Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 799

USULAN HARGA SATUAN UPAH DAN BAHAN TAHUN 2019

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


KABUPATEN KARANGANYAR

Wilayah 1 : Kecamatan Karanganyar, Tasikmadu, Jaten, Colomadu, Kebakkramat, Gondangrejo


Wilayah 2 : Kecamatan Jumapolo, Jumantono, Jatipuro, Matesih, Karangpandan, Mojogendang, Kerjo, Ng
Wilayah 3 : Kecamatan Jenawi, Jatioso, Tawangmangu

I. HARGA UPAH

Rasionalisasi
HARGA BUPATI
NO. URAIAN TENAGA SATUAN DPUPR
2019
Wilayah 1
1 2 3 4 5

1 Ass. Driller OH 130,000.00 105,000.00


2 Buruh semi terlatih OH 85,000.00 69,000.00
3 Buruh tak terlatih/Pekerja OH 80,000.00 65,000.00
4 Buruh terlatih OH 95,000.00 77,000.00
5 Crew Drilling OH 87,000.00 70,000.00
6 Driller OH 185,000.00 150,000.00
7 Geologis OH 230,000.00 186,000.00
8 Kepala tukang batu OH 110,000.00 89,000.00
9 Kepala tukang besi OH 110,000.00 89,000.00
10 Kepala tukang cat OH 110,000.00 89,000.00
11 Kepala tukang gali OH 110,000.00 89,000.00
12 Kepala tukang kayu OH 110,000.00 89,000.00
13 Koordinator logging OH 225,000.00 182,000.00
14 Mandor OH 100,000.00 81,000.00
15 Mekanik terlatih OH 100,000.00 81,000.00
16 Masinis/operator OH 100,000.00 81,000.00
17 Mekanik welder OH 95,000.00 77,000.00
18 Operator pompa OH 105,000.00 85,000.00
19 Operator semi terlatih/stoker OH 85,000.00 69,000.00
20 Operator terlatih OH 100,000.00 81,000.00
21 Pembantu geologis OH 200,000.00 162,000.00
22 Pembantu masinis/operator OH 85,000.00 69,000.00
23 Pembantu mekanik OH 85,000.00 69,000.00
24 Pembantu sopir OH 80,000.00 65,000.00
25 Penjaga malam OH 80,000.00 65,000.00
26 Sopir OH 95,000.00 77,000.00
27 Tukang batu OH 95,000.00 77,000.00
28 Tukang besi OH 95,000.00 77,000.00
29 Tukang cat OH 95,000.00 77,000.00
30 Tukang gali OH 95,000.00 77,000.00
31 Tukang kayu OH 100,000.00 81,000.00
32 Tukang las OH 95,000.00 77,000.00
33 Tukang listrik OH 95,000.00 77,000.00
34 Tukang masak aspal OH 110,000.00 89,000.00
35 Tukang pipa/pompa OH 100,000.00 81,000.00

II. HARGA BAHAN

Rasionalisasi
HARGA BUPATI
NO. URAIAN TENAGA SATUAN DPUPR
2019
Wilayah 1
1 2 3 4 5

A. BAHAN BANGUNAN
1 Abu batu m³ 233,800.00 190,000.00
2 Air ltr 105.00 85.00
3 Aluminium foil m2 16,800.00 13,600.00
4 Aluminium strip m' 10,800.00 8,700.00
5 Amplas besi/kayu lbr 6,700.00 5,400.00
6 Asbes bubungan gelombang m' 38,200.00 31,000.00
7 Asbes gelombang besar ( 100 x 200 ) lbr 140,300.00 114,000.00
1 2 3 4 5
8 Asbes gelombang kecil ( 100 x 120 ) lbr 133,600.00 108,600.00
9 Aspal curah kg 13,800.00 9,500.00
10 Aspal pen. 60/70 (kemasan drum) kg 15,100.00 12,000.00
11 Atap galvalum tebal 0,3 m² 65,600.00 53,000.00
12 Atap galvalum & laminasi m² 126,900.00 103,000.00
13 Atap galvalum rangka baja ringan m² 360,700.00 293,000.00
14 Atap galvalum rangka hollow m² 333,900.00 271,000.00
15 Atap kerpus onduline 0,5 m 120,300.00 97,000.00
16 Atap onduline lbr 213,700.00 173,000.00
17 Atap multiroof pasir lbr 133,600.00 108,000.00
18 Atap multiroof bubungan m' 40,100.00 32,000.00
19 Atap polycarbonat m² 80,200.00 65,000.00
20 Atap polycarbonat rangka besi tempa m² 601,100.00 488,000.00
21 Atap polycarbonat rangka hollow m² 534,300.00 434,000.00
22 Atap polycarbonat rangka stainleess m² 935,000.00 760,000.00
23 Automatic Water Level unit 2,337,300.00 1,900,000.00
24 Avour stainless bh 93,500.00 76,000.00
25 Baja konstruksi kg 18,200.00 14,700.00
26 Bambu apus 4 m' ljr 13,400.00 10,000.00
27 Bambu ori 4 m' ljr 23,500.00 19,000.00
28 Bataco bj 4,100.00 3,300.00
29 Batu andesit (20x20) m² 233,800.00 190,000.00
30 BATA RINGAN m³ 1,001,700.00 814,000.00
31 Batu apung/kambang kg 14,800.00 12,000.00
32 Batu bata merah bj 1,000.00 800.00
33 Batu berongga ekspos bh 27,500.00 22,000.00
34 Batu blondos m³ 333,900.00 271,000.00
35 Batu candi m² 120,300.00 97,000.00
1 2 3 4 5
36 Batu kali m³ 333,900.00 271,000.00
37 Batu lempeng m² 106,900.00 86,000.00
38 Batu palimanan m² 177,100.00 143,000.00
39 Batu paras m² 133,600.00 108,000.00
40 Batu pecah ½/1 cm / Mesin m³ 347,300.00 220,000.00
41 Batu pecah 1/2 cm / Mesin m³ 347,300.00 220,000.00
42 Batu pecah 2/3 cm (split) / Mesin m³ 347,300.00 220,000.00
43 Batu pecah 3/5 cm / Mesin m³ 347,300.00 220,000.00
44 Batu pecah 2/3 cm m³ 340,600.00 265,000.00
45 Batu pecah 3/5 cm m³ 340,600.00 265,000.00
46 Batu pecah 5/7 cm m³ 338,000.00 263,000.00
47 Batu pecah 10/15 cm m³ 336,700.00 262,000.00
48 Batu pecah 15/20 cm m³ 333,900.00 260,000.00
49 Baut baja kg 40,100.00 32,600.00
50 Besi beton kg 14,800.00 11,500.00
51 Besi Hollow 1,8/3,8 cm t:0,3 m' 6,100.00 4,900.00
52 Besi Hollow 3,8/3,8 cm t:0,3 m' 10,100.00 8,200.00
53 Besi Hollow galvanis 1,8/3,8 cm t:0,3 m' 10,800.00 8,700.00
54 Besi Hollow galvanis 3,8/3,8 cm t:0,3 m' 16,200.00 13,000.00
55 Besi profil siku kg 23,500.00 19,000.00
56 Besi teralis strip plat kg 23,500.00 19,000.00
57 Besi Wire Mesh M 5 (4,5 mm) uk. 2,1 x 5,4 lbr 318,200.00 258,000.00
58 Besi Wire Mesh M 6 (5,2 mm) uk. 2,1 x 5,4 lbr 441,000.00 358,000.00
59 Besi Wire Mesh M 6 (5,5 mm) uk. 2,1 x 5,4 lbr 473,600.00 385,000.00
60 Besi Wire Mesh M 6 (5,6 mm) uk. 2,1 x 5,4 lbr 509,600.00 414,000.00
61 Besi Wire Mesh M 7 (6,5 mm) uk. 2,1 x 5,4 lbr 661,500.00 537,000.00
62 Besi Wire Mesh M 8 (7,2 mm) uk. 2,1 x 5,4 lbr 835,000.00 678,000.00
63 Besi Wire Mesh M 8 (7,5 mm) uk. 2,1 x 5,4 lbr 880,200.00 715,000.00
64 Besi Wire Mesh M 8 (7,6 mm) uk. 2,1 x 5,4 lbr 928,900.00 755,000.00
65 Besi Wire Mesh M 10 (9,5 mm) uk. 2,1 x 5,4 lbr 1,447,600.00 1,176,000.00
66 Besi Wire Mesh M 12 (11,5 mm) uk. 2,1 x 5,4 lbr 2,253,500.00 1,832,000.00
67 Buis beton ½ Ø 20 cm m' 37,500.00 30,000.00
68 Buis beton ½ Ø 30 cm m' 47,500.00 38,000.00
69 Buis beton Ø 20 cm m' 47,500.00 38,000.00
70 Buis beton Ø 30 cm m' 67,600.00 54,000.00
71 Buis beton Ø 40 cm m' 70,900.00 57,000.00
72 Buis beton Ø 50 cm m' 97,600.00 79,000.00
73 Buis beton Ø 60 cm m' 110,900.00 90,000.00
74 Buis beton Ø 80 cm ½ m´ bj 117,600.00 95,000.00
75 Buis beton Ø 100 cm ½ m´ bj 171,000.00 139,000.00
76 Cat besi kg 73,500.00 59,000.00
77 Cat kayu (luar) kg 73,500.00 59,000.00
78 Cat kayu (dalam) kg 73,500.00 59,000.00
79 Cat tembok ( dalam ) kg 33,400.00 27,000.00
80 Cat tembok ( luar ) kg 167,000.00 135,000.00
81 Check valve Ø 1.5" bh 1,669,500.00 1,357,000.00
82 Closet duduk ex. INA/American Standard bh 1,803,100.00 1,465,000.00
83 Closet duduk ex. Toto bh 3,071,900.00 2,497,000.00
84 Closet duduk monoblock bh 1,335,600.00 1,085,000.00
85 Closet jongkok keramik bh 133,600.00 108,000.00
86 Closet jongkok ex. INA/American Standard bh 200,400.00 162,000.00
87 Dempul jadi/Wood Filler kg 26,800.00 21,000.00
88 Down light 4" bh 40,100.00 32,000.00
89 Engsel jendela biasa bh 13,400.00 10,000.00
90 Engsel jendela sedang bh 16,200.00 13,000.00
91 Engsel jendela super bh 20,100.00 16,000.00
92 Engsel pintu biasa bh 13,400.00 10,000.00
93 Engsel pintu sedang bh 20,100.00 16,000.00
94 Engsel pintu super bh 26,800.00 21,000.00
95 Eternit asbes ( 1,00 x 1,00 ) 3 mm lbr 18,800.00 15,000.00
96 Fiberglass (bak air) 0,50 m3 bh 801,400.00 651,000.00
97 Fiberglass (bak air) 1,00 m3 bh 1,335,600.00 1,085,000.00
98 Fitting porselin bh 10,100.00 8,000.00
99 Flang steel Ø 2" bh 86,900.00 70,000.00
100 Floor drain STAINLESS bh 93,500.00 76,000.00
101 Folding Gate tebal 1,20 mm m² 1,602,800.00 1,303,000.00
102 Folding Gate tebal 0,08 mm m² 1,335,600.00 1,085,000.00
103 Folding Gate tebal 0,06 mm m² 1,068,500.00 868,000.00
104 Folding Gate tebal 0,04 mm m² 868,200.00 705,000.00
105 Genting beton standard bh 6,700.00 5,400.00
106 Genting kerpus beton bh 9,500.00 7,700.00
1 2 3 4 5
107 Genteng ex. Mojolaban/Mantili bh 2,600.00 2,100.00
108 Genteng kerpus ex. Mojolaban bh 9,500.00 7,700.00
109 Genteng magas Kebumen bh 3,900.00 3,100.00
110 Genteng morando Kebumen bh 5,500.00 4,400.00
111 Genteng kerpus Kebumen bh 10,800.00 8,700.00
112 Genteng morando Jatiwangi bh 5,500.00 4,400.00
113 Genteng kerpus Jatiwangi bh 10,800.00 8,700.00
114 Genteng glasur Jatiwangi bh 7,000.00 5,600.00
115 Genteng kerpus glasur Jatiwangi bh 16,200.00 13,100.00
116 Genteng glasur Kebumen bh 10,100.00 8,200.00
117 Genteng kerpus glasur Kebumen bh 13,400.00 10,800.00
118 Genteng keramik bh 16,200.00 13,100.00
119 Genteng kerpus keramik bh 21,500.00 17,400.00
120 Glass Block 20x20 bh 26,800.00 21,000.00
121 Glass Block 30x30 bh 40,100.00 32,000.00
122 Granit tile 40 x 40 cm Warna tua m2 350,000.00 284,000.00
123 Granit tile 40 x 40 cm Warna muda m2 326,700.00 265,000.00
124 Granit tile 60 x 60 cm Warna tua m2 390,900.00 317,000.00
125 Granit tile 60 x 60 cm Warna muda m2 158,000.00 128,000.00
126 Granit tile 80 x 80 cm Warna tua m2 477,600.00 388,000.00
127 Granit tile 80 x 80 cm Warna muda m2 293,900.00 238,000.00
128 Granit tile 100 x 100 cm Warna tua m2 734,600.00 597,000.00
129 Granit tile 100 x 100 cm Warna muda m2 587,700.00 477,000.00
130 Granit/ubin 100 x 100 (batu granit) m2 1,175,400.00 955,000.00
131 Gravel Pack Ø 0,5 - 1,5 cm m³ 534,300.00 434,000.00
1 2 3 4 5
132 Grease (paselin) kg 60,200.00 48,000.00
133 Grendel biasa bh 8,100.00 6,500.00
134 Grendel sedang bh 10,800.00 8,700.00
135 Grendel super bh 13,400.00 10,800.00
136 Grosok 2/3 cm m³ 267,200.00 217,000.00
137 Grosok jagung m³ 267,200.00 217,000.00
138 GRC (120 x 240 cm) t: 5 mm lbr 106,900.00 86,000.00
139 Gypsum board (120 x 240 cm) t: 6.5 mm lbr 80,200.00 65,000.00
140 Gypsum board (120 x 240 cm) t: 9 mm lbr 100,200.00 81,000.00
141 Hak angin biasa bh 6,100.00 4,900.00
142 Hak angin sedang bh 11,500.00 9,300.00
143 Hak angin super bh 18,200.00 14,700.00
144 Handle Jendela bh 13,400.00 10,800.00
145 Harplex 3 mm (1,00 x 1,00) lbr 23,500.00 19,000.00
146 HB. 20 ### bh 12,100.00 9,800.00
147 Hospital plint fiber bh 24,500.00 19,000.00
148 Hospital plint keramik bh 53,500.00 43,000.00
149 Ijuk kg 16,800.00 13,000.00
150 Jet sower bh 160,300.00 130,000.00
151 Kabel listrik 1.50 mm m' 6,700.00 5,400.00
152 Kabel listrik 2.50 mm m' 8,100.00 6,500.00
153 Kabel power unit 2,270,600.00 1,846,000.00
154 Kaca aluminium profil m' 333,900.00 271,000.00
155 Kaca aluminium patri m' 1,068,500.00 868,000.00
156 Kaca bening 3 mm m2 106,900.00 86,000.00
157 Kaca bening 5 mm m2 140,300.00 114,000.00
158 Kaca bening 6 cm m2 253,800.00 206,000.00
159 Kaca bening 8 mm m2 320,600.00 260,000.00
160 Kaca es 5 mm m2 133,600.00 108,000.00
161 Kaca framelist 8 mm unit 1,068,500.00 868,000.00
162 Kaca naco/daun bening m2 106,900.00 86,000.00
163 Kaca rayband 5 mm m2 120,300.00 97,000.00
164 Kaca tempered 12 mm + komplit unit 10,684,800.00 8,686,000.00
165 Kanstein beton (0,15x0,4x0,6) bh 40,100.00 32,000.00
166 Karpet biasa m2 66,800.00 54,000.00
167 Karpet tebal m2 113,600.00 92,000.00
168 Kawat bendrat kg 29,500.00 23,000.00
169 Kawat bronjong kg 14,800.00 12,000.00
170 Kawat duri (30 m') roll 601,100.00 488,000.00
171 Kawat D 4 mm kg 22,100.00 17,000.00
172 Kawat las listrik (lastok) kg 33,400.00 27,000.00
173 Kawur/kapur Pasang m³ 300,600.00 244,000.00
174 Kayu bakar kg 1,500.00 1,200.00
175 Kayu begesting m³ 2,003,400.00 1,628,000.00
176 Kayu begesteng steiger/dolken 4 M' bh 16,200.00 13,000.00
177 Kayu dudukan fitting bh 5,500.00 4,400.00
178 Kayu bangkiray Balok m³ 15,359,400.00 12,487,000.00
179 Kayu bangkiray Papan m³ 16,695,000.00 13,573,000.00
180 Kayu jati untuk Konstrusi Jembatan m³ 31,800,200.00 25,853,000.00
181 Kayu jati untuk perquet m² 427,400.00 347,000.00
182 Kayu jati hutan untuk Kusen m³ 29,383,200.00 23,888,000.00
183 Kayu jati hutan untuk Rangka Atap m³ 29,383,200.00 23,888,000.00
184 Kayu jati lokal untuk Kusen m³ 21,369,600.00 17,373,000.00
185 Kayu jati lokal untuk Rangka Atap m³ 20,034,000.00 16,287,000.00
186 Kayu kamper Balok m³ 12,688,200.00 10,315,000.00
187 Kayu kamper Papan m³ 14,023,800.00 11,401,000.00
188 Kayu kruing Balok m³ 9,349,200.00 7,600,000.00
189 Kayu kruing Papan m³ 10,017,000.00 8,143,000.00
190 Kayu list profil m' 10,100.00 8,000.00
191 Kayu meranti 5/7 m³ 8,681,400.00 7,058,000.00
192 Kayu meranti reng 2/3 m³ 6,678,000.00 5,429,000.00
193 Kayu meranti papan 30 cm m³ 9,349,200.00 7,600,000.00
194 Kayu perancah/sengon m³ 2,003,400.00 1,628,000.00
195 Kayu sengon kaso 5/7 m³ 2,337,300.00 1,900,000.00
196 Kayu sengon papan m³ 2,671,200.00 2,171,000.00
197 Kayu sirap jati hutan pak 167,000.00 135,000.00
198 Keramik 20 x 20 m2 66,800.00 54,000.00
199 Keramik 20 x 25 dinding m2 73,500.00 59,000.00
200 Keramik 30 x 30 polos m2 60,200.00 48,000.00
201 Keramik 30 x 30 warna motif m2 69,600.00 56,000.00
202 Keramik 30 x 30 eksterior texture m2 80,200.00 65,000.00
1 2 3 4 5
203 Keramik 30 x 60 dinding m2 117,000.00 95,000.00
204 Keramik 40 x 40 polos m2 73,500.00 59,000.00
205 Keramik 40 x 40 warna motif m2 86,900.00 70,000.00
206 Keramik 40 x 40 eksterior texture m2 100,900.00 82,000.00
207 Keramik 40 x 40 (Platinum) m2 80,200.00 65,000.00
208 Keramik kayu m2 387,400.00 314,000.00
209 Keramik 10 x 40 cm stepnose bh 16,200.00 13,000.00
210 Kerikil sungai di Quary m³ 33,400.00 27,000.00
211 Knie galvanis Ø 2" - 90º dan 45º bh 82,900.00 67,000.00
212 Kran air d 1" biasa bh 22,100.00 17,000.00
213 Kran air d 1" sedang bh 36,800.00 29,000.00
214 Kran air d 1" super bh 73,500.00 59,000.00
215 Kran air d 3/4" biasa bh 26,800.00 21,000.00
216 Kran air d 3/4" sedang bh 34,200.00 27,000.00
217 Kran air d 3/4" super bh 83,600.00 67,000.00
218 Kran air d 1/2" biasa bh 23,500.00 19,000.00
219 Kran air d 1/2" sedang bh 40,100.00 32,000.00
220 Kran air d 1/2" super bh 60,200.00 48,000.00
221 Kran tipe handle Ø 3/4" bh 53,500.00 43,000.00
222 Kusen aluminium coklat 4" m' 126,900.00 103,000.00
223 Kusen aluminium coklat 3" m' 93,500.00 76,000.00
224 Kusen aluminium motif kayu 4" m' 187,000.00 152,000.00
225 Kusen aluminium putih 4" m' 133,600.00 108,000.00
226 Kusen aluminium silver 4" m' 106,900.00 86,000.00
227 Kusen aluminium silver 3" m' 86,900.00 70,000.00
228 Kuwas bh 18,200.00 14,000.00
1 2 3 4 5
229 Lampu SL 18 watt bh 46,800.00 38,000.00
230 Lampu SL 20 watt bh 50,200.00 40,000.00
231 Lampu TL 20 watt komplit bh 66,800.00 54,000.00
232 Lem kayu kg 16,800.00 13,000.00
233 Lem kuning (ex. Aica Aibon) kg 73,500.00 59,000.00
234 Lem kuning putih (ex. Fox) kg 16,200.00 13,000.00
235 Lem wallpaper kg 73,500.00 59,000.00
236 List gypsum profil m 16,200.00 13,000.00
237 Marmer Tulung Agung 30 x 30 cm m2 103,000.00 83,000.00
238 Marmer Tulung Agung 40 x 40 cm m2 125,000.00 101,000.00
239 Marmer Tulung Agung 60 x 60 cm m2 147,000.00 119,000.00
240 Marmer Tulung Agung 80 x 80 cm m² 293,900.00 238,000.00
241 Marmer Tulung Agung 100 x 100 cm m² 367,300.00 298,000.00
242 Marmer ex. import m² 3,672,900.00 2,986,000.00
243 Marmer ex. import Italy m² 1,836,500.00 1,493,000.00
244 MCB 32 amper bh 167,000.00 135,000.00
245 MCB bh 72,200.00 58,000.00
246 MCB Box bh 23,500.00 19,000.00
247 Meni besi kg 33,400.00 27,000.00
248 Meni kayu kg 33,400.00 27,000.00
249 Minyak begesting ltr 9,200.00 7,400.00
250 Minyak bensin non subsidi ltr 12,300.00 10,000.00
251 Minyak pelumas ltr 26,800.00 21,000.00
252 Minyak pertamax ltr 12,300.00 10,500.00
253 Minyak premium ltr 10,000.00 8,100.00
254 Minyak solar non subsidi ltr 14,800.00 12,000.00
255 Minyak cat / Tinner B 20,000.00 16,000.00
256 Multiplex 4 mm lbr 86,900.00 70,000.00
257 Multiplex 6 mm lbr 133,600.00 108,000.00
258 Multiplex 8 mm lbr 147,000.00 119,000.00
259 Multiplex 9 mm lbr 180,400.00 146,000.00
260 Multiplek 12 mm lbr 220,400.00 179,000.00
261 Pagar BRC (ting. 0,9 m x pj. 2,4 m x d. 6 mm ) lbr 257,200.00 209,000.00
262 Paku eternit kg 26,800.00 21,000.00
263 Paku pacing kg 26,800.00 21,000.00
264 Paku pacing bj 900.00 700.00
265 Paku reng kg 20,100.00 16,000.00
266 Paku sekrup kg 30,200.00 24,000.00
267 Paku sekrup bj 300.00 200.00
268 Paku sekrup fisher/dynebolt/ramset bj 6,700.00 5,400.00
269 Paku sekrup onduline bj 1,200.00 900.00
270 Paku triplek 2 cm kg 26,800.00 21,000.00
271 Paku usuk kg 20,100.00 16,000.00
272 Pasang rangka atap baja ringan m2 267,200.00 217,000.00
273 Portland Cement (PC) 40 Kg kg 1,600.00 1,250.00
274 PC putih (40 Kg) kg 3,100.00 2,500.00
275 PC warna (40 Kg) kg 16,500.00 13,000.00
276 Panel control lengkap unit 6,010,200.00 4,886,000.00
277 Pasir beton woro m³ 374,000.00 260,000.00
278 Pasir pasang m³ 333,900.00 260,000.00
279 Pasir sirtu lokal m³ 200,400.00 162,000.00
280 Pasir sirtu woro m³ 293,900.00 228,000.00
281 Pasir tras m³ 167,000.00 125,000.00
282 Pasir urug m³ 187,000.00 142,000.00
283 Paving 6 cm (kotak) m² 93,500.00 76,000.00
284 Paving 6 cm (segi enam) m² 93,500.00 76,000.00
285 Paving 8 cm m² 106,900.00 86,000.00
286 Paving 6 cm K.175 (abu-abu) m² 93,500.00 76,000.00
287 Paving 6 cm K.175 (warna) m² 100,200.00 81,000.00
288 Paving 8 cm K.175 (abu-abu) m² 113,600.00 92,000.00
289 Paving 8 cm K.175 (warna) m² 120,300.00 97,000.00
290 Paving 6 cm K. 225 m² 100,200.00 81,000.00
291 Paving 8 cm K. 225 m² 133,600.00 108,000.00
292 Paving 6 cm K.250 (abu-abu) m² 102,700.00 83,000.00
293 Paving 6 cm K.250 (warna) m² 113,600.00 92,000.00
294 Paving 8 cm K.250 (abu-abu) m² 147,000.00 119,000.00
295 Paving 8 cm K.250 (warna) m² 153,600.00 124,000.00
296 Paving 8 cm K.300 (abu-abu) m² 167,000.00 135,000.00
297 Paving 8 cm K.300 (warna) m² 173,700.00 141,000.00
298 Paving Difabel bh 60,200.00 48,000.00
299 Paving Grass Block m² 147,000.00 119,000.00
1 2 3 4 5
300 Pintu KM/WC sedang bh 734,600.00 597,000.00
301 Pintu PVC biasa bh 300,600.00 244,000.00
302 Pintu aluminium ram m2 467,500.00 380,000.00
303 Pipa Air Besi Ø 1/2 " / 6 m btg 66,800.00 54,000.00
304 Pipa Air Besi Ø 3/4 " / 6 m btg 86,900.00 70,000.00
305 Pipa Air Besi Ø 1 " / 6 m btg 93,500.00 76,000.00
306 Pipa Air Besi Ø 1,25 " / 6 m btg 120,300.00 97,000.00
307 Pipa Air Besi Ø 1,5 " / 6 m btg 167,000.00 135,000.00
308 Pipa Air Besi Ø 2 " / 6 m btg 200,400.00 162,000.00
309 Pipa Air Besi Ø 2,5 " / 6 m btg 360,700.00 293,000.00
310 Pipa Air GI Med. A Ø 1/2 " / 6 m btg 173,700.00 141,000.00
311 Pipa Air GI Med. A Ø 3/4 " / 6 m btg 200,400.00 162,000.00
312 Pipa Air GI Med. A Ø 1 " / 6 m btg 300,600.00 244,000.00
313 Pipa Air GI Med. A Ø 1,25 " / 6 m btg 380,700.00 309,000.00
314 Pipa Air GI Med. A Ø 1,5 " / 6 m btg 601,100.00 488,000.00
315 Pipa Air GI Med. A Ø 2 " / 6 m btg 734,600.00 597,000.00
316 Pipa Air GI Med. A Ø 2,5 " / 6 m btg 868,200.00 705,000.00
317 Pipa galvanis Ø 1,5" / 6 m. t= 2,5 mm btg 601,100.00 488,000.00
318 Pipa galvanis Ø 2 " / 6 m. t= 2,5 mm btg 734,600.00 597,000.00
319 Pipa galvanis Ø 3 " / 6 m. t= 2,5 mm btg 935,000.00 760,000.00
320 Pipa PVC Ø 1/2" / 4 m AW btg 29,500.00 23,000.00
321 Pipa PVC Ø 3/4" / 4 m AW btg 36,200.00 29,000.00
322 Pipa PVC Ø 1" / 4 m AW btg 42,900.00 34,000.00
323 Pipa PVC Ø 1,5" / 4 m AW btg 89,600.00 72,000.00
324 Pipa PVC Ø 2" / 4 m AW btg 256,400.00 208,000.00
325 Pipa PVC Ø 2,5" / 4 m AW btg 183,100.00 148,000.00
1 2 3 4 5
326 Pipa PVC Ø 3" / 4 m AW btg 209,800.00 170,000.00
327 Pipa PVC Ø 4" / 4 m AW btg 376,800.00 306,000.00
328 Pipa PVC Ø 6" / 4 m AW btg 597,100.00 485,000.00
329 Pipa PVC Ø 8" / 4 m AW btg 924,400.00 751,000.00
330 Pipa PVC S. 12.50 Ø 1 1/2" - 6 m btg 169,800.00 138,000.00
331 Pipa PVC S. 12.50 Ø 2" - 6 m btg 189,800.00 154,000.00
332 Pipa PVC S. 16 Ø 2" - 6 m btg 156,400.00 127,000.00
333 Pipa PVC S. 16 Ø 4" - 6 m btg 470,300.00 382,000.00
334 Plamir kg 23,500.00 19,000.00
335 Plint granit 10 x 20 cm m2 16,800.00 13,000.00
336 Plint granit 10 x 30 cm bh 26,800.00 21,000.00
337 Plint granit 10 x 40 cm bh 33,400.00 27,000.00
338 Plint granit 10 x 60 cm bh 40,100.00 32,000.00
339 Plint keramik 8 x 20 cm bh 4,100.00 3,000.00
340 Plint keramik 10 x 20 cm bh 6,100.00 4,000.00
341 Plint keramik 10 x 40 cm bh 6,700.00 5,000.00
342 Plint keramik 10 x 40 cm bh 7,500.00 6,000.00
343 Plint keramik 10 x 60 cm bh 8,700.00 7,000.00
344 Plint teraso bh 8,100.00 6,000.00
345 Plint ubin PC warna 15 x 20 cm bh 5,100.00 4,000.00
346 Politur ltr 93,500.00 76,000.00
347 Politur jadi ltr 106,900.00 86,000.00
348 Pompa Air (listrik) 450 watt ex. Dab bh 734,600.00 597,000.00
349 Pompa Submersible 2 pk, Q = 2 lt, H = 70 m unit 23,506,600.00 19,111,000.00
350 Pompa Submersible 3 pk, Q = 2 lt, H = 70 m unit 36,061,200.00 29,318,000.00
351 Profil aluminium m 9,500.00 7,700.00
352 Ram m 147,000.00 119,000.00
353 Ramset bh 2,000.00 1,600.00
354 Residu/ter ltr 5,500.00 4,400.00
355 Rolling door aluminium m2 567,700.00 461,000.00
356 Roster batu alam bh 47,500.00 38,000.00
357 Roster beton bh 18,200.00 14,000.00
358 Roster kayu jati bh 50,800.00 41,000.00
359 Roster tanah/genting bh 11,500.00 9,000.00
360 Roster keramik uk. 30x30 bh 48,200.00 39,000.00
361 Saklar ganda bh 26,800.00 21,000.00
362 Saklar tunggal bh 20,800.00 16,000.00
363 Sealant tube 82,900.00 67,000.00
364 Seal tape bh 6,700.00 5,000.00
365 Seling pengaman unit 1,469,200.00 1,194,000.00
366 Seng Glmbg.BJLS-0,3 ( 0,9 m x 1,8 m) lbr 100,200.00 81,000.00
367 Seng Glmbg.BJLS-0,3 ( 0,9 m x 2,1 m ) lbr 106,900.00 86,000.00
368 Seng Plat BJLS-0,3 ( 0.9 m x 1,8 m ) lbr 87,600.00 71,000.00
369 Seng Talang Bjls 0.3 lebar 0,60 m´ 40,100.00 32,000.00
370 Seng Talang Bjls 0.3 lebar 0,90 m´ 66,800.00 54,000.00
371 Shower bh 333,900.00 271,000.00
372 Slot biasa ( kuda terbang ) bh 93,500.00 76,000.00
373 Slot kunci pipih biasa bh 153,600.00 124,000.00
374 Slot Kunci Pipih sedang bh 267,200.00 217,000.00
375 Slot Kunci Pipih super bh 273,800.00 222,000.00
376 Stabilizer 5000 Watt bh 4,674,600.00 3,800,000.00
377 Stop kontak bh 20,800.00 16,000.00
378 Stop kran kuningan 3/4" bh 100,200.00 81,000.00
379 Stop kran KUNINGAN tipe handle Ø 1.5" bh 267,200.00 217,000.00
380 Stop kran KUNINGAN tipe handle Ø 2" bh 467,500.00 380,000.00
381 Strorox-100 kg 60,200.00 48,000.00
382 Tanah bentonit kg 7,500.00 6,000.00
383 Tanah cadas m³ 53,500.00 43,000.00
384 Tanah liat m³ 46,800.00 38,000.00
385 Tanah urug pilihan m³ 53,900.00 43,000.00
386 Tandon air 1000 lt (fiber) bh 2,003,400.00 1,628,000.00
387 Tandon air 1000 lt (stainless) bh 5,008,500.00 4,071,000.00
388 Teakwood 4 mm ( 1,20 x 240 ) lbr 147,000.00 119,000.00
389 Teakwood 3 mm ( 1,20 x 2,40 ) lbr 160,300.00 130,000.00
390 Tegel abu-abu 20 x 20 cm m² 29,500.00 23,000.00
391 Tegel abu-abu 30 x 30 cm m² 38,300.00 31,000.00
392 Tegel wafel abu-abu m² 35,300.00 28,000.00
393 Tegel wafel warna m² 42,700.00 34,000.00
394 Tepung gypsum kg 4,800.00 3,900.00
395 Tiang listrik beton C11.350 daN E bh - -
396 Tiang listrik beton C11.350 daN E BC bh - -
1 2 3 4 5
397 Tiang listrik beton C11.200 daN E bh - -
398 Tiang listrik beton C9.200 daN E bh - -
399 Travo 50 KVA bh - -
400 Triplex 2.7 mm (1.2 x 2.4 ) Kruing lbr 80,200.00 65,000.00
401 Triplex 2.7 mm (1.2 x 2.4 ) Sengon lbr 73,500.00 59,000.00
402 Triplex 4 mm (1.2 x 2.4 ) Kruing lbr 93,500.00 76,000.00
403 Triplex 4 mm (1.2 x 2.4 ) Sengon lbr 86,900.00 70,000.00
404 Urinoir bh 2,337,300.00 1,900,000.00
405 Vernis ltr 200,400.00 162,000.00
406 Wallpaper lebar 50 cm m' 66,800.00 54,000.00
407 Wastafel komplit unit 801,400.00 651,000.00
408 Wasbak (bak cuci) stainless unit 534,300.00 434,000.00
409 Woodplank ( 4 M ) LBR 133,600.00 108,000.00

