TRACK WORK & THIRD RAIL SYSTEM FOR THE ACCELERATED IMPLEMENTATION OF

THE INTEGRATED LIGHT RAIL TRANSIT (LRT) PROJECT IN JAKARTA, BOGOR, DEPOK AND BEKASI

POST INSTALLATION CHECK OUT (PICO) REPORT

Span / Pier No.: Date:


Item Description Result
Witness Comments Remarks
Pass Fail
Track Work Installation
1 Control of Rail Gauge and Cross Level
2 Flash Butt Welding (FBW) Visual and Geometry Control
3 Aluminothermic Welding (ATW) Visual and Geometry Control
4 Structure Gauge Check
5 General Cleaning / Housekeeping

Third Rail Installation


1 Conductor Rail Geometry Mounting Test
2 Continuity Test Bolted Joints
3 Cover Checks
4 Visual Inspection
5 Third Rail Validation Check
6 Structure Gauge Check
7 General Cleaning / Housekeeping

Note:

INSPECTION BY COLAS RAIL


Name:

Date:

Signature:

PT ADHI KARYA (Persero) Tbk.


Name:

Date:

Signature: