UTILITY [MERALCO]
436.396 MVAsc
HVSG ms
34.5 kV . 5 kV r
3 4
27.1 A rms 27.2 A rms 0.83
8 %
±
6.55 % THD
R R
10.7 % THD THD
±
Gen1 Gen2
1750 kW 1750 kW
27.1 A rms 27.2 A rms
6.55 % THD T1 10.7 % THD T2
± ±
±
R R R
R
±
ms
Open
s ATS2 Open kV r
V rm 4
ATS1 1
2 k 4.16 kV 4.
4.16 kV 4.1
226.4 A rms 2.78 225.8 A rms 4.55
6.51 % THD % TH 10.69 % THD % TH
D D
Network1
One-Line Diagram - OLV1=>Network1 (Harmonic Analysis) / Normal
ATS1
226.4 A rms
6.51 % THD
MCC-1
ms
4.16 kV kV r
4.12
56.6 A rms 56.6 A rms 56.6 A rms 56.6 A rms
± 6.5 % THD ± 6.5 % THD 6.51 % THD ± 6.5 % THD ±
Open
2.79
±
R R R R R
% TH
D
ATS2
225.8 A rms
10.69 % THD
MCC-2 ms
4.16 kV kV r
4.14
56.6 A rms 56.6 A rms 55.4 A rms 55.4 A rms 21.7 A rms 4.58
10.82 % THD 10.82 % THD 10.81 % THD 10.81 % THD 0.318 % THD % TH
± ± ± ±
±
±
± D
R R R R R R R
250 kVA
BusT3
SST-BP3 SST-BP4 SST-BP5 SST-BP6 0.23 kV
HVSG s
34.5 kV % rm
100
27.1 A rms 27.2 A rms 0.83
±
Gen1 Gen2
1750 kW 1750 kW
R
R
226.4 A rms ±
225.8 A rms
6.51 % THD ±
10.7 % THD
±
R R
±
s
Open
s ATS2 Open 2 % rm
% rm 4
ATS1 .
9 4 4.16 kV 99
4.16 kV 98.
226.4 A rms 2.78 225.8 A rms 4.55
6.51 % THD % TH 10.69 % THD % TH
D D
Network1
One-Line Diagram - OLV1=>Network1 (Harmonic Analysis) / Normal
ATS1
226.4 A rms
6.51 % THD
MCC-1
4.16 kV
ATS2
225.8 A rms
10.69 % THD
MCC-2
4.16 kV
56.6 A rms 56.6 A rms 55.4 A rms 55.4 A rms 21.7 A rms
±
10.82 % THD 10.82 % THD 10.81 % THD ±
10.81 % THD ±
0.318 % THD
± ± ± ±
R R R R R R R
250 kVA
BusT3
SST-BP3 SST-BP4 SST-BP5 SST-BP6 0.23 kV
Project File: D:\JDC_PROJECT\Maynilad Pagcor PS Electrical Audit\Power Study Actual Settings\Maynilad Pagcor_ETAP Study
Output Report: Rcase1
Spectrum
3.0
2.5
2.0
Voltage Spectrum (%)
1.5
1.0
0.5
0
0 500 1000 1500 2000 2500 3000
Frequency (Hz)
ETAP
Project: MAYNILAD PAGCOR PUMP STATION 16.0.0C Date: 05-22-2017
Location: PARANAQUE CITY, METRO MANILA SN: ELECDES-01
Contract: Revision: Base
Engineer: CONRADO BINONDO Study Case: HA Config.: Normal
Project File: D:\JDC_PROJECT\Maynilad Pagcor PS Electrical Audit\Power Study Actual Settings\Maynilad Pagcor_ETAP Study
Output Report: Rcase1
Waveform
100
50
Voltage (%)
0
0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1
-50
-100
Time (Cycle)
Project: MAYNILAD PAGCOR PUMP STATION ETAP Page: 1
16.0.0C
Location: PARANAQUE CITY, METRO MANILA Date: 05-23-2017
Fund. VIHD
ID kV % % Order
Fund. VIHD
ID kV % % Order
Voltage
Bus Distortion
Fund. VTHD
ID kV % %
Indicates buses with THD (Total Harmonic Distortion) exceeding the limit.
