Rab Jembatan
Rab Jembatan
NO
3
4
0.40
0.20
0.50
Ø0.025 0.20
0.30 0.20
0.50
0.20
3.00
3.10
PERHITUNGAN VOLUME JEMBATAN
KETERANGAN
Pondasi
Kepala Jembatan
Tuloanganb Pondasi
0.40
0.20
0.50
Ø0.025 0.20
0.30 0.20
0.50
0.20
3.00
3.10
OLUME JEMBATAN
V = PxLxT
V1 =3.1*0,3*9 8.37 m3
V2 =0,5*0,4*9 1.8 m3
V3 =V1+V2 10.17 m3
V = PxLxT
V =(3+1,5)*5*9/2 101.25 m3
V2 =0,5*0,4*9 1.8 m3
V =0,75*1,25*9 8.437 m3
V =0,25*0,25*9 0.5625 m3
V Total 90.45 m3
V = PxLxT
V1 = 0,25*9*0,25 0.5625 m3
V2 = 3,1*9*0,3 8.37 m3
V3 = 0,25*9*0,25 0.5625 m3
V4 = 0,5*9*0,5 2.25 m3
V Total 11.745 m3
V1=7,06*49*9 3113.46
V total 6226.92
P2
(2x0,2)+(2x3)+(0,08x2)=6,56m
6,56x45=295,2m
P3
2x0,08+0,5+0,7=1,36m
1,36x45=61,2m
61,2x2=122,4m
TEBAL ASPAL
0.04
13.28
6
3.1872
P4 2.3
4x(0,3+8,9)=36,8m 7.33056
LAPIS PEREKAT
ASPAL CAIR
13.28
6
79.68
0.15
11.952
BAHAN ANTI
PENGELUPASAN
3.1872
0.162
0.5163264