Location:: Jembatan Perniagaan Betapus B-3
Location:: Jembatan Perniagaan Betapus B-3
Location:: Jembatan Perniagaan Betapus B-3
h2
0.2 Backfill soil
0.15 g soil = 1.80 t/m3
g sat = 2.30 t/m3 a = 17.39 o
(untuk analisa stabilitas )
0.3 0.25 f = 30.0 o
a = 0.00 o
(untuk analisa struktural)
b1 b2 b3 c = 0.00 t/m2 b = 0.00 o
Tanah Pondasi
B
g s' = 1.37 t/m3 Angka keamanan (normal) (gempa)
18.963 fB = 24.0 o
Guling |e| < B/6=0.82 B/3=0.62
Potongan DPT 2.31 cB = 0.60 t/m2 Geser fs > 2.00 1.25
Koefisien geser Daya dukung tanah
m = 0.50 qmaks > qa=qu/3 qae=qu/2
Koefisien gaya angkat
Um = 1.00
|e| = 1.46 m > B/6 = 0.40 m Check! |e| = 0.83 m > B/3 = 0.80 m Check!
Sf = 0.822 < 3.00 Check! Sf = 1.307 < 2.50 Check!
q1 = 29.93 t/m2 > qa = 6.75 t/m2 Check! q1 = 0.00 t/m2 < qae = 10.12 t/m2 OK!
Sf = 0.676 < 3.00 Check! Sf = #DIV/0! ### 2.00 #DIV/0!
q2 = -5.55 t/m2 < qa = 6.75 t/m2 OK! q2 = 0.00 t/m2 < qae = 10.12 t/m2 OK!
Sf = -3.651 < 3.00 Check! Sf = #DIV/0! ### 2.00 #DIV/0!
Use Concrete pile = 0.75 m (spacing)
b1 = 0.00 m H=h1
b2 = 0.30 m
b3 = 1.55 m
h1 = 4.95 m hw
h2 = 0.20 m
h2
hw = 0.20 m
0.2
0.15
1.2 Parameter
0.3 0.25
B
q = 2.00 t/m2 (untuk kondisi normal)
= 0.00 t/m2 (untuk kondisi gempa) b1 b2 b3
gm = 2.20 t/m 3
2. Perhitungan Stabilitas
2.1 Kasus 1 (Kondisi normal, dengan beban hidup vertikal)
Pa
1 7 5
Pa2
4.95
qa2 qa1
8 6
2
0.20 Pp1 0.20
Pa4 1
Pa3 3
0.20
1
11 0
9 0.15
qa4 O
qa3 qp
1
qu2
qu1
Pu2
Pu
1
0.30 1.85 0.25
Cos2(f -a)
Ka =
Sin(f+d) x Sin(f-b) 2
Cos2a x Cos(a+d) x 1+
Cos(a+d) x Cos(a-b)
a = 17.387 o
d = 0.000 o
b = 0.00 o
a = 0.000 o
d = 20.000 o
b = 0.00 o
Cos2(f+a)
Kp =
Sin(f-d) x Sin(f+b)
2
Cos2a x Cos(a -d) x 1-
Cos(a +d) x Cos(a-b)
a = 17.387 o
d = 0.000 o
b = 0.00 o
Kp = 2.327
a = 0.000 o
d = 20.000 o
b = 0.00 o
Kp' = 1.648
B 2.95
e = - X = - -0.242 = 1.442 m > B/6 = 0.400 m Check !
2 2
a) -2 Dengan gaya angkat
B = 2.40 m
B 2.40
e = - X = - -0.259 = 1.459 m > B/6 = 0.400 m Check !
2 2
HR 7.800
Fs = = = 0.520 < 2.00 Check !
SH 14.988
b)-2 Dengan gaya angkat
Gaya geser : SH = 14.988 ton
Gaya penahan : HR = m x S W = 0.50 x 15.414 = 7.707 ton
(koefisien geser : m = 0.5 )
HR 7.707
Fs = = = 0.514 < 2.00 Check !
SH 14.988
c) Reaksi tekanan tanah pondasi
SW 6xe
q1,2 = x (1 + )
B B
15.599 6x 1.442
q1 = x (1 + ) = 29.931 t/m2 > qa = 6.749 t/m2 Check !
2.40 2.40
15.599 6x 1.442
q2 = x (1 - ) = -16.931 t/m2 < qa = 6.749 t/m2 OK !
