Sr. no. Discription of Item No. Length Width Depth Qty. Unit
Estate office
a Dismantling work
1 Removing doors and windows
doors 11 11 Nos
windows 37 37 Nos
48 Nos
2 Removing collapsible gate 2 1.16 2.19 5.08 m2
3 Removing partition/ false ceiling 1 6.15 3.67 22.57 m2
1 4.53 3.67 16.63 m2
1 2.50 3.67 9.18 m2
1 4.16 3.67 15.27 m2
1 3.21 1.22 3.92 m2
1 3.65 1.22 4.45 m2
2 1.70 1.2 4.08 m2
1 2.44 1.2 2.93 m2
1 3.64 1.2 4.37 m2
1 2.40 1.2 2.88 m2
1 1.69 1.2 2.03 m2
1 2.44 1.2 2.93 m2
1 2.66 3.67 9.76 m2
1 3.19 3.67 11.71 m2
1 2.08 0.7 1.46 m2
Less door -4 0.90 2.12 -7.63 m2
false ceiling 1 10.05 31.72 318.79 m2
425.30 m2
4 Removing cupboard 2 7.70 15.40 Rmt
1 5.20 5.20 Rmt
1 12.23 12.23 Rmt
2 10.05 20.10 Rmt
52.93 Rmt
5 Removing AC sheets 2 6.40 32.00 409.60 m2
external 1 3.00 9.80 29.40 m2
1 10.60 4.26 45.16 m2
1 31.72 3.70 117.36 m2
601.52 m2
6 Dismantling structural steel
truss ISA 60x6 40 6.40 5.390 1379.84 kg
40 6.00 5.390 1293.60 kg
20 1.50 5.390 161.70 kg
20 0.85 5.390 91.63 kg
20 0.45 5.390 48.51 kg
Purlins 10 32.00 5.390 1724.80 kg
Gusset plate 10mm thick 40 0.30 0.30 78.500 282.60 kg
280 0.30 0.30 78.500 1978.20 kg
ms pipe 3" 1 9.80 6.460 63.31 kg
4 3.00 6.460 77.52 kg
1 6.00 6.460 38.76 kg
1 4.00 6.460 25.84 kg
1 10.60 6.460 68.48 kg
1 11.80 6.460 76.23 kg
1 12.90 6.460 83.33 kg
7 2.50 6.460 113.05 kg
ISMB 100 11 3.70 11.500 468.05 kg
Purlins ISMC 75 3 31.72 7.140 679.44 kg
8654.89 kg
7 Dismantling brick wall
side walls 20 3.67 0.23 2.830 47.78 m3
internal walls 1 7.70 0.15 2.600 3.00 m3
3 3.37 0.15 2.600 3.94 m3
3 4.68 0.15 3.670 7.73 m3
1 3.17 0.15 3.670 1.75 m3
4 10.05 3.67 0.150 22.13 m3
1 9.70 3.67 0.150 5.34 m3
9 2.40 0.23 0.470 2.33 m3
1 2.40 3.67 0.150 1.32 m3
Less windows -21 1.32 1.32 0.230 -8.42 m3
-16 2.70 0.95 0.230 -9.44 m3
-1 0.72 0.78 0.150 -0.08 m3
-1 2.08 0.7 0.150 -0.22 m3
Less doors -8 1.00 2.20 0.150 -2.64 m3
outer supports 4 3.50 0.60 0.640 5.38 m3
2 1.00 3.50 0.640 4.48 m3
outer corriodor columns 11 0.26 0.34 2.450 2.38 m3
86.76 m3
8 Dismantling RCC 4 14.70 0.47 0.075 2.07 m3
corridor slab 1 31.72 0.15 3.230 15.37 m3
17.44 m3
9 Dismantling UCR
columns 22 0.70 0.38 4.300 25.16 m3
1 10.05 0.38 4.300 16.42 m3
0.5 10.05 2.14 0.380 4.09 m3
2 32.00 0.6 0.380 14.59 m3
1 38.33 0.38 0.600 8.74 m3
1 2.07 0.38 0.600 0.47 m3
69.47 m3
10 Dismantling PCC
floor 1 32.00 10.50 0.100 33.60 m3
extended portion 1 10.50 0.90 0.100 0.95 m3
1 38.33 2.83 0.100 10.85 m3
45.39 m3
11 Removing soling
floor 1 32.00 10.50 0.230 77.28 m3
extended portion 1 10.50 0.90 0.230 2.17 m3
79.45 m3
12 Disposing debrises
Brickwall 86.76 m3
RCC 15.54 m3
PCC 45.39 m3
147.69 m3
b Recovery
1 Aluminium
Partitions at starting three bays 6 3.05 0.942 17.24 kg
2 2.15 0.940 4.04 kg
8 3.67 0.940 27.60 kg
Glazing clips 8 2.58 0.097 2.00 kg
16 3.84 0.097 5.96 kg
16 4.14 0.097 6.43 kg
middle partition 5 3.67 0.940 17.25 kg
5 4.53 0.940 21.29 kg
Glazing clips 16 3.94 0.097 6.11 kg
16 4.26 0.097 6.61 kg
doors 4 0.95 1.600 6.08 kg
2 0.95 1.139 2.16 kg
4 2.00 1.139 9.11 kg
fixed glass 1 2.84 0.940 2.67 kg
Glazing clips 2 2.84 0.097 0.55 kg
Drawing office partition 8 3.67 0.940 27.60 kg
3 2.49 0.940 7.02 kg
1 1.59 0.940 1.49 kg
5 4.16 0.940 19.55 kg
Glazing clips 8 3.16 0.097 2.45 kg
4 1.40 0.097 0.54 kg
16 3.63 0.097 5.63 kg
8 4.06 0.097 3.15 kg
8 4.34 0.097 3.37 kg
half height partition 2 3.21 0.940 6.03 kg
6 1.22 0.940 6.88 kg
glazing clips 4 3.21 0.097 1.25 kg
16 1.22 0.097 1.89 kg
2 3.65 0.940 6.86 kg
4 1.22 0.940 4.59 kg
Glazing clips 4 3.65 0.097 1.42 kg
12 1.22 0.097 1.42 kg
shutter alu. sections 1 39.68 0.414 16.43 kg
tender section partition 0.00 kg
low height partition 26 1.22 0.940 29.82 kg
4 1.69 0.940 6.35 kg
4 2.44 0.940 9.17 kg
2 3.64 0.940 6.84 kg
2 2.40 0.940 4.51 kg
2 1.69 0.940 3.18 kg
Glazing clips 8 3.99 0.097 3.10 kg
18 4.73 0.097 8.26 kg
4 2.35 0.097 0.91 kg
4 3.98 0.097 1.54 kg
Wall hung compartment 0.00 kg
two track sliding 4 3.66 0.659 9.65 kg
bearing bottom 8 1.85 0.417 6.17 kg
top shutter member 8 1.85 0.475 7.03 kg
interlocking member 8 0.92 0.558 4.11 kg
openeable shutter 0.00 kg
shutter frame 4 3.66 0.849 12.43 kg
shutter alu. sections 8 2.62 0.414 8.68 kg
Tender section cupboard 32 1.12 0.414 14.84 kg
DR room 5 3.19 0.940 14.99 kg
9 3.67 0.940 31.05 kg
3 2.60 0.940 7.33 kg
1 1.70 0.940 1.60 kg
Glazing clips 24 3.30 0.097 7.68 kg
8 3.86 0.097 3.00 kg
6 3.50 0.097 2.04 kg
6 3.22 0.097 1.87 kg
4 3.70 0.097 1.44 kg
4 3.96 0.097 1.54 kg
top vetilator in tender section 6 2.77 0.781 12.98 kg
12 0.92 0.781 8.62 kg
3 0.50 0.781 1.17 kg
shutters 9 3.12 0.526 14.77 kg
9 3.00 0.724 19.55 kg
Glazing clips 9 3.00 0.286 7.72 kg
526.62 kg
2 Structural steel work
As per item no.7-dismantling work 8654.69 kg
Add for cupboard frames
at drawing section ISA 50x6 16 1.26 4.500 90.72 kg
10 1.23 4.500 55.35 kg
10 0.60 4.500 27.00 kg
SE cabin 32 1.28 4.500 184.32 kg
20 1.00 4.500 90.00 kg
20 0.60 4.500 54.00 kg
4 1.64 4.500 29.52 kg
2 1.00 4.500 9.00 kg
6 0.60 4.500 16.20 kg
Tender section 8 10.05 4.500 361.80 kg
36 0.93 4.500 150.66 kg
36 0.60 4.500 97.20 kg
Grills 12 2.70 0.92 15.000 447.12 kg
2 1.56 3.00 20.000 187.20 kg
4 3.00 0.46 20.000 110.40 kg
4 1.56 0.46 20.000 57.41 kg
Collapsible gate 100.00 kg
window gaurd bars 176 1.42 0.880 219.93 kg
ventilator guard bars 45 2.80 0.880 110.88 kg
11053.40 kg
3 Reinforcement
Approximate qty of steel consider 70 kg/m3 1 17.44 70.00 1220.80 kg
4 Wood
door frame 9 5.29 0.10 0.075 0.36 m3
window frame 21 6.58 0.06 0.095 0.79 m3
42 2.76 0.06 0.035 0.22 m3
42 1.48 0.06 0.035 0.13 m3
top ventilators 16 10.05 0.06 0.100 0.96 m3
frame 64 2.80 0.05 0.040 0.36 m3
ceiling frame 40 10.05 0.08 0.100 3.02 m3
9 32.00 0.10 0.080 2.30 m3
8.14 m3
750 kg/m3 6105.44 kg
5 Plywood, flush door kg/m2orm3
flush doors 9 0.95 2.10 17.00 305.24 kg
Plywood 18mm 6 5.07 0.60 7.560 137.99 kg
3 6.50 0.60 7.560 88.45 kg
18 0.40 0.91 7.560 49.53 kg
581.21 kg
6 Glass
windows 42 0.49 0.64 12.470 164.24 kg
winddows 42 0.49 0.25 12.470 64.16 kg
partitions 1 5.90 2.30 12.470 169.22 kg
partitions 1 0.66 0.66 12.470 5.41 kg
partitions 1 6.25 2.30 12.470 179.26 kg
partitions 1 2.00 0.64 12.470 15.96 kg
partitions 1 5.39 2.300 12.470 154.59 kg
752.84 kg
Printing press
a Dismantling work
1 Removing doors and windows
doors 6 6 Nos
windows 24 24 Nos
Top vetilators 15 15 Nos
45 Nos
2 Removing collapsible gate/rolling shutter 1 1.20 2.20 2.64 m2
3 Removing partition/ceiling 1 4.70 2.60 12.22 m2
1 4.26 2.56 10.91 m2
2 5.23 2.56 26.78 m2
1 4.50 2.56 11.52 m2
1 3.03 3.67 11.12 m2
1 3.65 1.22 4.45 m2
1 11.00 2.56 28.16 m2
2 2.50 2.43 12.15 m2
door portions 5 0.95 1.00 4.75 m2
False ceiling 1 10.05 31.72 318.79 m2
1 4.70 10.05 47.24 m2
1 5.23 3.60 18.83 m2
506.91 m2
4 Removing AC sheets 2 6.40 32.00 409.60 m2
5 Dismantling structural steel
truss ISA 60x6 40 6.40 5.390 1379.84 kg
40 6.00 5.390 1293.60 kg
20 1.50 5.390 161.70 kg
20 0.85 5.390 91.63 kg
20 0.45 5.390 48.51 kg
Purlins 10 32.00 5.390 1724.80 kg
Gusset plate 10mm thick 40 0.30 0.30 78.500 282.60 kg
280 0.30 0.30 78.500 1978.20 kg
6960.88 kg
6 Dismantling brick wall
side walls 20 3.67 0.23 2.83 47.78 m3
2 10.00 2.43 0.23 11.18 m3
5 10.05 3.67 0.15 27.66 m3
cabin walls 1 11.00 1.00 0.15 1.65 m3
1 4.26 1.00 0.15 0.64 m3
1 5.23 1.00 0.15 0.78 m3
1 4.50 1.00 0.15 0.68 m3
1 5.23 1.00 0.15 0.78 m3
less windows -24 1.31 1.31 0.23 -9.47 m3
doors -4 1.60 2.15 0.15 -2.06 m3
-4 1.18 2.10 0.23 -2.28 m3
Top ventilators -10 2.77 0.95 0.230 -6.05 m3
-5 2.40 0.45 0.230 -1.24 m3
less door bottom portions for cabin -5 0.95 1.00 0.150 -0.71 m3
69.33 m3
