Professional Documents
Culture Documents
Application of High Power in Water Treatment
Application of High Power in Water Treatment
Electron Accelerator
in Wastewater Treatment
S.M. Kim, B. Han, J.K. Kim Y.K. Kim (EB Tech Co., Ltd.)
J.S. Choi, S.J. Ahn (DYETEC)
R.A. Salimov, N.K. Kuksanov (BINP)
12 September, 2006
RUPAC–2006, September 10-14, 2006, Novosibirsk, Russia
What is water/wastewater treatment ?
Complete H2O,CO2
Decomposition
Partial
Decomposition
Suspended Coagu
eaq Harmful solid lation
Organic Monomer to
H H O OH*
in Polymerization
O H H H* Waste
H2O2 water Removal of Bio-
Toxic group Treat
4. Conclusions
dewatering Landfill
Thickening
- 1994~1995 : Lab. scale feasibility Test with e-beam and Gamma ray
- 95.12~99.5 : Researches on Dyeing Wastewater Treatment with e-beam
(Dyeing Technology Center/EB-TECH Co.)
- 96.2 ~97.2 : Treatment of Dyes and Dyeing Wastewater
- 97.2~98.10 : Construction of e-beam Pilot Plant (1000m3/day)
- 98.10~2005 : Continuous operation of treatment facility
- 1998.9.16 : KT (Korea New Technology) Award
- 2000.7.19 : IR52 Industrial Research Award
- 2001~2004 : IAEA TC Project (Demo Plant Construction)
- 2001~2003 : Preparation for Plant Construction
- 2004. 6 : Start up of Commercial Plant Construction
- 2005. 12 : Continuous Operation of Plant (10,000m3/day)
4. Conclusions
Process Development
I nflu ent
T o w e r Typ e B iological S ys tem R eservoir
E - Beam I r r adiation
2- without EB treatment
4. Conclusions
Construction Schedule
-The actual construction started on Summer of 2004, and finished by the
end of 2005. (Actual construction will be within 17 months)
Industrial plant
Objective :
To demonstrate the confidence in technological and economical advantages
To promote the commercialization of e-beam wastewater treatment
To promote the peaceful use of ionizing radiation
Wastewater
Wastewater P1 inlet
outlet P2
R
D2 D1
B2 B1
Simplified technological scheme of the plant. F1-F4 – Air fans, P1-P2 – Water
pumps, D1 and D2 – Diffusers, A – Accelerator, R – Reactor, B1 and B2 – Primary
and secondary basins.
1 10
2 11
12
3
5 13
1 ion pumps,
2 scanning system,
3 cylinder flange
4 protection cylinder,
5 foil blow cooling,
6 foil fixation frame,
7-extraction foils.
4 M$
Electric Equipment
Reactors (0.3M$)
(0.1M$)
3 M$
Shield Room & Civil Works
(0.5M$)
Cost of Construction
EB Tech Co., Ltd. -39-
Investment Invest (k$) - 3,000
Interest - 240 8%
Depreciation - 150 20yr
Operation Chemicals 1,367 580
Cost (yr) Sludge 1,712 1,005
Electricity 497 809
Total 3,576 2,784
Quality of COD 80 60
Effluent BOD 30 20
SS 30 20
Others The Investment will be returned in 5 yrs