2.40 2.40
Reaksi tekanan tanah pondasi pada kasus 1
0.30
0.00 1.55
Pa
1 7 5
Pa2
4.95
qa2 qa1
8 6
2
0.20 Pp1 0.20
Pa4 1
Pa3 3
1 0.20
11 0
9 0.15
qa4 O
qa3 qp
1
qu2
qu1
Pu2
Pu
1
0.30 1.85 0.25
Kp = 2.327
qa1 = Ka x q = 0.000 ton/m
qa2 = Ka x (h1- hw1) x gsoil = 4.032 ton/m
qa3 = qa1 + qa2 = 4.032 ton/m
qa4 = Ka x hw1 x gsat = 0.217 ton/m
qp1 = Kp x h4 x gsoil = 0.838 ton/m
HR 7.499
Fs = = = 0.73 < 2.00 Check !
SH 10.320
b)-2 Dengan gaya angkat
Gaya geser : SH = 10.320 ton
Gaya penahan : HR = m x S W = 0.50 x 14.814 = 7.407 ton
(koefisien geser : m = 0.5 )
HR 7.407
Fs = = = 0.72 < 2.00 Check !
SH 10.320
SW 6xe
q1,2 = x (1 + )
B B
14.999 6x 0.755
q1 = x (1 + ) = 18.045 t/m2 > qa = 6.749 t/m2 Check !
2.40 2.40
14.999 6x 0.755
q2 = x (1 - ) = -5.546 t/m2 < qa = 6.749 t/m2 OK !
2.40 2.40
Pa
1 7 5
Pa2
4.95
qa2 qa1
8 6
2
0.20 Pp1
Pa4 1 0.20
Pa3 3
1 0.20
11 0
9 0.15
qa4 O
qa3 qp
1
qu2
qu1
Pu2
Pu
1
0.3 1.85 0.25
Cos2(f-F-a)
Kae =
2
Sin(f+d) x Sin(f-b-F)
CosF x Cos2a x Cos(a+d+F) x 1+
Cos(a+d+F) x Cos(a-b)
(untuk analisa stabilitas)
a = 0.000 o
d = 21.55 o
a = 0.000 o
d = 15.00 o
Cos2(f-F+a)
Kpe =
2
Sin(f-d) x Sin(f+b-F)
CosF x Cos2a x Cos(a+d+F) x 1-
Cos(a+d-F) x Cos(a-b)
a = 0.000 o
d = 21.55 o
Cos (f-F+a)=
2
0.866 Sin(f-d) = 0.147
CosF = 0.989 Sin(f+b-F) = 0.366
Cos2a = 1.000 Cos(a-b) = 1.000
Cos(a+d+F)= 0.865
Kpe = 1.797
2xSW
q1' = = = - t/m2 qae = - t/m2
3 x (B/2-|e|)
- t/m2
- t/m2 - t/m2
in case, e > 0 and e < B/6 in case, e > 0 and B/6 < e < B/3
(tidak dipakai) (tidak dipakai)
- t/m2
- t/m2 - t/m2
in case, e < 0 and |e| < B/6 in case, e < 0 and B/6 < |e| < B/3
(tidak dipakai) (tidak dipakai)
(a x c x Nc) = 12.011
qu = 20.247 t/m2
qu = (40 x N x A) + (W x fi x li)
= ( 40 x 3.0 x 0.031 )+( 0.628 x 0.60 x 6.0 )
= 3.770 + 2.262 = 6.032 ton/tiang
(angka keamanan : n = 3)
p x D4
I = = 7,854.0 cm4 (I : Moment Inertia dari tiang pancang)
64
a = 0.20 E = 28 x N
Kh = a x E x D-3/4
= 0.20 x( 28 x 3.0 )x( 20.0 )-3/4 = 1.776 kg/cm3
4 Kh x D 4 1.776 x 20.0
b = = = 0.008 cm
4 EI 4 x 305,206 x 7,854.0
Kh x D 1.776 x 20.0
Ha = x d = x 1 = 4,553.66 kg
b 0.008
= 4.554 ton
(3) Daya dukung horisontal berdasarkan tegangan pada tiang pancang
Ha = 2 x b x Ma
p x D3
W = = 785.40 cm3 ; (W : modulus penampang tiang pancang)
32
Ha = 2 x b x Ma
= 2 x 0.008 x 58,904.9 = 919.15 kg/tiang = 0.919 ton/tiang
Allowable horizontal bearing capacity acting on the pile top depend upon the allowable
stress of pile itself.
Ha = 0.919 ton/tiang ; (Ha : Beban horisontal yang ditahan oleh tiang pancang)
Ha 0.919
Jarak antar tiang = = = 0.10 m
Hr 9.311
qa 2.011
Jarak antar tiang = = = 0.13 m
V 15.599
dipakai = 0.75 m
Jarak antar tiang dapat ditentukan sebesar 0.75 m untuk tiang ( f 20, L = 6.00 m ),
qa 2.011
Jarak antar tiang = = = 0.17 m
Vp 12.082
dipakai = 0.75 m
Jarak antar tiang dapat ditentukan 1.5 m untuk tiang ( f 20, L = 6.00 m ),