7 Dismantling RCC 1 10.00 3.00 0.150 4.50 m3
columns 6 0.30 0.30 2.450 1.32 m3
5.82 m3
8 Dismantling UCR
columns 22 0.70 0.38 4.300 25.16 m3
1 10.05 0.38 4.300 16.42 m3
0.5 10.05 2.14 0.380 4.09 m3
2 32.00 0.6 0.380 14.59 m3
60.26 m3
9 Dismantling PCC
floor 1 32.00 10.50 0.100 33.60 m3
extended portion 1 10.50 2.50 0.100 2.63 m3
36.23 m3
10 Removing soling
floor 1 32.00 10.50 0.230 77.28 m3
extended portion 1 10.00 2.50 0.230 5.75 m3
83.03 m3
11 Disposing debrises
Brickwall 69.33 m3
RCC 5.82 m3
PCC 36.23 m3
111.38 m3
B Recovery
1 Aluminium
Partitions at manager cabin 6 2.73 0.942 15.43 kg
4 4.70 0.942 17.71 kg
Glazing clips 8 2.72 0.097 2.11 kg
2 1.80 0.097 0.35 kg
6 4.42 0.097 2.57 kg
2 3.50 0.097 0.68 kg
6 3.76 0.097 2.19 kg
2 2.92 0.097 0.57 kg
door 2 0.90 1.600 2.88 kg
1 0.90 1.139 1.03 kg
2 2.23 1.139 5.08 kg
Glazing clips 4 4.15 0.097 1.61 kg
inside partition 3 4.50 0.942 12.72 kg
1 3.67 0.942 3.46 kg
5 2.67 0.942 12.58 kg
Glazing clips 10 3.55 0.097 3.44 kg
10 2.95 0.097 2.86 kg
8 3.85 0.097 2.99 kg
door 12 0.89 1.600 17.09 kg
6 0.89 1.139 6.08 kg
12 2.10 1.139 28.70 kg
Glazing clips 24 3.38 0.097 7.87 kg
middle partition 6 2.67 0.942 15.09 kg
4 5.23 0.942 19.71 kg
Glazing clips 10 3.65 0.097 3.54 kg
10 3.05 0.097 2.96 kg
10 3.85 0.097 3.73 kg
2nd partition 3 4.50 0.942 12.72 kg
1 3.67 0.942 3.46 kg
5 2.67 0.942 12.58 kg
Glazing clips 10 3.55 0.097 3.44 kg
10 2.95 0.097 2.86 kg
8 3.85 0.097 2.99 kg
door 12 0.89 1.600 17.09 kg
6 0.89 1.139 6.08 kg
12 2.10 1.139 28.70 kg
Glazing clips 12 3.38 0.097 3.93 kg
middle partition 6 2.67 0.942 15.09 kg
4 5.23 0.942 19.71 kg
Glazing clips 10 3.65 0.097 3.54 kg
10 3.05 0.097 2.96 kg
10 3.85 0.097 3.73 kg
3rd room partition 4 3.67 0.942 13.83 kg
3 3.00 0.942 8.48 kg
2 2.05 0.942 3.86 kg
Glazing clips 4 3.23 0.097 1.25 kg
8 3.39 0.097 2.63 kg
4 3.53 0.097 1.37 kg
4 3.79 0.097 1.47 kg
south side rooms 6 3.67 0.942 20.74 kg
4 2.81 0.942 10.59 kg
6 2.76 0.942 15.60 kg
4 3.15 0.942 11.87 kg
door 6 0.91 1.600 8.74 kg
3 0.91 1.139 3.11 kg
6 2.10 1.139 14.35 kg
Glazing clips 18 3.35 0.097 5.85 kg
18 2.75 0.097 4.80 kg
12 3.65 0.097 4.25 kg
door glazing clips 12 3.38 0.097 3.93 kg
backside room - partition 8 2.43 0.942 18.31 kg
4 2.50 0.942 9.42 kg
8 0.77 0.942 5.80 kg
door 4 0.95 0.719 2.73 kg
4 2.04 0.537 4.38 kg
Glazing clips 8 2.00 0.097 1.55 kg
16 1.55 0.097 2.41 kg
4 5.72 0.097 2.22 kg
Aluminium windows 4 5.28 0.526 11.11 kg
8 3.74 0.724 21.66 kg
4 1.26 0.764 3.85 kg
sliding window 2 2.46 0.933 4.59 kg
2 1.20 0.933 2.24 kg
shutters 6 0.80 0.417 2.00 kg
4 1.20 0.469 2.25 kg
2 1.20 0.417 1.00 kg
False ceiling 8 10.05 0.350 28.14 kg
17 4.70 0.350 27.97 kg
8 3.60 0.350 10.08 kg
6 4.50 0.350 9.45 kg
back side windows 25 0.45 0.945 10.63 kg
10 2.40 0.945 22.68 kg
Glazing clips 20 1.85 0.097 3.59 kg
678.69 kg
2 Structural steel work
As per item no.7-dismantling work 6960.88 kg
Rolling shutter 70.00 kg
window gaurd bars 28 1.30 0.880 32.03 kg
ventilator guard bars 45 2.80 0.880 110.88 kg
add for weld mesh 16 5.00 80.00 kg
grill 1 3.60 2.40 20.00 172.80 kg
7426.59 kg
3 Reinforcement
Approximate qty of steel consider 70 kg/m3 1 5.82 70.00 407.40 kg
4 Wood
door frame 3 5.40 0.10 0.075 0.12 m3
1 5.90 0.10 0.075 0.04 m3
1 6.50 0.10 0.075 0.05 m3
back side panelled door 8 0.55 0.13 0.030 0.02 m3
4 0.55 0.20 0.030 0.01 m3
8 2.18 0.20 0.030 0.10 m3
top ventilators 10 10.05 0.06 0.100 0.60 m3
frame 40 2.80 0.05 0.040 0.22 m3
ceiling frame 40 10.05 0.08 0.100 3.02 m3
9 32.00 0.10 0.080 2.30 m3
6.50 m3
750 kg/m3 4871.63 kg
5 Plywood, flush door kg/m2orm3
flush doors 1 1.40 2.05 17.00 48.79 kg
3 1.03 2.03 17.00 106.64 kg
155.43 kg
6 Glass
windows 36 0.49 0.64 12.470 140.78 kg
windows 36 0.49 0.25 12.470 54.99 kg
Top ventilators 40 0.60 0.78 12.470 233.44 kg
sliding window 1 2.25 1.10 12.470 30.86 kg
