Application of High Power

Electron Accelerator
in Wastewater Treatment
S.M. Kim, B. Han, J.K. Kim Y.K. Kim (EB Tech Co., Ltd.)
J.S. Choi, S.J. Ahn (DYETEC)
R.A. Salimov, N.K. Kuksanov (BINP)

12 September, 2006
RUPAC–2006, September 10-14, 2006, Novosibirsk, Russia
What is water/wastewater treatment ?

Main purpose of wastewater treatment


-. Removal of harmful impurities (COD, BOD, S/S etc. )
-. Removal of color, odor etc.
-. Removal of T-N, T-P

To discharge to river, or to re-use in industries or in agriculture


-. Disinfection of microorganisms
(Coli-form & pathogenic organisms)
-. Destruction of endocrine disrupter (natural and synthetic
chemicals such as Nonyl phenols and its derivatives)

EB Tech Co., Ltd. -2-


Principles of Wastewater treatment with electron beam

Complete H2O,CO2
Decomposition
Partial
Decomposition
Suspended Coagu
eaq Harmful solid lation
Organic Monomer to
H H O OH*
in Polymerization
O H H H* Waste
H2O2 water Removal of Bio-
Toxic group Treat

Water Molecule Active Radicals Removal of


Color, Odor

EB Tech Co., Ltd. -3-


Application of e-beam on water/wastewater treatment

-. Wastewater from Textile Dyeing Companies


-. Wastewater from Papermill
-. Leachate from Sanitary Landfill
-. Wastewater containing Heavy metals (Cd,Hg,Pb,Cr+6)
-. Re-use of effluent from sewage plant
-. Remediation of contaminated water (PCB,Explosives)
-. Contaminated Underground water
-. Drinking water
EB Tech Co., Ltd. -4-
1. Backgrounds

2. Pilot Plant Operation

3. Commercial Plant Construction

4. Conclusions

EB Tech Co., Ltd. -5-


Why Textile Dyeing Wastewater ?
(1000m3/day)
Number of Amount of waste- Amount of waste-
Companies (%) water generated (%) water discharged (%)

Textile co. 1,423 ( 5.6) 473 ( 5.4) 457 (19.2)


Paperrmill 268 ( 1.1) 711 ( 8.1) 364 (15.3)
Light ind. 511 ( 2.0) 390 ( 4.5) 243 (10.2)
Processing ind. 3,376 (13.3) 439 ( 5.0) 200 ( 8.4)
Metal Fabrication 437 ( 1.7) 5,346 (61.1) 169 ( 7.1)
Others 19,284 (76.2) 1,382 (15.8) 942 (39.7)

Total 25,299 (100 ) 8,741 (100 ) 2,375 (100 )

The amount of waste water generated and discharged in Korea, as of 1995

EB Tech Co., Ltd. -6-


Importance of Textile Dyeing Wastewater
(1000m3/day)

1995 1996 1997 1998

Total 2,375 2,511 2,618 2,614

Textile co. 457 452 552 551

Ratio(%) 19.2 18.0 21.1 21.0

Annual Discharge of Dyeing Wastewater from Textile co.

EB Tech Co., Ltd. -7-


Seoul

EB TECH CO. (Central Research


Institute of Samsung Heavy Ind.) Daegu Dyeing
Industrial Complex

Advanced Radiation Center


of KAERI (JeongEup city)

: Existing Dyeing Complex


: Under construction

EB Tech Co., Ltd. -8-


Daegu Dyeing Industrial Complex
- over 120 companies of dip dyeing, printing and yarn dyeing
- high consumption of water(90,000t/day),steam(515t/day),electricity(53,100kW)

Existing Wastewater Treatment Facilities


- up to 80,000m3/day
- coagulation with Chemical and Biological treatment
- close to limit ability
Suspended
Parameter pH BOD5, mg/l CODMn, mg/l Color, units
solids, mg/l

