Introduction

to
FPSO & FSO

10/6/2013 1 Introduction to FPSO & FSO


AGENDA:

• Main Ideas

• Conversion Process

• Conversion Key Issues

• Mooring System

• Questions and Answers

12/22/2013 Introduction to FPSO & FSO 2


Main Ideas

12/22/2013 Introduction to FPSO & FSO 3


Definition

FPSO : Floating Production Storage & Offloading


FSO : Floating Storage Offloading
FPU : Floating Production Unit
FLNG : Floating Liquefied Natural Gas
FSRU : Floating Storage and Regasification Unit
FDPSO : Floating Drilling Production Storage
Offloading

12/22/2013 Introduction to FPSO & FSO 4


12/22/2013 Introduction to FPSO & FSO 5
• Fixed Flat forms are economically feasible for installation in depth water up to
400m
• Compliant Tower typically used in water depth ranging from 400m to 550m
• Floating System are economically used in water depth above 550 m

12/22/2013 Introduction to FPSO & FSO 6


12/22/2013 Introduction to FPSO & FSO 7
Floating System that being in operation

12/22/2013 Introduction to FPSO & FSO 8