B. BAHAN BOX CULVERT TYPE BINA MARGA


BEBAN Gandar 21 Ton
1 BC 400x400x1000 unit 1,142,000.00 928,000.00
2 BC 500x500x1000 unit 1,469,200.00 1,194,000.00
3 BC 600x600x1000 unit 1,869,900.00 1,520,000.00
4 BC 800x800x1000 unit 3,339,000.00 2,714,000.00
5 BC 1000x1000x1000 unit 4,407,500.00 3,583,000.00
6 BC 1200x1200x1000 unit 6,678,000.00 5,429,000.00
7 BC 1400x1400x1000 unit 8,013,600.00 6,515,000.00
8 BC 1500x1500x1000 unit 11,352,600.00 9,229,000.00
9 BC 1600x1600x1000 unit 12,020,400.00 9,772,000.00
10 BC 1800x1800x1000 unit 13,356,000.00 10,858,000.00
11 BC 2000x2000x1000 unit 16,027,200.00 13,030,000.00
1 2 3 4 5

C. BAHAN PINTU PENGAIRAN


1 Plat daun pintu t: 8 mm m² 2,337,300.00 1,900,000.00
2 Drat ulir Ø 1 ½" m' 2,003,400.00 1,628,000.00
3 Drat ulir Ø 1 ¾" m' 1,024,000.00 832,000.00
4 Drat ulir Ø 2" m' 2,671,200.00 2,171,000.00
5 Siku L 70.70.3 ljr 467,500.00 380,000.00
6 Siku 0,80 SNI m' 144,000.00 117,000.00
7 Anting baja bh 333,900.00 271,000.00
8 Anting baja bh 133,600.00 108,000.00
9 Stang pintu bh 1,335,600.00 1,085,000.00
10 Stang pemutar bh 1,001,700.00 814,000.00
11 Baut anting bh 9,500.00 7,700.00
12 Baut anting Ø ¾" bh 267,200.00 217,200.00
13 Baut penguat anting bh 133,600.00 108,600.00
14 Peluncur stanlis (2,20 x 0,04 x 5 mm ) bh 1,335,600.00 1,085,800.00
15 Siku L ( 9 x 9 x 7 mm ) m' 200,400.00 162,900.00
16 Baja kerangka pintu ( 12 x 5 x 6 mm) ljr 734,600.00 597,200.00
17 Baja C 12 ( 12,8 , 5,2 , 5 mm) ljr 801,400.00 651,500.00
18 Plat block frame 120 x 240 lbr 1,536,000.00 1,248,700.00
19 Siku pengait landasan ( 70 x 70 x 6 mm) bh 467,500.00 380,000.00
20 Besi angkur Ø12 bh 129,700.00 105,400.00
21 Baut bingkai Ø12 bh 4,100.00 3,300.00
22 Mur baut Ø 12 bh 4,100.00 3,300.00
23 Mur kuningan Ø 3 " bh 333,900.00 271,400.00
24 Mur kuningan Ø 2" bh 267,200.00 217,200.00
25 Baut pengait landasan Ø 16 bh 6,700.00 5,400.00
26 Pengait box bh 6,700.00 5,400.00
27 Baja Cu ( 70 x 200 x 70 ) ljr 1,936,700.00 1,574,500.00
28 Plat blok 120 x 240 lbr 1,803,100.00 1,465,900.00
29 Baut pesagen bh 6,700.00 5,400.00
30 Dudukan kuningan bh 2,671,200.00 2,171,700.00
31 Dudukan kuningan bh 667,800.00 542,900.00
32 Gigi kuningan bh 1,803,100.00 1,465,900.00
33 Gigi stang bh 734,600.00 597,200.00
34 Dudukan stang pemutar bh 1,001,700.00 814,300.00
35 As pemutar m' 277,900.00 225,900.00
36 Blok penyangga as bh 1,001,700.00 814,300.00
37 Mur kuningan Ø 3 " bh 333,900.00 271,400.00
38 Mur kuningan Ø 2" bh 267,200.00 217,200.00
39 Gigi nanas bh 1,001,700.00 814,300.00
40 Tutup pengaman gigi bh 667,800.00 542,900.00
41 Druk laker bh 333,900.00 271,400.00
42 Balok kayu kati 10/20 x 120 btg 913,000.00 742,200.00
43 Balok kayu kati 10/20 x 170 btg 1,141,000.00 927,600.00
44 Balok kayu kati 10/20 x 170 btg 1,212,000.00 985,300.00
45 Usuk kayu jati 4/6 x 200 btg 61,000.00 49,500.00
46 Besi UNP 100.50 m 130,000.00 105,600.00
47 Besi strip plat 80 x 8 m 124,000.00 100,800.00
48 Baut baja ø 1/2" x 5" NC btg 9,000.00 7,300.00
49 Baut baja As Draft ø 1" x 6" NC nt 97,000.00 78,800.00
50 Kuningan Peluncur m 980,000.00 796,700.00
51 Cat meni dan Fliinkoot ls 173,000.00 140,600.00
52 Metal Mur bh 768,000.00 624,300.00
53 Mur Kuningan ø 1 3/4" bh 1,344,000.00 1,092,600.00
54 Drug laker 51111 bh 256,000.00 208,100.00
55 As Drajat ø 1 3/4" m 1,024,000.00 832,500.00
56 Balok pemikul UNP 100 m 96,000.00 78,000.00
57 Stang pemutar / Kunci bh 448,000.00 364,200.00
58 Baut baja as drajat 3/4 x 5" bh 72,000.00 58,500.00
59 Baut baja blok mur 5/8 x 3" bh 10,000.00 8,100.00
60 Baut baja frame 5/8 x 3" bh 7,000.00 5,600.00
61 Plat box 15 x 20 cm bh 626,200.00 509,100.00
62 Greese pelumas ls 133,600.00 108,600.00
63 Gembok kunci pengaman bh 100,200.00 81,400.00
64 Plat daun pintu t: 10 mm m² 2,871,600.00 2,334,600.00
65 Stang pintu engkel bh 1,001,700.00 814,300.00
66 Stang pintu doubel bh 1,335,600.00 1,085,800.00
67 Gir piringan ø 35 bh 2,003,400.00 1,628,700.00
68 Gir piringan ø 40 bh 2,671,200.00 2,171,700.00
69 Gir piringan ø 50 bh 3,339,000.00 2,714,600.00
1 2 3 4 5
70 Drat ulir 1 1/2" m' 2,003,400.00 1,628,700.00
71 Drat ulir 2" m' 2,671,200.00 2,171,700.00
72 Drat ulir 3" m' 3,339,000.00 2,714,600.00
73 Wortel mur ø 1 1/2" bh 1,335,600.00 1,085,800.00
74 Wortel mur ø 2" bh 2,003,400.00 1,628,700.00
75 Wortel mur ø 3" bh 3,339,000.00 2,714,600.00
76 Wortel mur ø 4" bh 4,674,600.00 3,800,400.00
77 Gigi nanas kecil bh 1,335,600.00 1,085,800.00
78 Gigi nanas besar bh 2,671,200.00 2,171,700.00
79 As pemutar gigi ø 2" m 2,003,400.00 1,628,700.00
80 Drat ulir ø 4" m 6,010,200.00 4,886,300.00
81 Plat penutup gir bh 1,335,600.00 1,085,800.00
82 Dudukan as pemutar gigi bh 667,800.00 542,900.00
83 Kerangka pintu siku 60 x 60 x 6 unit 467,500.00 380,000.00
84 Kerangka pintu siku 80 x 80 x 8 unit 128,900.00 104,700.00
85 Kerangka pintu siku 90 x 90 x 9 unit 1,402,400.00 1,140,100.00
86 Kerangka pintu siku 70 x 70 x 10 unit 734,600.00 597,200.00
87 Kerangka atas canal U 10 x 10 unit 1,335,600.00 1,085,800.00
88 Kerangka bawah duobel siku unit 667,800.00 542,900.00

Daftar Harga Pintu Sorong Baja


1 B = 0,50 ; H1 = 0,50 ; H2 = 3,00 bh 8,681,400.00 7,058,000.00
2 B = 0,50 ; H1 = 1,00 ; H2 = 3,00 bh 10,304,000.00 8,377,200.00
3 B = 0,60 ; H1 = 0,60 ; H2 = 2,50 bh 9,754,000.00 7,930,000.00
4 B = 0,60 ; H1 = 0,60 ; H2 = 3,50 bh 9,349,200.00 7,600,900.00
5 B = 0,60 ; H1 = 0,80 ; H2 = 1,90 bh 8,576,000.00 6,972,300.00
1 2 3 4 5
6 B = 0,60 ; H1 = 0,70 ; H2 = 2,20 bh 9,280,000.00 7,544,700.00
7 B = 0,70 ; H1 = 0,70 ; H2 = 4,00 bh 11,352,600.00 9,229,700.00
8 B = 0,80 ; H1 = 0,70 ; H2 = 2,00 bh 9,600,000.00 7,804,800.00
9 B = 0,80 ; H1 = 0,80 ; H2 = 4,15 bh 13,056,000.00 10,614,600.00
10 B = 0,80 ; H1 = 0,80 ; H2 = 4,50 bh 12,020,400.00 9,772,600.00
11 B = 0,90 ; H1 = 0,70 ; H2 = 3,00 bh 11,479,000.00 9,332,500.00
12 B = 0,90 ; H1 = 0,90 ; H2 = 4,90 bh 14,656,000.00 11,915,400.00
13 B = 0,90 ; H1 = 0,90 ; H2 = 5,00 bh 14,023,800.00 11,401,400.00
14 B = 1,00 ; H1 = 0,60 ; H2 = 2,30 bh 9,984,000.00 8,117,000.00
15 B = 1,00 ; H1 = 0,60 ; H2 = 2,40 bh 10,234,000.00 8,320,300.00
16 B = 1,00 ; H1 = 1,00 ; H2 = 3,70 bh 12,928,000.00 10,510,500.00

Daftar Haraga Pintu Tarik


1 B = 0,30 ; H1 = 0,30 ; H2 = 1,25 bh 1,669,500.00 1,357,300.00
2 B = 0,35 ; H1 = 0,35 ; H2 = 1,30 bh 2,003,400.00 1,628,700.00
3 B = 0,40 ; H1 = 0,40 ; H2 = 1,35 bh 2,337,300.00 1,900,200.00

Daftar Harga Pintu Ronsel Ganda


1 B = 1,70 ; H1 = 1,50 ; H2 = 6'20 63,662,000.00 51,757,700.00

Daftar Harga Pintu Drat Dobel Daun Besi


1 B = 1,50 ; H1 = 1,50 ; H2 = 3,50 bh 66,780,000.00 54,292,600.00
2 B = 1,75 ; H1 = 1,50 ; H2 = 4,00 bh 73,458,000.00 59,721,900.00
3 B = 2,00 ; H1 = 2,00 ; H2 = 5,00 bh 93,492,000.00 76,009,700.00
4 B = 2,00 ; H1 = 1,50 ; H2 = 6,00 bh 100,170,000.00 81,439,000.00

