The document provides area statements for internal painting in Tower A1 and Tower B1. It includes measurements in meters of walls, ceilings, corridors, staircases and landings. The total internal painting area for Tower A1 is 165.19 square meters and for Tower B1 is 165.13 square meters. Deductions are listed for openings, railings, ducts and other exclusions.
The document provides area statements for internal painting in Tower A1 and Tower B1. It includes measurements in meters of walls, ceilings, corridors, staircases and landings. The total internal painting area for Tower A1 is 165.19 square meters and for Tower B1 is 165.13 square meters. Deductions are listed for openings, railings, ducts and other exclusions.
The document provides area statements for internal painting in Tower A1 and Tower B1. It includes measurements in meters of walls, ceilings, corridors, staircases and landings. The total internal painting area for Tower A1 is 165.19 square meters and for Tower B1 is 165.13 square meters. Deductions are listed for openings, railings, ducts and other exclusions.
AREA STATEMENT - INTERNAL PAINTING A1 TOWER S.N. ITEM NO. L B H AREA UNIT 1 Finishing wall with Acrylic Smooth Paint AT FIRST FLOOR CORRIDOR AREA STAIR SIDE WALL - (Y-13-Y-24)/X-12 1 12.88 2.850 36.71 DEDUCTION D3 2 1.20 2.100 -5.04 STAIR CASE ENTRY /EXIT OPENING 1 1.500 2.100 -3.15 RAILING 1 2.820 2.100 -5.92 SIDE WALL FLAT ENTRY 2 0.490 2.850 2.79
LIFT SIDE WALL - (Y-13-Y-24)/X-15 1 12.88 2.875 37.03
DEDUCTION FIRE DUCT 2 0.75 1.750 2.100 -5.51 IV DUCT 2 0.750 1.170 -1.76 CEILING COORIDOR AREA 1 12.880 3.650 47.01 CEILING NEAR FLAT ENTRY AREA 1 1.630 0.490 0.80 CEILING NEAR FLAT ENTRY AREA 1 2.435 0.490 1.19 STAIR CASE FRONT INTERNAL WALL 1 17.860 2.850 50.90 CEILING LANDING 2 3.230 1.500 9.69 CEILING WAIST SLAB 2 3.020 1.500 9.06 DEDUCTION STAIR CASE ENTRY /EXIT OPENING 1 1.500 2.100 -3.15 RAILING 1 1.500 2.850 -4.28 STAIR CASE LIFT SIDE INTERNAL WALL 1 15.700 2.850 44.75 CEILING LANDING 2 2.650 1.250 6.63 CEILING WAIST SLAB 2 2.500 1.250 6.25 DEDUCTION STAIR CASE ENTRY /EXIT OPENING 1 1.500 2.100 -3.15 RAILING 1 2.650 2.100 -5.57 Total 165.19 SQM G.Total 165.19 SQM DETAIL OF MEASUREMENT(B1 TOWER ) EVEREST ENCLAVE,SEC-18 ,GROUP HOUSING VRINDAVAN SCHEME,LUCKNOW
Vascon Engineers Ltd
AREA STATEMENT - INTERNAL PAINTING B1 TOWER S.N. ITEM NO. L B H AREA UNIT 1 Finishing wall with Acrylic Smooth Paint AT FIRST FLOOR CORRIDOR AREA STAIR SIDE WALL - (C-9-Y-20)/A-13 1 12.87 2.850 36.68 DEDUCTION D3 2 1.20 2.100 -5.04 STAIR CASE ENTRY /EXIT OPENING 1 1.500 2.100 -3.15 RAILING 1 2.820 2.100 -5.92 SIDE WALL FLAT ENTRY 2 0.490 2.850 2.79
LIFT SIDE WALL - (C-9-Y-20)/A-11 1 12.87 2.875 37.00