partitions 1 2.48 4.30 12.470 132.98 kg
partitions 2 0.80 3.29 12.470 65.64 kg
2 4.18 2.35 12.470 244.99 kg
middle partition 2 4.85 2.35 12.470 284.25 kg
1 2.75 3.29 12.470 112.82 kg
south side rooms 1 10.00 2.51 14.470 363.20 kg
backside room 1 2.25 2.18 14.470 70.98 kg
top fixed glass 20 0.51 0.32 14.470 47.82 kg
1782.75 kg
MMD OFFICE
a Dismantling work
1 Removing doors and windows
doors 14 14 Nos
windows 34 34 Nos
ventilators 13 13 Nos
61 Nos
2 Removing collapsible gate/rolling shutter 1 2.72 2.37 6.45 m2
1 1.46 2.42 3.53 m2
1 3.00 2.45 7.35 m2
17.33 m2
3 Removing partition 1 6.30 3.67 23.12 m2
1 3.66 3.67 13.43 m2
1 10.05 3.67 36.88 m2
1 3.66 3.15 11.53 m2
1 44.48 10.05 447.02 m2
531.99 m2
4 Removing AC sheets 2 44.80 6.40 573.44 m2
573.44 m2
5 Dismantling structural steel
truss ISA 60x6 48 6.40 5.390 1655.81 kg
48 6.00 5.390 1552.32 kg
24 1.50 5.390 194.04 kg
24 0.85 5.390 109.96 kg
24 0.45 5.390 58.21 kg
Purlins 10 44.80 5.390 2414.72 kg
Gusset plate 10mm thick 48 0.30 0.30 78.500 339.12 kg
336 0.30 0.30 78.500 2373.84 kg
8698.02 kg
6 Dismantling brick wall
side walls 28 3.67 0.23 2.830 66.89 m3
1 10.05 3.67 0.150 5.53 m3
1 6.30 3.67 0.150 3.47 m3
1 3.34 3.67 0.150 1.84 m3
1 6.00 3.67 0.150 3.30 m3
Less windows -34 1.32 1.32 0.230 -13.63 m3
-13 2.70 0.95 0.230 -7.67 m3
-1 1.22 1.25 0.150 -0.23 m3
Less doors -8 0.90 2.00 0.150 -2.16 m3
-4 1.10 2.10 0.230 -2.13 m3
-2 2.72 2.37 0.230 -2.97 m3
52.25 m3
7 Dismantling RCC 2 2.20 1.00 0.180 0.79 m3
1 3.15 1.00 0.180 0.57 m3
1 5.30 0.38 0.160 0.32 m3
1.68 m3
8 Dismantling UCR
columns 28 0.70 0.38 4.300 32.03 m3
1 10.05 0.38 4.300 16.42 m3
0.5 10.05 2.14 0.380 4.09 m3
1 3.42 5.00 0.380 6.50 m3
2 44.48 0.38 0.900 30.42 m3
1 10.05 0.9 0.380 3.44 m3
92.89 m3
9 Dismantling PCC
floor 1 44.48 10.50 0.100 46.70 m3
46.70 m3
10 Removing soling
floor 1 44.48 10.50 0.230 107.42 m3
107.42 m3
11 Disposing debrises
Brickwall 52.79 m3
RCC 1.68 m3
PCC 46.70 m3
101.17 m3
b Recovery
1 Aluminium
fixed window 1 4.88 0.942 4.60 kg
door 1 4.95 1.200 5.94 kg
10.54 kg
2 Structural steel work
As per item no.7-dismantling work 8698.02 kg
Collapsible gate/rolling shutter 135.00 kg
window gaurd bars 374 1.42 0.880 467.35 kg
ventilator guard bars 65 2.80 0.880 160.16 kg
ceiling grid 16mm dia. Bar 24 3.34 1.580 126.65 kg
33 2.42 1.580 126.18 kg
9713.36 kg
3 Reinforcement
Approximate qty of steel consider 70 kg/m3 1 1.68 70.00 117.60 kg
4 Wood
door frame 7 5.10 0.10 0.075 0.27 m3
4 5.28 0.10 0.075 0.16 m3
window frame 34 6.58 0.06 0.095 1.28 m3
68 2.76 0.06 0.035 0.36 m3
68 1.48 0.06 0.035 0.21 m3
top ventilators 13 10.05 0.06 0.100 0.78 m3
frame 52 2.80 0.05 0.040 0.29 m3
ceiling frame 56 10.05 0.08 0.100 4.22 m3
9 44.48 0.10 0.080 3.20 m3
10.77 m3
750 kg/m3 8079.48 kg
5 Plywood, flush door kg/m2orm3
flush doors 9 0.95 2.10 17.00 305.24 kg
4 1.08 2.10 17.00 154.22 kg
Plywood 18mm 2 6.30 3.67 7.560 349.59 kg
2 10.05 3.67 7.560 557.68 kg
2 3.66 3.67 7.560 203.09 kg
1569.82 kg
6 Glass
windows 68 0.49 0.64 12.470 265.92 kg
winddows 68 0.49 0.25 12.470 103.88 kg
ventilators 52 0.60 0.78 12.470 303.47 kg
1 1.10 1.10 12.470 15.09 kg
688.35 kg
Connecting corriodors
a Dismantling work
1 Removing AC sheets
Corridor infront of printing press 1 44.40 3.70 164.28 m2
infront of toilet 1 19.02 3.70 70.37 m2
1 3.00 3.70 11.10 m2
1 28.35 3.70 104.90 m2
350.65 m2
2 Dismantling structural steel
ISMB 100 15 3.70 11.500 638.25 kg
9 3.70 11.500 382.95 kg
10 3.70 11.500 425.50 kg
Purlins ISMC 75 3 44.40 7.140 951.05 kg
3 19.02 7.140 407.41 kg
3 28.35 7.140 607.26 kg
3 3.00 7.140 64.26 kg
3476.67 kg
3 Dismantling brick wall
outer corriodor columns 34 0.26 0.34 2.450 7.36 m3
4 Dismantling RCC
corridor slab 1 44.40 0.15 3.230 21.51 m3
1 19.02 0.15 3.230 9.22 m3
1 3.00 0.15 3.230 1.45 m3