Daftar Harga Pintu Daun Kayu Drat Dobel -


1 B = 1,00 ; H1 = 1,00 ; H2 = 3,00 bh 80,136,000.00 65,151,200.00
2 B = 1,50 ; H1 = 1,50 ; H2 = 3,50 bh 86,814,000.00 70,580,400.00
3 B = 2,00 ; H1 = 1,50 ; H2 = 4,00 bh 93,492,000.00 76,009,700.00
4 B = 2,00 ; H1 = 2,00 ; H2 = 5,00 bh 106,848,000.00 86,868,200.00

D. HARGA SEWA ALAT BERAT BINA MARGA


Kapasitas Alat -
1 ASPHALT MIXING PLANT 60 T/Jam 9,843,400.00 8,002,700.00
2 ASPHALT FINISHER 10 Ton 482,200.00 392,000.00
3 ASPHALT SPRAYER 850 Liter 172,400.00 140,100.00
4 BULLDOZER 100-150 HP - 805,400.00 654,700.00
5 COMPRESSOR 4000-6500 L\M 5000 CPM/(L/m) 275,200.00 223,700.00
6 CONCRETE MIXER 0.3-0.6 M3 500 Liter 78,900.00 64,100.00
7 CRANE 10-15 TON 15 Ton 609,100.00 495,200.00
8 DUMP TRUCK 3.5 TON 3,5 Ton 418,100.00 339,900.00
9 DUMP TRUCK 10 TON 10 Ton 776,100.00 630,900.00
10 EXCAVATOR 80-140 HP 0,9 M3 638,500.00 519,100.00
11 FLAT BED TRUCK 3-4 M3 10 ton 693,300.00 563,600.00
12 GENERATOR SET 135 KVA 746,700.00 607,000.00
13 MOTOR GRADER >100 HP 10,800 713,300.00 579,900.00
14 TRACK LOADER 75-100 HP 0,8 M3 338,000.00 274,700.00
15 WHEEL LOADER 1.0-1.6 M3 1,5 M3 526,300.00 427,800.00
16 THREE WHEEL ROLLER 6-8 T 8,0 Ton 272,600.00 221,600.00
17 TANDEM ROLLER 6-8 T. 8,1 Ton 450,200.00 366,000.00
18 TIRE ROLLER 8-10 T. 9 Ton 499,600.00 406,100.00
19 VIBRATORY ROLLER 5-8 T. 7,1 Ton 412,800.00 335,600.00
20 CONCRETE VIBRATOR 25- 53,500.00 43,400.00
21 STONE CRUSHER T/Jam 1,231,600.00 1,001,300.00
22 WATER PUMP 70-100 mm - 58,900.00 47,800.00
23 WATER TANKER 3000-4500 L. 4000 Liter 221,800.00 180,300.00
24 PEDESTRIAN ROLLER 835 Ton 132,300.00 107,500.00
25 TAMPER 121 Ton 53,500.00 43,400.00
26 JACK HAMMER 1,330 68,200.00 55,400.00
27 FULVI MIXER 2,005 1,433,200.00 1,165,200.00
28 CONCRETE PUMP 8 M3 460,800.00 374,600.00
29 TRAILER 20 TON 20 Ton 694,600.00 564,700.00
30 PILE DRIVER + HAMMER 2,5 Ton 159,000.00 129,200.00
31 CRANE ON TRACK 35 TON 35 Ton 687,900.00 559,200.00
32 WELDING SET 250 Amp 168,400.00 136,900.00
33 BORE PILE MACHINE 2000 Meter 2,361,400.00 1,919,800.00
34 ASPHALT LIQUID MIXER 1000 Liter 121,600.00 98,800.00
35 TRONTON 15 Ton 794,700.00 646,000.00
36 ROCK DRILL BREAKER - 288,600.00 234,600.00
37 COLD MILLING 1000 m 1,860,600.00 1,512,600.00
1 2 3 4 5
38 COLD RECYCLER 2,2 M 3,960,100.00 3,219,500.00
39 HOT RECYCLER 3M 2,350,700.00 1,911,100.00
40 AGGREGAT (CHIP) SPREADER 3,5M 713,300.00 579,900.00
41 ASPHALT DISTRIBUTOR 4000 Liter 475,600.00 386,600.00
42 SLIP FORM PAVER 2,5 M 399,500.00 324,700.00
43 CONCRETE PAN MIXER 600 Liter 607,700.00 494,000.00
44 CONCRETE BREAKER 20 m3/jam 1,172,700.00 953,400.00
45 ASPHALT TANKER 4000 liter 716,000.00 582,100.00
46 CEMENT TANKER 4000 liter 655,900.00 533,200.00
47 CONCRETE MIXER (350) 350 liter 56,200.00 45,600.00
48 VIBRATING RAMMER 80 KG 56,200.00 45,600.00
49 TRUK MIXER (AGITATOR) 5 M3 492,900.00 400,700.00
50 BORE PILE MACHINE 60 CM 2,925,000.00 2,378,000.00
51 CRANE ON TRACK 75-100 TON 75 Ton 981,700.00 798,100.00
52 BLENDING EQUIPMENT 30 Ton 251,200.00 204,200.00
53 ASPHALT LIQUID MIXER 20000 Liter 235,200.00 191,200.00
54 Chain Saw 61,500.00 50,000.00
55 Dongkrak 78,900.00 64,100.00
56 Water Tanker Kap 15000-18000 913,700.00 742,800.00
57 Vibrator Compactor 474,200.00 385,500.00
58 Cement Spreader Truck 546,400.00 444,200.00
59 Smooth Drum Vibratory Roller 566,400.00 460,400.00
60 Padfoot Roller 1,128,600.00 917,500.00
1 2 3 4 5
E. PERALATAN KERJA
1 Kuas 4" buah 26,000.00 21,100.00
2 Kuas 3" buah 20,000.00 16,200.00
3 Doran buah 16,000.00 13,000.00
4 Garuk/Garpu buah 64,000.00 52,000.00
5 Pacul Pendek buah 128,000.00 104,000.00
6 Sabit Kecil buah 96,000.00 78,000.00
7 Topi Lapangan buah 103,000.00 83,700.00
8 Sikat Kawat buah 16,000.00 13,000.00
9 Roll Meter 5 M' buah 26,000.00 21,100.00
10 Roll Meter 20 M' buah 45,000.00 36,500.00
11 Roll Meter 30 M' buah 61,000.00 49,500.00
12 Roll Meter 50 M' buah 84,000.00 68,200.00

F. BAHAN / PERALATAN AIR MINUM


1 Flang steel Ø 1.5" bh 55,000.00 44,700.00
2 Meter air sumur bh 1,650,000.00 1,341,400.00
3 Klem sedel bh 42,000.00 34,100.00
4 Meter air SR bh 200,000.00 162,600.00
5 Plug Kran bh 44,000.00 35,700.00
6 Stop kran kuningan 1/2" bh 70,000.00 56,900.00
7 Double nepel bh 20,000.00 16,200.00
8 Knee Ø 1.5" bh 20,000.00 16,200.00
9 V sock Ø 2" x Ø 1.5" bh 25,000.00 20,300.00
10 Water mur Ø 1.5" bh 50,000.00 40,600.00

Catatan : Harga Rasionalisasi DPUPR tersebut tidak termasuk PPN, Overhead dan Profit, dan Kenaikan Harga.

### 1 Sekretaris DPUPR Kab. Karanganyar


TITIK UMARNI, SH., MM. 1. .................................................
NIP. 19660923 198607 2 001

### 2 Kepala Bidang Tata Ruang dan Bina Konstruksi


SUPANI, ST., MSI
NIP. 19680626 199703 2 008

### 3 Kepala Bidang Cipta Karya


ASIHNO PURWADI, ST. 3. .................................................
NIP. 19720828 199803 1 016

### 4 Kepala Bidang Bina Marga


DARMANTO, ST., MM.
NIP. 19631108 198909 1 001

### 5 Bidang Pengairan dan ESDM


WIDODO, ST. M.Eng. 5. .................................................
NIP. 19630113 198808 1 001

Mengetahui /Menyetujui
Kepala Dinas Pekerjaan Umum
dan Penataan Ruang
Kabupaten Karanganyar

EDHY SRIYATNO, S.T.,M.T.


NIP. 19600323 198703 1 007
AHUN 2019
RUANG

endang, Kerjo, Ngargoyoso

Rasionalisasi Rasionalisasi
DPUPR DPUPR
Wilayah 2 Wilayah 3
6 7

105,000.00 105,000.00
69,000.00 69,000.00
65,000.00 65,000.00
77,000.00 77,000.00
70,000.00 70,000.00
150,000.00 150,000.00
186,000.00 186,000.00
89,000.00 89,000.00
89,000.00 89,000.00
89,000.00 89,000.00
89,000.00 89,000.00
89,000.00 89,000.00
182,000.00 182,000.00
81,000.00 81,000.00
81,000.00 81,000.00
81,000.00 81,000.00
77,000.00 77,000.00
85,000.00 85,000.00
69,000.00 69,000.00
81,000.00 81,000.00
162,000.00 162,000.00
69,000.00 69,000.00
69,000.00 69,000.00
65,000.00 65,000.00
65,000.00 65,000.00
77,000.00 77,000.00
77,000.00 77,000.00
77,000.00 77,000.00
77,000.00 77,000.00
77,000.00 77,000.00
81,000.00 81,000.00
77,000.00 77,000.00
77,000.00 77,000.00
89,000.00 89,000.00
81,000.00 81,000.00

Rasionalisasi Rasionalisasi
DPUPR DPUPR
Wilayah 2 Wilayah 3
6 7

190,000.00 190,000.00
85.00 85.00
13,600.00 13,600.00
8,700.00 8,700.00
5,400.00 5,400.00
31,000.00 31,000.00
114,000.00 114,000.00
6 7
108,600.00 108,600.00
9,500.00 9,500.00
12,000.00 12,000.00
53,000.00 53,000.00
103,000.00 103,000.00
293,000.00 293,000.00
271,000.00 271,000.00
97,000.00 97,000.00
173,000.00 173,000.00
108,000.00 108,000.00
32,000.00 32,000.00
65,000.00 65,000.00
488,000.00 488,000.00
434,000.00 434,000.00
760,000.00 760,000.00
1,900,000.00 1,900,000.00
76,000.00 76,000.00
14,700.00 14,700.00
10,000.00 10,000.00
19,000.00 19,000.00
3,300.00 3,300.00
190,000.00 190,000.00
814,000.00 814,000.00
12,000.00 12,000.00
800.00 800.00
22,000.00 22,000.00
271,000.00 271,000.00
97,000.00 97,000.00
6 7
261,000.00 261,000.00
86,000.00 86,000.00
143,000.00 143,000.00
108,000.00 108,000.00
225,000.00 230,000.00
225,000.00 230,000.00
225,000.00 230,000.00
225,000.00 230,000.00
255,000.00 255,000.00
255,000.00 255,000.00
253,000.00 253,000.00
252,000.00 252,000.00
250,000.00 250,000.00
32,600.00 32,600.00
11,500.00 11,500.00
4,900.00 4,900.00
8,200.00 8,200.00
8,700.00 8,700.00
13,000.00 13,000.00
19,000.00 19,000.00
19,000.00 19,000.00
258,000.00 258,000.00
358,000.00 358,000.00
385,000.00 385,000.00
414,000.00 414,000.00
537,000.00 537,000.00
678,000.00 678,000.00
715,000.00 715,000.00
755,000.00 755,000.00
1,176,000.00 1,176,000.00
1,832,000.00 1,832,000.00
30,000.00 30,000.00
38,000.00 38,000.00
38,000.00 38,000.00
54,000.00 54,000.00
57,000.00 57,000.00
79,000.00 79,000.00
90,000.00 90,000.00
95,000.00 95,000.00
139,000.00 139,000.00
59,000.00 59,000.00
59,000.00 59,000.00
59,000.00 59,000.00
27,000.00 27,000.00
135,000.00 135,000.00
1,357,000.00 1,357,000.00
1,465,000.00 1,465,000.00
2,497,000.00 2,497,000.00
1,085,000.00 1,085,000.00
108,000.00 108,000.00
162,000.00 162,000.00
21,000.00 21,000.00
32,000.00 32,000.00
10,000.00 10,000.00
13,000.00 13,000.00
16,000.00 16,000.00
10,000.00 10,000.00
16,000.00 16,000.00
21,000.00 21,000.00
15,000.00 15,000.00
651,000.00 651,000.00
1,085,000.00 1,085,000.00
8,000.00 8,000.00
70,000.00 70,000.00
76,000.00 76,000.00
1,303,000.00 1,303,000.00
1,085,000.00 1,085,000.00
868,000.00 868,000.00
705,000.00 705,000.00
5,400.00 5,400.00
7,700.00 7,700.00
6 7
2,100.00 2,100.00
7,700.00 7,700.00
3,100.00 3,100.00
4,400.00 4,400.00
8,700.00 8,700.00
4,400.00 4,400.00
8,700.00 8,700.00
5,600.00 5,600.00
13,100.00 13,100.00
8,200.00 8,200.00
10,800.00 10,800.00
13,100.00 13,100.00
17,400.00 17,400.00
21,000.00 21,000.00
32,000.00 32,000.00
284,000.00 284,000.00
265,000.00 265,000.00
317,000.00 317,000.00
128,000.00 128,000.00
388,000.00 388,000.00
238,000.00 238,000.00
597,000.00 597,000.00
477,000.00 477,000.00
955,000.00 955,000.00
434,000.00 434,000.00
6 7
48,000.00 48,000.00
6,500.00 6,500.00
8,700.00 8,700.00
10,800.00 10,800.00
217,000.00 217,000.00
217,000.00 217,000.00
86,000.00 86,000.00
65,000.00 65,000.00
81,000.00 81,000.00
4,900.00 4,900.00
9,300.00 9,300.00
14,700.00 14,700.00
10,800.00 10,800.00
19,000.00 19,000.00
9,800.00 9,800.00
19,000.00 19,000.00
43,000.00 43,000.00
13,000.00 13,000.00
130,000.00 130,000.00
5,400.00 5,400.00
6,500.00 6,500.00
1,846,000.00 1,846,000.00
271,000.00 271,000.00
868,000.00 868,000.00
86,000.00 86,000.00
114,000.00 114,000.00
206,000.00 206,000.00
260,000.00 260,000.00
108,000.00 108,000.00
868,000.00 868,000.00
86,000.00 86,000.00
97,000.00 97,000.00
8,686,000.00 8,686,000.00
32,000.00 32,000.00
54,000.00 54,000.00
92,000.00 92,000.00
23,000.00 23,000.00
12,000.00 12,000.00
488,000.00 488,000.00
17,000.00 17,000.00
27,000.00 27,000.00
244,000.00 244,000.00
1,200.00 1,200.00
1,628,000.00 1,628,000.00
13,000.00 13,000.00
4,400.00 4,400.00
12,487,000.00 12,487,000.00
13,573,000.00 13,573,000.00
25,853,000.00 25,853,000.00
347,000.00 347,000.00
23,888,000.00 23,888,000.00
23,888,000.00 23,888,000.00
17,373,000.00 17,373,000.00
16,287,000.00 16,287,000.00
10,315,000.00 10,315,000.00
11,401,000.00 11,401,000.00
7,600,000.00 7,600,000.00
8,143,000.00 8,143,000.00
8,000.00 8,000.00
7,058,000.00 7,058,000.00
5,429,000.00 5,429,000.00
7,600,000.00 7,600,000.00
1,628,000.00 1,628,000.00
1,900,000.00 1,900,000.00
2,171,000.00 2,171,000.00
135,000.00 135,000.00
54,000.00 54,000.00
59,000.00 59,000.00
48,000.00 48,000.00
56,000.00 56,000.00
65,000.00 65,000.00
6 7
95,000.00 95,000.00
59,000.00 59,000.00
70,000.00 70,000.00
82,000.00 82,000.00
65,000.00 65,000.00
314,000.00 314,000.00
13,000.00 13,000.00
27,000.00 27,000.00
67,000.00 67,000.00
17,000.00 17,000.00
29,000.00 29,000.00
59,000.00 59,000.00
21,000.00 21,000.00
27,000.00 27,000.00
67,000.00 67,000.00
19,000.00 19,000.00
32,000.00 32,000.00
48,000.00 48,000.00
43,000.00 43,000.00
103,000.00 103,000.00
76,000.00 76,000.00
152,000.00 152,000.00
108,000.00 108,000.00
86,000.00 86,000.00
70,000.00 70,000.00
14,000.00 14,000.00
6 7
38,000.00 38,000.00
40,000.00 40,000.00
54,000.00 54,000.00
13,000.00 13,000.00
59,000.00 59,000.00
13,000.00 13,000.00
59,000.00 59,000.00
13,000.00 13,000.00
83,000.00 83,000.00
101,000.00 101,000.00
119,000.00 119,000.00
238,000.00 238,000.00
298,000.00 298,000.00
2,986,000.00 2,986,000.00
1,493,000.00 1,493,000.00
135,000.00 135,000.00
58,000.00 58,000.00
19,000.00 19,000.00
27,000.00 27,000.00
27,000.00 27,000.00
7,400.00 7,400.00
10,000.00 10,000.00
21,000.00 21,000.00
10,500.00 10,500.00
8,100.00 8,100.00
12,000.00 12,000.00
16,000.00 16,000.00
70,000.00 70,000.00
108,000.00 108,000.00
119,000.00 119,000.00
146,000.00 146,000.00
179,000.00 179,000.00
209,000.00 209,000.00
21,000.00 21,000.00
21,000.00 21,000.00
700.00 700.00
16,000.00 16,000.00
24,000.00 24,000.00
200.00 200.00
5,400.00 5,400.00
900.00 900.00
21,000.00 21,000.00
16,000.00 16,000.00
217,000.00 217,000.00
1,250.00 1,250.00
2,500.00 2,500.00
13,000.00 13,000.00
4,886,000.00 4,886,000.00
265,000.00 271,000.00
265,000.00 271,000.00
157,000.00 157,000.00
233,000.00 238,000.00
130,000.00 135,000.00
147,000.00 152,000.00
76,000.00 76,000.00
76,000.00 76,000.00
86,000.00 86,000.00
76,000.00 76,000.00
81,000.00 81,000.00
92,000.00 92,000.00
97,000.00 97,000.00
81,000.00 81,000.00
108,000.00 108,000.00
83,000.00 83,000.00
92,000.00 92,000.00
119,000.00 119,000.00
124,000.00 124,000.00
135,000.00 135,000.00
141,000.00 141,000.00
48,000.00 48,000.00
119,000.00 119,000.00
6 7
597,000.00 597,000.00
244,000.00 244,000.00
380,000.00 380,000.00
54,000.00 54,000.00
70,000.00 70,000.00
76,000.00 76,000.00
97,000.00 97,000.00
135,000.00 135,000.00
162,000.00 162,000.00
293,000.00 293,000.00
141,000.00 141,000.00
162,000.00 162,000.00
244,000.00 244,000.00
309,000.00 309,000.00
488,000.00 488,000.00
597,000.00 597,000.00
705,000.00 705,000.00
488,000.00 488,000.00
597,000.00 597,000.00
760,000.00 760,000.00
23,000.00 23,000.00
29,000.00 29,000.00
34,000.00 34,000.00
72,000.00 72,000.00
208,000.00 208,000.00
148,000.00 148,000.00
6 7
170,000.00 170,000.00
306,000.00 306,000.00
485,000.00 485,000.00
751,000.00 751,000.00
138,000.00 138,000.00
154,000.00 154,000.00
127,000.00 127,000.00
382,000.00 382,000.00
19,000.00 19,000.00
13,000.00 13,000.00
21,000.00 21,000.00
27,000.00 27,000.00
32,000.00 32,000.00
3,000.00 3,000.00
4,000.00 4,000.00
5,000.00 5,000.00
6,000.00 6,000.00
7,000.00 7,000.00
6,000.00 6,000.00
4,000.00 4,000.00
76,000.00 76,000.00
86,000.00 86,000.00
597,000.00 597,000.00
19,111,000.00 19,111,000.00
29,318,000.00 29,318,000.00
7,700.00 7,700.00
119,000.00 119,000.00
1,600.00 1,600.00
4,400.00 4,400.00
461,000.00 461,000.00
38,000.00 38,000.00
14,000.00 14,000.00
41,000.00 41,000.00
9,000.00 9,000.00
39,000.00 39,000.00
21,000.00 21,000.00
16,000.00 16,000.00
67,000.00 67,000.00
5,000.00 5,000.00
1,194,000.00 1,194,000.00
81,000.00 81,000.00
86,000.00 86,000.00
71,000.00 71,000.00
32,000.00 32,000.00
54,000.00 54,000.00
271,000.00 271,000.00
76,000.00 76,000.00
124,000.00 124,000.00
217,000.00 217,000.00
222,000.00 222,000.00
3,800,000.00 3,800,000.00
16,000.00 16,000.00
81,000.00 81,000.00
217,000.00 217,000.00
380,000.00 380,000.00
48,000.00 48,000.00
6,000.00 6,000.00
43,000.00 43,000.00
38,000.00 38,000.00
43,000.00 43,000.00
1,628,000.00 1,628,000.00
4,071,000.00 4,071,000.00
119,000.00 119,000.00
130,000.00 130,000.00
23,000.00 23,000.00
31,000.00 31,000.00
28,000.00 28,000.00
34,000.00 34,000.00
3,900.00 3,900.00
- -
- -
6 7
- -
- -
- -
65,000.00 65,000.00
59,000.00 59,000.00
76,000.00 76,000.00
70,000.00 70,000.00
1,900,000.00 1,900,000.00
162,000.00 162,000.00
54,000.00 54,000.00
651,000.00 651,000.00
434,000.00 434,000.00
108,000.00 108,000.00

928,000.00 928,000.00
1,194,000.00 1,194,000.00
1,520,000.00 1,520,000.00
2,714,000.00 2,714,000.00
3,583,000.00 3,583,000.00
5,429,000.00 5,429,000.00
6,515,000.00 6,515,000.00
9,229,000.00 9,229,000.00
9,772,000.00 9,772,000.00
10,858,000.00 10,858,000.00
13,030,000.00 13,030,000.00
6 7

