Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

12/21/2018 _APL (South America Promo) PP30 Price List — 2018 - Google Docs

Price List — 2018 
South American market promotional pricing 

Note :  Prices  subject  to  change.  Please  request  most  recent  prices  if  this  list  if  you 
received this more than a month ago. 

Power Pallet PP30 Cogen­CS — Standard Package  

Item  MSRP  Discount  Discounted Price 


Power Pallet PP30 (25kW) —grid­tie capable, 3­stage 
$65,000  20%  $52,000 
cogeneration system 
PP30 Operator’s Maintenance Kit  $400  20%  $320 
PP30 Spare Parts Kit  $400  20%  $320 
Preparation for shipment: crating, loading  $750  20%  $600 
Total:  $66,550    $53,240 
 

Note :  Prices  are  rounded  to  the  nearest  whole  dollar.  Price  does  not  include  shipping,  taxes,  tariffs,  or 
other  fees.  On­site  service  is  typically  quoted  with  3  days,  with  the  expectation that the first and last day 
may be impacted by travel. The cost of shipment is not included in the price above.  

Options  

Item  Price  Discount  Discount Price  With Standard Package 


Catalytic Exhaust Emissions System  $5,000  25%  $3,750  $56,990 
 

Accessories 
Power Pallet tool kit (tools using English imperial units, various tools)  $142 

   

Revision 2018­12­20 
https://docs.google.com/document/d/1qT-AvJGTFTbO7MUOoNskfu1W8PZn_zm76aVDJ29tspc/edit 1/2
12/21/2018 _APL (South America Promo) PP30 Price List — 2018 - Google Docs

Commissioning & Training Services 
 
Commissioning  services  are  necessary  for  commissioning  the  machines.  The  two  options  are  remote, 
and  on­site.  Online  commissioning  may  be  the  only  option in cases where there is no in­region technical 
support  partner.  Onsite  prices  here  indicate  typical  service  for  one  or  two  machines,  spread  out  over  3 
days, but actual service can be adjusted determined based on installation size and application. 
 
 

Remote commissioning (via live web video conferencing)  $1,500 
   

On­site service base fee (set­up, commissioning, training)  $3,500 
On­site service per­diem fee (3 days, $500/day)  $1,500 
Technician food & lodging (3 days, $250/day)  $750 
Total:  $5,750 
 

(Add 1 day of per diem and food and lodging expenses for every two additional PP30s in an order.) 

Price totals for various combinations of options and commissioning  

  Online commissioning  On­site commissioning 
Standard Package  $54,740  $58,990 

With Catalytic Exhaust Emissions System  $58,490  $62,740 

Revision 2018­12­20 
https://docs.google.com/document/d/1qT-AvJGTFTbO7MUOoNskfu1W8PZn_zm76aVDJ29tspc/edit 2/2

You might also like