Project: MAYNILAD PAGCOR PUMP STATION ETAP Page: 1
16.0.0C
Location: PARANAQUE CITY, METRO MANILA Date: 05-23-2017
Bus10 4.160 98.869 -31.3 0 0 0.402 0.005 MCC-1 -0.402 -0.005 56.5 100.0
Bus11 4.160 99.294 -31.2 0 0 0.402 0.005 MCC-2 -0.402 -0.005 56.2 100.0
* Bus12 4.160 100.000 0.0 0.402 0.281 0 0 Bus13 0.402 0.281 68.1 82.0
Bus13 4.160 99.937 0.0 0 0 0.402 0.281 Bus12 -0.402 -0.281 68.1 82.0
Bus14 4.160 98.873 -31.3 0 0 0.402 0.005 MCC-1 -0.402 -0.005 56.5 100.0
* Bus16 4.160 100.000 0.0 0.402 0.281 0 0 Bus17 0.402 0.281 68.1 82.0
Bus17 4.160 99.927 0.0 0 0 0.402 0.281 Bus16 -0.402 -0.281 68.1 82.0
Bus18 4.160 98.868 -31.3 0 0 0.402 0.005 MCC-1 -0.402 -0.005 56.5 100.0
Bus19 4.160 99.294 -31.2 0 0 0.402 0.005 MCC-2 -0.402 -0.005 56.2 100.0
* Bus20 4.160 100.000 0.0 0.402 0.281 0 0 Bus21 0.402 0.281 68.1 82.0
Bus21 4.160 99.917 0.0 0 0 0.402 0.281 Bus20 -0.402 -0.281 68.1 82.0
Bus22 4.160 98.870 -31.3 0 0 0.402 0.005 MCC-1 -0.402 -0.005 56.5 100.0
* Bus24 4.160 100.000 0.0 0.402 0.281 0 0 Bus25 0.402 0.281 68.1 82.0
Bus25 4.160 99.908 0.0 0 0 0.402 0.281 Bus24 -0.402 -0.281 68.1 82.0
Bus26 4.160 99.924 0.0 0 0 0.394 0.244 Bus27 -0.394 -0.244 64.4 85.0
Project: MAYNILAD PAGCOR PUMP STATION ETAP Page: 2
16.0.0C
Location: PARANAQUE CITY, METRO MANILA Date: 05-23-2017
* Bus27 4.160 100.000 0.0 0.394 0.244 0 0 Bus26 0.394 0.244 64.3 85.0
Bus28 4.160 99.913 0.0 0 0 0.402 0.281 Bus29 -0.402 -0.281 68.1 82.0
* Bus29 4.160 100.000 0.0 0.402 0.281 0 0 Bus28 0.402 0.281 68.1 82.0
* Bus30 4.160 100.000 0.0 0.394 0.244 0 0 Bus31 0.394 0.244 64.3 85.0
Bus31 4.160 99.931 0.0 0 0 0.394 0.244 Bus30 -0.394 -0.244 64.3 85.0
* Bus32 4.160 100.000 0.0 0.402 0.281 0 0 Bus33 0.402 0.281 68.1 82.0
Bus33 4.160 99.906 0.0 0 0 0.402 0.281 Bus32 -0.402 -0.281 68.1 82.0
Bus34 0.230 96.850 -60.1 0 0 0.000 0.053 BusT3 0.000 -0.053 137.5 0.9
Bus35 0.230 96.966 -60.2 0 0 0.000 0.036 BusT3 0.000 -0.036 92.1 0.8
Bus36 4.160 99.294 -31.2 0 0 0.394 0.005 MCC-2 -0.394 -0.005 55.1 100.0
Bus37 4.160 99.294 -31.2 0 0 0.394 0.005 MCC-2 -0.394 -0.005 55.1 100.0
BusT3 0.230 97.197 -60.4 0 0 0.001 0.063 Bus34 0.001 0.053 137.5 1.4
* HVSG 34.500 100.000 0.0 3.221 0.267 0 0 Bus1 1.617 0.056 27.1 99.9
SST-BP3 4.160 100.000 0.0 0.402 0.281 0 0 Bus32 0.402 0.281 68.1 82.0
SST-BP4 4.160 100.000 0.0 0.402 0.281 0 0 Bus29 0.402 0.281 68.1 82.0
SST-BP5 4.160 100.000 0.0 0.394 0.244 0 0 Bus27 0.394 0.244 64.3 85.0
SST-BP6 4.160 100.000 0.0 0.394 0.244 0 0 Bus30 0.394 0.244 64.3 85.0
VFD-BP1 4.160 100.000 0.0 0.402 0.281 0 0 Bus20 0.402 0.281 68.1 82.0
VFD-BP2 4.160 100.000 0.0 0.402 0.281 0 0 Bus24 0.402 0.281 68.1 82.0
VFD-SP1 4.160 100.000 0.0 0.402 0.281 0 0 Bus12 0.402 0.281 68.1 82.0
VFD-SP2 4.160 100.000 0.0 0.402 0.281 0 0 Bus16 0.402 0.281 68.1 82.0
* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it).
