Professional Documents
Culture Documents
Belgaum Existing Structures
Belgaum Existing Structures
With the aim to assess and appreciate the existing condition / characteristics of the
bridges and CD structures along the project corridor, and particularly to visually
inspection of the bridges & culverts, a detail condition survey will be carried out with
the following main objectives:
To systematically record the physical state of the structure as it exists
now.
To ensure that the existing bridges with repair/rehabilitation are fit for use
and structurally safe.
The project corridor has even distribution of CD structures along the length of the
stretch. About 187 nos. structures & cross drainage (CD) structures i.e. bridges and
culverts were observed during reconnaissance survey of project corridor. Out of
these, 41 nos. are Underpass, 6 nos. are major bridges, 12 nos. are minor bridges
&128 nos. culverts found within Project Length. All cross drainage structures are 4
lane road configuration. Parapets and railings for most of the structures (wherever
present) were found good. Generally no skew angle crossing of the cross drainage
structures is observed.
The summary of the existing structures as observed is given below in Table 2.4 and
a detail inventory of the structures are produced in Table 2.5 & 2.6 (ROB &
RUB),Table 2.7 (Grade Seperator/underpass), 2.8 (Major Bridges), Table 2.9
(Minor Bridge), Table 2.10 (Box/Slab/Arch Culverts) & Table 2.11 (Pipe Culverts)
as noted during the reconnaissance survey. These will be further firmed up during
detailed survey.
TABLE 2-4: STRUCTURAL TYPE DETAILS
S. No. Type of Structure Numbers
1 ROB 0
2 RUB 0
3 GRADE SEPERATOR 7
4 VUP/PUP 6/9
5 CUP 19
6 MAJOR BRIDGES 6
7 MINOR BRIDGES 12
8 CULVERTS 128
Total no. of existing Structures 187
The existing span arrangement along with the carriageway widths of the bridges
corresponding to the chainages is summarized below:
TABLE 2-5 : ROB DETAILS
Span
Sl.
Chainage (km) Type arrangement Remarks
No:
(m)
1 NIL
Sr. Span
Location (Km) Structure Type Remark
No. arrangement (m)
1 516+993 Culvert Box 1X4.00
2 517+943 Culvert Box 1X4.00
3 518+763 Culvert Box 1X2.80
4 519+608 Culvert Box 1X2.80
Sr. Span
Location (Km) Structure Type Remark
No. arrangement (m)
5 520+488 Culvert Box 1X4.00
6 526+891 Culvert Box 1X4.45
7 531+088 Culvert Box 1X2.30
8 531+193 Culvert Box 1X2.30
9 531+963 Culvert Box 1X2.80
10 533+713 Culvert Box 1X2.80
11 536+913 Culvert Box 1X2.25
12 539+213 Culvert Box 1X7.10
13 539+803 Culvert Box 1X2.30
14 548+123 Culvert Box 1x4.00
15 548+538 Culvert Box 1X4.00
16 549+238 Culvert Box 1X4.00
17 549+363 Culvert Box 1X4.00
18 550+888 Culvert Box 1X2.80
19 555+313 Culvert Box 1X4.00
20 555+538 Culvert Box 1X3.00
21 556+808 Culvert Box 1X3.00
22 557+173 Culvert Box 1X3.00
23 557+293 Culvert Box 1X3.00
24 557+883 Culvert Box 1X3.00
25 560+923 Culvert Box 1X4.85
26 562+093 Culvert Box 1X4.00
27 563+378 Culvert Box 1x3.00
28 568+585 Culvert Box 1X3.00
29 569+388 Culvert Box 1x4.00
30 571+638 Culvert Box 1x4.00
31 572+207 Culvert Box 1x4.30
32 573+813 Culvert Box 1x2.35
33 575+523 Culvert Box 1X2.30
34 576+443 Culvert Box 1X2.90
35 577+488 Culvert Box 1X2.80
36 577+678 Culvert Box 1X2.90
37 577+978 Culvert Box 1X2.75
38 583+563 Culvert Box 1X3.00
39 583+863 Culvert Box 1X3.00
40 584+488 Culvert Box 1X2.90
41 585+188 Culvert Box 1X3.20
42 587+088 Culvert Box 1X3.00
43 587+863 Culvert Box 1X2.60
44 588+938 Culvert Box 1X3.10
45 589+213 Culvert Box 1X2.35
46 589+583 Culvert Box 1X2.80
47 590+038 Culvert Box 1X2.80