1,900,000.00 1,900,000.00
1,628,000.00 1,628,000.00
832,000.00 832,000.00
2,171,000.00 2,171,000.00
380,000.00 380,000.00
117,000.00 117,000.00
271,000.00 271,000.00
108,000.00 108,000.00
1,085,000.00 1,085,000.00
814,000.00 814,000.00
7,700.00 7,700.00
217,200.00 217,200.00
108,600.00 108,600.00
1,085,800.00 1,085,800.00
162,900.00 162,900.00
597,200.00 597,200.00
651,500.00 651,500.00
1,248,700.00 1,248,700.00
380,000.00 380,000.00
105,400.00 105,400.00
3,300.00 3,300.00
3,300.00 3,300.00
271,400.00 271,400.00
217,200.00 217,200.00
5,400.00 5,400.00
5,400.00 5,400.00
1,574,500.00 1,574,500.00
1,465,900.00 1,465,900.00
5,400.00 5,400.00
2,171,700.00 2,171,700.00
542,900.00 542,900.00
1,465,900.00 1,465,900.00
597,200.00 597,200.00
814,300.00 814,300.00
225,900.00 225,900.00
814,300.00 814,300.00
271,400.00 271,400.00
217,200.00 217,200.00
814,300.00 814,300.00
542,900.00 542,900.00
271,400.00 271,400.00
742,200.00 742,200.00
927,600.00 927,600.00
985,300.00 985,300.00
49,500.00 49,500.00
105,600.00 105,600.00
100,800.00 100,800.00
7,300.00 7,300.00
78,800.00 78,800.00
796,700.00 796,700.00
140,600.00 140,600.00
624,300.00 624,300.00
1,092,600.00 1,092,600.00
208,100.00 208,100.00
832,500.00 832,500.00
78,000.00 78,000.00
364,200.00 364,200.00
58,500.00 58,500.00
8,100.00 8,100.00
5,600.00 5,600.00
509,100.00 509,100.00
108,600.00 108,600.00
81,400.00 81,400.00
2,334,600.00 2,334,600.00
814,300.00 814,300.00
1,085,800.00 1,085,800.00
1,628,700.00 1,628,700.00
2,171,700.00 2,171,700.00
2,714,600.00 2,714,600.00
6 7
1,628,700.00 1,628,700.00
2,171,700.00 2,171,700.00
2,714,600.00 2,714,600.00
1,085,800.00 1,085,800.00
1,628,700.00 1,628,700.00
2,714,600.00 2,714,600.00
3,800,400.00 3,800,400.00
1,085,800.00 1,085,800.00
2,171,700.00 2,171,700.00
1,628,700.00 1,628,700.00
4,886,300.00 4,886,300.00
1,085,800.00 1,085,800.00
542,900.00 542,900.00
380,000.00 380,000.00
104,700.00 104,700.00
1,140,100.00 1,140,100.00
597,200.00 597,200.00
1,085,800.00 1,085,800.00
542,900.00 542,900.00

7,058,000.00 7,058,000.00
8,377,200.00 8,377,200.00
7,930,000.00 7,930,000.00
7,600,900.00 7,600,900.00
6,972,300.00 6,972,300.00
6 7
7,544,700.00 7,544,700.00
9,229,700.00 9,229,700.00
7,804,800.00 7,804,800.00
10,614,600.00 10,614,600.00
9,772,600.00 9,772,600.00
9,332,500.00 9,332,500.00
11,915,400.00 11,915,400.00
11,401,400.00 11,401,400.00
8,117,000.00 8,117,000.00
8,320,300.00 8,320,300.00
10,510,500.00 10,510,500.00

1,357,300.00 1,357,300.00
1,628,700.00 1,628,700.00
1,900,200.00 1,900,200.00

51,757,700.00 51,757,700.00

54,292,600.00 54,292,600.00
59,721,900.00 59,721,900.00
76,009,700.00 76,009,700.00
81,439,000.00 81,439,000.00

- -
65,151,200.00 65,151,200.00
70,580,400.00 70,580,400.00
76,009,700.00 76,009,700.00
86,868,200.00 86,868,200.00

- -
8,002,700.00 8,002,700.00
392,000.00 392,000.00
140,100.00 140,100.00
654,700.00 654,700.00
223,700.00 223,700.00
64,100.00 64,100.00
495,200.00 495,200.00
339,900.00 339,900.00
630,900.00 630,900.00
519,100.00 519,100.00
563,600.00 563,600.00
607,000.00 607,000.00
579,900.00 579,900.00
274,700.00 274,700.00
427,800.00 427,800.00
221,600.00 221,600.00
366,000.00 366,000.00
406,100.00 406,100.00
335,600.00 335,600.00
43,400.00 43,400.00
1,001,300.00 1,001,300.00
47,800.00 47,800.00
180,300.00 180,300.00
107,500.00 107,500.00
43,400.00 43,400.00
55,400.00 55,400.00
1,165,200.00 1,165,200.00
374,600.00 374,600.00
564,700.00 564,700.00
129,200.00 129,200.00
559,200.00 559,200.00
136,900.00 136,900.00
1,919,800.00 1,919,800.00
98,800.00 98,800.00
646,000.00 646,000.00
234,600.00 234,600.00
1,512,600.00 1,512,600.00
6 7
3,219,500.00 3,219,500.00
1,911,100.00 1,911,100.00
579,900.00 579,900.00
386,600.00 386,600.00
324,700.00 324,700.00
494,000.00 494,000.00
953,400.00 953,400.00
582,100.00 582,100.00
533,200.00 533,200.00
45,600.00 45,600.00
45,600.00 45,600.00
400,700.00 400,700.00
2,378,000.00 2,378,000.00
798,100.00 798,100.00
204,200.00 204,200.00
191,200.00 191,200.00
50,000.00 50,000.00
64,100.00 64,100.00
742,800.00 742,800.00
385,500.00 385,500.00
444,200.00 444,200.00
460,400.00 460,400.00
917,500.00 917,500.00
6 7

21,100.00 21,100.00
16,200.00 16,200.00
13,000.00 13,000.00
52,000.00 52,000.00
104,000.00 104,000.00
78,000.00 78,000.00
83,700.00 83,700.00
13,000.00 13,000.00
21,100.00 21,100.00
36,500.00 36,500.00
49,500.00 49,500.00
68,200.00 68,200.00

44,700.00 44,700.00
1,341,400.00 1,341,400.00
34,100.00 34,100.00
162,600.00 162,600.00
35,700.00 35,700.00
56,900.00 56,900.00
16,200.00 16,200.00
16,200.00 16,200.00
20,300.00 20,300.00
40,600.00 40,600.00

Kenaikan Harga.

2. .................................................

4. .................................................
PAGU ANGGARAN BELANJA MODAL FISIK :

1 MOJOGEDANG : Rp 3,870,000,000

2 JATEN : Rp 3,872,245,000

3 JUMANTONO : Rp 3,872,245,000

4 JATIYOSO : Rp 3,872,435,000

5 TASIKMADU : -

6 MATESIH : -
1 Assisten Driller OH 105,000.00
2 Buruh semi terlatih OH 69,000.00

2 Buruh terlatih OH 77,000.00


3 Crew Drilling OH 70,000.00
4 Driller OH 150,000.00
5 Geologis OH 186,000.00

6 Koordinator logging OH 182,000.00

8 Mekanik Terlatih OH 81,000.00


9 Masinis/Operator OH 81,000.00
10 Mekanik Welder OH 77,000.00
11 Operator pompa OH 85,000.00
12 Operator semi terlatih / stoker OH 69,000.00
13 Operator terlatih OH 81,000.00
14 Pembantu Geologis OH 162,000.00
15 Pembantu Masinis/Operator OH 69,000.00
16 Pembantu Mekanik OH 69,000.00
17 Pembantu Sopir OH 65,000.00
18 Penjaga Malam OH 65,000.00
19 Sopir OH 77,000.00
10 Tukang gali OH 77,000.00

13 Tukang las OH 77,000.00

Err:509 Tukang masak aspal OH 89,000.00


### Tukang pipa/pompa OH 81,000.00

1 Abu batu m³ 190,000.00

9 Aluminium foil m² 13,600.00


10 Aluminium strip m' 8,700.00

Err:509 Asbes bubungan gelombang m' 31,000.00


### Asbes gelombang ( 2,00 x 1,00 ) lbr 114,000.00
### Asbes gelombang ( 100 x 120 ) lbr 108,600.00
### Aspal Curah kg 9,500.00
### Aspal Pen. 60/70 (kemasan drum) kg 12,000.00

### Atap galvalum dan laminasi m² 103,000.00


### Atap galvalum rangka baja ringan m² 293,000.00
### Atap galvalum rangka hollow m² 271,000.00
### Atap kerpus onduline m' 97,000.00
### Atap onduline (2x0,95) lbr 173,000.00
### Atap multiroof pasir lbr 108,000.00
### Atap multiroof bubungan m' 32,000.00
### Atap polycarbonat m² 65,000.00
### Atap Polycarbonat rangka besi tempa m² 488,000.00
### Atap Polycarbonat rangka hollow m² 434,000.00
### Atap Polycarbonat rangka stainleess m² 760,000.00
### Automatic Water Level unit 1,900,000.00
### Avour stainless bh 76,000.00

### Bambu apus 4 m' ljr 10,000.00


### Bambu ori 4 m' ljr 19,000.00
### Bataco bj 3,300.00
### Batu andesit (20X20) m² 190,000.00
### Bata ringan kg 814,000.00
### Batu apung/kambang kg 12,000.00
12 Batu berongga ekspos bh 1,500.00
13 Batu blondos m² 271,000.00
14 Batu candi m² 97,000.00

10 Batu lempeng/tempel kg 86,000.00


11 Batu palimanan m² 143,000.00
12 Batu paras m² 108,000.00
13 Batu pecah ½/1 cm, cruser m³ 220,000.00
14 Batu pecah 1/2 cm, cruser m³ 220,000.00

8 Batu pecah 3/5 cm, cruser m³ 220,000.00


9 Batu pecah 2/3 cm (split), manual m³ 265,000.00
10 Batu pecah 3/5 cm, manual m³ 265,000.00
11 Batu pecah 5/7 cm, manual m³ 263,000.00
12 Batu pecah 10/15 cm, manual m³ 262,000.00
13 Batu pecah 15/20 cm, manual m³ 260,000.00
14 Baut baja kg 32,600.00

13 Besi Hollow 1,8/3,8 cm t:0,3 m' 4,900.00


14 Besi Hollow 3,8/3,8 cm t:0,3 m' 8,200.00

Err:509 Besi profil siku kg 19,000.00


### Besi teralis strip plat kg 19,000.00
### Besi Wire Mesh M 5 (4,5 mm) uk. 2,1 x 5,4 lbr 258,000.00
### Besi Wire Mesh M 6 (5,2 mm) uk. 2,1 x 5,4 lbr 358,000.00
### Besi Wire Mesh M 6 (5,5 mm) uk. 2,1 x 5,4 lbr 385,000.00
### Besi Wire Mesh M 6 (5,6 mm) uk. 2,1 x 5,4 lbr 414,000.00
### Besi Wire Mesh M 7 (6,5 mm) uk. 2,1 x 5,4 lbr 537,000.00
### Besi Wire Mesh M 8 (7,2 mm) uk. 2,1 x 5,4 lbr 678,000.00
### Besi Wire Mesh M 8 (7,5 mm) uk. 2,1 x 5,4 lbr 715,000.00
### Besi Wire Mesh M 8 (7,6 mm) uk. 2,1 x 5,4 lbr 755,000.00
### Besi Wire Mesh M 10 (9,5 mm) uk. 2,1 x 5,4 lbr 1,176,000.00
### Besi Wire Mesh M 12 (11,5 mm) uk. 2,1 x 5,4 lbr 1,832,000.00
### Buis beton ½ Ø 20 cm m' 30,000.00
### Buis beton ½ Ø 30 cm m' 38,000.00
### Buis beton Ø 20 cm m' 38,000.00
### Buis beton Ø 30 cm m' 54,000.00
### Buis beton Ø 40 cm m' 57,000.00
### Buis beton Ø 50 cm m' 79,000.00
### Buis beton Ø 60 cm m' 90,000.00
### Buis beton Ø 80 cm, pj. 50 cm bj 95,000.00
### Buis beton Ø 100 cm, pj. 50 cm bj 139,000.00
### Cat besi kg 59,000.00
### Cat kayu (luar) kg 59,000.00

22 Cat tembok ( luar ) kg 135,000.00


23 Check Valve Ø 1.5" bh 1,357,000.00
24 Closet duduk ex. INA/American Standard bh 1,465,000.00
25 Closet duduk ex. Toto bh 2,497,000.00
26 Closet duduk monoblock bh 1,085,000.00
27 Closet jongkok keramik bh 108,000.00
28 Closet jongkok ex. INA/American Standard bh 162,000.00
29 Dempul Jadi/wood filler/plamur kg 21,000.00
30 Down light 4" bh 32,000.00

Err:509 Engsel jendela sedang bh 13,000.00


### Engsel jendela super bh 16,000.00

Err:509 Engsel pintu sedang bh 16,000.00


### Engsel pintu super bh 21,000.00
### Eternit ( 1,00 x 1,00 ) 3 mm lbr 15,000.00
### Fiberglass (Bak Air) 0,50 m3 bh 651,000.00
### Fiberglass (Bak Air) 1 m3 bh 1,085,000.00

Err:509 Flang steel Ø 2" bh 70,000.00


### Floor drain stainless bh 76,000.00
### Folding Gate tebal 1.20 mm m² 1,303,000.00
### Folding Gate tebal 0.80 mm m² 1,085,000.00
### Folding Gate tebal 0.60 mm m² 868,000.00
### Folding Gate tebal 0.40 mm m² 705,000.00
### Genting beton standard bh 5,400.00
### Genting kerpus beton bh 7,700.00
### Genteng pres ex. mojolaban/mantili bh 2,100.00
### Genteng kerpus ex. mojolaban bh 7,700.00

24 Genteng morando kebumen bh 4,400.00

Err:509 Genteng morando jatiwangi bh 4,400.00


### Genteng kerpus jatiwangi bh 8,700.00
### Genteng glasur jatiwangi bh 5,600.00
### Genteng kerpus glasur jatiwangi bh 13,100.00
### Genteng glasur kebumen bh 8,200.00
### Genteng kerpus glasur kebumen bh 10,800.00
### Genteng keramik bh 13,100.00
### Genteng kerpus keramik bh 17,400.00
### Glass Block 20x20 bh 21,000.00
### Glass Block 30x30 bh 32,000.00
### Granit tile 40 x 40 cm Warna tua m2 284,000.00
### Granit tile 40 x 40 cm Warna muda m2 265,000.00
### Granit tile 60 x 60 cm Warna tua m2 317,000.00
### Granit tile 60 x 60 cm Warna muda m2 128,000.00
### Granit tile 80 x 80 cm Warna tua m2 388,000.00
### Granit tile 80 x 80 cm Warna muda m2 238,000.00
### Granit tile 100 x 100 cm Warna tua m2 597,000.00
### Granit tile 100 x 100 cm Warna muda m2 477,000.00
### Granit/ubin 100 x 100 (batu granit) m2 955,000.00
### Gravel pack Ø 0,5 - 1,5 cm m³ 434,000.00
### Grease ( paselin ) kg 48,000.00

Err:509 Grendel sedang bh 8,700.00


### Grendel super bh 10,800.00
### Grosok 2/3 m³ 217,000.00
### Grosok jagung m³ 217,000.00
### GRC (120 x 240 cm) t: 5 mm lbr 86,000.00
### Gypsum board (120 x 240 cm) t: 6.5 mm lbr 65,000.00

Err:509 Hak angin sedang bh 9,300.00


### Hak angin super bh 14,700.00
### Handle Jendela bh 10,800.00

### HB.20 bj 9,800.00


### Hospital plint fiber bh 19,000.00
### Hospital plint keramik bh 43,000.00
### Ijuk kg 13,000.00
### Jet sower bh 130,000.00

Err:509 Kabel listrik 2.50 mm m' 6,500.00


### Kabel power unit 1,846,000.00
### Kaca aluminium profil m' 271,000.00
### Kaca aluminium patri m' 868,000.00
### Kaca bening 3 mm m2 86,000.00

Err:509 Kaca bening 6 cm m2 206,000.00


### Kaca bening 8 mm m2 260,000.00
### Kaca es 5 mm m2 108,000.00
### Kaca framelist 8 mm m2 868,000.00
### Kaca naco merk Daici / daun bening m2 86,000.00
### Kaca rayband 5 mm m2 97,000.00
### Kaca tempered 12 mm + komplit ls 8,686,000.00
### Kanstein beton (0,15x0,4x0,6) bh 32,000.00
### Karpet biasa m2 54,000.00
### Karpet tebal m2 92,000.00

14 Kawat bronjong kg 12,000.00


15 Kawat duri (30 m') roll 488,000.00

Err:509 Kawat las listrik kg 27,000.00


### Kawur/kapur pasang m³ 244,000.00
### Kayu bakar kg 1,200.00

2 Kayu begesteng steiger/dolken 4 M' bh 13,000.00

Err:509 Kayu bangkiray Balok m³ 12,487,000.00


### Kayu bangkiray Papan m³ 13,573,000.00
### Kayu jati hutan untuk konstrusi jembatan m³ 25,853,000.00
### Kayu jati hutan untuk perquet m² 347,000.00
### Kayu jati hutan untuk kusen m³ 23,888,000.00
### Kayu jati hutan untuk rangka atap m³ 23,888,000.00
### Kayu jati lokal untuk kusen m³ 17,373,000.00
### Kayu jati lokal untuk rangka atap m³ 16,287,000.00

23 Kayu kruing Papan m³ 8,143,000.00

25 Kayu meranti 5/7 m³ 7,058,000.00


26 Kayu meranti reng 2/3 m³ 5,429,000.00
27 Kayu meranti papan 30 cm m³ 7,600,000.00
28 Kayu perancah/sengon m³ 1,628,000.00
29 Kayu sengon kaso 5/7 m³ 1,900,000.00

4 Kayu sirap jati hutan pak 135,000.00


5 Keramik 20x20 m3 54,000.00

Err:509 Keramik 30 x 30 warna motif m2 56,000.00


### Keramik 30 x 30 eksterior texture m3 65,000.00
### Keramik 30 x 60 cm dinding m² 95,000.00
### Keramik 40 x 40 polos m2 59,000.00
### Keramik 40 x 40 warna motif m2 70,000.00
### Keramik 40 x 40 eksterior texture m2 82,000.00
### Keramik 40x40 (Platinum) m2 65,000.00
### Keramik kayu m2 314,000.00
### Keramik 10 x 40 cm stepnose bh 13,000.00
### Kerikil sungai di quary m³ 27,000.00
### Knie galvanis Ø 2" - 90º dan 45º bh 67,000.00
### Kran air d 1" biasa bh 17,000.00
### Kran air d 1" sedang bh 29,000.00
### Kran air d 1" super bh 59,000.00
### Kran air d 3/4" biasa bh 21,000.00
### Kran air d 3/4" sedang bh 27,000.00
### Kran air d 3/4" super bh 67,000.00
### Kran air d 1/2" biasa bh 19,000.00
### Kran air d 1/2" sedang bh 32,000.00
### Kran air d 1/2" super bh 48,000.00
### Kran tipe handle Ø 3/4" bh 43,000.00
### Kusen aluminium coklat 4" m' 103,000.00
### Kusen aluminium coklat 3" m' 76,000.00
### Kusen aluminium motif kayu 4" m' 152,000.00
### Kusen aluminium putih 4" m' 108,000.00
### Kusen aluminium silver 4" m' 86,000.00
### Kusen aluminium silver 3" m' 70,000.00

Err:509 Lampu SL 20 watt bh 40,000.00


### Lampu TL 20 watt komplit bh 54,000.00

17 Lem kuning (ex. Aica Aibon) kg 59,000.00


18 Lem kuning (ex. Fox) kg 13,000.00
19 Lem wallpaper kg 59,000.00
20 List profil gypsum m' 13,000.00
21 Marmer tulung agung 30 x 30 cm m2 83,000.00
22 Marmer tulung agung 40 x 40 cm m2 101,000.00
23 Marmer tulung agung 60 x 60 cm m2 119,000.00
24 Marmer Tulung Agung 80 x 80 cm m² 238,000.00
25 Marmer Tulung Agung 100 x 100 cm m² 298,000.00
26 Marmer ex. import m² 2,986,000.00
27 Marmer ex. import Italy m² 1,493,000.00
28 MCB 32 Amper bh 135,000.00
29 MCB bh 58,000.00
30 MCB Box bh 19,000.00
31 Meni besi kg 27,000.00

15 Minyak bensin non subsidi ltr 10,000.00


16 Minyak pelumas ltr 21,000.00
17 Minyak pertamax ltr 10,500.00
18 Minyak premium ltr 8,100.00
19 Minyak solar non subsidi ltr 12,000.00
20 Minyak cat/Tinner B ltr 16,000.00
21 Multiplek 4 mm lbr 70,000.00
22 Multiplek 6 mm lbr 108,000.00
23 Multiplek 8 mm Lbr 119,000.00
24 Multiplek 9 mm lbr 146,000.00
25 Multiplek 12 mm Lb 179,000.00
26 Pagar BRC ( ting. 0,9 m x pj. 2,4 m x d. 6 mm ) lbr 209,000.00

### Paku reng kg 16,000.00


### Paku sekrup kg 24,000.00
### Paku sekrup bj 200.00
### Paku sekrup fisher/dynebolt/ramset bh 5,400.00
### Paku sekrup onduline bj 900.00

