ROOF SLAB AND SECOND W u=1.4 ( 7.5 )+ 1.7 ( 0.425 )=11.

22 KN /m
2
FLOOR SLAB 3¿
¿
Note: t=125mm 11.22 ¿
M u=¿
SLAB 3:
4.8 ¿3
= SLAB 4:
210 ( 2.5 )( 4)
( 0.24 ) (3) ( 3.5 )
L L3 =0.23 KN /m ¿= =0.72 KN / m
3.5
( 0.125 ) (3) ( 2.5 ) (24 )
SLAB 2: DL= =9.0 KN /m
4.8 ¿2 3.5
= W u=1.4 ( 9 ) +1.7 ( 0.72 )=13.82 KN /m
210 ( 3.5 ) ( 4)
L L2=0.32 KN /m 3.5 ¿2
¿
13.82¿
SLAB 1:
M u =¿
4.8 ¿1
=
210 ( 3 )(2.5)
L L1=0.17 KN /m long span 4
= =1.14< 2
short span 3.5
SLAB 4: ; two way slab
4.8 ¿4
=
210 ( 3.5 ) ( 3) ( 0.32 ) ( 4) ( 3.5 )
¿= =1.12 KN / m
L L 4=0.24 KN /m 4
( 24 ) (4 ) ( 3.5 ) (0.125)
DL= =10.5 KN /m
SLAB 3: 4
( 0.23 )( 4 ) (2.5) W u=1.4 ( 10.5 )+ 1.71.12=16.604 KN /m
¿= =0.575 KN /m 2
4 4¿
( 0.125 )( 4 ) ( 2.5 ) (24) ¿
DL= =7.5 KN /m 16.604 ¿
4
M u=¿
W u=1.4 ( 7.5 )+ 1.7 ( 0.575 )=11.48 KN /m
4 ¿2
¿ TEMPERATURE BAR
11.48 ¿ As=kbh ¿ ( 0.0018 ) ( 1000 ) (125 )=225 mm2
M u=¿
Determining if Safe or Unsafe
SLAB 2:
C=T
( 0.32 ) ( 3.5 ) (4) 2
¿= =1.12 KN /m 12¿ ( 9)( 414.5)
4 π
( 0.125 )( 4 ) ( 3.5 ) (24) 0.85 ( 20.7 ) ( a ) ( 1000 )= ¿
DL= =10.5 KN /m 4
4 a=23.98 mm
W u=1.4 ( 10.5 )+ 1.7 ( 1.12 )=16.604 KN / m c=28.21 mm
4 ¿2
¿ 600 (125−28.21)
16.604 ¿ ; use this fs=
(28.21)
M u=¿ fs=1633.25>414.5 ; will yield

SLAB 1: 23.98
M u=( 0.85 ) ( 0.90 ) ( 20.7 ) ( 23.98 ) ( 1000 ) (125− )
( 0.17 )( 2.5 ) (3) 2
¿= =0.425 KN /m
4 M u=35.32 KN ∙ m
( 0.125 )( 2.5 ) (3)(24 )
DL= =7.5 KN /m M u =33.208 KN ∙m
3 actual
M u =35.32 KN ∙ m
theory
Determining if Safe or Unsafe
16 ¿2 (5 )=1005.31 m2
Mu <Mu π
actual theory
As= ¿
∴ safe 4

ROOF BEAM C=T


Slab B 15=( 4−2 ) ( 0.25 )=0.5 0.85 ( 20.7 ) ( a ) ( 200 )=(1005.31)(414.5)
( 0.5+ 4 ) a=118.42 mm
A SLA B = ( 1.75 ) (2 )=7.88 m2 c=139.31 mm
2
15

600 (250−139.31)
fs=
(139.31)
fs=476.74 >414.5 ; will yield

118.42
M u =( 0.85 ) ( 20.7 ) ( 200 ) ( 118.42 ) (250− )
0.32(7.88) 1
2
¿= =0.63 KN /m M u =79.51 KN ∙ m
4 1

( 0.125 ) ( 7.88 ) (24)


DL SLAB= =5.91 KN /m 12¿ 2 ( 2 ) =226.20 m2
4
0.3 ( 0.2 ) (4)(24) π
DL BEAM = =1.44 KN /m As ' = ¿
4 4
DLTOTAL=5.91+1.44=7.35 KN /m
600(139.31−50)
fs ' =
W u=1.4 ( 7.35 )+ 1.7 ( 0.63 )=11.36 KN /m 139.31
'
4 ¿2 f s =384.65< fy
¿
11.36 ¿ C1 +C 1=T
M u=¿ 600 ( c−50 )

As max =ρmax bd ; ρmax =0.75 ρ b


( 0.85 ) ( 20.7 ) ( 0.85 ) ( c )( 200 )+ 226.20 ( c )
=1005.3
c=113.86 mm
0.85 ( 20.7 ) ( 0.85 ) ( 600 ) a=96.78 mm
( 0.75 )
(( 414.5 )( 600+ 414.5 ) ) ( 200 ) (250)
600 ( 113.86−50 )
2 f s' = =336.52
As max =800.23 m 113.86
C=T
0.85 ( 20.7 ) ( a ) ( 200 )=(800.23)(414.5) M u =∅ f s ' A s' (d −d ' )
2

a=94.26 mm M u =( 0.90 ) ( 336.52 )( 226.20 ) (250−50)