# Indicates a bus with a load mismatch of more than 0.1 MVA.
Project: MAYNILAD PAGCOR PUMP STATION ETAP Page: 1
16.0.0C
Location: PARANAQUE CITY, METRO MANILA Date: 05-22-2017
# * ATS2 4.160 99.32 99.42 110.53 4.55 233.87 0.00 0.00 4.55 4.55
Bus1 34.500 100.00 100.00 102.08 0.84 38.65 0.00 0.00 0.84 0.84
# * Bus2 4.160 98.98 99.02 106.33 2.70 131.34 0.00 0.00 2.70 2.70
# * Bus3 4.160 98.95 98.99 106.36 2.73 132.29 0.00 0.00 2.73 2.73
Bus5 34.500 100.00 100.00 102.08 0.84 38.69 0.00 0.00 0.84 0.84
# * Bus6 4.160 99.41 99.50 110.33 4.42 228.19 0.00 0.00 4.42 4.42
# * Bus7 4.160 99.38 99.48 110.39 4.46 229.79 0.00 0.00 4.46 4.46
# * Bus10 4.160 98.87 98.91 106.44 2.79 134.83 0.00 0.00 2.79 2.79
# * Bus11 4.160 99.29 99.40 110.57 4.58 235.19 0.00 0.00 4.58 4.58
Bus12 4.160 100.00 100.00 100.00 0 0.50 0.00 0.00 0.00 0.00
Bus13 4.160 99.94 99.94 99.94 0 0.50 0.00 0.00 0.00 0.00
# * Bus14 4.160 98.87 98.91 106.44 2.79 134.79 0.00 0.00 2.79 2.79
Bus16 4.160 100.00 100.00 100.00 0 0.50 0.00 0.00 0.00 0.00
Bus17 4.160 99.93 99.93 99.93 0 0.50 0.00 0.00 0.00 0.00
# * Bus18 4.160 98.87 98.91 106.44 2.79 134.84 0.00 0.00 2.79 2.79
# * Bus19 4.160 99.29 99.40 110.57 4.58 235.19 0.00 0.00 4.58 4.58
Bus20 4.160 100.00 100.00 100.00 0 0.50 0.00 0.00 0.00 0.00
Bus21 4.160 99.92 99.92 99.92 0 0.50 0.00 0.00 0.00 0.00
# * Bus22 4.160 98.87 98.91 106.44 2.79 134.82 0.00 0.00 2.79 2.79
Bus24 4.160 100.00 100.00 100.00 0 0.50 0.00 0.00 0.00 0.00
Bus25 4.160 99.91 99.91 99.91 0 0.50 0.00 0.00 0.00 0.00
Bus26 4.160 99.92 99.92 99.92 0 0.50 0.00 0.00 0.00 0.00
Bus27 4.160 100.00 100.00 100.00 0 0.50 0.00 0.00 0.00 0.00
Bus28 4.160 99.91 99.91 99.91 0 0.50 0.00 0.00 0.00 0.00
Bus29 4.160 100.00 100.00 100.00 0 0.50 0.00 0.00 0.00 0.00
Bus30 4.160 100.00 100.00 100.00 0 0.50 0.00 0.00 0.00 0.00
Bus31 4.160 99.93 99.93 99.93 0 0.50 0.00 0.00 0.00 0.00
Bus32 4.160 100.00 100.00 100.00 0 0.50 0.00 0.00 0.00 0.00
Bus33 4.160 99.91 99.91 99.91 0 0.50 0.00 0.00 0.00 0.00
# * Bus34 0.230 96.85 96.95 107.65 4.53 230.09 0.00 0.00 4.53 4.53
# * Bus35 0.230 96.97 97.07 107.78 4.53 230.05 0.00 0.00 4.53 4.53
# * Bus36 4.160 99.29 99.40 110.57 4.58 235.18 0.00 0.00 4.58 4.58
# * Bus37 4.160 99.29 99.40 110.57 4.58 235.18 0.00 0.00 4.58 4.58
# * BusT3 0.230 97.20 97.30 108.03 4.53 229.99 0.00 0.00 4.53 4.53
Project: MAYNILAD PAGCOR PUMP STATION ETAP Page: 2
