FOR
VACUUM PUMP
INTRODUCTION: Vacuum pump is needed to evacuate fly ash from ESP & APH hopper to buffer hopper.
It required 04 pumps operation & 04 no’s pump stand by for 01 unit.
PRE CHECKS:
VACUUM PUMP TECHNICAL DATA:-
OPERATING PROCEDURE -
RESPONSIBILITY
Sr.
Description UCE DE FE E
No.
E
PRE- START CHECKS:
1 All permits and cross permits have been returned.
2 Power supply and control power supply available.
3 Seal water pump is in running condition.
4 vacuum line header valve open
5 Vacuum breaker opened.
6 Seal water pressure normal.
START PERMISSIVE :
SHUTDOWN SEQUENCE:
1. PLANNED SHUTDOWN :
1 The vacuum pump shut down only after ash evacuation is completed or it
required stopping evacuation of ash from hopper.
2 Release the interlock of standby vacuum pump.
3 Stop the vacuum pump & closed vacuum header inlet, outlet valve.
INTERLOCKS : Remarks
ABRIVIATIONS / NOTATIONS:-
o SOP: Standard Operating Procedure
DO’s :
2. Ensure that Seal Water Pump is running with adequate pressure & flow before starting the Pump.
3. Ensure Suction Valve/Vacuum Breaker/Dust Detector is working properly before starting of Pump.
4. Ensure that Vacuum Transmitter & Vacuum Gauge is working before starting/during running of Pump.
DONT’s :
1. Don’t run the Pump if Ash is coming out with sealing water outlet.