PRESUPUESTO HASTA LA FECHA 15 DE FEBRERO DEL 2019

METRADO
CATEGORIA ML M2 GLB PRECIO PARCIAL TOTAL
MUROS S/. 2,036.10
EXCAVACION TRAMO A
3.13 S/. 30.00 S/. 93.90
3.13 S/. 30.00 S/. 93.90
3.65 S/. 30.00 S/. 109.50
3.65 S/. 30.00 S/. 109.50
3.8 S/. 30.00 S/. 114.00
2.66 S/. 30.00 S/. 79.80
2.66 S/. 30.00 S/. 79.80
2.66 S/. 30.00 S/. 79.80
2.66 S/. 30.00 S/. 79.80
2.66 S/. 30.00 S/. 79.80
2.66 S/. 30.00 S/. 79.80
TOTAL S/. 999.60
EXCAVACION TRAMO 16
3.2 S/. 30.00 S/. 96.00
3.2 S/. 30.00 S/. 96.00
3.2 S/. 30.00 S/. 96.00
3.2 S/. 30.00 S/. 96.00
4.4 S/. 30.00 S/. 132.00
2.5 S/. 30.00 S/. 75.00
4.53 S/. 30.00 S/. 135.90
5.04 S/. 30.00 S/. 151.20
2.62 S/. 30.00 S/. 78.60
2.66 S/. 30.00 S/. 79.80
S/. 1,036.50
ENCOFRADO Y VACEADO DE VIGA DE ARRASTRE S/. 2,688.20
VIGA DE ARRASTRE TRAMO A
3.13 S/. 40.00 S/. 125.20
3.13 S/. 40.00 S/. 125.20
3.65 S/. 40.00 S/. 146.00
3.65 S/. 40.00 S/. 146.00
3.8 S/. 40.00 S/. 152.00
2.66 S/. 40.00 S/. 106.40
2.66 S/. 40.00 S/. 106.40
2.66 S/. 40.00 S/. 106.40
2.66 S/. 40.00 S/. 106.40
2.66 S/. 40.00 S/. 106.40
2.66 S/. 30.00 S/. 79.80
TOTAL S/. 1,306.20
VIGA DE ARRASTRE TRAMO 16
3.2 S/. 40.00 S/. 128.00
3.2 S/. 40.00 S/. 128.00
3.2 S/. 40.00 S/. 128.00
3.2 S/. 40.00 S/. 128.00
4.4 S/. 40.00 S/. 176.00
2.5 S/. 40.00 S/. 100.00
4.53 S/. 40.00 S/. 181.20
5.04 S/. 40.00 S/. 201.60
2.62 S/. 40.00 S/. 104.80
2.66 S/. 40.00 S/. 106.40
S/. 1,382.00
ENCOFRADO Y VACEADO DE SOBRECIMIENTO S/. 1,036.50
S0BRECIMIENTO TRAMO 16
3.2 S/. 30.00 S/. 96.00
3.2 S/. 30.00 S/. 96.00
3.2 S/. 30.00 S/. 96.00
3.2 S/. 30.00 S/. 96.00
4.4 S/. 30.00 S/. 132.00
2.5 S/. 30.00 S/. 75.00
4.53 S/. 30.00 S/. 135.90
5.04 S/. 30.00 S/. 151.20
2.62 S/. 30.00 S/. 78.60
2.66 S/. 30.00 S/. 79.80
S/. 1,036.50
MAMPOSTERIA S/. 8,070.60
LADRILLO CERAMICO TRAMO A
3.13 3.00 S/. 20.00 S/. 187.80
3.13 3.00 S/. 20.00 S/. 187.80
3.65 3.00 S/. 20.00 S/. 219.00
3.65 3.00 S/. 20.00 S/. 219.00
3.8 3.00 S/. 20.00 S/. 228.00
2.66 3.00 S/. 20.00 S/. 159.60
2.66 3.00 S/. 20.00 S/. 159.60
2.66 3.00 S/. 20.00 S/. 159.60
2.66 3.00 S/. 20.00 S/. 159.60
2.66 3.00 S/. 20.00 S/. 159.60
2.66 3.00 S/. 20.00 S/. 159.60
TOTAL S/. 1,999.20