2

c=110.89 mm M u =13.70 KN ∙ m
2

600 (250−110.89) M u =13.70+79.51=93.21 KN ∙ m


fs= theory
(110.89)
M u =22.76 KN ∙ m
fs=752.69>414.5 ; will yield actual

a Mu <Mu
actual theory
M u =∅ As max fy (d− ) ∴ safe !
max
2
94.26
M u =( 0.90 ) ( 800.23 ) (414.5)(250− )
max
2 COLUMN (SECOND FLOOR)
M u =20.67 KN ∙ m
max

Pu=71.52 KN
M u=22.72 KN ∙ m
kLu ( 1 ) (3.5)
M u> M u = =33.33
max r 0.3(3.5)
; design as Doubly Reinforcement
kLu 94.26
< 34 ∴ short column M u =( 0.90 ) ( 800.23 ) (414.5)(250− )
r max
2
M u =20.67 KN ∙ m
max

( 0.85 ) ( 20.7 ) ( A g−0.01 A g ) + 0.01 A g ( 414.5)


71.52 x 10 6=0.8(0.70)¿ M u=22.72 KN ∙ m
M u> M u
A g=5922.56 mm2 max

; design as Doubly Reinforcement

h=b= √ 5922.56=76.96 mm (for min. dimension) TIE BEAM


; use 300mm x 300mm dimension
( 0.2 ) ( 0.5 ) ( 4 ) (26)
DL SOIL= =1.28 KN /m
4
( 0.2 ) ( 0.3 ) ( 4 ) (24)
DL BEAM = =1.44 KN / m
4
( 0.15 ) ( 3.5 ) ( 4 ) (24)
DLWALL= =12.6 KN /m
4
DLTOTAL=12.6 +1.44+1.28=15.32 KN /m

COLUMN (GROUND FLOOR) W u=1.4 ( 15.32 )=21.448 KN /m


Pu=71.52+154.68=226.2 KN 4 ¿2
¿
21.448 ¿
kLu ( 1 ) (3.5) M u =¿
= =33.33
r 0.3(3.5)
kLu
< 34 ∴ short column
r

( 0.85 ) ( 20.7 ) ( A g−0.01 A g ) + 0.01 A g ( 414.5)


226.2 x 10 6=0.8(0.70)¿
A g=18731.57 mm2

h=b= √18731.57=136.86 mm (for min. dimension)


; use 300mm x 300mm dimension

BEAM (SECOND FLOOR)


As max =ρmax bd ; ρmax =0.75 ρ b
CRITICAL BEAM
0.85 ( 20.7 ) ( 0.85 ) ( 600 ) BEAM 2:
( 0.75 )
( ( 414.5 )( 600+ 414.5 ) ) ( 200 ) (250)
A=
( 0.5+3 )
2
( 1.25 )=2.188 m2
As max =800.23 m2 0.17 (2.188)
C=T ¿= =0.124 KN /m
3
0.85 ( 20.7 ) ( a ) ( 200 )=(800.23)(414.5) ( 0.125 ) ( 2.188 ) (24)
a=94.26 mm D L SLAB= =2.188 KN /m
3
c=110.89 mm ( 0.3 )( 0.2 ) (3)(24 )
D L BEAM = =1.44 KN /m
3
600 (250−110.89)
fs= D LTOTAL =2.188+1.44=3.63 KN /m
(110.89)
fs=752.69>414.5 ; will yield W u=1.4 ( 3.63 )+ 1.7(0.124)=5.293 KN /m

a BEAM 3:
M u =∅ As max fy (d− )
max
2
1 W u=1.4 ( 6.2525 ) +1.7(0.344)=9.3213 KN / m
A= ( 1.25 )( 2.5 ) =1.5625m2
2
0.17 (1.5625)
¿= =0.10625 KN /m
2.5 BEAM 6:
( 0.125 ) (1.5625 ) (24) 1
D L SLA B = =1.875 KN /m A 1= (1.5)( 2.5)=1.875 m2
2
2.5 2
( 0.3 )( 0.2 ) (2.5)(24 ) 1
D L BEAM = =1.44 KN /m A 2= (2)(2.5)=2.5 m2
2.5 2
2
D LTOTA L =1.875+ 1.44=3.63 KN /m A T =4.375 m
2

W u=1.4 ( 3.315 )+ 1.7(0.10625)=4.822 KN /m 0.17 (1.875) 0.24(2.5)