16.0.0C
Location: PARANAQUE CITY, METRO MANILA Date: 05-22-2017
# * MCC-1 4.160 98.89 98.93 106.45 2.79 134.61 0.00 0.00 2.79 2.79
# * MCC-2 4.160 99.31 99.41 110.57 4.58 234.90 0.00 0.00 4.58 4.58
ATS1 Bus3 225.91 226.38 258.95 6.51 181.62 41115.04 41115.04 0.00 0.00 0.00 6.51 6.51
MCC-1 225.91 226.38 258.95 6.51 181.62 41115.04 41115.04 0.00 0.00 0.00 6.51 6.51
ATS2 Bus7 224.56 225.84 271.11 10.69 364.44 82304.40 82304.40 0.00 0.00 0.00 10.69 10.69
MCC-2 224.56 225.84 271.11 10.69 364.44 82304.40 82304.40 0.00 0.00 0.00 10.69 10.69
Bus1 HVSG 27.07 27.13 31.06 6.55 183.09 4967.01 4967.01 0.00 0.00 0.00 6.55 6.55
Bus2 27.07 27.13 31.06 6.55 183.09 4967.01 4967.01 0.00 0.00 0.00 6.55 6.55
Bus2 Bus3 225.90 226.38 259.00 6.51 181.96 41192.74 41192.74 0.00 0.00 0.00 6.51 6.51
Bus1 225.90 226.38 259.00 6.51 181.96 41192.74 41192.74 0.00 0.00 0.00 6.51 6.51
Bus3 Bus2 225.91 226.38 258.98 6.51 181.85 41168.27 41168.27 0.00 0.00 0.00 6.51 6.51
ATS1 225.91 226.38 258.98 6.51 181.85 41168.27 41168.27 0.00 0.00 0.00 6.51 6.51
Bus5 HVSG 27.08 27.23 32.70 10.70 365.01 9939.80 9939.80 0.00 0.00 0.00 10.70 10.70
Bus6 27.08 27.23 32.70 10.70 365.01 9939.80 9939.80 0.00 0.00 0.00 10.70 10.70
Bus6 Bus7 224.56 225.84 271.17 10.70 365.01 82433.44 82433.44 0.00 0.00 0.00 10.70 10.70
Bus5 224.56 225.84 271.17 10.70 365.01 82433.44 82433.44 0.00 0.00 0.00 10.70 10.70
Bus7 Bus6 224.56 225.84 271.15 10.70 364.85 82397.31 82397.31 0.00 0.00 0.00 10.70 10.70
ATS2 224.56 225.84 271.15 10.70 364.85 82397.31 82397.31 0.00 0.00 0.00 10.70 10.70
Bus10 MCC-1 56.47 56.59 64.72 6.50 181.44 10266.75 10266.75 0.00 0.00 0.00 6.50 6.50
Bus11 MCC-2 56.25 56.57 68.03 10.81 368.43 20843.91 20843.91 0.00 0.00 0.00 10.81 10.81
Bus12 Bus13 68.06 68.06 68.06 0 0.50 34.03 34.03 0.00 0.00 0.00 0.00 0.00
Bus13 Bus12 68.07 68.07 68.07 0 0.50 34.03 34.03 0.00 0.00 0.00 0.00 0.00
Bus14 MCC-1 56.47 56.59 64.72 6.50 181.44 10267.88 10267.88 0.00 0.00 0.00 6.50 6.50
Bus16 Bus17 68.07 68.07 68.07 0 0.50 34.03 34.03 0.00 0.00 0.00 0.00 0.00
Bus17 Bus16 68.08 68.08 68.08 0 0.50 34.04 34.04 0.00 0.00 0.00 0.00 0.00
Bus18 MCC-1 56.48 56.60 64.73 6.50 181.44 10269.37 10269.37 0.00 0.00 0.00 6.50 6.50