Err:509 Pasang rangka atap baja ringan, bentang 15,5 m' m² 275,000.00

6 PC putih (40 Kg) kg 2,500.00

19 Panel control lengkap unit 4,886,000.00

11 Pasir sirtu lokal m³ 162,000.00


12 Pasir sirtu woro m³ 228,000.00
13 Pasir tras m³ 125,000.00

6 Paving 6 cm (kotak) m² 76,000.00


7 Paving 6 cm (segi enam) m² 76,000.00
8 Paving 8 cm m² 86,000.00
9 Paving 6 cm K.175 (abu-abu) m² 76,000.00
10 Paving 6 cm K.175 (warna) m² 81,000.00
11 Paving 8 cm K.175 (abu-abu) m² 92,000.00
12 Paving 8 cm K.175 (warna) m² 97,000.00
13 Paving 6 cm K.225 m² 81,000.00
14 Paving 8 cm K.225 m² 108,000.00
15 Paving 6 cm K.250 (abu-abu) m² 83,000.00
16 Paving 6 cm K.250 (warna) m² 92,000.00
17 Paving 8 cm K.250 (abu-abu) m² 119,000.00
18 Paving 8 cm K.250 (warna) m² 124,000.00
19 Paving 8 cm K.300 (abu-abu) m² 135,000.00
20 Paving 8 cm K.300 (warna) m² 141,000.00
21 Paving Difabel bh 48,000.00
22 Paving Grass Block m² 119,000.00
23 Pintu KM/WC PVC sedang bh 597,000.00
24 Pintu PVC biasa bh 244,000.00
25 Pintu aluminium ram m' 380,000.00
26 Pipa Air Besi Ø 1/2 " / 6 m btg 54,000.00
27 Pipa Air Besi Ø 3/4 " / 6 m btg 70,000.00
28 Pipa Air Besi Ø 1 " / 6 m btg 76,000.00
29 Pipa Air Besi Ø 1,25 " / 6 m btg 97,000.00
30 Pipa Air Besi Ø 1,5 " / 6 m btg 135,000.00
31 Pipa Air Besi Ø 2 " / 6 m btg 162,000.00
32 Pipa Air Besi Ø 2,5 " / 6 m btg 293,000.00
33 Pipa Air GI Med. A Ø 1/2 " / 6 m btg 141,000.00
34 Pipa Air GI Med. A Ø 3/4 " / 6 m btg 162,000.00
35 Pipa Air GI Med. A Ø 1 " / 6 m btg 244,000.00
36 Pipa Air GI Med. A Ø 1,25 " / 6 m btg 309,000.00
37 Pipa Air GI Med. A Ø 1,5 " / 6 m btg 488,000.00
38 Pipa Air GI Med. A Ø 2 " / 6 m btg 597,000.00
39 Pipa Air GI Med. A Ø 2,5 " / 6 m btg 705,000.00
40 Pipa galvanis Ø 1,5 " / 6 m. t= 2,5 mm btg 488,000.00
41 Pipa galvanis Ø 2 " / 6 m. t= 2,5 mm btg 597,000.00
42 Pipa galvanis Ø 3 " / 6 m. t= 2,5 mm btg 760,000.00
43 Pipa PVC Ø ½" / 4 m AW btg 23,000.00
44 Pipa PVC Ø ¾" / 4 m AW btg 29,000.00
45 Pipa PVC Ø 1" / 4 m AW btg 34,000.00
46 Pipa PVC Ø 1,5" / 4 m AW btg 72,000.00
47 Pipa PVC Ø 2" / 4 m AW btg 125,000.00
48 Pipa PVC Ø 2,5" / 4 m AW btg 148,000.00
49 Pipa PVC Ø 3" / 4 m AW btg 170,000.00
50 Pipa PVC Ø 4" / 4 m AW btg 306,000.00
51 Pipa PVC Ø 6" / 4 m AW btg 485,000.00
52 Pipa PVC Ø 8" / 4 m AW btg 751,000.00
53 Pipa PVC S. 12.50 Ø 1 1/2" m' 138,000.00
54 Pipa PVC S. 12.50 Ø 2" m' 154,000.00
55 Pipa PVC S. 16 Ø 2" - 6 m m' 127,000.00
56 Pipa PVC S. 16 Ø 4" - 6 m m' 382,000.00

21 Plint Granit 10 x 20 cm bh 13,000.00


22 Plint Granit 10 x 30 cm bh 21,000.00
23 Plint Granit 10 x 40 cm bh 27,000.00
24 Plint Granit 10 x 60 cm bh 32,000.00
25 Plint Keramik 8 x 20 cm bh 3,000.00
26 Plint Keramik 10 x 20 cm bh 4,000.00
27 Plint keramik 10 x 30 cm m' 5,000.00
28 Plint keramik 10 x 40 cm m' 6,000.00
29 Plint keramik 10 x 60 cm m' 7,000.00
30 Plint Teraso bh 6,000.00
31 Plint Ubin PC Warna 15 x 20 cm bh 4,000.00
32 Politur ltr 76,000.00
33 Politur jadi ltr 86,000.00
34 Pompa Air (listrik) 450 watt ex. Dab bh 597,000.00
35 Pompa Submersible 2 pk, Q = 2 lt, H = 70 m unit 19,111,000.00
36 Pompa Submersible 3 pk, Q = 2 lt, H = 70 m unit 29,318,000.00
37 Profil aluminium m' 7,700.00
38 Ram pintu 5 x 2,5 cm m' 119,000.00
39 Ramset bh 1,600.00
40 Residu / ter ltr 4,400.00
41 Rolling door alumunium m2 461,000.00
42 Roster batu alam bh 38,000.00
43 Roaster beton bh 14,000.00
44 Roaster kayu jati bh 41,000.00
45 Roster tanah/genting bh 9,000.00
46 Roaster keramik uk. 30x30 bh 39,000.00

Err:509 Sealent tube 67,000.00


### Seal tape bh 5,000.00
### Seling pengaman unit 1,194,000.00
### Seng gelombang ( 90 x 180 ) tbl. 0,3 lbr 81,000.00
### Seng gelombang (90 x 210 ) tbl. 0,3 lbr 86,000.00
### Seng plat Bjls 30 Lebar 90 x 180 m' 71,000.00
### Seng talang Bjls 30 lebar 0,60 m' 32,000.00
### Seng talang Bjls 30 lebar 0,90 m' 54,000.00
### Shower bh 271,000.00
### Slot kunci pipih biasa bh 76,000.00

Err:509 Slot kunci pipih sedang bh 217,000.00


### Slot kunci pipih super bh 222,000.00
### Stabilizer 5000 Watt bh 3,800,000.00

Err:509 Stop kran kuningan 3/4" bh 81,000.00


### Stop kran tipe handle Ø 1.5" bh 217,000.00
### Stop kran tipe handle Ø 2" bh 380,000.00
### Strorox-100 kg 48,000.00
### Tanah bentonite kg 6,000.00

5 Tanah liat m³ 38,000.00


6 Tanah urug pilihan m³ 43,000.00
7 Tandon air 1000 lt (fiber) bh 1,628,000.00
8 Tandon air 1000 lt (stainless) bh 4,071,000.00
9 Teakwood 4 mm ( 1,20 x 240 ) lbr 119,000.00
10 Teakwood 3 mm ( 1,20 x 2,40 ) lbr 130,000.00
11 Tegel abu-abu 20 x 20 cm m² 23,000.00
12 Tegel abu-abu 30 x 30 cm m² 31,000.00
13 Tegel wafel abu-abu m² 28,000.00
14 Tegel wafel warna m² 34,000.00
15 Tepung gypsum kg 3,900.00
16 Tiang listrik beton C11.350 daN E bh -
17 Tiang listrik beton C11.350 daN E BC bh -
18 Tiang listrik beton C11.200 daN E bh -
19 Tiang listrik beton C9.200 daN E bh -
20 Travo 50 KVA bh -
21 Triplex 4 mm (1.2 x 2.4 ) Kruing lbr 65,000.00
22 Triplex 4 mm (1.2 x 2.4 ) Sengon lbr 59,000.00
23 Triplex 2.7 mm (1.2 x 2.4 ) Kruing lbr 76,000.00
24 Triplex 2.7 mm (1.2 x 2.4 ) Sengon lbr 70,000.00
25 Urinoir bh 1,900,000.00
26 Vernis ltr 162,000.00
27 Wallpaper lebar 50 cm m' 54,000.00
28 Wastafel komplit unit 651,000.00
29 Washbak (bak cuci) steinless unit 434,000.00

13 Pengait box / spacer begisting bh 5,400.00


### Sewa alat pemasangan pompa hari 330,000.00
### Ball point bh 3,000.00
### Pemasangan / Pengelasan ls 330,000.00
### Shield tape / packing ls 60,000.00
### Depresiasi mesin / rig hr 385,000.00
### Pengadaan kertas, pena dan tinta logging ls 120,000.00
### Sewa + transportasi alat Resistivity meter / loger ls 2,200,000.00
### Depresiasi mesin kompresor hr 880,000.00
### Olie mesin ltr 40,000.00
### Olie hydroulik ltr 40,000.00
### Paket AKLI bh 1,200,000.00
### Material SR bh 800,000.00
### Material pelengkap bh 145,000.00
### Jasa BTL / Administrasi bh 275,000.00
### Biaya Penyambungan ( BP ) ls 1,650,000.00
### Biaya Uang Jaminan Langganan (UJL) ls 550,000.00
### Data Gambar Teknik ls 825,000.00
### Materai bh 6,000.00
### Klem sedel bh 42,000.00
### Meter air SR bh 200,000.00
### Check Valve SR bh 45,000.00
### Flang steel Ø 1.5" bh 55,000.00
### Meter air bh 1,650,000.00
### Double nepel bh 20,000.00
### Knee Ø 1.5" bh 20,000.00
### V sock Ø 2" x Ø 1.5" bh 25,000.00
### Water mur Ø 1.5" bh 50,000.00
### Plug Kran bh 44,000.00
### Stop kran kuningan 1/2" bh 70,000.00
### Pekerjaan persiapan dan mobilisasi ls 3,000,000.00
### Uji laboratorium kualitas air ls 500,000.00
### Pemasangan tulisan timbul ls 500,000.00
### Pemasangan tiang listrik komplit unit 7,000,000.00
### Keramik lantai 60/60 m² 62,500.00
### Keramik lantai 60/60, exterior tekstur m² 90,000.00
### Genteng kodok bh 3,100.00
### Genteng Keramik bh 10,000.00
### Genteng bubungan keramik bh 17,500.00
Sealent kg 30,000.00

Karanganyar, ........................................ 2019


KEPALA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN KARANGANYAR

EDHY SRIYATNO, ST, MT


NIP. 19600323 198703 1 007
-

1 HB.15 bj
2 HB.10 bj
3 Batu teraso kg
4 Formika lbr
5 Bilik bambu m2
6 Waterstop lebar 150 mm m
7 Waterstop lebar 200 mm m
8 W.Stop lbr 230 - 320 mm m
9 Langit-2 akustik 30/30 lbr
10 Langit-2 akustik 30/60 lbr
11 Langit-2 akustik 60/120 lbr
12 Kayu papan, tb. 9 mm m3
13 Ramset bh
14 Profil allumi T m'
15 Besi scuare tube m
16 Besi lis kaca 1x1 cm m
17 Sunscreen alluminium m2
18 Venetions blinds dan vertical blinds (tirai) m2
19 Kawat nyamuk m2
20 Seng Plat, lb. 45 cm m
21 Ubin abu-abu 40/40 bh
22 Ubin abu-abu 30/30 bh
23 Ubin abu-abu 20/20 bh
24 Ubin warna 40/40 bh
25 Ubin warna 30/30 bh
26 Ubin warna 20/20 bh
27 Ubin teraso 40/40 bh
28 Ubin teraso 30/30 bh
29 Ubin Granit 30/30
30 Ubin Teralux kerang 40/40 bh
31 Ubin Teralux kerang 30/30 bh
32 Plint ubin abu-2 15/20 bh
33 Plint ubin abu-2 10/30 bh
34 Plint Ubin abu-2 10/40 bh
35 Plint ubin teralux kr 10/40 bh
36 Plint ubin teralux kr 10/30 bh
37 Plint ubin trlx marmer 10/60 bh
38 Plint ubin trlx marmer 10/40 bh
39 Plint ubin trlx marmer 10/30 bh
40 Ubin keramik arts 10/20 bh
41 Ubin keramik arts 10/10 bh
42 Ubin Keramik 10/30 bh
43 Lantai mosaik 30/30 bh
44 Plint keramik art 10/10 bh
45 Plint keramik art 5/20 bh
46 Internal cove 5/5/20 bh
47 Uderlayer m2
48 Gymfloor m3
49 Keramik dind. Artistik 10/20 bh
50 Keramik dind. Artistik 5/20 bh
51 Keramik 10/20 bh
52 Bata pelapis dinding 3/7/24 bh
53 Vinyl bh
54 Floor hardener kg
55 Vinyl karet bh
56 Papan kayu kl II 2/10 cm m3
57 Asbes gelombang (3 m x 1,08 m) x 6mm lbr
58 Bubung gelombang 1,08 m lbr
59 Bathcuip unit
60 Pipa beton d. 15-20 cm bh
61 Kunci tanam biasa bh
62 Pegangan pintu/door holder bh
63 Pipa listrik 5/8" btg 8,000.00
64 T Dus bh
65 L Bow bh
66 Las Dop bh
67 Klem bh
68 Mongkok bh

### Cetak Foto set 45,000.00


### Kertas folio 70 gr rim 40,000.00
### Kertas sampul bh 1,250.00
### Tinta print refill bh 50,000.00

### Alat-alat kerja set 75,000.00


### Alat bantu set 75,000.00
### Chainsaw jam -
### Jack hammer bh -
### Mesin las listrik 250 A diesel sewa/hari -
### Mesin potong besi sewa/hari -
### Molen 0,35 m3 unit/hari -
### Stamper sewa/hari -
### Pemasangan pagar besi dan cat m2 600,000.00
### Pemasangan pintu besi dan cat m2 750,000.00
### Pemasangan pagar besi hollow m2 400,000.00
### Pemasangan pintu pagar besi hollow m2 400,000.00
### Pemasangan pagar besi stainless bulat m2 550,000.00
### Pemasangan pagar besi stainless kotak m2 650,000.00
### Pemasangan pagar besi stainless & plat m2 850,000.00
### Pemasangan pintu pagar besi stainless m2 850,000.00
### Penebangan pohon bh 200,000.00
### Reyling tangga "stainlees" tinggi 1 m' m 632,500.00
### Pasang intalasi penangkal petir 2 split lengkap ls 5,000,000.00
### Pasang kabel pembagi m' 20,000.00
### Pasang listrik baru 2200 watt ls 3,500,000.00
### Pasang listrik baru 22000 watt ls 35,000,000.00

Err:509 Sparingan Instalasi Listrik (Pipa 5/8", kabel NYM 2x2,5, T d ls 5,750,000.00
### Instalasi jaringan AC m' 110,000.00
### Pembuatan groundtank ( 2 m x 2 m x 3 m ) ls 10,000,000.00
### Tandon air stainless 1 m3 bh 3,500,000.00
### Pembuatan septictank lengkap unit 4,500,000.00
### Sumur resapan unit 1,500,000.00
### Pasang tempat sabun tanam keramik bh 50,000.00
### Grill besi beton m2 350,000.00
### Pasang glass block bh 25,000.00
### Pasang talang U PVC m' 20,000.00

Err:509 Sewa brak direksi keet bh 2,500,000.00


### Pembersihan lapangan ls 500,000.00
### Pembersihan lokasi akibat pelaksanaan pekerjaan ls 2,000,000.00
### Pembongkaran bangunan lama ls 2,000,000.00
Err:509 Nomen Klatur bh 45,000.00
### Waterproofing atap dak m2 52,000.00
### Stop kontak analog bh -
### Stop kontak digital bh -

85 Keramik interlik 30/60 m2 225,000.00

106 Memasang pintu alluminium strip lebar 8 cm unit 1,600,000.00


113 Pemindahan dan pemasangan Jaringan Listrik lama unit 500,000.00
108 Pasang jet pam unit 2,000,000.00
112 Pemindahan dan pemasangan PDAM lama unit 500,000.00
109 Pasang instalasi penangkal petir 1 split lengkap unit 2,500,000.00
110 Pasang Drop ceilling plafond m' 45,000.00
111 Pasang usuk reng baja ringan m2 100,000.00

SATUAN HARGA BAHAN DAN ALAT PEKERJAAN SUMUR DALAM' 2013

NO NAMA UPAH SATUAN HARGA

### Automatic Water Level unit 1,794,000.00


### Pompa submersible Q 2 lt/dt H = 70 m unit 16,301,000.00
### Panel control pompa 1 phase unit 4,945,000.00
### Alat tulis ls 34,500.00
### Pemasangan tiang listrik komplit titik 4,500,000.00
http://tanggobangunan.blogspot.com/2010/01/daftar-harga-terbaru-material-tanggo.html
http://hargabahanbangunan.net/harga-kusen-aluminium-terbaru/
http://www.rumahmaterial.com/2015/09/analisa-harga-paving-block-kansteen.html

4 Tanah cadas m³ 43,000.00


5 Pasir urug m³ 142,000.00

Err:509 Pemadatan tanah ls 500,000.00


Err:509 Baja konstruksi kg 14,700.00
### Atap galvalum t:0,3 m² 53,000.00
### Paku pacing bj 700.00
### Paku pacing kg 21,000.00

### Harplex 3 mm (1,00 x 1,00) lbr 19,000.00


27 Paku eternit kg 21,000.00
24 Kayu lis profil m' 8,000.00
WILAYAH 1 WILAYAH 2 WILAYAH 3
105,000.00 105,000.00 105,000.00
69,000.00 69,000.00 69,000.00

77,000.00 77,000.00 77,000.00


70,000.00 70,000.00 70,000.00
150,000.00 150,000.00 150,000.00
186,000.00 186,000.00 186,000.00

182,000.00 182,000.00 182,000.00

81,000.00 81,000.00 81,000.00


81,000.00 81,000.00 81,000.00
77,000.00 77,000.00 77,000.00
85,000.00 85,000.00 85,000.00
69,000.00 69,000.00 69,000.00
81,000.00 81,000.00 81,000.00
162,000.00 162,000.00 162,000.00
69,000.00 69,000.00 69,000.00
69,000.00 69,000.00 69,000.00
65,000.00 65,000.00 65,000.00
65,000.00 65,000.00 65,000.00
77,000.00 77,000.00 77,000.00
77,000.00 77,000.00 77,000.00

77,000.00 77,000.00 77,000.00

89,000.00 89,000.00 89,000.00


81,000.00 81,000.00 81,000.00

WILAYAH 1 WILAYAH 2 WILAYAH 3


190,000.00 190,000.00 190,000.00

13,600.00 13,600.00 13,600.00


8,700.00 8,700.00 8,700.00

31,000.00 31,000.00 31,000.00


114,000.00 114,000.00 114,000.00
108,600.00 108,600.00 108,600.00
9,500.00 9,500.00 9,500.00
12,000.00 12,000.00 12,000.00

103,000.00 103,000.00 103,000.00


293,000.00 293,000.00 293,000.00
271,000.00 271,000.00 271,000.00
97,000.00 97,000.00 97,000.00
173,000.00 173,000.00 173,000.00
108,000.00 108,000.00 108,000.00
32,000.00 32,000.00 32,000.00
65,000.00 65,000.00 65,000.00
488,000.00 488,000.00 488,000.00
434,000.00 434,000.00 434,000.00
760,000.00 760,000.00 760,000.00
1,900,000.00 1,900,000.00 1,900,000.00
76,000.00 76,000.00 76,000.00

10,000.00 10,000.00 10,000.00


19,000.00 19,000.00 19,000.00
3,300.00 3,300.00 3,300.00
190,000.00 190,000.00 190,000.00
814,000.00 814,000.00 814,000.00
12,000.00 12,000.00 12,000.00
WILAYAH 1 WILAYAH 2 WILAYAH 3

271,000.00 271,000.00 271,000.00


97,000.00 97,000.00 97,000.00

86,000.00 86,000.00 86,000.00


143,000.00 143,000.00 143,000.00
108,000.00 108,000.00 108,000.00
220,000.00 225,000.00 230,000.00
220,000.00 225,000.00 230,000.00

220,000.00 225,000.00 230,000.00


265,000.00 255,000.00 255,000.00
265,000.00 255,000.00 255,000.00
263,000.00 253,000.00 253,000.00
262,000.00 252,000.00 252,000.00
260,000.00 250,000.00 250,000.00
32,600.00 32,600.00 32,600.00

4,900.00 4,900.00 4,900.00


8,200.00 8,200.00 8,200.00

19,000.00 19,000.00 19,000.00


19,000.00 19,000.00 19,000.00
258,000.00 258,000.00 258,000.00
358,000.00 358,000.00 358,000.00
385,000.00 385,000.00 385,000.00
414,000.00 414,000.00 414,000.00
537,000.00 537,000.00 537,000.00
678,000.00 678,000.00 678,000.00
715,000.00 715,000.00 715,000.00
755,000.00 755,000.00 755,000.00
1,176,000.00 1,176,000.00 1,176,000.00
1,832,000.00 1,832,000.00 1,832,000.00
30,000.00 30,000.00 30,000.00
38,000.00 38,000.00 38,000.00
38,000.00 38,000.00 38,000.00
54,000.00 54,000.00 54,000.00
57,000.00 57,000.00 57,000.00
79,000.00 79,000.00 79,000.00
90,000.00 90,000.00 90,000.00
95,000.00 95,000.00 95,000.00
139,000.00 139,000.00 139,000.00
59,000.00 59,000.00 59,000.00
WILAYAH 1 WILAYAH 2 WILAYAH 3
59,000.00 59,000.00 59,000.00

135,000.00 135,000.00 135,000.00


1,357,000.00 1,357,000.00 1,357,000.00
1,465,000.00 1,465,000.00 1,465,000.00
2,497,000.00 2,497,000.00 2,497,000.00
1,085,000.00 1,085,000.00 1,085,000.00
108,000.00 108,000.00 108,000.00
162,000.00 162,000.00 162,000.00
21,000.00 21,000.00 21,000.00
32,000.00 32,000.00 32,000.00

13,000.00 13,000.00 13,000.00


16,000.00 16,000.00 16,000.00

16,000.00 16,000.00 16,000.00


21,000.00 21,000.00 21,000.00
15,000.00 15,000.00 15,000.00
651,000.00 651,000.00 651,000.00
1,085,000.00 1,085,000.00 1,085,000.00

70,000.00 70,000.00 70,000.00


76,000.00 76,000.00 76,000.00
1,303,000.00 1,303,000.00 1,303,000.00
1,085,000.00 1,085,000.00 1,085,000.00
868,000.00 868,000.00 868,000.00
705,000.00 705,000.00 705,000.00
5,400.00 5,400.00 5,400.00
7,700.00 7,700.00 7,700.00
2,100.00 2,100.00 2,100.00
7,700.00 7,700.00 7,700.00

4,400.00 4,400.00 4,400.00

4,400.00 4,400.00 4,400.00


8,700.00 8,700.00 8,700.00
5,600.00 5,600.00 5,600.00
13,100.00 13,100.00 13,100.00
8,200.00 8,200.00 8,200.00
10,800.00 10,800.00 10,800.00
13,100.00 13,100.00 13,100.00
17,400.00 17,400.00 17,400.00
21,000.00 21,000.00 21,000.00
32,000.00 32,000.00 32,000.00
WILAYAH 1 WILAYAH 2 WILAYAH 3
284,000.00 284,000.00 284,000.00
265,000.00 265,000.00 265,000.00
317,000.00 317,000.00 317,000.00
128,000.00 128,000.00 128,000.00
388,000.00 388,000.00 388,000.00
238,000.00 238,000.00 238,000.00
597,000.00 597,000.00 597,000.00
477,000.00 477,000.00 477,000.00
955,000.00 955,000.00 955,000.00
434,000.00 434,000.00 434,000.00
48,000.00 48,000.00 48,000.00