¿= + =0.3575 KN /m
2.5 2.5
BEAM 1: ( 0.125 ) ( 4.375 ) ( 24)
( 0.5+3 ) D L SLAB= =5.25 KN / m
A= ( 1.25 ) (2)=4.375m2 2.5
2 ( 0.3 )( 0.2 ) (2.5)(24 )
0.17 (4.375) D L BEAM = =1.44 KN /m
¿= =0.248 KN /m 2.5
3 D LTOTAL =5.25+1.44=6.69 KN / m
( 0.125 ) ( 4.375 ) (24)
D L SLAB= =4.375 KN /m W u=1.4 ( 6.69 ) +1.7(0.3575)=9.973 KN /m
3
( 0.3 )( 0.2 ) (2.5)(24 )
D L BEAM = =1.44 KN /m BEAM 7:
2.5
( 0.5+3.5 )
D LTOTAL =4.375+1.44=5.815 KN /m A= ( 1.5 )=3.0 m2
2
W u=1.4 ( 5.815 )+ 1.7 ( 0.248 )=8.5626 KN /m 0.24 (3)
¿= =0.206 KN /m
3.5
BEAM 4: ( 0.125 ) (3)(24)
1 D L SLAB= =2.57 KN /m
A= ( 1.5 )( 2.5 ) (2)=3.75 m
2 3.5
2 ( 0.3 )( 0.2 ) (3.5)(24 )
0.17 (3.75) D L BEAM = =1.44 KN /m
¿= =0.255 KN /m 3.5
2.5 D LTOTAL =2.57+1.44=4.01 KN /m
( 0.125 ) ( 3.75 ) (24)
D L SLAB= =4.5 KN /m W u=1.4 ( 4.01 ) +1.7(0.206)=5.9642 KN /m
2.5
( 0.3 )( 0.2 ) (2.5)(24 )
D L BEAM = =1.44 KN /m BEAM 8:
2.5
D LTOTAL =4.5+1.44=5.94 KN /m ( 0.5+3.5 )
A= ( 1.5 ) (2)=6.0 m2
2
W u=1.4 ( 5.94 ) +1.7( 0.255)=8.7495 KN /m 0.24 (6)
¿= =0.411 KN /m
3.5
BEAM 5: ( 0.125 ) (6)(24 )
( 0.5+3 ) D L SLAB= =5.14 KN / m
A 1= ( 1.25 )=2.1875 m2 3.5
2 ( 0.3 )( 0.2 ) (3.5)(24 )
1 D L BEAM = =1.44 KN /m
A 2= (1.75)(3)=2.625 m
2
3.5
2 D LTOTAL =5.14+1.44=6.58 KN /m
A T =4.8125 m2
W u=1.4 ( 6.58 ) +1.7(0.411)=9.911 KN /m
0.17 (2.1875) 0.24(2.625)
¿= + =0.344 KN /m BEAM 9:
3 3
1
( 0.125 ) ( 4.8125 ) (24 ) A= ( 1.5 )( 3 ) (2)=4.5 m2
D L SLAB= =4.8125 KN /m 2
3 0.24 (4.5)
( 0.3 )( 0.2 ) (3)(24 ) ¿= =0.36 KN /m
D L BEAM = =1.44 KN /m 3.5
3 ( 0.125 ) ( 4.5)(24)
D LTOTAL =4.8125+1.44=6.2525 KN /m D L SLAB= =4.5 KN /m
3
( 0.3 )( 0.2 ) (3)(24 ) ( 0.5+ 4 )
D L BEAM = =1.44 KN /m A= ( 1.25 ) (2)=5.625 m2
3 2
D LTOTAL =4.5+1.44=5.94 KN /m 0.23( 5.625)
¿= =0.323 KN / m
W u=1.4 ( 5.94 ) +1.7( 0.36)=8.928 KN /m 4
( 0.125 ) (5.625)(24)
D L SLAB= =4.22 KN /m
BEAM 10: 4
1 2 ( 0.3 )( 0.2 ) (4)(24)
A= ( 1.5 )( 3 ) =2.25 m D L BEAM = =1.44 KN /m
2 4
0.24 (2.25) D LTOTAL =4.22+1.44=5.66 KN /m
¿= =0.18 KN /m
3 W u=1.4 ( 5.66 ) +1.7(0.323)=8.4731 KN /m
( 0.125 ) (2.25)(24)
D L SLAB= =2.25 KN /m
3 BEAM 14:
( 0.3 )( 0.2 ) (3)(24 ) ( 0.5+ 4 )
D L BEAM = =1.44 KN /m A 1= (1.25 )=2.8125 m2
3 2
D LTOTAL =2.25+1.44=3.69 KN / m ( 0.5+ 4 )
A 1= (1.75 )=3.94 m2
