PERHITUNGAN VOLUME JEMBATAN

NO

3
4

0.40

0.20
0.50
Ø0.025 0.20

0.30 0.20
0.50
0.20
3.00
3.10
PERHITUNGAN VOLUME JEMBATAN

KETERANGAN

Pondasi

Abutment Trapesium Full

Kepala Jembatan
Tuloanganb Pondasi

0.40

0.20
0.50
Ø0.025 0.20

0.30 0.20
0.50
0.20
3.00
3.10
OLUME JEMBATAN

PERHITUNGAN VOLUME SATUAN

V = PxLxT
V1 =3.1*0,3*9 8.37 m3
V2 =0,5*0,4*9 1.8 m3
V3 =V1+V2 10.17 m3

V = PxLxT
V =(3+1,5)*5*9/2 101.25 m3
V2 =0,5*0,4*9 1.8 m3
V =0,75*1,25*9 8.437 m3
V =0,25*0,25*9 0.5625 m3

V Total 90.45 m3

V = PxLxT
V1 = 0,25*9*0,25 0.5625 m3
V2 = 3,1*9*0,3 8.37 m3
V3 = 0,25*9*0,25 0.5625 m3
V4 = 0,5*9*0,5 2.25 m3

V Total 11.745 m3
V1=7,06*49*9 3113.46

V total 6226.92

V1= 16*8,9 142.2

V2= 16*8,9 142.2

V3= (2*0,2)+(2*3)+(0,08*2)*45 13.6

V4= (0,08+0,5+0,7+0,08)*45 61.2

V5= (0,08+0,5+0,7+0,08)*45 61.2

V6= 2*(0,3+8,9)*2*45 1656

P2
(2x0,2)+(2x3)+(0,08x2)=6,56m
6,56x45=295,2m

P3
2x0,08+0,5+0,7=1,36m
1,36x45=61,2m
61,2x2=122,4m

TEBAL ASPAL
0.04
13.28
6
3.1872
P4 2.3
4x(0,3+8,9)=36,8m 7.33056

LAPIS PEREKAT
ASPAL CAIR
13.28
6
79.68
0.15
11.952

BAHAN ANTI
PENGELUPASAN
3.1872
0.162
0.5163264