8,700.00 8,700.00 8,700.00


10,800.00 10,800.00 10,800.00
217,000.00 217,000.00 217,000.00
217,000.00 217,000.00 217,000.00
86,000.00 86,000.00 86,000.00
65,000.00 65,000.00 65,000.00

9,300.00 9,300.00 9,300.00


14,700.00 14,700.00 14,700.00
10,800.00 10,800.00 10,800.00

9,800.00 9,800.00 9,800.00


19,000.00 19,000.00 19,000.00
43,000.00 43,000.00 43,000.00
13,000.00 13,000.00 13,000.00
130,000.00 130,000.00 130,000.00

6,500.00 6,500.00 6,500.00


1,846,000.00 1,846,000.00 1,846,000.00
271,000.00 271,000.00 271,000.00
868,000.00 868,000.00 868,000.00
86,000.00 86,000.00 86,000.00

206,000.00 206,000.00 206,000.00


260,000.00 260,000.00 260,000.00
108,000.00 108,000.00 108,000.00
868,000.00 868,000.00 868,000.00
86,000.00 86,000.00 86,000.00
97,000.00 97,000.00 97,000.00
8,686,000.00 8,686,000.00 8,686,000.00
32,000.00 32,000.00 32,000.00
54,000.00 54,000.00 54,000.00
WILAYAH 1 WILAYAH 2 WILAYAH 3
92,000.00 92,000.00 92,000.00

12,000.00 12,000.00 12,000.00


488,000.00 488,000.00 488,000.00

27,000.00 27,000.00 27,000.00


244,000.00 244,000.00 244,000.00
1,200.00 1,200.00 1,200.00

13,000.00 13,000.00 13,000.00

12,487,000.00 12,487,000.00 12,487,000.00


13,573,000.00 13,573,000.00 13,573,000.00
25,853,000.00 25,853,000.00 25,853,000.00
347,000.00 347,000.00 347,000.00
23,888,000.00 23,888,000.00 23,888,000.00
23,888,000.00 23,888,000.00 23,888,000.00
17,373,000.00 17,373,000.00 17,373,000.00
16,287,000.00 16,287,000.00 16,287,000.00

8,143,000.00 8,143,000.00 8,143,000.00

7,058,000.00 7,058,000.00 7,058,000.00


5,429,000.00 5,429,000.00 5,429,000.00
7,600,000.00 7,600,000.00 7,600,000.00
1,628,000.00 1,628,000.00 1,628,000.00
1,900,000.00 1,900,000.00 1,900,000.00

135,000.00 135,000.00 135,000.00


54,000.00 54,000.00 54,000.00

56,000.00 56,000.00 56,000.00


65,000.00 65,000.00 65,000.00
95,000.00 95,000.00 95,000.00
59,000.00 59,000.00 59,000.00
70,000.00 70,000.00 70,000.00
82,000.00 82,000.00 82,000.00
65,000.00 65,000.00 65,000.00
314,000.00 314,000.00 314,000.00
13,000.00 13,000.00 13,000.00
27,000.00 27,000.00 27,000.00
67,000.00 67,000.00 67,000.00
WILAYAH 1 WILAYAH 2 WILAYAH 3
17,000.00 17,000.00 17,000.00
29,000.00 29,000.00 29,000.00
59,000.00 59,000.00 59,000.00
21,000.00 21,000.00 21,000.00
27,000.00 27,000.00 27,000.00
67,000.00 67,000.00 67,000.00
19,000.00 19,000.00 19,000.00
32,000.00 32,000.00 32,000.00
48,000.00 48,000.00 48,000.00
43,000.00 43,000.00 43,000.00
103,000.00 103,000.00 103,000.00
76,000.00 76,000.00 76,000.00
152,000.00 152,000.00 152,000.00
108,000.00 108,000.00 108,000.00
86,000.00 86,000.00 86,000.00
70,000.00 70,000.00 70,000.00

40,000.00 40,000.00 40,000.00


54,000.00 54,000.00 54,000.00

59,000.00 59,000.00 59,000.00


13,000.00 13,000.00 13,000.00
59,000.00 59,000.00 59,000.00
13,000.00 13,000.00 13,000.00
83,000.00 83,000.00 83,000.00
101,000.00 101,000.00 101,000.00
119,000.00 119,000.00 119,000.00
238,000.00 238,000.00 238,000.00
298,000.00 298,000.00 298,000.00
2,986,000.00 2,986,000.00 2,986,000.00
1,493,000.00 1,493,000.00 1,493,000.00
135,000.00 135,000.00 135,000.00
58,000.00 58,000.00 58,000.00
19,000.00 19,000.00 19,000.00
27,000.00 27,000.00 27,000.00

10,000.00 10,000.00 10,000.00


21,000.00 21,000.00 21,000.00
10,500.00 10,500.00 10,500.00
8,100.00 8,100.00 8,100.00
12,000.00 12,000.00 12,000.00
16,000.00 16,000.00 16,000.00
70,000.00 70,000.00 70,000.00
WILAYAH 1 WILAYAH 2 WILAYAH 3
108,000.00 108,000.00 108,000.00
119,000.00 119,000.00 119,000.00
146,000.00 146,000.00 146,000.00
179,000.00 179,000.00 179,000.00
209,000.00 209,000.00 209,000.00

16,000.00 16,000.00 16,000.00


24,000.00 24,000.00 24,000.00
200.00 200.00 200.00
5,400.00 5,400.00 5,400.00
900.00 900.00 900.00

2,500.00 2,500.00 2,500.00

4,886,000.00 4,886,000.00 4,886,000.00

162,000.00 157,000.00 157,000.00


228,000.00 233,000.00 238,000.00
125,000.00 130,000.00 135,000.00

76,000.00 76,000.00 76,000.00


76,000.00 76,000.00 76,000.00
86,000.00 86,000.00 86,000.00
76,000.00 76,000.00 76,000.00
81,000.00 81,000.00 81,000.00
92,000.00 92,000.00 92,000.00
97,000.00 97,000.00 97,000.00
81,000.00 81,000.00 81,000.00
108,000.00 108,000.00 108,000.00
83,000.00 83,000.00 83,000.00
92,000.00 92,000.00 92,000.00
119,000.00 119,000.00 119,000.00
124,000.00 124,000.00 124,000.00
135,000.00 135,000.00 135,000.00
141,000.00 141,000.00 141,000.00
48,000.00 48,000.00 48,000.00
119,000.00 119,000.00 119,000.00
597,000.00 597,000.00 597,000.00
WILAYAH 1 WILAYAH 2 WILAYAH 3
244,000.00 244,000.00 244,000.00
380,000.00 380,000.00 380,000.00
54,000.00 54,000.00 54,000.00
70,000.00 70,000.00 70,000.00
76,000.00 76,000.00 76,000.00
97,000.00 97,000.00 97,000.00
135,000.00 135,000.00 135,000.00
162,000.00 162,000.00 162,000.00
293,000.00 293,000.00 293,000.00
141,000.00 141,000.00 141,000.00
162,000.00 162,000.00 162,000.00
244,000.00 244,000.00 244,000.00
309,000.00 309,000.00 309,000.00
488,000.00 488,000.00 488,000.00
597,000.00 597,000.00 597,000.00
705,000.00 705,000.00 705,000.00
488,000.00 488,000.00 488,000.00
597,000.00 597,000.00 597,000.00
760,000.00 760,000.00 760,000.00
23,000.00 23,000.00 23,000.00
29,000.00 29,000.00 29,000.00
34,000.00 34,000.00 34,000.00
72,000.00 72,000.00 72,000.00

148,000.00 148,000.00 148,000.00


170,000.00 170,000.00 170,000.00
306,000.00 306,000.00 306,000.00
485,000.00 485,000.00 485,000.00
751,000.00 751,000.00 751,000.00
138,000.00 138,000.00 138,000.00
154,000.00 154,000.00 154,000.00
127,000.00 127,000.00 127,000.00
382,000.00 382,000.00 382,000.00

13,000.00 13,000.00 13,000.00


21,000.00 21,000.00 21,000.00
27,000.00 27,000.00 27,000.00
32,000.00 32,000.00 32,000.00
3,000.00 3,000.00 3,000.00
4,000.00 4,000.00 4,000.00
5,000.00 5,000.00 5,000.00
6,000.00 6,000.00 6,000.00
7,000.00 7,000.00 7,000.00
6,000.00 6,000.00 6,000.00
4,000.00 4,000.00 4,000.00
WILAYAH 1 WILAYAH 2 WILAYAH 3
76,000.00 76,000.00 76,000.00
86,000.00 86,000.00 86,000.00
597,000.00 597,000.00 597,000.00
19,111,000.00 19,111,000.00 19,111,000.00
29,318,000.00 29,318,000.00 29,318,000.00
7,700.00 7,700.00 7,700.00
119,000.00 119,000.00 119,000.00
1,600.00 1,600.00 1,600.00
4,400.00 4,400.00 4,400.00
461,000.00 461,000.00 461,000.00
38,000.00 38,000.00 38,000.00
14,000.00 14,000.00 14,000.00
41,000.00 41,000.00 41,000.00
9,000.00 9,000.00 9,000.00
39,000.00 39,000.00 39,000.00

67,000.00 67,000.00 67,000.00


5,000.00 5,000.00 5,000.00
1,194,000.00 1,194,000.00 1,194,000.00
81,000.00 81,000.00 81,000.00
86,000.00 86,000.00 86,000.00
71,000.00 71,000.00 71,000.00
32,000.00 32,000.00 32,000.00
54,000.00 54,000.00 54,000.00
271,000.00 271,000.00 271,000.00
76,000.00 76,000.00 76,000.00

217,000.00 217,000.00 217,000.00


222,000.00 222,000.00 222,000.00
3,800,000.00 3,800,000.00 3,800,000.00

81,000.00 81,000.00 81,000.00


217,000.00 217,000.00 217,000.00
380,000.00 380,000.00 380,000.00
48,000.00 48,000.00 48,000.00
6,000.00 6,000.00 6,000.00

38,000.00 38,000.00 38,000.00


43,000.00 43,000.00 43,000.00
1,628,000.00 1,628,000.00 1,628,000.00
4,071,000.00 4,071,000.00 4,071,000.00
119,000.00 119,000.00 119,000.00
130,000.00 130,000.00 130,000.00
23,000.00 23,000.00 23,000.00
WILAYAH 1 WILAYAH 2 WILAYAH 3
31,000.00 31,000.00 31,000.00
28,000.00 28,000.00 28,000.00
34,000.00 34,000.00 34,000.00
3,900.00 3,900.00 3,900.00
- - -
- - -
- - -
- - -
- - -
65,000.00 65,000.00 65,000.00
59,000.00 59,000.00 59,000.00
76,000.00 76,000.00 76,000.00
70,000.00 70,000.00 70,000.00
1,900,000.00 1,900,000.00 1,900,000.00
162,000.00 162,000.00 162,000.00
54,000.00 54,000.00 54,000.00
651,000.00 651,000.00 651,000.00
434,000.00 434,000.00 434,000.00

5,400.00 5,400.00 5,400.00


WILAYAH 1 WILAYAH 2 WILAYAH 3

RUANG

- - -
- - -
WILAYAH 1 WILAYAH 2 WILAYAH 3
WILAYAH 1 WILAYAH 2 WILAYAH 3
WILAYAH 1 WILAYAH 2 WILAYAH 3

KET.
WILAYAH 1 WILAYAH 2 WILAYAH 3

43,000.00 43,000.00 43,000.00


142,000.00 147,000.00 152,000.00

14,700.00 14,700.00 14,700.00


53,000.00 53,000.00 53,000.00
700.00 700.00 700.00
21,000.00 21,000.00 21,000.00

19,000.00 19,000.00 19,000.00


21,000.00 21,000.00 21,000.00
8,000.00 8,000.00 8,000.00
RENCANA ANGGARAN BIAYA

PROGRAM : WAJIB BELAJAR PENDIDIKAN DASAR SEMBILAN TAHUN


KEGIATAN : PEMBANGUNAN KANTIN SISWA SDN 01 KARANGANYAR
LOKASI : SDN 01 KARANGANYAR
KABUPATEN : KARANGANYAR
TAHUN ANGGARAN : 2019

No. Uraian Pekerjaan Volume Sat.

1 2 3

I. PEKERJAAN PERSIAPAN
3 1 Pengukuran dan pemasangan bouwplank 7.00 m'
### 2 Bongkaran dan pembersihan 1.00 ls

II. PEKERJAAN TANAH


1 Menggali tanah biasa sedalam 1 m' 9.72 m3
2 Pengurugan kembali galian tanah 9.72 m3

III. PEKERJAAN PASANGAN


### 1 Membuat beton mutu f'c = 7,4 Mpa (mutu K 100) 2.06 m3
### 2 Memasang pondasi batu belah, campuran 1 PC : 8 PP 4.86 m3
3 Membuat dinding bt. merah t: 1/2bata, camp 1PC:8PP 41.88 m2
67 4 Memasang plesteran 1 PC : 8 PP, tebal 15 mm 52.29 m2
86 5 Memasang acian 60.38 m2
86 6 Membuat beton mutu f'c = 19,3 Mpa (Mutu K 225) 1.80 m3
### 7 Pembesian 1 kg dengan besi polos atau besi ulir 245.70 kg
86 8 Memasang bekisting (asumsi bahan kayu 3 x pakai) 22.69 m2
9 Pasang kusen pintu dan jendela kayu kamper 0.11 m3
99 10 Membuat dan memasang daun pintu panel kayu kamper 4.80 m2
86 11 Memasang dinding keramik uk. (20x25) cm 4.40 m2
### 12 Pengecatan tembok baru 60.38 m2

IV. PEKERJAAN ATAP


### 1 Memasang konstruksi gording, kayu kruing 0.08 m3
### 2 Memasang konstruksi gording, kayu kruing (lama) 0.16 m3
### 3 Memasang rangka atap (usuk/reng) genteng kayu kruing 16.60 m2
### 4 Memasang rk. atap (usuk lama/reng baru) genteng ky. kruing 20.00 m2
### 5 Pasang genteng Magas Kebumen 38.00 m2

REKAPITULASI :
I. PEKERJAAN PERSIAPAN :
II. PEKERJAAN TANAH :
III. PEKERJAAN PASANGAN :
IV. PEKERJAAN ATAP :
Terbilang : Empat Puluh Tujuh Juta Rupiah
GARAN BIAYA ( RAB )

BILAN TAHUN
ARANGANYAR

Analysa Harga Jumlah Harga


Satuan Harga Semua
Rp. Rp. Rp.
4 5 6 7

A.2.2.1.4. 57,571.24 402,998.68


Dihitung 500,000.00 500,000.00

JUMLAH I. 902,998.68

A.2.3.1.1. 57,375.75 557,692.29


A.2.3.1.9. 41,301.50 401,450.58

JUMLAH II. 959,142.87

A.4.1.1.1. 891,401.30 1,836,286.68


A.3.2.1.5. 857,432.70 4,167,122.92
A.4.4.1.12. 120,265.90 5,036,735.89
A.4.4.2.8. 51,369.80 2,686,126.84
A.4.4.2.27. 29,902.63 1,805,520.80
A.4.1.1.7. 1,039,504.84 1,871,108.71
A.4.1.1.17. 15,264.83 3,750,568.73
An. Dihitung 97,775.14 2,218,517.93
A.4.6.1.1b. 15,538,347.50 1,709,218.23
A.4.6.1.5a. 905,457.70 4,346,196.96
An.Dihitung 161,326.71 709,837.52
A.4.7.1.10. 20,989.41 1,267,340.58

JUMLAH III. 31,404,581.79

A.4.6.1.15b. 12,260,641.25 980,851.30


Dihitung 2,913,846.25 466,215.40
An.Dihitung 173,630.15 2,882,260.49
An. Dihitung 53,398.15 1,067,963.00
A.4.5.2.1. 106,943.77 4,063,863.26

JUMLAH IV. 9,461,153.45

Rp. 902,998.68
Rp. 959,142.87
Rp. 31,404,581.79
Rp. 9,461,153.45
JUMLAH Rp. 42,727,876.79
Pajak : PPn 10% Rp. 4,272,787.68
JUMLAH TOTAL Rp. 47,000,664.47
DIBULATKAN Rp. 47,000,000.00
Karanganyar, ………………………… 2019

PERENCANA
CV. BROMAS DAMAR KAURIPAN

ANTO DWI STYAWAN, ST.


DIREKTUR
DAFTAR ANALISIS HARGA SATUAN PEKERJAAN
BIDANG CIPTA KARYA TAHUN 2017
BERDASARKAN
PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT REPUBLIK INDON
NOMOR 28 /PRT/M/2016
TENTANG
PEDOMAN ANALISIS HARGA SATUAN PEKERJAAN BIDANG PEKERJAAN UMUM

PROGRAM : WAJIB BELAJAR PENDIDIKAN DASAR SEMBILAN TAHUN


KEGIATAN : PEMBANGUNAN KANTIN SISWA SDN 01 KARANGANYAR
LOKASI : SDN 01 KARANGANYAR
KABUPATEN : KARANGANYAR
TAHUN ANGGARAN : 2019

1 Pengukuran dan pemasangan bouwplank


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu begesting 5/7 m3 0.012 1,628,000.00
Paku biasa 2" - 5 " kg 0.020 16,000.00
Kayu papan sengon 3/20 m3 0.007 2,171,000.00

B Tenaga Kerja Tukang kayu OH 0.100 81,000.00


Pekerja OH 0.100 65,000.00
Kep.Tukang OH 0.010 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

2 Menggali tanah biasa sedalam 1 m'


m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Tenaga Kerja Pekerja OH 0.750 65,000.00
Mandor OH 0.025 81,000.00

B Peralatan

C Jumlah harga tenaga, bahan dan peralatan


D Overhead & profit 10% + 3% x
E Jumlah harga per-satuan pekerjaan
3 Pengurugan kembali galian tanah
m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Tenaga Kerja Pekerja OH 0.500 65,000.00
Mandor OH 0.050 81,000.00

B Peralatan

C Jumlah harga tenaga, bahan dan peralatan


D Overhead & profit 10% + 3% x
E Jumlah harga per-satuan pekerjaan

4 Membuat beton mutu f'c = 7,4 Mpa (mutu K 100)


m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 247.000 1,250.00
Pasir Beton kg 869.000 185.71
Kerikil ( maks 30 mm ) kg 999.000 162.96
Air ltr 215.000 85.00

B Tenaga Kerja Pekerja OH 1.650 65,000.00


Tukang Batu OH 0.275 77,000.00
Kepala Tukang OH 0.028 89,000.00
Mandor OH 0.083 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

5 Memasang pondasi batu belah, campuran 1 PC : 8 PP


m3
Harga Satuan
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Belah 15/20 cm m3 1.200 271,000.00
PC kg 91.000 1,250.00
Pasir Pasang m3 0.584 260,000.00

B Tenaga Kerja Pekerja OH 1.500 65,000.00


Tukang Batu OH 0.750 77,000.00
Kepala Tukang OH 0.075 89,000.00
Mandor OH 0.075 81,000.00

C Peralatan
D Jumlah harga tenaga, bahan dan peralatan
E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

6 Membuat dinding bt. merah t: 1/2bata, camp 1PC:8PP


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Merah Buah 70.000 800.00
PC kg 6.500 1,250.00
Pasir Pasang m3 0.050 260,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.100 77,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

7 Memasang plesteran 1 PC : 8 PP, tebal 15 mm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 3.456 1,250.00
Pasir Pasang m3 0.029 260,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.150 77,000.00
Kepala Tukang OH 0.015 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

8 Memasang acian
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 3.250 1,250.00

B Tenaga Kerja Pekerja OH 0.200 65,000.00


Tukang Batu OH 0.100 77,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.010 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

9 Membuat beton mutu f'c = 19,3 Mpa (Mutu K 225)


m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 371.000 1,250.00
Pasir Beton kg 698.000 185.71
Kerikil ( maks 30 mm ) kg 1047.000 162.96
Air ltr 215.000 85.00

B Tenaga Kerja Pekerja OH 1.650 65,000.00


Tukang Batu OH 0.275 77,000.00
Kepala Tukang OH 0.028 89,000.00
Mandor OH 0.083 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

10 Pembesian 1 kg dengan besi polos atau besi ulir


kg
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Besi Beton ( polos/ulir ) kg 10.500 11,500.00
Kawat Beton kg 0.150 23,000.00

B Tenaga Kerja Pekerja OH 0.070 65,000.00


Tukang Besi OH 0.070 77,000.00
Kepala Tukang OH 0.007 89,000.00
Mandor OH 0.004 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
Pembesian 1 kg dengan besi polos atau besi ulir 0.10 152,648.31

11 Memasang bekisting (asumsi bahan kayu 3 x pakai)


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.013 1,628,000.00
Paku 5 cm - 10 cm kg 0.300 16,000.00
Minyak Bekisting ltr 0.100 7,400.00

B Tenaga Kerja Pekerja OH 0.520 65,000.00


Tukang Kayu OH 0.260 81,000.00
Kepala Tukang OH 0.026 89,000.00
Mandor OH 0.026 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

12 Pasang kusen pintu dan jendela kayu kamper


m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok Kayu Kamper m3 1.100 10,315,000.00
Paku 10 cm kg 1.250 16,000.00
Lem Kayu kg 1.000 13,000.00

B Tenaga Kerja Pekerja OH 7.000 65,000.00


Tukang kayu OH 21.000 81,000.00
Kepala tukang OH 2.100 89,000.00
Mandor OH 0.350 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

13 Membuat dan memasang daun pintu panel kayu kamper


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.040 11,401,000.00
Lem kayu kg 0.500 13,000.00

B Tenaga Kerja Pekerja OH 1.000 65,000.00


Tukang kayu OH 3.000 81,000.00
Kepala tukang OH 0.300 89,000.00
Mandor OH 0.050 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

14 Memasang dinding keramik uk. (20x25) cm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Keramik dind. 20/25 buah 21.200 2,783.02
PC kg 9.300 1,250.00
Pasir Pasang m3 0.018 260,000.00
Semen Warna kg 0.194 13,000.00

B Tenaga Kerja Pekerja OH 0.400 65,000.00


Tukang Batu OH 0.450 77,000.00
Kepala Tukang OH 0.030 89,000.00
Mandor OH 0.020 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

15 Pengecatan tembok baru


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plamir kg 0.100 19,000.00
Cat dasar kg 0.100 27,000.00
Cat penutup 2 X kg 0.260 27,000.00

B Tenaga Kerja Pekerja OH 0.020 65,000.00


Tukang cat OH 0.063 77,000.00
Kep.Tukang OH 0.0063 89,000.00
Mandor OH 0.003 81,000.00

C Peralatan
D Jumlah harga tenaga, bahan dan peralatan
E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

16 Memasang konstruksi gording, kayu kruing


m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok kayu m3 1.1000 7,600,000.00
Besi strip tb 5 mm kg 15.000 11,500.00
Paku 12 cm kg 3.000 16,000.00

B Tenaga Kerja Pekerja OH 6.700 65,000.00


Tukang Kayu OH 20.100 81,000.00
Kepala Tukang OH 2.010 89,000.00
Mandor OH 0.335 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

17 Memasang konstruksi gording, kayu kruing (lama)


m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok kayu m3 1.1000
Besi strip tb 5 mm kg 15.000 16,000.00
Paku 12 cm kg 3.000 23,000.00

B Tenaga Kerja Pekerja OH 6.700 65,000.00


Tukang Kayu OH 20.100 81,000.00
Kepala Tukang OH 2.010 89,000.00
Mandor OH 0.335 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

18 Memasang rangka atap (usuk/reng) genteng kayu kruing


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kaso 5/7 cm m3 0.014 7,600,000.00
Reng 2/3 cm m3 0.0036 7,600,000.00
Paku 5 cm&10 cm kg 0.250 16,000.00

B Tenaga Kerja Pekerja OH 0.100 65,000.00


Tukang Kayu OH 0.100 81,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

19 Memasang rk. atap (usuk lama/reng baru) genteng ky. kruing


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kaso 5/7 cm m3 0.014
Reng 2/3 cm m3 0.0036 7,600,000.00
Paku 5 cm&10 cm kg 0.250 16,000.00

B Tenaga Kerja Pekerja OH 0.100 65,000.00


Tukang Kayu OH 0.100 81,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.005 81,000.00
C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

20 Pasang genteng Magas Kebumen


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Genteng magas Buah 25.000 3,100.00

B Tenaga Kerja Pekerja OH 0.150 65,000.00


Tukang kayu OH 0.075 81,000.00
Kepala tukang OH 0.0075 89,000.00
Mandor OH 0.008 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

Karanganyar,

CV. BROMAS

ANTO DW
N

EPUBLIK INDONESIA

RJAAN UMUM

MBILAN TAHUN
KARANGANYAR

A.2.2.1.4.