W u=1.4 ( 3.69 )+ 1.7 ( 0.18 )=5.427 KN /m 2
2
A T =6.75 m
BEAM 11:
1 0.23( 2.8125) 0.32(3.94)
A 1= (1.75)(3.5)=3.065m2 ¿= + =0.477 KN /m
2 4 4
( 0.5+3.5 ) ( 0.125 ) ( 6.75 ) (24)
A 2= ( 1.5 )=3.0 m2 D L SLAB= =5.0625 KN /m
2 4
A T =6.0625 m2 ( 0.3 )( 0.2 ) (24 )(4)
D L BEAM = =1.44 KN /m
4
0.32(3.065) 0.24 (3) D LTOTAL =5.0625+1.44=6.5025 KN /m
¿= + =0.486 KN /m
3.5 3.5
W u=1.4 ( 5.0625 )+ 1.7 ( 0.477 )=9.9144 KN /m
( 0.125 ) ( 6.0625 ) (24)
D L SLAB= =5.196 KN /m
3.5 BEAM 15:
( 0.3 )( 0.2 ) (3.5)(24 ) ( 0.5+ 4 )
D L BEAM = =1.44 KN /m A= ( 1.75 ) (2)=7.88 m2
3.5 2
D LTOTAL =5.196+1.44=6.636 KN /m 0.32(7.88)
¿= =0.63 KN /m
W u=1.4 ( 6.636 ) +1.7 ( 0.486 ) =10.1166 KN / m 4
( 0.125 ) (7.88)(24)
D L SLAB= =5.91 KN /m
4
( 0.3 )( 0.2 ) (4)(24)
D L BEAM = =1.44 KN /m
4
BEAM 12:
D LTOTAL =5.91+ 1.44=7.35 KN / m
( 0.5+ 4 )
A= (1.25)=2.8125 m2
2 W u=1.4 ( 7.35 )+ 1.7(0.63)=11.36 KN /m
0.23( 2.8125) ; CRITICAL BEAM
¿= =0.1617 KN /m
4
BEAM 16:
( 0.125 ) (2.8125)(24)
D L SLAB= =2.11 KN /m ( 0.5+ 4 )
4 A= ( 1.75 )=3.94 m2
2
( 0.3 )( 0.2 ) ( 4)(24)
D L BEAM = =1.44 KN / m 0.32(3.92)
4 ¿= =0.3152 KN /m
D LTOTAL =2.11+1.44=3.55 KN / m 4
( 0.125 ) (3.94)(24)
W u=1.4 ( 3.55 )+ 1.7(0.1617)=5.245 KN /m D L SLAB= =2.955 KN /m
4
( 0.3 )( 0.2 ) (4)(24)
BEAM 13: D L BEAM = =1.44 KN /m
4
D LTOTAL =2.955+1.44=4.395 KN /m
W u=1.4 ( 4.395 ) +1.7( 0.3152)=6.69 KN /m
COLUMN 6:
BEAM 17: 6.0327 ( 2.5 ) (2) 8.4731(4)
+
1 2 2
A= ( 1.75 )(3.5)=3.0625 m2
2 Pu=32.028 KN
0.32(3.0625)
¿= =0.28 KN /m
3.5 COLUMN 7:
( 0.125 ) (3.0625)(24) 9.973 ( 2.5 ) (2) 8.4731(4) 8.5626(3)
D L SLAB= =2.625 KN /m + +
3.5 2 2 2
( 0.3 )( 0.2 ) (3.5)(24 ) Pu=54.7226 KN
D L BEAM = =1.44 KN /m
3.5
COLUMN 8:
D LTOTAL =2.625+1.44=4.065 KN /m
8.7495 ( 2.5 ) (2) 8.5626 ( 3 ) (2)
W u=1.4 ( 4.065 ) +1.7 ( 0.28 ) =6.167 KN /m +
2 2
Pu=47.56 KN
BEAM 18:
1 2
A= ( 1.75 )( 2.5)=2.1875 m COLUMN 8= COLUMN 9
2 Pu=47.56 KN
0.23( 2.1875)
¿= =0.201 KN /m
2.5 COLUMN 10:
( 0.125 ) (2.1875)(24) 4.822 (2.5 ) (2) 8.5626 ( 3 )
D L SLAB= =2.625 KN /m +
2.5 2 2
( 0.3 )( 0.2 ) (2.5)(24 ) Pu=24.90 KN
D L BEAM = =1.44 K N /m
2.5
D LTOTAL =2.625+1.44=4.065 KN /m COLUMN 11:
W u=1.4 ( 4.065 ) +1.7 ( 0.201 )=6.0327 KN /m 4.822 (2.5 ) 9.3213(4) 5.9642(3.5)
+ +
2 2 2
CRITICAL COLUMN Pu=30.447 KN