Bus19 MCC-2 56.24 56.57 68.03 10.81 368.43 20841.95 20841.95 0.00 0.00 0.00 10.81 10.81
Bus20 Bus21 68.08 68.08 68.08 0 0.50 34.04 34.04 0.00 0.00 0.00 0.00 0.00
Bus21 Bus20 68.08 68.08 68.08 0 0.50 34.04 34.04 0.00 0.00 0.00 0.00 0.00
Bus22 MCC-1 56.49 56.61 64.74 6.50 181.44 10270.49 10270.49 0.00 0.00 0.00 6.50 6.50
Bus24 Bus25 68.08 68.08 68.08 0 0.50 34.04 34.04 0.00 0.00 0.00 0.00 0.00
Bus25 Bus24 68.09 68.09 68.09 0 0.50 34.04 34.04 0.00 0.00 0.00 0.00 0.00
Bus26 Bus27 64.35 64.35 64.35 0 0.50 32.18 32.18 0.00 0.00 0.00 0.00 0.00
Bus27 Bus26 64.34 64.34 64.34 0 0.50 32.17 32.17 0.00 0.00 0.00 0.00 0.00
Bus28 Bus29 68.09 68.09 68.09 0 0.50 34.04 34.04 0.00 0.00 0.00 0.00 0.00
Bus29 Bus28 68.08 68.08 68.08 0 0.50 34.04 34.04 0.00 0.00 0.00 0.00 0.00
Bus30 Bus31 64.34 64.34 64.34 0 0.50 32.17 32.17 0.00 0.00 0.00 0.00 0.00
Bus31 Bus30 64.35 64.35 64.35 0 0.50 32.17 32.17 0.00 0.00 0.00 0.00 0.00
Bus32 Bus33 68.08 68.08 68.08 0 0.50 34.04 34.04 0.00 0.00 0.00 0.00 0.00
Bus33 Bus32 68.09 68.09 68.09 0 0.50 34.05 34.05 0.00 0.00 0.00 0.00 0.00
Bus34 BusT3 137.51 137.51 138.40 0.32 11.39 1566.14 1566.14 0.00 0.00 0.00 0.32 0.32
Bus35 BusT3 92.13 92.13 92.73 0.32 11.36 1046.23 1046.23 0.00 0.00 0.00 0.32 0.32
Project: MAYNILAD PAGCOR PUMP STATION ETAP Page: 4
16.0.0C
Location: PARANAQUE CITY, METRO MANILA Date: 05-22-2017
Bus36 MCC-2 55.10 55.42 66.63 10.80 368.09 20398.83 20398.83 0.00 0.00 0.00 10.80 10.80
Bus37 MCC-2 55.09 55.41 66.63 10.80 368.09 20397.08 20397.08 0.00 0.00 0.00 10.80 10.80
BusT3 Bus34 137.51 137.51 138.40 0.32 11.39 1566.14 1566.14 0.00 0.00 0.00 0.32 0.32
Bus35 92.13 92.13 92.73 0.32 11.36 1046.23 1046.23 0.00 0.00 0.00 0.32 0.32
MCC-2 392.86 392.86 395.42 0.32 11.38 4471.98 4471.98 0.00 0.00 0.00 0.32 0.32
HVSG Bus1 27.07 27.13 31.06 6.55 183.09 4967.01 4967.01 0.00 0.00 0.00 6.55 6.55
Bus5 27.08 27.23 32.70 10.70 365.01 9939.80 9939.80 0.00 0.00 0.00 10.70 10.70
MCC-1 ATS1 225.91 226.38 258.94 6.50 181.59 41107.88 41107.88 0.00 0.00 0.00 6.50 6.50
Bus10 56.47 56.59 64.72 6.50 181.59 10275.47 10275.47 0.00 0.00 0.00 6.50 6.50
Bus14 56.47 56.59 64.73 6.50 181.57 10275.02 10275.02 0.00 0.00 0.00 6.50 6.50
Bus18 56.48 56.60 64.74 6.51 181.60 10278.57 10278.57 0.00 0.00 0.00 6.51 6.51