DEMOLICION DE LADRILLO CERAMICO TRAMO A
3.13 3.00 S/. 20.00 S/. 187.80
3.13 3.00 S/. 20.00 S/. 187.80
3.65 3.00 S/. 20.00 S/. 219.00
3.65 3.00 S/. 20.00 S/. 219.00
3.8 3.00 S/. 20.00 S/. 228.00
2.66 3.00 S/. 20.00 S/. 159.60
2.66 3.00 S/. 20.00 S/. 159.60
2.66 3.00 S/. 20.00 S/. 159.60
2.66 3.00 S/. 20.00 S/. 159.60
2.66 3.00 S/. 20.00 S/. 159.60
2.66 3.00 S/. 20.00 S/. 159.60
TOTAL S/. 1,999.20
LADRILLO ACTAUL TRAMO A
3.13 3.00 S/. 20.00 S/. 187.80
3.13 3.00 S/. 20.00 S/. 187.80
3.65 3.00 S/. 20.00 S/. 219.00
3.65 3.00 S/. 20.00 S/. 219.00
3.8 3.00 S/. 20.00 S/. 228.00
2.66 3.00 S/. 20.00 S/. 159.60
2.66 3.00 S/. 20.00 S/. 159.60
2.66 3.00 S/. 20.00 S/. 159.60
2.66 3.00 S/. 20.00 S/. 159.60
2.66 3.00 S/. 20.00 S/. 159.60
2.66 3.00 S/. 20.00 S/. 159.60
TOTAL S/. 1,999.20
LADRILLO TRAMO 16
3.2 3.00 S/. 20.00 S/. 192.00
3.2 3.00 S/. 20.00 S/. 192.00
3.2 3.00 S/. 20.00 S/. 192.00
3.2 3.00 S/. 20.00 S/. 192.00
4.4 3.00 S/. 20.00 S/. 264.00
2.5 3.00 S/. 20.00 S/. 150.00
4.53 3.00 S/. 20.00 S/. 271.80
5.04 3.00 S/. 20.00 S/. 302.40
2.62 3.00 S/. 20.00 S/. 157.20
2.66 3.00 S/. 20.00 S/. 159.60
TOTAL S/. 2,073.00
EXCAVACION DE COLUMNA S/. 1,040.00
TRAMO A
EJE 1
0.6 0.6 S/. 40.00 S/. 40.00
EJE 2
0.6 0.6 S/. 40.00 S/. 40.00
EJE 3
1.2 1.5 S/. 50.00 S/. 50.00
EJE 4
0 0 S/. 0.00 S/. 0.00
EJE 5
1.2 1.5 S/. 50.00 S/. 50.00
EJE 6
1.2 1.5 S/. 50.00 S/. 50.00
EJE 7
1.2 1.5 S/. 50.00 S/. 50.00
EJE 8
0 0 S/. 0.00 S/. 0.00
EJE 9
0.6 0.6 S/. 40.00 S/. 40.00
EJE 10
0.6 0.6 S/. 40.00 S/. 40.00
EJE 11
1.2 1.5 S/. 50.00 S/. 50.00
EJE 12
0 0 S/. 0.00 S/. 0.00
EJE 13
0.6 0.6 S/. 40.00 S/. 40.00
EJE 14
0.6 0.6 S/. 40.00 S/. 40.00
EJE 15
1.2 1.5 S/. 50.00 S/. 50.00
EJE 16
0 0 S/. 0.00 S/. 0.00
EJE A
0 0 S/. 0.00 S/. 0.00
EJE B
0.6 0.6 S/. 40.00 S/. 40.00
EJE C
1.2 1.5 S/. 50.00 S/. 50.00
EJE D
0 0 S/. 0.00 S/. 0.00
EJE E
0.6 0.6 S/. 40.00 S/. 40.00
EJE F
1.2 1.5 S/. 50.00 S/. 50.00
EJE G
0 0 S/. 0.00 S/. 0.00
EJE H
1.2 1.5 S/. 50.00 S/. 50.00
EJE I
2 1.3 S/. 60.00 S/. 60.00
EJE J
2 1.3 S/. 60.00 S/. 60.00
EJE K
2 1.3 S/. 60.00 S/. 60.00
EJE L
1.2 1.2 S/. 50.00 S/. 50.00
EJE M
0 0 S/. 0.00 S/. 0.00
EJE N
0.6 0.6 S/. 40.00 S/. 40.00

