5 SPRINKLERS 0% 0% NON

6 DRY LINE 0% 0% 0%
6 DRY LINE 0% 0% 0%

7 FIRE EXTINGUSHER 0% 0% 0%

8 CO2 SYSTEM 0% 0% NON

9 FM 200 SYSTEM 0% 0% NON

PLUMBING
ITEM types GROUND FLOOR First Floor ROOF

1 FIRST FIX OF DRAINAGE 90% 90% 0%

2 FIRST FIX OF WATER SUPPLY 90% 90% 0%

3 SANITARY FIXTURE 0% 0% 0%

4 POLY ETHELYNE TANK NON NON NON

5 FLOOR DRAIN 0% 0% 0%
‫وادي ا‬

Top Roof

NON

NON

NON

NON

NON

NON

NON

NON

NON

NON

NON

Top Roof

NON

NON

NON

NON

NON

NON
NON

NON

NON

NON

Top Roof

0%

0%

NON

0%

0%