Bus22 56.49 56.61 64.75 6.50 181.59 10278.82 10278.82 0.00 0.00 0.00 6.50 6.50
MCC-2 ATS2 224.56 225.84 271.09 10.69 364.33 82280.60 82280.60 0.00 0.00 0.00 10.69 10.69
Bus11 56.25 56.57 68.04 10.82 368.60 20853.47 20853.47 0.00 0.00 0.00 10.82 10.82
Bus19 56.24 56.57 68.03 10.82 368.60 20851.51 20851.51 0.00 0.00 0.00 10.82 10.82
Bus36 55.10 55.42 66.64 10.81 368.26 20408.38 20408.38 0.00 0.00 0.00 10.81 10.81
Bus37 55.09 55.41 66.63 10.81 368.26 20406.64 20406.64 0.00 0.00 0.00 10.81 10.81
BusT3 21.72 21.72 21.86 0.32 11.38 247.25 247.25 0.00 0.00 0.00 0.32 0.32
Project: MAYNILAD PAGCOR PUMP STATION ETAP Page: 5
16.0.0C
Location: PARANAQUE CITY, METRO MANILA Date: 05-22-2017
Bus Tabulation
Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag.
Hz % Hz % Hz % Hz % Hz % Hz %
5.00 300.00 0.29 7.00 420.00 0.20 11.00 660.00 1.78 13.00 780.00 1.47 17.00 1020.00 0.08 19.00 1140.00 0.06
23.00 1380.00 0.82 25.00 1500.00 0.81 29.00 1740.00 0.06 31.00 1860.00 0.05 35.00 2100.00 0.52 37.00 2220.00 0.50
41.00 2460.00 0.05 43.00 2580.00 0.05 47.00 2820.00 0.44 49.00 2940.00 0.43
Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag.
Hz % Hz % Hz % Hz % Hz % Hz %
5.00 300.00 0.04 7.00 420.00 0.03 11.00 660.00 2.51 13.00 780.00 2.40 17.00 1020.00 0.01 19.00 1140.00 0.01
23.00 1380.00 1.92 25.00 1500.00 1.76 29.00 1740.00 0.01 31.00 1860.00 0.01 35.00 2100.00 0.98 37.00 2220.00 0.80
41.00 2460.00 0.00 43.00 2580.00 0.00 47.00 2820.00 0.40 49.00 2940.00 0.42
Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag.
Hz % Hz % Hz % Hz % Hz % Hz %
5.00 300.00 0.04 7.00 420.00 0.03 11.00 660.00 0.52 13.00 780.00 0.46 17.00 1020.00 0.01 19.00 1140.00 0.01
23.00 1380.00 0.30 25.00 1500.00 0.28 29.00 1740.00 0.01 31.00 1860.00 0.01 35.00 2100.00 0.14 37.00 2220.00 0.12
41.00 2460.00 0.00 43.00 2580.00 0.00 47.00 2820.00 0.07 49.00 2940.00 0.07
Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag.
Hz % Hz % Hz % Hz % Hz % Hz %
5.00 300.00 0.29 7.00 420.00 0.20 11.00 660.00 1.79 13.00 780.00 1.47 17.00 1020.00 0.08 19.00 1140.00 0.06
23.00 1380.00 0.83 25.00 1500.00 0.81 29.00 1740.00 0.06 31.00 1860.00 0.05 35.00 2100.00 0.52 37.00 2220.00 0.50
41.00 2460.00 0.05 43.00 2580.00 0.05 47.00 2820.00 0.44 49.00 2940.00 0.43
Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag.