1 28.35 0.15 3.230 13.74 m3
45.92 m3
5 Dismantling UCR 1 44.40 0.38 0.450 7.59 m3
2 2.07 0.38 0.450 0.71 m3
1 19.02 0.38 0.900 6.50 m3
1 10.02 0.38 0.900 3.43 m3
1 28.35 0.38 0.900 9.70 m3
1 2.07 0.38 0.900 0.71 m3
2 3.00 0.38 0.600 1.37 m3
30.00 m3
6 Dismantling PCC 1 44.40 2.83 0.100 12.57 m3
1 19.02 2.33 0.100 4.43 m3
1 28.35 2.33 0.100 6.61 m3
1 3.00 2.33 0.100 0.70 m3
24.30 m3
7 Removing soling 1 44.40 2.83 0.230 28.90 m3
1 19.02 2.33 0.230 10.19 m3
1 28.35 2.33 0.230 15.19 m3
1 3.00 2.33 0.230 1.61 m3
55.89 m3
8 Disposing debrises
Brickwall 7.36 m3
RCC 45.92 m3
PCC 24.30 m3
77.58 m3
b Recovery
1 Structural steel work
As per item no.2-dismantling work 3476.67 kg
2 Reinforcement
Approximate qty of steel consider 70 kg/m3 1 45.92 70.00 3214.40 kg
Toilet block
a Dismantling work
1 Removing doors and windows
doors 8 8 Nos
windows 9 9 Nos
17 Nos
2 Dismantling brick wall 2 7.31 0.23 2.500 8.41 m3
1 5.18 0.23 2.500 2.98 m3
4 1.20 0.15 2.100 1.51 m3
1 6.36 0.15 2.100 2.00 m3
1 3.00 0.15 2.500 1.13 m3
1 1.50 0.15 2.500 0.56 m3
16.59 m3
3 Removing wash hand basin/urinal 6 6 Nos
4 Removing G.I pipe line 1 12.00 12.00 Rmt
5 Dismantling RCC 1 7.31 5.18 0.150 5.68 m3
5.68 m3
6 Dismantling UCR 1 5.18 0.38 2.500 4.92 m3
1 3.98 0.38 2.500 3.78 m3
for foundation 2 5.18 0.38 0.600 2.36 m3
2 7.31 0.38 0.600 3.33 m3
14.40 m3
7 Dismantling PCC
floor 1 5.18 7.31 0.100 3.79 m3
3.79 m3
8 Removing soling
floor 1 5.18 7.31 0.230 8.71 m3
8.71 m3
9 Disposing debrises
Brickwall 16.59 m3
RCC 5.68 m3
PCC 3.79 m3
26.06 m3
b Recovery
1 Aluminium
Ventilators 8 3.00 0.850 20.40 kg
louvered 16 0.100 1.60 kg
22.00 kg
2 Reinforcement
Approximate qty of steel consider 70 kg/m3 1 5.68 70.00 397.60 kg
3 Plywood, flush door kg/m2orm3
FRP door 8 0.75 2.10 8.00 100.80 kg
4 G.I pipe line 1 12.00 1.930 23.16 kg
Store room
A Dismantling work
1 Removing doors and windows
doors 1 1 Nos
windows 10 10 Nos
11 Nos
2 Dismantling brick wall 2 8.30 0.4 3.350 22.24 m3
2 4.55 0.4 3.350 12.19 m3
1 5.35 0.4 0.950 2.03 m3
36.47 m3
for foundation 2 8.30 0.40 0.600 3.98 m3
2 4.55 0.40 0.600 2.18 m3
6.17 m3
3 Dismantling RCC 5 1.20 0.6 0.100 0.36 m3
3 Dismantling PCC
floor 1 7.50 4.50 0.100 3.38 m3
1 8.30 1.20 0.100 1.00 m3
4.37 m3
4 Removing soling
floor 1 7.50 4.50 0.350 11.81 m3
1 8.30 1.20 0.600 5.98 m3
17.79 m3
5 Disposing debrises
Brickwall 42.64 m3
RCC 0.36 m3
PCC 4.37 m3
17.79 m3
65.16 m3
B Recovery
2 Reinforcement
Approximate qty of steel consider 70 kg/m3 1 0.36 70.00 25.20 kg
3 MS DOOR kg/m2orm3
angle 25*25*3 1 13.30 1.10 14.63 kg
Plate 1 1.50 2.20 0.02 51.80 kg
66.43
4 Structural steel 1 12.00 1.930 23.16 kg
ISMC 75 6 8.50 6.800 346.80 kg
MS Angle 50X50X5 12 2.96 3.800 134.98 kg
MS pipe 65 dia 4 3.65 5.840 85.26 kg
2 8.50 5.840 99.28 kg
4 1.30 5.840 30.37 kg
MS Angle 40X40X4 40 0.60 2.400 57.60 kg
20 1.20 2.400 57.60 kg
811.89 kg
24 Exposing 8.00 m2
25 P/A Bond coat 8.00 kg
26 P/A PMM 1 8.00 0.02 2275.000 364.00 kg
27 P/A Internal plaster
Removing plaster 8.00 m2
wall 1 0.90 1.40 1.26 m2
2 0.30 2.10 1.26 m2
1 0.30 1.10 0.33 m2
10.85 m2
Say 11.00 m2
28 P/A Birla putty 11.00 m2
29 P/A Sand face plaster 1 0.90 1.40 1.26 m2
2 0.30 2.10 1.26 m2
1 0.30 1.10 0.33 m2
2.85 m2
Say 3.00 m2
30 P/F mosquito mesh 2 0.60 1.40 1.68 m2
Say 2.00 m2
31 P/A Primer
for G1/4 2 9.00 3.10 55.80 m2
1 4.50 3.10 13.95 m2
ceiling 1 7.00 7.00 49.00 m2
room no.110A 2 4.50 3.90 35.10 m2
2 3.00 3.90 23.40 m2
1 3.50 4.50 15.75 m2
1 5.00 2.50 12.50 m2
205.50 m2
Say 206.00 m2
32 P/A Plastic paint
for G1/4 2 9.00 3.10 55.80 m2
1 4.50 3.10 13.95 m2
ceiling 1 7.00 7.00 49.00 m2
room no.110A 2 4.50 3.90 35.10 m2
2 3.00 3.90 23.40 m2
1 3.50 4.50 15.75 m2
193.00 m2
33 P/A OBD 1 5.00 2.50 12.50 m2
Say 13.00 m2
34 P/A Exterior primer and paint 3.00 m2
35 P/A Rain coat 1 8.50 9.00 76.50 m2