COLUMN 1: COLUMN 12:


B 2+ B 3 B 5+ B 4 +B 8
4.822(2.5) 5.293(3) 9.32132 ( 3 ) (2) 9.911 (3.5) 8.7495(2.5)
+ + +
2 2 2 2 2
Pu=13.967 KN Pu=42.26 KN

COLUMN 2: COLUMN 12= COLUMN 13


5.293 ( 3 ) ( 2) 8.7495 (2.5) Pu=42.26 KN
+
2 2
Pu=26.82 KN COLUMN 14:
B 5+ B6 + B14 + B11
COLUMN 3= COLUMN 2 9.32132 ( 3 ) 9.973(2.5) 9.9144 (4) 10.1166 (3.5)
Pu=22.94 KN + + +
2 2 2 2
Pu=63.98 KN
COLUMN 4:
4.822(2.5) 5.245(4) COLUMN 15:
+
2 2 B 18+ B17 + B14
Pu=16.5175 KN 6.0327 (2.5) 6.167(3.5) 9.9144 (4)
+ +
2 2 2
COLUMN 5:
Pu=38.162 KN
5.245 (4) 6.0327 (2.5)
+
2 2 COLUMN 16:
Pu=18.0309 KN
B 17 (2)+ B15
6.167 (3.5 ) (2) 11.36 ( 4 ) 6.69 (4) 6.167(3.5)
+ +
2 2 2 2
Pu=33.51225 KN Pu=24.172 KN

COLUMN 17: CRITICAL BEAM (SECOND


B 15+ B9 + B11 (2)
11.36 ( 4 ) 8.928(3) 10.1166 (3.5 ) (2)
FLOOR)
+ +
2 2 2 BEAM 1:
Pu=71.52 KN ( 0.5+3 )
; CRITICAL COLUMN A= ( 1.25 ) (2)=4.375m2
2
0.17 (4.375)
COLUMN 18: ¿= =0.248 KN /m
3
B 9 (2)+ B8 (2)
( 0.125 ) ( 4.375 ) ( 24)
8.928 ( 3 ) (2) 9.911 ( 3.5 ) (2) D L SLAB= =4.375 KN /m
+ 3
2 2
( 0.3 )( 0.2 ) (2.5)(24 )
Pu=61.47 KN D L BEAM = =1.44 KN /m
2.5
D LTOTAL =4.375+1.44=5.815 KN /m
COLUMN 18= COLUMN 19
Pu=61.47 KN W u=1.4 ( 5.815 )+ 1.7 ( 0.248 )=8.5626 KN /m

COLUMN 20:
BEAM 2:
B 7 (2)+ B9
( 0.5+3 )
8.928(3) 5.9642 ( 3.5 )( 2) A= ( 1.25 )=2.188 m2
+ 2
2 2 0.17 (2.188)
Pu=34.267 KN ¿= =0.124 KN /m
3
( 0.125 ) ( 2.188 ) (24)
COLUMN 21: D L SLAB= =2.188 KN /m
3
B 7+ B10
( 0.3 )( 0.2 ) (3)(24 )
5.9642(3.5) 5.472(3) D L BEAM = =1.44 KN /m
+ 3
2 2 D LTOTAL =2.188+1.44=3.63 KN /m
Pu=18.65 KN
W u=1.4 ( 3.63 )+ 1.7(0.124)=5.293 KN /m
COLUMN 22:
B 10(2)+ B8 BEAM 3:
9.911 ( 3.5 ) (2) 5.472 ( 3 ) 1 2
+ A= ( 1.25 )( 2.5 ) =1.5625m
2 2 2
Pu=42.90 KN 0.17 (1.5625)
¿= =0.10625 KN / m
2.5
COLUMN 22= COLUMN 23 ( 0.125 ) (1.5625 ) (24)
D L SLA B = =1.875 KN /m
Pu=42.90 KN 2
2.5
( 0.3 )( 0.2 ) (2.5)(24 )
D L BEAM = =1.44 KN /m
2.5
COLUMN 24: D LTOTA L =1.875+ 1.44=3.63 KN /m
B 10+ B16 + B11 2