Hz % Hz % Hz % Hz % Hz % Hz %
5.00 300.00 0.04 7.00 420.00 0.03 11.00 660.00 2.52 13.00 780.00 2.41 17.00 1020.00 0.01 19.00 1140.00 0.01
23.00 1380.00 1.92 25.00 1500.00 1.77 29.00 1740.00 0.01 31.00 1860.00 0.01 35.00 2100.00 0.98 37.00 2220.00 0.80
41.00 2460.00 0.00 43.00 2580.00 0.00 47.00 2820.00 0.40 49.00 2940.00 0.42
Project: MAYNILAD PAGCOR PUMP STATION ETAP Page: 6
16.0.0C
Location: PARANAQUE CITY, METRO MANILA Date: 05-22-2017
Bus Tabulation
Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag.
Hz % Hz % Hz % Hz % Hz % Hz %
5.00 300.00 0.29 7.00 420.00 0.20 11.00 660.00 1.76 13.00 780.00 1.45 17.00 1020.00 0.07 19.00 1140.00 0.06
23.00 1380.00 0.82 25.00 1500.00 0.80 29.00 1740.00 0.06 31.00 1860.00 0.05 35.00 2100.00 0.51 37.00 2220.00 0.50
41.00 2460.00 0.05 43.00 2580.00 0.05 47.00 2820.00 0.44 49.00 2940.00 0.43
Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag.
Hz % Hz % Hz % Hz % Hz % Hz %
5.00 300.00 0.04 7.00 420.00 0.03 11.00 660.00 2.49 13.00 780.00 2.38 17.00 1020.00 0.01 19.00 1140.00 0.01
23.00 1380.00 1.90 25.00 1500.00 1.75 29.00 1740.00 0.01 31.00 1860.00 0.01 35.00 2100.00 0.97 37.00 2220.00 0.80
41.00 2460.00 0.00 43.00 2580.00 0.00 47.00 2820.00 0.40 49.00 2940.00 0.42
Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag.
Hz % Hz % Hz % Hz % Hz % Hz %
5.00 300.00 0.04 7.00 420.00 0.03 11.00 660.00 0.52 13.00 780.00 0.46 17.00 1020.00 0.01 19.00 1140.00 0.01
23.00 1380.00 0.30 25.00 1500.00 0.28 29.00 1740.00 0.01 31.00 1860.00 0.01 35.00 2100.00 0.14 37.00 2220.00 0.12
41.00 2460.00 0.00 43.00 2580.00 0.00 47.00 2820.00 0.07 49.00 2940.00 0.07
Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag.
Hz % Hz % Hz % Hz % Hz % Hz %
5.00 300.00 0.29 7.00 420.00 0.20 11.00 660.00 1.77 13.00 780.00 1.46 17.00 1020.00 0.07 19.00 1140.00 0.06
23.00 1380.00 0.82 25.00 1500.00 0.80 29.00 1740.00 0.06 31.00 1860.00 0.05 35.00 2100.00 0.52 37.00 2220.00 0.50
41.00 2460.00 0.05 43.00 2580.00 0.05 47.00 2820.00 0.44 49.00 2940.00 0.43
Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag. Order Freq. Mag.
Hz % Hz % Hz % Hz % Hz % Hz %
5.00 300.00 0.04 7.00 420.00 0.03 11.00 660.00 2.51 13.00 780.00 2.39 17.00 1020.00 0.01 19.00 1140.00 0.01
23.00 1380.00 1.91 25.00 1500.00 1.75 29.00 1740.00 0.01 31.00 1860.00 0.01 35.00 2100.00 0.97 37.00 2220.00 0.80
41.00 2460.00 0.00 43.00 2580.00 0.00 47.00 2820.00 0.40 49.00 2940.00 0.42
Project: MAYNILAD PAGCOR PUMP STATION ETAP Page: 7
16.0.0C
Location: PARANAQUE CITY, METRO MANILA Date: 05-22-2017