EDIFICO A
EXCAVACION S/. 2,385.30
EJE G
3.15 S/. 30.00 S/. 94.50
EJE H
3.15 S/. 30.00 S/. 94.50
EJE I
3.15 S/. 30.00 S/. 94.50
EJE J
3.15 S/. 30.00 S/. 94.50
EJE K
0 S/. 30.00 S/. 0.00
EJE L
13.57 S/. 30.00 S/. 407.10
EJE 17
12.5 S/. 30.00 S/. 375.00
EJE 18
15.43 S/. 30.00 S/. 462.90
EJE 19
17.76 S/. 30.00 S/. 532.80
EJE 20
7.65 S/. 30.00 S/. 229.50
SOBRECIMIENTO S/. 3,975.50
EJE G
3.15 S/. 50.00 S/. 157.50
EJE H
3.15 S/. 50.00 S/. 157.50
EJE I
3.15 S/. 50.00 S/. 157.50
EJE J
3.15 S/. 50.00 S/. 157.50
EJE K
0 S/. 50.00 S/. 0.00
EJE L
13.57 S/. 50.00 S/. 678.50
EJE 17
12.5 S/. 50.00 S/. 625.00
EJE 18
15.43 S/. 50.00 S/. 771.50
EJE 19
17.76 S/. 50.00 S/. 888.00
EJE 20
7.65 S/. 50.00 S/. 382.50
VIGA DE ARRASTRE S/. 9,541.20
EJE G
3.15 S/. 120.00 S/. 378.00
EJE H
3.15 S/. 120.00 S/. 378.00
EJE I
3.15 S/. 120.00 S/. 378.00
EJE J
3.15 S/. 120.00 S/. 378.00
EJE K
0 S/. 120.00 S/. 0.00
EJE L
13.57 S/. 120.00 S/. 1,628.40
EJE 17
12.5 S/. 120.00 S/. 1,500.00
EJE 18
15.43 S/. 120.00 S/. 1,851.60
EJE 19
17.76 S/. 120.00 S/. 2,131.20
EJE 20
7.65 S/. 120.00 S/. 918.00
FALSO PISO AREA S/. 3,450.40
172.52 S/. 20.00
COLUMNA CUADRADA DEL MODULO A S/. 10,600.00
CUADRADA 19.00 S/. 400.00 S/. 8,100.00
CIRCULAES 4 UNID S/. 450.00 S/. 1,800.00
COLUMNA CHATA 7 S/. 100.00 S/. 700.00

COLUMNA CUADRADA DE CERCO S/. 2,985.80


CERCO 19.00 S/. 120.00 S/. 2,280.00
MODULO B 4.00 S/. 80.00 S/. 320.00
VIGA 25.72 ML S/. 15.00 S/. 385.80
ZANJEO DE ZAPATAS UND S/. 1,710.00
C1 CERCO 19 S/. 40.00 S/. 760.00
Z1 MODULO A 5 S/. 50.00 S/. 250.00
Z2 MODULO A 3 S/. 50.00 S/. 150.00
Z3 MODULO A 7 S/. 50.00 S/. 350.00
Z4 MODULO A 4 S/. 50.00 S/. 200.00

S/. 2,036.10 (MUROS)


S/. 2,688.20 (ENCOFRADO Y VACEADO DE VIGA DE ARRASTRE)
S/. 1,036.50 (ENCOFRADO Y VACEADO DE SOBRECIMIENTO)
S/. 8,070.60 (MAMPOSTERIA)
S/. 1,040.00 (EXCAVACION DE COLUMNA)
S/. 2,385.30 (EXCAVACION)
S/. 3,975.50 (SOBRECIMIENTO)
S/. 9,541.20 (VIGA DE ARRASTRE)
S/. 3,450.40 (FALSO PISO)
S/. 10,600.00 (COLUMNA CUADRADA DEL MODULO A)
S/. 2,985.80 (COLUMNA CUADRADA DE CERCO)
S/. 1,710.00 (ZANJEO DE ZAPATAS)
S/. 49,519.60
320 (DSCTO. DE COLUMNA SIN LLENAR Y PISOS DE BAÑOS)

S/. 49,199.60
S/. 38,084.00 (ADELANTOS AL SR. PANELO)
S/. 11,115.60 (TOTAL A CANCELAR)