9.911(3.5) 6.69(4) 10.1166 (3.5) W u=1.4 ( 3.315 )+ 1.7(0.10625)=4.822 KN /m


+ +
2 2 2
Pu=48.43 KN BEAM 4:
1
A= ( 1.5 )( 2.5 ) (2)=3.75 m2
COLUMN 25: 2
B 17+ B16 0.17 (3.75)
¿= =0.255 KN /m
2.5
( 0.125 ) ( 3.75 ) (24) ( 0.3 )( 0.2 ) (3.5)(24 )
D L SLAB= =4.5 KN /m D L BEAM = =1.44 KN /m
2.5 3.5
( 0.3 )( 0.2 ) (2.5)(24 ) D LTOTAL =2.57+1.44=4.01 KN /m
D L BEAM = =1.44 KN /m
2.5 W u=1.4 ( 4.01 ) +1.7(0.206)=5.9642 KN /m
D LTOTAL =4.5+1.44=5.94 KN /m
W u=1.4 ( 5.94 ) +1.7( 0.255)=8.7495 KN /m BEAM 8:
( 0.5+3.5 )
A= ( 1.5 ) (2)=6.0 m2
2
BEAM 5: 0.24 (6)
( 0.5+3 ) ¿= =0.411 KN /m
A 1= ( 1.25 )=2.1875 m2 3.5
2 ( 0.125 ) (6)(24 )
1 D L SLAB= =5.14 KN / m
A 2= (1.75)(3)=2.625 m
2
3.5
2 ( 0.3 )( 0.2 ) (3.5)(24 )
A T =4.8125 m
2 D L BEAM = =1.44 KN /m
3.5
D LTOTAL =5.14+1.44=6.58 KN /m
0.17 (2.1875) 0.24(2.625)
¿= + =0.344 KN /m W u=1.4 ( 6.58 ) +1.7(0.411)=9.911 KN /m
3 3
( 0.125 ) ( 4.8125 ) (24 )
D L SLAB= =4.8125 KN /m BEAM 9:
3
1 2
( 0.3 )( 0.2 ) (3)(24 ) A= ( 1.5 )( 3 ) (2)=4.5 m
D L BEAM = =1.44 KN /m 2
3
0.24 (4.5)
D LTOTAL =4.8125+1.44=6.2525 KN /m ¿= =0.36 KN /m
3.5
W u=1.4 ( 6.2525 ) +1.7(0.344)=9.3213 KN /m ( 0.125 ) ( 4.5)(24)
D L SLAB= =4.5 KN /m
3
BEAM 6: ( 0.3 )( 0.2 ) (3)(24 )
D L BEAM = =1.44 KN /m
1 2 3
A 1= (1.5)( 2.5)=1.875 m D LTOTAL =4.5+1.44=5.94 KN /m
2
1 W u=1.4 ( 5.94 ) +1.7(0.36)=8.928 KN /m
A 1= (2)(2.5)=2.5 m2
2
A T =4.375 m2 BEAM 10:
1 2
A= ( 1.5 )( 3 ) =2.25 m
0.17 (1.875) 0.23(2.5) 2
¿= + =0.3575 KN /m
2.5 2.5 0.24 (2.25)
¿= =0.18 KN /m
( 0.125 ) ( 4.375 ) ( 24) 3
D L SLAB= =5.25 KN /m
2.5 ( 0.125 ) (2.25)(24)
D L SLAB= =2.25 KN /m
( 0.3 )( 0.2 ) (2.5)(24 ) 3
D L BEAM = =1.44 KN /m
2.5 ( 0.3 )( 0.2 ) (3)(24 )
D L BEAM = =1.44 KN /m
( 0.15 )( 3 ) (2.5)(24 ) 3
D LWALL = =10.8 KN / m
2.5 D LTOTAL =2.25+1.44=3.69 KN / m
D LTOTAL =5.25+1.44+10.8=17.49 KN /m
W u=1.4 ( 3.69 )+ 1.7 ( 0.18 )=5.427 KN /m
W u=1.4 ( 17.49 )+ 1.7(0.3575)=25.09 KN /m
BEAM 11:
1
BEAM 7: A 1= (1.75)(3.5)=3.065m2
2
( 0.5+3.5 ) ( 0.5+3.5 )
A= ( 1.5 )=3.0 m2 A 2= ( 1.5 )=3.0 m2
2 2
0.24 (3) 2
¿= =0.206 KN /m A T =6.0625 m
3.5
( 0.125 ) (3)(24) 0.32(3.065) 0.24 (3)
D L SLAB= =2.57 KN /m ¿= + =0.486 KN /m
3.5 3.5 3.5
( 0.125 ) ( 6.0625 ) (24) ( 0.3 )( 0.2 ) (4)(24)
D L SLAB= =5.196 KN /m D L BEAM = =1.44 KN /m
3.5 4
( 0.3 )( 0.2 ) (3.5)(24 ) ( 0.15 )( 3 ) (4)(24 )
D L BEAM = =1.44 KN /m D LWALL = =10.8 KN /m
3.5 4
( 0.15 )( 3 ) (3.5)(24 ) D LTOTAL =5.0625+1.44+10.8=17.3025 KN /m
D LWALL = =10.8 KN / m
3.5 W u=1.4 ( 17.3025 )+ 1.7 ( 0.477 )=25.0344 KN /m
D LTOTAL =5.196+1.44+10.8=17.436 KN /m
W u=1.4 ( 17.436 ) +1.7 ( 0.486 )=25.2366 KN /m BEAM 15:
( 0.5+ 4 )
BEAM 12: A= ( 1.75 ) (2)=7.88 m2
2
( 0.5+ 4 )
A= ( 1.25 )=2.8125 m2 0.32(7.88)
2 ¿= =0.63 KN /m
4
0.23( 2.8125) ( 0.125 ) (7.88)(24)
¿= =0.1617 KN /m
4 D L SLAB= =5.91 KN /m
4
( 0.125 ) (2.8125)(24)
D L SLAB= =2.11 KN /m ( 0.3 )( 0.2 ) (4)(24)
4 D L BEAM = =1.44 KN /m
4
( 0.3 )( 0.2 ) ( 4)(24)
D L BEAM = =1.44 KN / m ( 0.15 )( 3 ) (4)(24 )
4 D LWALL = =10.8 KN /m
4
( 0.15 )( 3 ) ( 4)(24 ) D LTOTAL =5.91+ 1.44+10.8=18.15 KN /m
D LWALL = =10.8 KN /m
4
D LTOTAL =2.11+1.44+10.8=14.35 KN /m W u=1.4 (18.15)+1.7(0.63)=26.481 KN /m
; CRITICAL BEAM
W u=1.4 ( 14.35 )+ 1.7(0.1617)=20.36 KN /m