Jumlah Total Harga


( Rp. ) ( Rp. )

19,536.00
320.00
15,197.00
35,053.00
8,100.00
6,500.00
890.00
405.00
15,895.00

-
(A+B+C) 50,948.00
D 6,623.24
(D+E) 57,571.24

A.2.3.1.1.

Jumlah Total Harga


( Rp. ) ( Rp. )

48,750.00
2,025.00
50,775.00

-
(A+B) 50,775.00
C 6,600.75
(C+D) 57,375.75
A.2.3.1.9.

Jumlah Total Harga


( Rp. ) ( Rp. )

32,500.00
4,050.00
36,550.00

-
(A+B) 36,550.00
C 4,751.50
(C+D) 41,301.50

A.4.1.1.1.

Jumlah Total Harga


( Rp. ) ( Rp. )

308,750.00
161,385.71
162,800.00
18,275.00
651,210.71
107,250.00
21,175.00
2,492.00
6,723.00
137,640.00

-
(A+B+C) 788,850.71
D 102,550.59
(D+E) 891,401.30

A.3.2.1.5.

Jumlah Total Harga


( Rp. ) ( Rp. )

325,200.00
113,750.00
151,840.00
590,790.00
97,500.00
57,750.00
6,675.00
6,075.00
168,000.00
-
(A+B+C) 758,790.00
D 98,642.70
(D+E) 857,432.70

A.4.4.1.12.

Jumlah Total Harga


( Rp. ) ( Rp. )

56,000.00
8,125.00
13,000.00
77,125.00
19,500.00
7,700.00
890.00
1,215.00
29,305.00

-
(A+B+C) 106,430.00
D 13,835.90
(D+E) 120,265.90

A.4.4.2.8.

Jumlah Total Harga


( Rp. ) ( Rp. )

4,320.00
7,540.00
11,860.00
19,500.00
11,550.00
1,335.00
1,215.00
33,600.00

-
(A+B+C) 45,460.00
D 5,909.80
(D+E) 51,369.80

A.4.4.2.27.

Jumlah Total Harga


( Rp. ) ( Rp. )
4,062.50
4,062.50
13,000.00
7,700.00
890.00
810.00
22,400.00

-
(A+B+C) 26,462.50
D 3,440.13
(D+E) 29,902.63

A.4.1.1.7.

Jumlah Total Harga


( Rp. ) ( Rp. )

463,750.00
129,628.57
170,622.22
18,275.00
782,275.79
107,250.00
21,175.00
2,492.00
6,723.00
137,640.00

-
(A+B+C) 919,915.79
D 119,589.05
(D+E) 1,039,504.84

A.4.1.1.17.

Jumlah Total Harga


( Rp. ) ( Rp. )

120,750.00
3,450.00
124,200.00
4,550.00
5,390.00
623.00
324.00
10,887.00

-
(A+B+C) 135,087.00
D 17,561.31
(D+E) 152,648.31
15,264.83

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

21,706.67
4,800.00
740.00
27,246.67
33,800.00
21,060.00
2,314.00
2,106.00
59,280.00

-
(A+B+C) 86,526.67
D 11,248.47
(D+E) 97,775.14

A.4.6.1.1b.

Jumlah Total Harga


( Rp. ) ( Rp. )

11,346,500.00
20,000.00
13,000.00
11,379,500.00
455,000.00
1,701,000.00
186,900.00
28,350.00
2,371,250.00

-
(A+B+C) 13,750,750.00
D 1,787,597.50
(D+E) 15,538,347.50

A.4.6.1.5a.

Jumlah Total Harga


( Rp. ) ( Rp. )
456,040.00
6,500.00
462,540.00
65,000.00
243,000.00
26,700.00
4,050.00
338,750.00

-
(A+B+C) 801,290.00
D 104,167.70
(D+E) 905,457.70

An.Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

59,000.00
11,625.00
4,680.00
2,522.00
77,827.00
26,000.00
34,650.00
2,670.00
1,620.00
64,940.00

-
(A+B+C) 142,767.00
D 18,559.71
(D+E) 161,326.71

A.4.7.1.10.

Jumlah Total Harga


( Rp. ) ( Rp. )

1,900.00
2,700.00
7,020.00
11,620.00
1,300.00
4,851.00
560.70
243.00
6,954.70
-
(A+B+C) 18,574.70
D 2,414.71
(D+E) 20,989.41

A.4.6.1.15b.

Jumlah Total Harga


( Rp. ) ( Rp. )

8,360,000.00
172,500.00
48,000.00
8,580,500.00
435,500.00
1,628,100.00
178,890.00
27,135.00
2,269,625.00

-
(A+B+C) 10,850,125.00
D 1,410,516.25
(D+E) 12,260,641.25

Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )
-
240,000.00
69,000.00
309,000.00
435,500.00
1,628,100.00
178,890.00
27,135.00
2,269,625.00

-
(A+B+C) 2,578,625.00
D 335,221.25
(D+E) 2,913,846.25

An.Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

106,400.00
27,360.00
4,000.00
137,760.00
6,500.00
8,100.00
890.00
405.00
15,895.00

-
(A+B+C) 153,655.00
D 19,975.15
(D+E) 173,630.15

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

-
27,360.00
4,000.00
31,360.00
6,500.00
8,100.00
890.00
405.00
15,895.00

-
(A+B+C) 47,255.00
D 6,143.15
(D+E) 53,398.15

A.4.5.2.1.

Jumlah Total Harga


( Rp. ) ( Rp. )

77,500.00
77,500.00
9,750.00
6,075.00
667.50
648.00
17,140.50

-
(A+B+C) 94,640.50
D 12,303.27
(D+E) 106,943.77

Karanganyar, ………………………… 2019

PERENCANA
CV. BROMAS DAMAR KAURIPAN

ANTO DWI STYAWAN, ST.


DIREKTUR
DAFTAR HARGA SATUAN UPAH TENAGA DAN BAHAN BANGUNAN

PROGRAM : WAJIB BELAJAR PENDIDIKAN DASAR SEMBILAN TAHUN


KEGIATAN : PEMBANGUNAN KANTIN SISWA SDN 01 KARANGANYAR
LOKASI : SDN 01 KARANGANYAR
KABUPATEN : KARANGANYAR
TAHUN ANGGARAN : 2019

SATUAN HARGA UPAH TENAGA 2019

NO NAMA UPAH SATUAN

1 Buruh tak terlatih/Pekerja OH


2 Kepala tukang batu OH
3 Kepala tukang cat OH
4 Kepala tukang gali OH
5 Kepala tukang kayu OH
6 Kepala tukang besi OH
7 Mandor OH
8 Tukang besi OH
9 Tukang cat OH
10 Tukang batu OH
11 Tukang gali OH
12 Tukang kayu OH

SATUAN HARGA BAHAN BANGUNAN 2019

NO NAMA BAHAN SATUAN

1 Kayu begesting m³
2 Paku usuk kg
3 Kayu sengon papan m³
4 Bongkaran dan pembersihan ls
5 Portland Cement (PC) 40 Kg kg
6 Pasir beton m³
7 Batu pecah 2/3 cm (split), cruser m³
8 Air ltr
9 Batu kali m³
10 Pasir pasang m³
11 Batu bata merah bh
12 Besi beton kg
13 Kawat bendrat kg
14 Minyak begesting ltr
15 Kayu kamper Balok m³
16 Lem kayu kg
17 Kayu kamper Papan m³
18 PC warna (40 Kg) kg
19 Keramik 20x25 (dinding) m2
20 Plamir kg
21 Cat tembok ( dalam ) kg
22 Kayu kruing Balok m³
23 Genteng magas kebumen bh

Karanganyar, …………………………

CV. BROMAS DAMAR KAURIPA


N BAHAN BANGUNAN

MBILAN TAHUN
KARANGANYAR

HARGA KET.

65,000.00
89,000.00
89,000.00
89,000.00
89,000.00
89,000.00
81,000.00
77,000.00
77,000.00
77,000.00
77,000.00
81,000.00

HARGA KET.

1,628,000.00
16,000.00
2,171,000.00
500,000.00
1,250.00
260,000.00
220,000.00
85.00
271,000.00
260,000.00
800.00
11,500.00
23,000.00
7,400.00
10,315,000.00
13,000.00
11,401,000.00
13,000.00
59,000.00
19,000.00
27,000.00
7,600,000.00
3,100.00

Karanganyar, ………………………… 2019

PERENCANA
CV. BROMAS DAMAR KAURIPAN

ANTO DWI STYAWAN, ST.


DIREKTUR
REKAPITULASI HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM KABUPATEN KARANGANYAR
BIDANG KECIPTAKARYAAN
TAHUN ANGGARAN 2017