Say 77.00 m2
100
100
INDIAN INSTITUTE OF TECHNOLOGY
IIT POWAI, MUMBAI- 400 076.
EO/A/WORKSHOP/WKS- /17-18 Estate Office
Name of work : Demolition of Old Estate office, MMD, Printing press, NASA office(TCS shed 2) IIT Bombay.
SR.
Description of work Qty Unit Rate Details of basis Amount
NO.
A) Old Estate office
CPWD 2016,
Removing door shutters and window shutters of any size item
1 and type with fittings (if available) and taking out the 48.00 Nos 261.40 no.15.12.2+35.2 12547.20
same outside IIT Campus etc. complete. 9% cost index-
12% GST
Removing rolling shutters, collpsible gate etc. with fittings
2 5.08 m2 141.00 Rate Analysis 716.28
and taking out the same outside IIT Campus etc. complete.
Removing teak wood or aluminium paneled / partly glazed CPWD 2016,
or veneer / plywood partitions, any type of ceiling item
carefully without damaging the frame or panels and taking
3 out the same outside IIT Campus etc. complete. 425.30 m2 29.35 no.15.57+35.29 12482.56
% cost index-
12% GST
Removing existing cupboard from its position, stacking
4 dismantled material at site and taking away the same 52.93 Rmt 71.00 Rate Analysis 3758.03
outside campus etc. completed as directed.
CPWD 2016,
Removing galvanised iron or asbestos cement sheet roof item
covering and taking out the same outside IIT Campus,
5 scaffolding etc. complete. (5% cost will be deducted from
601.52 m2 84.68 no.15.28.1+35.2 50934.94
Item of work if material taken outside campus) 9% cost index-
12% GST
CPWD 2016,
Dismantling steel work in built up sections in angles, tees, item
flats and channels including all gusset plates, bolts, nuts,
6 cutting rivets, welding etc. including dismembering and
8654.89 kg 2.90 no.15.18+35.29 25091.14
stacking within 50 meters lead etc. completed as directed. % cost index-
12% GST
Dismantling burnt brick masonry (in cement mortar) with CPWD 2016,
plaster including sorting out serviceable bricks and item
lowering down debrises, stacking the same and debris
7 separately upto a distance of 50 meters or spreading the 86.76 m3 1018.00 no.15.7.4+35.29 88321.68
debris as directed. % cost index-
12% GST
Dismantling R.C.C. work including breaking concrete by CPWD 2016,
chiselling, wedging etc., cutting the reinforcement, item
8 17.44 m3 1757.02 no.15.3+35.29% 30642.40
lowering down debrises, stacking the debris upto a cost index-12%
distance of 50 metres or spreading as directed. GST
Pulling down stone masonry in cement mortar with plaster CPWD 2016,
/ pointing without dust nuisance including sorting out the item
9 69.47 m3 1214.83 no.15.9.2+35.29 84394.36
stone chips and debris separately and stacking upto % cost index-
distance of 1000 metres as directed. 12% GST
Dismantling plain cement concrete work including CPWD 2016,
breaking concrete by chiselling, wedging etc., and item
10 45.39 m3 743.07 no.15.2.2+35.29 33727.95
stacking the debris upto a distance of 50 metres or % cost index-
spreading as directed. 12% GST
Removing soling without dust nuisance including sorting
11 out the stone chips and debris separately and stacking upto 79.45 m3 170.00 Rate Analysis 13506.50
distance of 50 metres as directed.
Disposing debris, loose stones, boulders, concrete pieces
broken etc. collected and stacked as directed including
loading in trucks, transporting out of IIT Campus
including obtaining approval from Government/ private CPWD 2016,
land owners for disposing off on to their approved item
12 147.69 m3 145.62 no.15.60+35.29 21506.31
location. The contractor will be solely responsible for
% cost index-
disposing debrises out of campus and the debris are to be 12% GST
removed from site within 72 hours from stacking (30%
voids will be deducted from actual measurement for
debris, loose stones, boulders, concrete pieces).
