I am a qualified. Planning Engineer with 12 years experience of project planning, scheduling and control in handling multi-
million dollars projects, including but not limited to, Engineering, Procurement and Construction/Commissioning (EPCC)
and Maintenance/Shutdown/ Turnaround Projects for Oil & Gas/Energy’ Sectors. The main highlights of my skills incl. but
not limited to following;
I am internationally mobile and willing to work for project sites in remote locations.
On the personal side, I am 36 years old, married and we are taking care of a beautiful daughter (4 years) which enjoying
their lovely childhood time.
------------------------------------------------------------------------------------------------------------------------------------------------------------------
Highlights
Work Experience
¥ Prepare the EPC Project Planning in Breaking down and updating at level 04 as well (CPM) using primavera P6R8.4,
¥ Loaded resources into the project resource wizard in Primavera P6, maintained and assigned baseline schedules for the
project.
¥ Tracking the progress and forecasting in according to the Engineering, procurement and construction dates,
¥ Analyzed and maintained all reported project activities emphasizing items such as Scope Variations, Slipped Tasks,
Upcoming Tasks, and Actual Hours vs. Planned Hours.
¥ Identified critical activities and schedule variances that will put key milestone dates at risk and proposed remedial action
plans.
¥ Printed 2-weeks look ahead with columns to indicate remaining duration and issue standardized performance reports on
EV, SPI, CPI and EAC.
¥ Prepare and monitoring the PMS sheets (progress measurement system),
¥ Weekly progress reporting to the client,
¥ Prepare and invoicing the physical and financial monthly attachment to the client.
¥ Prepare the communication plan with the various sub-contractor (kick of meeting),
¥ Prepare the EPC Project Planning in Breaking down and updating at level 04 as well (CPM) using primavera P6V7,
¥ Loaded resources into the project resource wizard in Primavera P6, maintained and assigned baseline schedules for the
project.
¥ Tracking the progress and forecasting in according to the Engineering, procurement and construction dates,
¥ Analyzed and maintained all reported project activities emphasizing items such as Scope Variations, Slipped Tasks,
Upcoming Tasks, and Actual Hours vs. Planned Hours.
¥ Identified critical activities and schedule variances that will put key milestone dates at risk and proposed remedial action
plans.
¥ Updated Project Dashboard with various reports (Earned Value, Resource allocations, Key Milestones, etc.) on a
monthly basis as part of the Project Management Office (PMO) requirement
¥ Printed 2-weeks look ahead with columns to indicate remaining duration and issue standardized performance reports on
EV, SPI, CPI and EAC.
¥ Educated and advised project teams on various Project Management processes - planning, controlling, executing and
closing
¥ Collaborated with project teams to ensure schedules are accurate and ensured that all the changes and their impacts
are accurately reflected in schedules.
¥ Monitored projects for adherence to schedule, cost and for achieving milestones
¥ Prepare and monitoring the PMS sheets (progress measurement system),
¥ Weekly progress reporting, Weekly meeting with the Sub-Contractor and the client,
¥ Quantity survey and Cost Control of the sub-contractors invoices,
¥ Prepare and invoicing the physical and financial monthly attachment to the client.
Construction Planning & Cost Control Engineer 2012 to 2013_
Entrepose-Algérie (M’sila Algeria)
Cement plant Extension Project.
¥ Prepare the EPC Project Planning in Breaking down and updating at level 04 as well (CPM) using primavera P6V7,
¥ Tracking the progress and weekly planning forecasting in according to the available materials at site,
¥ Issue the S curve and prepare the weekly progress report,
¥ Printed 2-weeks look ahead with columns to indicate remaining duration and issue standardized performance reports.
¥ Prepare and monitoring the PMS sheets (progress measurement system),
¥ Weekly progress reporting, weekly meeting with the client,
¥ Prepare and invoicing the physical and financial monthly attachment to the client.
¥ Tracking the progress and weekly planning forecasting in according to the available materials at site,
¥ Issue the S curve and prepare the weekly progress report,
¥ Prepare and monitoring the PMS (progress measurement system),
¥ Prepare and invoicing the physical and financial monthly attachment to the client.
¥ Tracking the progress, Weekly planning forecasting in according to the available materials at site,
¥ Prepare and monitoring the PMS (progress measurement system),
¥ Daily, Weekly progress reporting, Weekly meeting with the client,
Construction Planning Engineer 2007 to 2008_
YOUKAIS (Tipaza Algeria)
Electrical Power plant Project (Civil scope of work).
¥ Breakdown and update the Construction planning/scheduling Level 04 as well as (CPM) using primavera P3
¥ Tracking the progress, Prepare and monitoring the PMS (progress measurement system),
¥ Daily and weekly progress reporting, weekly meeting with the main contractor
¥ Prepare and invoicing the monthly attachment with the client.
------------------------------------------------------------------------------------------------------------------------------------------------------------------