Raw wastewater 12 2,000 900 100 1,000

after Chemical Treatment 6.8-7.5 1,700 450 50 500

after 1st Bio-treatment 7.0-8.0 1,300 250 50 400

after 2nd Bio-treatment 7.0-8.0 30 60 50 250

EB Tech Co., Ltd. -9-


Wastewater Treatment Facility in
Daegu Dyeing Industrial Complex

EB Tech Co., Ltd. -10-


Effluent

Influent Chemical Primary


Sedimentation 2nd Aeration Sedimentation Reservoir
Treatment Aeration

dewatering Landfill

Thickening

Process Flow of Existing Wastewater Treatment Facility

EB Tech Co., Ltd. -11-


Researches on Textile Dyeing Wastewater Treatment

- 1994~1995 : Lab. scale feasibility Test with e-beam and Gamma ray
- 95.12~99.5 : Researches on Dyeing Wastewater Treatment with e-beam
(Dyeing Technology Center/EB-TECH Co.)
- 96.2 ~97.2 : Treatment of Dyes and Dyeing Wastewater
- 97.2~98.10 : Construction of e-beam Pilot Plant (1000m3/day)
- 98.10~2005 : Continuous operation of treatment facility
- 1998.9.16 : KT (Korea New Technology) Award
- 2000.7.19 : IR52 Industrial Research Award
- 2001~2004 : IAEA TC Project (Demo Plant Construction)
- 2001~2003 : Preparation for Plant Construction
- 2004. 6 : Start up of Commercial Plant Construction
- 2005. 12 : Continuous Operation of Plant (10,000m3/day)

EB Tech Co., Ltd. -12-


1. Backgrounds

2. Pilot Plant Operation

3. Commercial Plant Construction

4. Conclusions

EB Tech Co., Ltd. -13-


Pilot Plant for Treating Wastewater from Dyeing Process
- to find the effective methods of treating wastewater
- to improve the decoloration and destruction of organic impurities

Characteristics of Pilot Plant


- Maximum flow rate of 1000m3/day with 1MeV, 40kW accelerator
- Combined with Biological Treatment

Construction and Operation


1996 1997 1998 1999 remarks

Process Development

Design of Pilot Plant

Shieldroom Construction construction


delayed
Accelerator Installation

Pilot Plant Operation

EB Tech Co., Ltd. -14-


Location of
Pilot Plant

Wastewater Treatment Facility in


Daegu Dyeing Industrial Complex

EB Tech Co., Ltd. -15-


M ain f a cility
【 Schematic Diagram of Pilot Plant 】
20,000 m3 /day 1 0 0 0m3 /day 1,0 0 0m3 /day
E f flu ent

I nflu ent
T o w e r Typ e B iological S ys tem R eservoir
E - Beam I r r adiation

EB Tech Co., Ltd. -16-


EB Tech Co., Ltd. -17-
EB Tech Co., Ltd. -18-
Effect of dose on TPA
degradation (0.3 kGy)

EB Tech Co., Ltd. -19-


Effect of irradiation and
biological treatment on
wastewater parameters:

a-TOC; b-CODCr; c-CODMn; d-BOD.


1- after EB treatment

2- without EB treatment

EB Tech Co., Ltd. -20-


1. Backgrounds

2. Pilot Plant Operation

3. Commercial Plant Construction

4. Conclusions

EB Tech Co., Ltd. -21-


Construction of Demonstration Facility

Industrial Plant for Treating Wastewater from Dyeing Process


- Decrease the Amount of Sludge up to 50%
- Improve the Efficiency of Biological Treatment by 30%
- Decrease the Retention time in Biological Treatment Facility

Characteristics of Industrial Plant


- Maximum flow rate of 10,000m3/day with one 1MeV, 400kW accelerator
- Combined with existing Biological Treatment Facility

Construction Schedule
-The actual construction started on Summer of 2004, and finished by the
end of 2005. (Actual construction will be within 17 months)

EB Tech Co., Ltd. -22-


Location of
Pilot Plant

Industrial plant

Wastewater Treatment Facility in


Daegu Dyeing Industrial Complex

EB Tech Co., Ltd. -23-


Existing Problem :
The water demand needs to develop a water-efficient technologies
Limitations to acceptance of ionizing radiation for treating wastewater
Needs of a demonstration facility under real industrial conditions on the actual
site of an industry

Objective :
To demonstrate the confidence in technological and economical advantages
To promote the commercialization of e-beam wastewater treatment
To promote the peaceful use of ionizing radiation

EB Tech Co., Ltd. -24-


DYETEC
EB-TECH KAERI
- Plant Design Radiolysis Study
and Installation Lab. Analysis