BEAM 16:
BEAM 13:
( 0.5+ 4 )
( 0.5+ 4 ) A= ( 1.75 ) (2)=3.94 m2
A= ( 1.25 ) (2)=5.625 m2 2
2 0.32(3.94 )
0.23( 5.625) ¿= =0.3152 KN /m
¿= =0.323 KN / m 4
4 ( 0.125 ) (3.94)(24)
( 0.125 ) (5.625)(24) D L SLAB= =2.955 KN /m
D L SLAB= =4.22 KN /m 4
4 ( 0.3 )( 0.2 ) (4)(24)
( 0.3 )( 0.2 ) ( 4)(24) D L BEAM = =1.44 KN /m
D L BEAM = =1.44 KN / m 4
4 ( 0.15 )( 3 ) (4)(24 )
( 0.15 )( 3 ) ( 4)(24 ) D LWALL = =10.8 KN /m
D LWALL = =10.8 KN /m 4
4 D LTOTAL =2.955+1.44+10.8=15.195 KN /m
D LTOTAL =4.22+1.44+10.8=16.46 KN / m
W u=1.4 (15.195)+1.7(0.3152)=21.81 KN /m
W u=1.4 ( 16.46 ) +1.7(0.323)=23.59 KN /m

BEAM 17:
BEAM 14: 1
( 0.5+ 4 ) A= ( 1.75 )( 3.5 ) =3.0625m2
A 1= (1.25 )=2.8125 m2 2
2 0.32(3.0625)
( 0.5+ 4 ) ¿= =0.28 KN / m
A 2= (1.75 )=3.94 m2 3.5
2 ( 0.125 ) (3.0625)(24)
A T =6.75 m2 D L SLAB= =2.625 KN /m
3.5
( 0.3 )( 0.2 ) (3.5)(24 )
0.23( 2.8125) 0.32(3.94) D L BEAM = =1.44 KN /m
¿= + =0.477 KN / m 3.5
4 4 ( 0.15 )( 3 ) (3.5)(24 )
( 0.125 ) (6.75)(24) D LWALL = =10.8 KN /m
D L SLAB= =5.0625 KN /m 3.5
4 D LTOTAL =2.625+1.44+10.8=14.865 KN /m
W u=1.4 (14.865)+1.7(0.28)=21.287 KN /m COLUMN 7:
9.973 ( 2.5 ) (2) 8.4731(4) 8.5626(3)
+ +
BEAM 18: 2 2 2
1 2
Pu=54.7226 KN
A= ( 2.5 )( 1.75 ) =2.1875 m COLUMN 8:
2
0.23 ( 2.1875 ) 8.7495 ( 2.5 ) (2) 8.5626 ( 3 ) (2)
¿= =0.201 KN /m +
2.5 2 2
( 0.125 ) (2.1875)(24) Pu=47.56 KN
D L SLAB= =2.625 KN /m
2.5
( 0.3 )( 0.2 ) (2.5)(24 ) COLUMN 8= COLUMN 9
D L BEAM = =1.44 KN /m Pu=47.56 KN
2.5
( 0.15 )( 2.5 ) (3)(24 )
D LWALL = =10.8 KN / m COLUMN 10:
2.5
4.822 (2.5 ) (2) 8.5626 ( 3 )
D LTOTAL =2.625+1.44+10.8=14.87 KN /m +
2 2
W u=1.4 (14.87)+1.7(0.201)=21.1597 KN /m Pu=24.90 KN

