Professional Documents
Culture Documents
L&T Vadodara Mumbai Expressway PDF
L&T Vadodara Mumbai Expressway PDF
L&T Vadodara Mumbai Expressway PDF
(A subsidiory of
corporote office: 3rd Flooa lRB.comptex, chondivoti Form, ChondiJji.,}il,,iT:f"llH iflttffi:ttlt#i
Tel:9i - 22'66404220 / 48804200.Fox:91 -22-6675.l024.e--moil: info@irb.co.in.www.irb.co.in
CIN: U45203MH I 994PTC07 7 07 5
Dear Sir,
Thanking you,
Yours faithfully,
Binayak Tripathy.
Authorized Signatory."
Encl- As above(2pg)
Registered Office: I I 0l , Hironondoni Knowledge Po*, I I'n Floor, Technolgy Street, Hill Side Avenue, Opp. Hironondoni Hospitol, powoi, Mumboi - 4OO 076
tel:91-22-6733 64C0 / 4053 6400. Fox91-22-4053 6699. e-moil: in{o@irb.co.in . www.irb.co.in
sfrrvee sssocietes
architectsengineers & consultants pW, ltd.
Indeperrcient Engilreer for B-Laning of \radodoro KIM
lixprcssrvay, Pockoges l, ll & lll frorn l(nr. p9g.0OO to
Km. 378.740, in the state of Gujarat under Blraratnrela
Paroyojrra on Hybrid Auuity Mode
To
fitfik
Page I of2
Project Office 15& 16, Aartee Bunglaws, Neer N4arry,s pre schoof, Opp: Kshatriyo Sanraj, Karjan ^ 3g1 g4\,V6dodara Dist.,
Gujarat. Tel: 0?66(r - 232766, Fax: 0e666-939866. e-nrail lD: tEgg05karjun(g:ue*u*.nut
l"lead Office Rovula Residetrcy, srinagar colony Mdin Rd., l{yderabad - 5o0 082, India. clN: u74900TG2005pTc045491
lel: -t-9'l-40-93737633;48a\3ai6; ljox: r.91-40-93r36e77; ernail: aarvae@)aarvee.ne! web: www.aarvee_com
Continuation sheet
In view of the above, we are communicating our consent for procuring HYSD TMT bars
(Fe 500 D Grade) conforming to IS:1786-2008 from the following souices to use in the
project.
1) SteelAuthority of India Limited (SAIL)
2) Rashtriya Ispat Nigam Limited (RINL)
3) JSW Steel Limited (JSW)
4) Electrosteel Steels Limited
5) Jindaf Steel & Power Limited (JSPL)
The reinforcement steel shall be procured from the storage depots of the said approved
sources only and not from their authorized agents / dealers,
Please ensure that all quality control tests are carried out to comply with IS:f786-2008
and MORTH specifications prior to using the reinforcement material from the above
sources in the project works and the test reports from rnanufacturer and third party
NABL accredited Independent Laboratories after witnessing by the IE shall also be
submitted for our review and comments if any,
It is further requested that every lot shall be tested on random sampling in NABL
accredited Independent Laboratories to verify the results with MTC and Specifications.
It is also requested to ensure proper stacking of steel at the site to comply with
specification requirements without any lapse.
The company profiles & credentials of 1) M/s Electrotherm (India) Ltd., Ahmedabad are
under review of the IE and comments / observations would be communicated soon,
M*?
Abdul Rahiman
TL & Engineer's Representative
CC: l.The General Manager (T) and Project Director,NHAI, PIU-Surat (Expressway)
2.The Authorised signatory, M/s Aarvee Associates pvt. Ltd, Hyderabad
3'The Resident Engineer -1 and SQME-I for information and follow up action
4.The Flle
Page2 of?