A Total dismantling amount Rs. 377629.35
RECOVERY
1 structural and Reinforcement Steel 12274.20 kg 20.00 Market Rate 245483.95
2 Aluminum sheets, sections etc. 526.62 kg 100.00 Market Rate 52662.48
3 wood 6105.44 kg 25.00 Market Rate 152636.00
4 Plywood, door shutters 581.21 kg 6.00 Market Rate 3487.26
5 Glass 752.84 kg 6.00 Market Rate 4517.04
B Total recovery amount Rs. 458786.73
Amount to be recover from contractor by IIT Total B-A 81157.38
B Printing press
CPWD 2016,
Removing door shutters and window shutters of any size item
1 and type with fittings (if available) and taking out the 45.00 Nos 261.40 no.15.12.2+35.2 11763.00
same outside IIT Campus etc. complete. 9% cost index-
12% GST
Removing rolling shutters, collpsible gate etc. with fittings
2 2.64 m2 141.00 Rate Analysis 372.24
and taking out the same outside IIT Campus etc. complete.
Removing teak wood or aluminium paneled / partly glazed CPWD 2016,
or veneer / plywood partitions, any type of ceiling item
carefully without damaging the frame or panels and taking
3 out the same outside IIT Campus etc. complete. 506.91 m2 29.35 no.15.57+35.29 14877.81
% cost index-
12% GST
CPWD 2016,
Removing galvanised iron or asbestos cement sheet roof item
covering and taking out the same outside IIT Campus,
4 scaffolding etc. complete. (5% cost will be deducted from
409.60 m2 84.68 no.15.28.1+35.2 34683.72
Item of work if material taken outside campus) 9% cost index-
12% GST
CPWD 2016,
Dismantling steel work in built up sections in angles, tees, item
flats and channels including all gusset plates, bolts, nuts,
5 cutting rivets, welding etc. including dismembering and
6960.88 kg 2.90 no.15.18+35.29 20180.09
stacking within 50 meters lead etc. completed as directed. % cost index-
12% GST
Dismantling burnt brick masonry (in cement mortar) with CPWD 2016,
plaster including sorting out serviceable bricks and item
lowering down debrises, stacking the same and debris
6 separately upto a distance of 50 meters or spreading the 69.33 m3 1018.00 no.15.7.4+35.29 70577.94
debris as directed. % cost index-
12% GST
Dismantling R.C.C. work including breaking concrete by CPWD 2016,
chiselling, wedging etc., cutting the reinforcement, item
7 5.82 m3 1757.02 no.15.3+35.29% 10225.85
lowering down debrises, stacking the debris upto a cost index-12%
distance of 50 metres or spreading as directed. GST
Pulling down stone masonry in cement mortar with plaster CPWD 2016,
/ pointing without dust nuisance including sorting out the item
8 60.26 m3 1214.83 no.15.9.2+35.29 73205.76
stone chips and debris separately and stacking upto % cost index-
distance of 1000 metres as directed. 12% GST
Dismantling plain cement concrete work including CPWD 2016,
breaking concrete by chiselling, wedging etc., and item
9 36.23 m3 743.07 no.15.2.2+35.29 26921.43
stacking the debris upto a distance of 50 metres or % cost index-
spreading as directed. 12% GST
Removing soling without dust nuisance including sorting
10 out the stone chips and debris separately and stacking upto 83.03 m3 170.00 Rate Analysis 14115.10
distance of 50 metres as directed.
Disposing debris, loose stones, boulders, concrete pieces
broken etc. collected and stacked as directed including
loading in trucks, transporting out of IIT Campus
including obtaining approval from Government/ private CPWD 2016,
land owners for disposing off on to their approved item
11 111.38 m3 145.62 no.15.60+35.29 16218.93
location. The contractor will be solely responsible for
% cost index-
disposing debrises out of campus and the debris are to be 12% GST
removed from site within 72 hours from stacking (30%
voids will be deducted from actual measurement for
debris, loose stones, boulders, concrete pieces).
A Total dismantling amount Rs. 293141.85
Recovary
1 structural and Reinforcement Steel 7833.99 kg 20.00 Market Rate 156679.84
2 Aluminum sheets, sections etc. 678.69 kg 100.00 Market Rate 67868.62
3 wood 4871.63 kg 25.00 Market Rate 121790.63
4 Plywood, door shutters 155.43 kg 6.00 Market Rate 932.56
5 Glass 1782.75 kg 6.00 Market Rate 10696.51
B Total recovery amount Rs. 357968.15
Amount to be recover from contractor by IIT Total B-A 64826.30
c NASA and SOUL lab
CPWD 2016,
Removing door shutters and window shutters of any size item
1 and type with fittings (if available) and taking out the 32.00 Nos 261.40 no.15.12.2+35.2 8364.80
same outside IIT Campus etc. complete. 9% cost index-
12% GST
Removing teak wood or aluminium paneled / partly glazed CPWD 2016,
or veneer / plywood partitions, any type of ceiling item
carefully without damaging the frame or panels and taking
2 out the same outside IIT Campus etc. complete. 289.86 m2 29.35 no.15.57+35.29 8507.39
% cost index-
12% GST
Dismantling existing platform and stacking dismantled
3 material at site and taking away the same outside campus 14.91 Rmt 42.00 Rate Analysis 626.22
etc. completed as directed.