IAEA Korean City of


BINP Government
DYECEN Daegu
IPC

-TechnicalSupport - Research Project - Analysis of Economy - Funding from


-Consulting - Peaceful use of - Electric Power Local Gov. Budget
Radiation Technology - Bio-treatment

EB Tech Co., Ltd. -25-


F1
To ozone
decomposer F3 Air from
atmosphere
F2
To atmosphere
F4 A
(to stack)

Wastewater
Wastewater P1 inlet
outlet P2
R

D2 D1
B2 B1

Simplified technological scheme of the plant. F1-F4 – Air fans, P1-P2 – Water
pumps, D1 and D2 – Diffusers, A – Accelerator, R – Reactor, B1 and B2 – Primary
and secondary basins.

EB Tech Co., Ltd. -26-


6
7,8,9

1 10

2 11

12
3

5 13

1 - Accelerator/Generator Room, 2 - Reactor Room, 3 - Reactor, 4 - Collector, 5


- Reactor Output Channels, 6 - Ceiling Window, 7 - Instruments Room, 8 -
Montage Area 9 - Control Room, 10 - Safe Door (First Floor), 11 - Safe Door
(Ground Floor), 12 - Primary Basin, 13 - Secondary Basin. Entrance to building
is by staircase to montage area on the first floor. Ceiling window may be used
for primary installation of accelerator units into the building as well as for
repair needs.
EB Tech Co., Ltd. -27-
EB Tech Co., Ltd. -28-
Commercial Plant (10,000m3/d)
ƒ Energy : 0.6 - 1.0 MeV
ƒ Beam power : 400 kW
Accelerator ƒ
ƒ
Beam current
Irradiators
: 500 mA
: 3 (0~200mA)
ƒ Window width : up to 2m
ƒ Double window extraction system

EB Tech Co., Ltd. -29-


Double-window extraction device

1 ion pumps,
2 scanning system,
3 cylinder flange
4 protection cylinder,
5 foil blow cooling,
6 foil fixation frame,
7-extraction foils.

EB Tech Co., Ltd. -30-


Double-window extraction device

EB Tech Co., Ltd. -31-


Control system of ELV-12 accelerator

EB Tech Co., Ltd. -32-


Commercial Plant (10,000m3/d)

EB Tech Co., Ltd. -33-


Commercial Plant (10,000m3/d)

EB Tech Co., Ltd. -34-


Commercial Plant (10,000m3/d)

EB Tech Co., Ltd. -35-


Commercial Plant (10,000m3/d)

EB Tech Co., Ltd. -36-


EB Tech Co., Ltd. -37-
EB
EB Dyeing
Dyeing W/W
W/W Treatment
Treatment Plant
Plant

4 M$

IAEA City of Daegu DYCEN Gov.


(0.25M$) (0.25M$) (1.75M$) (1.75M$)

Consulting, From Science Own expenses Research Project


Technical Support Development FUND

EB Tech Co., Ltd. -38-


Accelerator
(1.7M$)

Electric Equipment
Reactors (0.3M$)
(0.1M$)

3 M$
Shield Room & Civil Works
(0.5M$)

Piping for Wastewater


Ozone Ventilation etc. (0.3M$)
(0.1M$)

Cost of Construction
EB Tech Co., Ltd. -39-
Investment Invest (k$) - 3,000
Interest - 240 8%
Depreciation - 150 20yr
Operation Chemicals 1,367 580
Cost (yr) Sludge 1,712 1,005
Electricity 497 809
Total 3,576 2,784
Quality of COD 80 60
Effluent BOD 30 20
SS 30 20
Others The Investment will be returned in 5 yrs

Economic Evaluation of Industrial Plant

EB Tech Co., Ltd. -40-


Conclusions
1. Complete construction of industrial wastewater treatment plant by
electron beam
Æ expects to be applied on various wastewater

2. Complete installation and operation of high power electron


accelerator
Æ make it possible to supply economical and efficient facility
Æ promotes the confidence in technical and economical advantages of treating wastewater
by electron beam

3. The wastewater treatment process with high power accelerator is


very economical and simple.
This project is supported by the International Atomic Energy Agency (IAEA) and Korean
Government.

EB Tech Co., Ltd. -41-


Thank You for your attention

Electron Beam Technology


WWW.EB-TECH.COM
EB Tech Co., Ltd. -42-