COLUMN 11:
CRITICAL COLUMN 4.822 (2.5 ) 9.3213(4) 5.9642(3.5)
(GROUND FLOOR) 2
+
2
+
2
Pu=30.447 KN
COLUMN 1:
B 2+ B 3 COLUMN 12:
4.822(2.5) 5.293(3) B 5+ B 4 +B 8
+
2 2 9.32132 ( 3 ) (2) 9.911 (3.5) 8.7495(2.5)
Pu=13.967 KN + +
2 2 2
Pu=42.26 KN
COLUMN 2:
5.293 ( 3 ) ( 2) 8.7495 (2.5)
+ COLUMN 12= COLUMN 13
2 2 Pu=42.26 KN
Pu=26.82 KN
COLUMN 14:
COLUMN 3= COLUMN 2
B 14+ B6 + B5 + B11
Pu=22.94 KN
9.3213 ( 3 ) 25.0344( 4) 25.2366( 3.5) 25.09 (2.5)
+ + +
COLUMN 4: 2 2 2 2
B 12+ B2 + B6 Pu=139.58 KN
5.293 (3) 20.36(4 )
+ COLUMN 15:
2 2
Pu=16.5175 KN B 14+ B18 + B17
25.0344 ( 4) 21.1597(2.5) 21.287 (3.5)
+ +
2 2 2
Pu=113.77 KN
COLUMN 5:
5.245 (4) 6.0327 (2.5) COLUMN 16:
+ B 17 (2)+ B15
2 2
Pu=18.0309 KN 21.287 ( 3.5 ) (2) 26.481( 4)
+
2 2
COLUMN 6: Pu=127.47 KN
6.0327 ( 2.5 ) (2) 8.4731(4)
+
2 2 COLUMN 17:
Pu=32.028 KN B 15+ B11 (2)+ B9
26.481(4) 25.2366 ( 3.5 ) (2) 8.928 (3) ( 0.2 ) ( 0.5 ) (3.5 ) (16)
+ + DL SOIL= =1.28 KN /m
2 2 2 3.5
Pu=1154.68 KN ( 0.2 ) ( 0.3 ) ( 3.5 ) (24)
DL BEAM = =1.44 KN /m
3.5
; CRITICAL COLUMN
( 0.15 ) ( 3.5 ) ( 3.5 ) (24)
DLWALL= =12.6 KN /m
COLUMN 18: 3.5
B 9 (2)+ B8 (2) DLTOTAL=1.28+ 1.44+12.6=15.32 KN /m
8.928 ( 3 ) (2) 9.911 ( 3.5 ) (2) W u=1.4 ( 15.32 )=21.448 KN /m
+
2 2
BEAM 9:
Pu=61.47 KN
( 0.2 ) ( 0.5 ) (3.5 ) (16)
DL SOIL= =1.28 KN /m
COLUMN 18= COLUMN 19 3.5
Pu=61.47 KN ( 0.2 ) ( 0.3 ) ( 3.5 ) (24)
DL BEAM = =1.44 KN /m
3.5
COLUMN 20: ( 0.15 ) ( 3.5 ) ( 3.5 ) (24)
DLWALL= =12.6 KN /m
B 7 (2)+ B9 3.5
8.928(3) 5.9642 ( 3.5 )( 2) DLTOTAL=1.28+ 1.44+12.6=15.32 KN /m
+
2 2 W u=1.4 ( 15.32 )=21.448 KN /m
Pu=34.267 KN
BEAM 9= BEAM 15
COLUMN 21:
B 7+ B10
5.9642(3.5) 5.472(3)
+
2 2 CRITICAL COLUMN BELOW
Pu=18.65 KN
TIE BEAM
COLUMN 22: B 11 ( 2 )+ B15 + B9
B 10(2)+ B8 21.448 ( 3.5 ) (2) 21.448(4) 21.448 (3.5)
+ +
9.911 ( 3.5 ) (2) 5.472 ( 3 ) 2 2 2
+ Pu=155.50 KN
2 2
Pu=42.90 KN Pu =155.50+226.2=381.7 KN
T

COLUMN 22= COLUMN 23 COLUMN BELOW TIE BEAM


Pu=42.90 KN Pu=155.50 KN
kLu 1(1)
= =33.33
COLUMN 24: r 0.3(1)
B 16+ B11 +B10
21.81(4) 25.2366 (3.5) 5.472(3) 381 x 103=( 0.8 )( 0.7 ) [ ( 0.85 )( 20.7 ) ( A g −0.1 A g ) +0.01 A g ( 4
+ +
2 2 2 A g=31,608.49 mm
2

Pu=95.99 KN
h=b= √31,608.49=177.79mm
∴ use 300mm x 300mm
COLUMN 25:
300 ¿ =900 m m2
2
B 17+ B16
A ST =0.01¿
21.287 (3.5) 21.82(4 )
+
2 2
Pu=80.87 KN BASED ON NSCP
1.) 48 ( 10 ) =480
2.) 16 ( 16 )=256 ≈ 260
CRITICAL TIE BEAM
3.) Lowest dimension = 300
BEAM 11:
; use S= 260mm
h 1
= ; h=0.167
6 6
0.167 ÷ 0.05=3.34 ≈ say 4 pcs
0.9 ÷ 0.20=4.5≈ say 5 pcs

@A
0.167 ÷ 4=0.04175 ≈ 45 mm
@B
0.167 ÷ 5=0.033 ≈ 35 mm

STIRRUPS ON SECOND FLOOR BEAM


W u=26.481 KN /m
26.481(3.7)
R= =48.99 KN
2

48.99 V u
=
1.85 1.6
V u=42.37 KN
1
V c = √20.7 ( 200 ) ( 250 )=37.91 KN
6
42.37
V S= −37.81=11.94 KN
0.85
∅ V C =0.85 ( 37.91 )=32.22 KN
V u >∅ V C
∴ NEED DESIGN STIRRUPS

2
√ 20.7 ( 200 )( 250 )=151.66
3
V S <151.66
∴ OKAY !

SPACING
1
√ 20.7 ( 200 )( 250 )=75.82
3
V S <75.82
d
; use ∨600 mm(whichever is smaller )
2

250
S= =125 mm
2
10 ¿2 ( 2 )( 100 ) (250)
¿
π
¿
4
S=¿
; USE 125mm FOR MIN. SPACING, 330mm FOR
MAX. SPACING