CPWD 2016,
Removing galvanised iron or asbestos cement sheet roof item
covering and taking out the same outside IIT Campus,
4 scaffolding etc. complete. (5% cost will be deducted from
239.23 m2 84.68 no.15.28.1+35.2 20257.29
Item of work if material taken outside campus) 9% cost index-
12% GST
CPWD 2016,
Dismantling steel work in built up sections in angles, tees, item
flats and channels including all gusset plates, bolts, nuts,
5 cutting rivets, welding etc. including dismembering and
2904.26 kg 2.90 no.15.18+35.29 8419.66
stacking within 50 meters lead etc. completed as directed. % cost index-
12% GST
Dismantling burnt brick masonry (in cement mortar) with CPWD 2016,
plaster including sorting out serviceable bricks and item
lowering down debrises, stacking the same and debris
6 separately upto a distance of 50 meters or spreading the 48.96 m3 1018.00 no.15.7.4+35.29 49841.28
debris as directed. % cost index-
12% GST
Pulling down stone masonry in cement mortar with plaster CPWD 2016,
/ pointing without dust nuisance including sorting out the item
7 47.42 m3 1214.83 no.15.9.2+35.29 57607.32
stone chips and debris separately and stacking upto % cost index-
distance of 1000 metres as directed. 12% GST
Dismantling plain cement concrete work including CPWD 2016,
breaking concrete by chiselling, wedging etc., and item
8 19.82 m3 743.07 no.15.2.2+35.29 14727.65
stacking the debris upto a distance of 50 metres or % cost index-
spreading as directed. 12% GST
Removing soling without dust nuisance including sorting
9 out the stone chips and debris separately and stacking upto 45.60 m3 170.00 Rate Analysis 7752.00
distance of 50 metres as directed.
Disposing debris, loose stones, boulders, concrete pieces
broken etc. collected and stacked as directed including
loading in trucks, transporting out of IIT Campus
including obtaining approval from Government/ private CPWD 2016,
land owners for disposing off on to their approved item
10 68.78 m3 145.62 no.15.60+35.29 10015.60
location. The contractor will be solely responsible for
% cost index-
disposing debrises out of campus and the debris are to be 12% GST
removed from site within 72 hours from stacking (30%
voids will be deducted from actual measurement for
debris, loose stones, boulders, concrete pieces).
A Total dismantling amount Rs. 186119.21
RECOVERY
1 structural and Reinforcement Steel 4837.92 kg 20.00 Market Rate 96758.44
2 Aluminum sheets, sections etc. 206.89 kg 100.00 Market Rate 20688.90
3 wood 891.94 kg 25.00 Market Rate 22298.44
4 Plywood, door shutters 176.30 kg 6.00 Market Rate 1057.78
5 Glass 1007.76 kg 6.00 Market Rate 6046.55
B Total recovery amount Rs. 146850.11
Amount to be recover from contractor by IIT Total B-A -39269.10
d MMD dept.
CPWD 2016,
Removing door shutters and window shutters of any size item
1 and type with fittings (if available) and taking out the 61.00 Nos 261.40 no.15.12.2+35.2 15945.40
same outside IIT Campus etc. complete. 9% cost index-
12% GST
Removing rolling shutters, collpsible gate etc. with fittings
2 17.33 m2 141.00 Rate Analysis 2443.53
and taking out the same outside IIT Campus etc. complete.
Removing teak wood or aluminium paneled / partly glazed CPWD 2016,
or veneer / plywood partitions, any type of ceiling item
carefully without damaging the frame or panels and taking
3 out the same outside IIT Campus etc. complete. 531.99 m2 29.35 no.15.57+35.29 15613.91
% cost index-
12% GST
CPWD 2016,
Removing galvanised iron or asbestos cement sheet roof item
covering and taking out the same outside IIT Campus,
4 scaffolding etc. complete. (5% cost will be deducted from
573.44 m2 84.68 no.15.28.1+35.2 48557.20
Item of work if material taken outside campus) 9% cost index-
12% GST
CPWD 2016,
Dismantling steel work in built up sections in angles, tees, item
flats and channels including all gusset plates, bolts, nuts,
5 cutting rivets, welding etc. including dismembering and
8698.02 kg 2.90 no.15.18+35.29 25216.18
stacking within 50 meters lead etc. completed as directed. % cost index-
12% GST
Dismantling burnt brick masonry (in cement mortar) with CPWD 2016,
plaster including sorting out serviceable bricks and item
lowering down debrises, stacking the same and debris
6 separately upto a distance of 50 meters or spreading the 52.25 m3 1018.00 no.15.7.4+35.29 53190.50
debris as directed. % cost index-
12% GST
Dismantling R.C.C. work including breaking concrete by CPWD 2016,
chiselling, wedging etc., cutting the reinforcement, item
7 1.68 m3 1757.02 no.15.3+35.29% 2951.79
lowering down debrises, stacking the debris upto a cost index-12%
distance of 50 metres or spreading as directed. GST
Pulling down stone masonry in cement mortar with plaster CPWD 2016,
/ pointing without dust nuisance including sorting out the item
8 92.89 m3 1214.83 no.15.9.2+35.29 112845.72
stone chips and debris separately and stacking upto % cost index-
distance of 1000 metres as directed. 12% GST
Dismantling plain cement concrete work including CPWD 2016,
breaking concrete by chiselling, wedging etc., and item
9 46.70 m3 743.07 no.15.2.2+35.29 34701.37
stacking the debris upto a distance of 50 metres or % cost index-
spreading as directed. 12% GST
Removing soling without dust nuisance including sorting
10 out the stone chips and debris separately and stacking upto 107.42 m3 170.00 Rate Analysis 18261.40
distance of 50 metres as directed.
Disposing debris, loose stones, boulders, concrete pieces
broken etc. collected and stacked as directed including
loading in trucks, transporting out of IIT Campus
including obtaining approval from Government/ private CPWD 2016,
land owners for disposing off on to their approved item
11 101.17 m3 145.62 no.15.60+35.29 14732.17
location. The contractor will be solely responsible for
% cost index-
disposing debrises out of campus and the debris are to be 12% GST
removed from site within 72 hours from stacking (30%
voids will be deducted from actual measurement for
debris, loose stones, boulders, concrete pieces).
A Total dismantling amount Rs. 344459.17
RECOVERY
1 structural and Reinforcement Steel 9830.96 kg 20.00 Market Rate 196619.24
2 Aluminum sheets, sections etc. 10.54 kg 100.00 Market Rate 1054.00
3 wood 8079.48 kg 25.00 Market Rate 201987.00
4 Plywood, door shutters 1569.82 kg 6.00 Market Rate 9418.92
5 Glass 688.35 kg 6.00 Market Rate 4130.10
B Total recovery amount Rs. 413209.26
Amount to be recover from contractor by IIT Total B-A 68750.09