NO. URAIAN ANALYSA

1 2 3

1 Administrasi dan dokumentasi An. Dihitung


2 Pembersihan lapangan dan perataan A.2.2.1.9.
3 Pengukuran dan pemasangan bouwplank A.2.2.1.4.
4 Bongkaran dinding tembok bata merah A.2.2.1.14.
5 Bongkaran beton bertulang A.2.2.1.13.
6 Menggali tanah biasa sedalam 1 m' A.2.3.1.1.
7 Menggali tanah biasa sedalam 2 m' A.2.3.1.2.
8 Menggali tanah biasa sedalam 3 meter A.2.3.1.3.
9 Menggali tanah keras sedalam 1 meter A.2.3.1.4.
10 Menggali tanah cadas sedalam 1 meter A.2.3.1.5.
11 Menggali tanah lumpur sedalam 1 meter A.2.3.1.6.
12 Mengerjakan stripping tebing 1 meter A.2.3.1.7.
13 (K3) Membuang tanah sejauh 30 meter A.2.3.1.8.
14 Pengurugan kembali galian tanah A.2.3.1.9.
15 (K3) Memadatkan tanah ( per 20 cm ) A.2.3.1.10.
16 Urug tanah padat An. Dihitung
17 Mengurug pasir urug A.2.3.1.11.
18 Memasang Lapisan pudel campuran 1 Kp : 3 PP : 7 TL A.2.3.1.12.
19 Memasang Lapisan pudel campuran 1 Kp : 5 TL T.6.13.2008
20 Memasang lapisan ijuk tebal 10 cm untuk bidang resapan A.2.3.1.13.
21 Urugan tanah mendatangkan dan dipadatkan A.2.3.1.10.+bahan
22 Mengurug sirtu padat A.2.3.1.14.
23 Memasang pondasi batu belah, campuran 1 PC : 3 PP A.3.2.1.1.
24 Memasang pondasi batu belah, campuran 1 PC : 4 PP A.3.2.1.2.
25 Memasang pondasi batu belah, campuran 1 PC : 5 PP A.3.2.1.3.
26 Memasang pondasi batu belah, campuran 1 PC : 6 PP A.3.2.1.4.
27 Memasang pondasi batu belah, campuran 1 PC : 8 PP A.3.2.1.5.
28 Memasang pondasi batu belah, campuran 1 KP : 1 SM : 2 PP A.3.2.1.6.
29 Memasang pondasi bt belah, camp 1 PC : 3 KP : 10 PP A.3.2.1.7
30 Memasang pondasi batu belah, campuran 1/4 PC : 1 KP : 4 PP A.3.2.1.8.
31 (K3) Memasang batu kosong ( anstamping ) A.3.2.1.9.
32 Memasang pondasi siklop, A.3.2.1.10.
33 Memasang pondasi sumuran, diameter 100 cm A.3.2.1.11.
34 Membuat dinding bata merah tebal 1 bata , camp 1 PC : 2 PP A.4.4.1.1.
35 Membuat dinding bata merah tebal 1 bata , camp 1 PC : 3 PP A.4.4.1.2.
36 Membuat dinding bata merah tebal 1 bata , camp 1 PC : 4 PP A.4.4.1.3.
37 Membuat dinding bata merah tebal 1 bata , camp 1 PC : 5 PP A.4.4.1.4.
38 Membuat dinding bata merah tebal 1 bata , camp 1 PC : 6 PP A.4.4.1.5.
39 Membuat dinding bata merah tebal 1 bata , camp 1 PC : 3 KP : 10 PP A.4.4.1.6
40 Membuat dinding bata merah tebal 1/2 bata , camp 1 PC : 2 PP A.4.4.1.7.
41 Membuat dinding bata merah tebal 1/2 bata , camp 1 PC : 3 PP A.4.4.1.8.
42 Membuat dinding bata merah tebal 1/2 bata , camp 1 PC : 4 PP A.4.4.1.9.
43 Membuat dinding bata merah tebal 1/2 bata , camp 1 PC : 5 PP A.4.4.1.10.
44 Membuat dinding bata merah tebal 1/2 bata , camp 1 PC : 6 PP A.4.4.1.11.
45 Membuat dinding bt. merah t: 1/2bata, camp 1PC:8PP A.4.4.1.12.
46 Membuat dinding bt merah tebal 1/2 bt camp 1 PC : 3 KP : 10 PP A.4.4.1.13
47 Membuat dinding bata merah tebal 1/2 bata , camp 1 KP : 1 SM : 1 PP A.4.4.1.14.
48 Memasang dinding bt merah tebal 1/2 bata , camp 1 KP : 1 SM : 2 PP A.4.4.1.15.
49 Memasang dinding HB/CB 20 , camp 1 PC : 3 PP A.4.4.1.16.
50 Memasang dinding HB/CB 20 , camp 1 PC : 4 PP A.4.4.1.17.
51 Memasang dinding HB/CB 15 , camp 1 PC : 3 PP A.4.4.1.18.
52 Memasang dinding HB/CB 15 , camp 1 PC : 4 PP A.4.4.1.19.
53 Memasang dinding HB/CB 10 , camp 1 PC : 3 PP A.4.4.1.20.
54 Memasang dinding HB 10 , camp 1 PC : 4 PP A.4.4.1.21.
55 Memasang dinding terawang ( roster ), camp. 1 PC : 3 PP A.4.4.1.22.
56 Memasang dinding terawang ( roster ) camp 1 PC : 4 PP A.4.4.1.23.
57 Memasang dinding bata berongga ekspose ukuran , camp. 1 PC : 3 PP A.4.4.1.24.
58 Memasang dinding terawang (roster) tanah/genting A.2.2.1.23.a.
59 Memasang glass blok An. Dihitung
60 Memasang plesteran 1 PC : 1 PP, tebal 15 mm A.4.4.2.1.
61 Memasang plesteran 1 PC : 2 PP, tebal 15 mm A.4.4.2.2.
62 Memasang plesteran 1 PC : 3 PP, tebal 15 mm A.4.4.2.3.
63 Memasang plesteran 1 PC : 4 PP, tebal 15 mm A.4.4.2.4.
64 Memasang plesteran 1 PC : 5 PP, tebal 15 mm A.4.4.2.5.
65 Memasang plesteran 1 PC : 6 PP, tebal 15 mm A.4.4.2.6.
66 Memasang plesteran 1 PC : 7 PP, tebal 15 mm A.4.4.2.7.
67 Memasang plesteran 1 PC : 8 PP, tebal 15 mm A.4.4.2.8.
68 Memasang plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm A.4.4.2.9.
69 Memasang plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm A.4.4.2.10.
70 Memasang plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm A.4.4.2.11.
71 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm A.4.4.2.12.
72 Memasang plesteran 1 PC : 2 PP, tebal 20 mm A.4.4.2.13.
73 Memasang plesteran 1 PC : 3 PP, tebal 20 mm A.4.4.2.14.
74 Memasang plesteran 1 PC : 4 PP, tebal 20 mm A.4.4.2.15.
75 Memasang plesteran 1 PC : 5 PP, tebal 20 mm A.4.4.2.16.
76 Memasang plesteran 1 PC : 6 PP, tebal 20 mm A.4.4.2.17.
77 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm A.4.4.2.18.
78 Memasang Berapen 1 PC : 5 PP, tebal 15 mm A.4.4.2.19.
79 Memasang Plesteran Skoning 1 PC : 3 PP, tebal 10 mm A.4.4.2.20.
80 Memasang Plesteran Granit 1 PC : 2 Granit, tebal 10 mm A.4.4.2.21.
81 Memasang Plesteran Teraso, 1 PC : 2 Batu Teraso, tebal 10 mm A.4.4.2.22.
82 Memasang Plesteran Ciprat 1 PC : 2 PP A.4.4.2.23.
83 Memasang finishing siar pasangan dinding bata merah ( = 20 M' ) A.4.4.2.24.
84 Memasang finishing siar pasangan dinding conblock ekspose ( = 8 M' ) A.4.4.2.25.
85 Memasang finishing siar pasangan batu kali adukan 1 PC : 2 PP A.4.4.2.26.
86 Memasang acian A.4.4.2.27.
87 Err:509 ls
88 Pasang kusen pintu dan kusen jendela, kayu kelas I A.4.6.1.1.
89 Pasang kusen pintu dan jendela kayu bangkiray A.4.6.1.1a.
90 Pasang kusen pintu dan jendela kayu kamper A.4.6.1.1b.
91 Pasang kusen pintu dan kusen jendela, kayu kelas II atau III A.4.6.1.2.
92 Pasang kusen pintu dan jendela kayu jati hutan A.4.6.1.2a.
93 Pasang kusen pintu dan jendela, kayu jati lokal A.4.6.1.2b.
94 Pasang kusen pintu dan jendela, kayu kruing A.4.6.1.2c.
95 Pasang pintu klamp standar, kayu kelas II A.4.6.1.3.
96 Membuat dan memasang pintu klamp sederhana, kayu kelas III A.4.6.1.4.
97 Membuat dan memasang pintu panil , kayu jati lokal A.4.6.1.5c.
98 Membuat dan memasang pintu panil , kayu jati hutan A.4.6.1.5b.
99 Membuat dan memasang daun pintu panel kayu kamper A.4.6.1.5a.
100 Membuat dan memasang pintu dan jendela kaca , kayu jati lokal A.4.6.1.6c.
101 Membuat dan memasang pintu dan jendela kaca , kayu jati hutan A.4.6.1.6b.
102 Err:509 Err:509
103 Membuat dan memasang pintu dan jendela jalusi, kayu kelas I atau II A.4.6.1.7.
104 Membuat daun pintu kayu lapis ( plywood) rangkap, rangka tertutup ky kelas II A.4.6.1.8.
105 Membuat pintu plywood rangkap, rangka ekspose kayu kelas I atau II A.4.6.1.9.
106 Memasang jalusi kusen, kelas I atau Kelas II A.4.6.1.10.
107 Memasang teakwood rangkap, rangka expose kayu kelas I A.4.6.1.11.
108 Memasang teakwood rangkap lapis formika, rangka expose kayu kelas II A.4.6.1.12.
109 Memasang konstruksi kuda-kuda , kayu kelas I, II dan III A.4.6.1.13.
110 Memasang konstruksi kuda-kuda konvensional kayu bangkiray A.4.6.1.13a.
111 Memasang konstruksi kuda-kuda konvensional kayu kruing A.4.6.1.13b.
112 Memasang konstruksi kuda-kuda konvensional Kayu Jati hutan A.4.6.1.13c.
113 Memasang konstruksi kuda-kuda konvensional, Kayu lama A.4.6.1.13d.
114 Memasang konstruksi kuda-kuda ekspose, kayu kelas I A.4.6.1.14.
115 Memasang konstruksi gording, kayu kelas II A.4.6.1.15.
116 Memasang konstruksi gording, kayu bangkiray A.4.6.1.15a.
117 Memasang konstruksi gording, kayu kruing A.4.6.1.15b.
118 Memasang rangka atap (usuk/reng) genteng kayu kelas II A.4.6.1.16.
119 Memasang rangka atap (usuk/reng) genteng kayu bangkiray A.4.6.1.16a.
120 Memasang rangka atap (usuk/reng) genteng kayu kruing A.4.6.1.16b.
121 Memasang rangka atap (usuk lama/reng baru) kayu kruing K.6.16.2008.c
122 Memasang rk. atap (usuk lama/reng baru) genteng ky. kruing An. Dihitung
123 Memasang rangka atap genteng beton, kayu kelas II A.4.6.1.17.
124 Memasang rangka atap genteng beton, kayu kruing A.4.6.1.17a.
125 Memasang rangka atap sirap, kayu kelas II A.4.6.1.18.
126 Memasang rangka atap sirap, kayu kruing A.4.6.1.18a.
127 Memasang langit-langit ( 50 x 100 ) cm kayu kelas II atau III A.4.6.1.19.
128 Memasang langit-langit (50x100) cm kayu kruing A.4.6.1.19a.
129 Memasang langit-langit ( 60 x 60 ) cm kayu kelas II atau III A.4.6.1.20.
130 Memasang langit-langit ( 60 x 60 ) cm kayu kruing A.4.6.1.20a.
131 Memasang lisplank ukuran ( 3 x 20 ) cm, kayu klas I / II A.4.6.1.21.
132 Memasang lisplank ukuran (3x20) cm, kayu kruing A.4.6.1.21a.
133 Memasang lisplank ukuran (3x20) cm, kayu kamper A.4.6.1.21b.
134 Err:509 Err:509
135 Memasang lisplank ukuran (3x30) cm, kayu kelas I atau II A.4.6.1.22.
136 Memasang lisplank ukuran ( 3 x 30 ) cm, kayu bangkiray A.4.6.1.22a.
137 Memasang lisplank ukuran ( 3 x 30 ) cm, kayu kamper A.4.6.1.22b.
138 Memasang rangka dinding pemisah ( 60 x 120 ) cm kayu kruing ( kelas II atau II A.4.6.1.23.
139 Memasang dinding pemisah teakwood rangkap, rangka kayu kelas II A.4.6.1.24.
140 Memasang dinding pemisah plywood rangkap, rangka kayu kelas II A.4.6.1.25.
141 Memasang dinding lambriziring dari papan kayu kelas I A.4.6.1.26.
142 Memasang dinding lambriziring dari plywood ukuran ( 120 x 240 ) cm A.4.6.1.27.
143 Memasang dinding dinding bilik, rangka kayu kelas III atau IV A.4.6.1.28.
144 Membuat beton mutu f'c = 7,4 Mpa (mutu K 100) A.4.1.1.1.
145 Membuat beton mutu f'c = 9,8 Mpa (mutu K125) A.4.1.1.2.
146 Membuat beton mutu f'c =12,2 Mpa A.4.1.1.3.
147 Membuat lantai kerja beton mutu f'c = 7,4 Mpa slump (3-6) cm, w/c = 0,87 A.4.1.1.4.
148 Err:509 Err:509
149 Membuat beton mutu f'c = 16,9 Mpa A.4.1.1.6.
150 Membuat beton mutu f'c = 19,3 Mpa (Mutu K 225) A.4.1.1.7.
151 Membuat beton mutu f'c = 21,7 Mpa A.4.1.1.8.
152 Membuat beton mutu f'c = 24,0 Mpa A.4.1.1.9.
153 Membuat beton mutu f'c = 26,4 Mpa A.4.1.1.10.
154 Membuat beton mutu f'c = 28,8 Mpa A.4.1.1.11.
155 Membuat beton mutu f'c = 31,2 Mpa ( K 350 ), slump ( 120 + 20 )mm A.4.1.1.12.
156 Membuat beton kedap air dengan strorox - 100 A.4.1.1.13.
157 Membuat PVC Waterstop lebar 150 mm A.4.1.1.14.
158 Membuat PVC Waterstop lebar 200 mm A.4.1.1.15.
159 Membuat PVC Waterstop lebar 230 mm - 320 mm A.4.1.1.16.
160 Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17.
161 Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17.
162 Memasang 10 kg kabel presstressed polos / strands A.4.1.1.18.
163 Memasang 10 kg jaring kawat baja / wire mesh A.4.1.1.19.
164 (K3) Memasang bekisting untuk pondasi A.4.1.1.20.
165 (K3) Memasang bekisting untuk sloof A.4.1.1.21.
166 Err:509 Err:509
167 (K3) Memasang bekisting untuk kolom A.4.1.1.22.
168 (K3) Memasang bekisting untuk balok A.4.1.1.23.
169 (K3) Memasang bekisting untuk lantai A.4.1.1.24
170 Memasang bekisting (asumsi bahan kayu 3 x pakai) An. Dihitung
171 (K3) Memasang bekisting untuk dinding A.4.1.1.25.
172 (K3) Memasang bekisting untuk tangga A.4.1.1.26.
173 Memasang jembatan untuk pengecoran beton A.4.1.1.27.
174 Membuat pondasi beton bertulang ( 150 kg besi + bekisting ) Bt.6.28.2008
175 Membuat pondasi beton K.225 (150 kg besi + bekisting) Bt.6.28.2008.a
176 Membuat pondasi beton K.175 (150 kg besi + bekisting) Bt.6.28.2008.b
177 Membuat sloof beton bertulang ( 200 kg besi + bekisting ) Bt.6.29.2008
178 Membuat sloof beton K.225 ( 150 kg besi + bekisting ) Bt.6.29.2008.a
179 Membuat sloof beton K.175 ( 150 kg besi + bekisting ) Bt.6.29.2008.b
180 Membuat kolom beton bertulang ( 300 kg besi + bekisting ) Bt.6.30.2008
181 Membuat kolom beton K.225 ( 300 kg besi + bekisting ) Bt.6.30.2008.a
182 Membuat kolom beton K.225 (200 kg besi + bekisting) Bt.6.30.2008.b
183 Membuat kolom beton K.225 (150 kg besi + bekisting) Bt.6.30.2008.c
184 Membuat kolom beton K.175 (150 kg besi + bekisting) Bt.6.30.2008.d
185 Membuat balok beton bertulang ( 200 kg besi + bekisting ) Bt.6.31.2008
186 Membuat balok beton K.225 ( 200 kg besi + bekisting ) Bt.6.31.2008.a
187 Membuat balok beton K.225 ( 150 kg besi + bekisting ) Bt.6.31.2008.b
188 Membuat balok beton K.175 ( 150 kg besi + bekisting ) Bt.6.31.2008.c
189 Membuat plat beton bertulang ( 150 kg besi + bekisting ) Bt.6.32.2008
190 Membuat plat beton K.225 ( 150 kg besi + bekisting ) Bt.6.32.2008.a
191 Membuat plat beton K.175 ( 150 kg besi + bekisting ) Bt.6.32.2008.b
192 Membuat plat beton K.225 ( 125 kg besi + bekisting ) Bt.6.32.2008.c
193 Membuat dinding beton bertulang ( 150 kg besi + bekisting ) Bt.6.33.2008
194 Membuat dinding beton K.175 ( 150 kg besi + bekisting ) Bt.6.33.2008.a
195 Membuat dinding beton bertulang ( 200 kg besi + bekisting ) Bt.6.34.2008
196 Membuat kolom praktis beton bertulang ( 11 x 11 ) cm Bt.6.35.2008
197 Membuat kolom praktis beton bertulang 11/11 cm A.4.1.1.35.
198 Membuat ring balok beton bertulang ( 10 x 15 ) cm A.4.1.1.36.
199 Membuat ring balok beton bertulang 10/15 cm Bt.6.36.2008.a
200 Memasang langit-langit asbes semen, tebal 4 mm, 5 mm, 6 mm A.4.5.1.1.
201 Memasang langit-langit harplek A.4.5.1.1a.
202 Memasang langit-langit akustik ukuran ( 30 x 30 ) cm A.4.5.1.2.
203 Memasang langit-langit akustik ukuran ( 30 x 60 ) cm A.4.5.1.3.
204 Memasang langit-langit akustik ukuran ( 60 x 120 ) cm A.4.5.1.4.
205 Memasang langit-langit tripleks uk ( 120 x 240 ) cm, tebal 3 mm, 4 mm dan 6 A.4.5.1.5.
206 Memasang langit-langit lambriziring kayu, tebal 9 mm. A.4.5.1.6.
207 Err:509 Err:509
208 Memasang langit-langit GRC ukuran ( 120 x 240 ) , tb. 5 mm. L.6.7.2008.a
209 Memasang list plafond gypsum profil Dihitung
210 Memasang langit-langit akustik ukuran ( 60 x 120 ) cm + rangka alluminium A.4.5.1.8.
211 Memasang list langit-langit kayu profil A.4.5.1.9.
212 Memasang 1 m2 rangka plafond galvanis ukuran (60x80) cm Dihitung
213 Memasang rk. plafond besi hollow uk. (60x80) cm A.4.2.1.20.
214 Memasang besi profil A.4.2.1.1.
215 Memasang rangka kuda - kuda baja IWF A.4.2.1.2.
216 Mengerjakan 100 kg pekerjaan perakitan A.4.2.1.3.
217 Membuat pintu besi plat baja t: 2 mm rangkap, rk. baja siku A.4.2.1.4.
218 Mengerjakan 10 cm pengelasan dengan las listrik A.4.2.1.5.
219 Membuat rangka jendela besi scuare tube A.4.2.1.6.
220 Memasang pintu rolling door besi A.4.2.1.7.
221 Memasang pintu lipat (folding door) bahan besi A.4.2.1.8.
222 Memasang sunscreen alluminium A.4.2.1.9.
223 Memasang rolling door alluminium A.4.2.1.10.
224 Memasang kusen pintu/jendela alluminium A.4.2.1.11.
225 Memasang pintu alluminium strip lebar 8 cm A.4.2.1.12.
226 Memasang pintu kaca es rangka alluminium coklat An. Dihitung
227 Memasang jendela & boven kaca rangka aluminium coklat An. Dihitung
228 Memasang pintu multiplex rangka alluminium coklat Dihitung
229 Memasang venetions blinds dan vertical blinds A.4.2.1.14.
230 Memasang terali besi strip ( 2 x 3 ) mm A.4.2.1.15.
231 Memasang kawat nyamuk A.4.2.1.16.
232 Memasang jendela nako dan tralis A.4.2.1.17.
233 Membuat pintu besi plat baja tebal 2 mm, rangka baja siku An. Dihitung
234 Memasang pintu PVC An. Dihitung
235 Memasang pintu KM/WC PVC An. Dihitung
236 Memasang talang datar / jurai seng bjls 28 lebar 90 cm A.4.2.1.18.
237 Memasang talang 1/2 lingkaran D -15 cm seng plat BJLS 30 lebar 45 cm A.4.2.1.19.
238 Memasang lantai ubin PC abu-abu ukuran ( 40 x 40 ) cm A.4.4.3.1.
239 Memasang lantai ubin PC abu-abu ukuran ( 30 x 30 ) cm A.4.4.3.2.
240 Memasang lantai ubin PC abu-abu ukuran ( 20 x 20 ) cm A.4.4.3.3.
241 Memasang lantai ubin warna ( 40 x 40 ) cm A.4.4.3.4.
242 Memasang lantai ubin warna ( 30 x 30 ) cm A.4.4.3.5.
243 Memasang lantai ubin warna ( 20 x 20 ) cm A.4.4.3.6.
244 Memasang lantai ubin teraso ( 40 x 40 ) cm A.4.4.3.7.
245 Memasang lantai ubin teraso ( 30 x 30 ) cm A.4.4.3.8.
246 Memasang lantai granit tile warna muda( 40 x 40 ) cm A.4.4.3.9.
247 Memasang lantai ubin granit ( 30 x 30 ) cm A.4.4.3.10.
248 Memasang lantai granit tile warna tua ( 60 x 60 ) cm An.Dihitung
249 Memasang lantai ubin granit ( 60 x 60 ) cm, import TL.6.10.2008.b
250 Memasang lantai ubin teralux ukuran ( 40 x 40 ) cm A.4.4.3.11.
251 Memasang lantai ubin teralux ukuran ( 30 x 30 ) cm A.4.4.3.12.
252 Memasang lantai ubin teralux marmer ukuran ( 60 x 60 ) cm A.4.4.3.13.
253 Memasang lantai ubin teralux marmer ukuran ( 40 x 40 ) cm A.4.4.3.14.
254 Memasang lantai ubin teralux marmer ukuran ( 30 x 30 ) cm A.4.4.3.15.
255 Memasang plint ubin PC abu-abu ukuran ( 15 x 20 ) cm A.4.4.3.16.
256 Memasang plint ubin PC abu-abu ukuran ( 10 x 30 ) cm A.4.4.3.17.
257 Memasang plint ubin PC abu-abu ukuran ( 10 x 40 ) cm A.4.4.3.18.
258 Memasang plint ubin PC warna ukuran ( 10 x 20 ) cm A.4.4.3.19.
259 Memasang plint ubin PC warna ukuran ( 10 x 30 ) cm A.4.4.3.20.
260 Memasang plint ubin PC warna ukuran ( 10 x 40 ) cm A.4.4.3.21.
261 Memasang plint ubin teraso ukuran ( 10 x 30 ) cm A.4.4.3.22.
262 Memasang plint ubin teraso ukuran ( 10 x 40 ) cm A.4.4.3.23.
263 Memasang plint ubin granit ukuran ( 10 x 40 ) cm A.4.4.3.24.
264 Memasang plint ubin granit ukuran ( 10 x 30 ) cm A.4.4.3.25.
265 Memasang plint ubin teralux kerang ukuran ( 10 x 40 ) cm A.4.4.3.26.
266 Memasang plint ubin teralux kerang uk. ( 10 x 30 ) cm A.4.4.3.27.
267 Memasang plint ubin teralux marmer uk. (10 x 60) cm A.4.4.3.28.
268 Memasang plint ubin teralux marmer ukuran (10 x 40) cm A.4.4.3.29.
269 Memasang plint ubin teralux marmer ukuran ( 10 x 30 ) cm A.4.4.3.30.
270 Memasang lantai teraso cor di tempat tebal 3 cm A.4.4.3.31.
271 Memasang lantai keramik artistik ukuran ( 10 x 20 ) cm A.4.4.3.32.
272 Memasang lantai keramik artistik ukuran ( 10 x 10 ) cm atau ( 5 x20 ) cm A.4.4.3.33.
273 Memasang lantai keramik ukuran ( 33 x 33 ) cm A.4.4.3.34.
274 Memasang lantai keramik ukuran 30/30 cm dof A.4.4.3.35.
275 Memasang lantai keramik uk. (30x30) cm A.4.4.3.35.
276 Memasang lantai keramik uk. (20x20) cm A.4.4.3.36.
277 Memasang lantai keramik ukuran ( 10 x 33 ) cm, variasi / border A.4.4.3.37.
278 Memasang lantai mosaik ukuran ( 30 x 30 ) cm, campuran spesi 1 PC : 3 PP A.4.4.3.38.
279 Memasang plint keramik ukuran ( 10 x 10 ) cm A.4.4.3.40.
280 Memasang plint keramik ukuran ( 5 x 20 ) cm A.4.4.3.41.
281 Memasang plint internal cove artistik ukuran( 5 x 5 x 20 ) cm A.4.4.3.42.
282 Memasang lantai marmer ukuran ( 100 x 100 ) cm A.4.4.3.43.
283 Memasang lantai karpet A.4.4.3.44.
284 Memasang underlayer / rubber corrugated A.4.4.3.45.
285 Memasang lantai parquet kayu A.4.4.3.46.
286 Memasang lantai kayu (gymfloor) A.4.4.3.47.
287 Memasang dinding porselen ukuran ( 11 x 11 ) cm A.4.4.3.48.
288 Memasang dinding porselen ukuran ( 10 x 20 ) cm A.4.4.3.49.
289 Memasang dinding porselen ukuran ( 20 x 20 ) cm A.4.4.3.50.
290 Memasang dinding keramik artistik ukuran ( 10 x 20 ) cm A.4.4.3.51.
291 Memasang dinding keramik artistik ukuran ( 5 x 20 ) cm A.4.4.3.52.
292 Memasang dinding keramik ukuran ( 10 x 20 ) cm A.4.4.3.53.
293 Memasang dinding keramik uk. (20x20) cm A.4.4.3.54.
294 Memasang dinding marmer ukuran (100 x 100) cm A.4.4.3.55.
295 Memasang dinding bata pelapis ukuran ( 3 x 7 x 24 ) cm A.4.4.3.56.
296 Memasang dinding batu paras A.4.4.3.57.
297 Memasang dinding batu tempel hitam/lempeng A.4.4.3.58.
298 Pasang batu lempeng tdk beraturan tanpa nat A.4.4.3.58a.
299 Pasang batu andesit 3x30 A.4.4.3.58b.
300 Memasang lantai vinyl ukuran ( 30 x 30 ) cm KL I A.4.4.3.59.
301 Memasang wallpaper, lebar 50 cm A.4.4.3.60.
302 Memasang floor hardener A.4.4.3.61.
303 Memasang plint vinil karet ukuran ( 15 x 30 ) cm dengan perekat A.4.4.3.62.
304 Memasang plint kayu kelas II ukuran ( 2 x 10 ) cm A.4.4.3.63.
305 Memasang lantai keramik uk. (40x40) cm An. Dihitung
306 Memasang lantai keramik uk. (60x60) cm An. Dihitung
307 Memasang lantai keramik uk. (60x60) cm, exterior texture An. Dihitung
308 Memasang dinding keramik uk. (30x60) cm An. Dihitung
309 Memasang plint keramik uk. (10 x 60) cm A.4.4.3.28.a.
310 Memasang plint keramik uk. (10 x 30) cm A.4.4.3.27.a.
311 Memasang plint keramik uk. (10x20) cm A.4.4.3.39.
312 Memasang plint keramik uk. (10x40) cm A.4.4.3.39a.
313 Memasang plint keramik uk. (10x60) cm A.4.4.3.39b.
314 Memasang 1 m' "step nose" uk. (10x40) cm An. Dihitung
315 Memasang hospital plint A.4.4.3.25.
316 Pasang genteng Magas Kebumen A.4.5.2.1.
317 Pasang genteng Kodok Kebumen At.8.6.2.2002
318 Pasang genteng keramik A.4.5.2.2.
319 Err:509 Err:509
320 Pasang genteng bubung keramik A.4.5.2.5.
321 Pasang genteng bubung Kodok Kebumen At.8.6.5.2002
322 Pasang atap asbes gelombang (2,00x0,92 m') x 5 mm A.4.5.2.10.
323 Pasang atap asbes gelombang ( 3,00 x 1,08 m' ) x 6 mm A.4.5.2.17.
324 Pasang bubung stel gelombang 0,92 m A.4.5.2.22.
325 Pasang bubung stel gelombang 1,08 m' A.4.5.2.24.
326 Pasang atap sirap At.8.6.33.2002
327 Pasang genteng bubung sirap At.8.6.37.2002
328 Pasang penutup atap galvalum A.4.5.2.17.
329 Pasang bubungan galvalum A.4.5.2.39a.
330 Pasang atap seng gelombang A.4.5.2.39.
331 Pasang atap nok seng A.4.5.2.40.
332 Pasang atap Multiroof( 0.3mm) Daftar harga
333 Pasang bubungan Multiroof Daftar harga
334 Memasang atap onduline An. Dihitung
335 Memasang kerpus onduline An. Dihitung
336 Pasang aluminium foil/sisalation A.4.5.2.43.
337 Err:509 Daftar harga
338 Memasang kloset duduk/monoblok A.5.1.1.1.
339 Memasang kloset jongklok porselin A.5.1.1.2.
340 Memasang urinoir A.5.1.1.4.
341 Memasang wastafel A.5.1.1.5.
342 Memasang bathcuip porselin A.5.1.1.6.
343 Memasang bak fiberglass, vol. 0,5 m3 air Sn.11.6.11.2002
344 Memasang bak fiberglass, vol. 1,0 m3 air A.5.1.1.7.
345 Memasang floor drain A.5.1.1.14.
346 Memasang bak kontrol pas. Batu bata ( 45 x 45 x 50 cm) A.5.1.1.16.
347 Memasang bak kontrol pas. Batu bata ( 60 x 60 x 65 cm) A.5.1.1.17.
348 Memasang pipa galvanis diameter 3/4" A.5.1.1.20.
349 Memasang pipa galvanis diameter 1,5" A.5.1.1.22.
350 Memasang pipa PVC tipe AW diameter 1/2" A.5.1.1.25.
351 Memasang pipa PVC tipe AW diameter 3/4" A.5.1.1.26.
352 Memasang pipa PVC tipe AW diameter 1" A.5.1.1.27.
353 Memasang pipa PVC tipe AW diameter 1 1/2" A.5.1.1.28.
354 Memasang pipa PVC tipe AW diameter 2" A.5.1.1.29.
355 Memasang pipa PVC tipe AW diameter 2,5" A.5.1.1.30.
356 Memasang pipa PVC tipe AW diameter 3" A.5.1.1.31.
357 Memasang pipa PVC tipe AW diameter 4" A.5.1.1.32.
358 Memasang bak cuci piring stainlessteel A.5.1.1.12.
359 Memasang kran diameter 1/2" atau 3/4", biasa A.5.1.1.19.
360 Pasang stop kran bahan kuningan ukuran 3/4 " An. Dihitung
361 Pasang avour stainless An. Dihitung
362 Pasang Jet shower An. Dihitung
363 Pasang shower komplit An. Dihitung
364 Pasang tempat sabun tanam keramik Dihitung
365 Memasang saluran U.20 cm A.5.1.1.35b.
366 Memasang pipa beton diameter 15-20 cm A.5.1.1.35.
367 Grill besi beton Harga Satuan
368 Pasang talang U PVC Harga Satuan
369 Pembuatan groundtank ( 2 m x 2 m x 3 m ) Dihitung
370 Tandon air stainless 1 m3 Harga Satuan
371 Pembuatan septictank lengkap Harga Satuan
372 Sumur resapan Harga Satuan
373 Memasang kunci tanam biasa A.4.6.2.2.
374 Err:509 Err:509
375 Memasang engsel pintu, sedang Kc.12.6.5.2002.a
376 Memasang engsel pintu, super Kc.12.6.5.2002.b
377 Err:509 Err:509
378 Err:509 Err:509
379 Memasang hak angin, sedang Kc.12.6.9.2002.a
380 Memasang hak angin, super Kc.12.6.9.2002.b
381 Err:509 Err:509
382 Memasang handel jendela An. Dihitung
383 Err:509 Err:509
384 Memasang grendel, sedang An. Dihitung
385 Memasang grendel, super An. Dihitung
386 Memasang pegangan pintu / door holder A.4.6.2.12.
387 Pasang kaca tebal 3 mm A.4.6.2.16.
388 Err:509 Err:509
389 Pasang kaca tebal 8 mm A.4.6.2.18.
390 Pasang kaca rayban tebal 5 mm A.4.6.2.17a.
391 Pasang kaca es tebal 5 mm A.4.6.2.17b.
392 Kaca framelist 8 mm Daftar harga
393 Kaca tempered 12 mm + komplit Daftar harga
394 Pengecatan bidang kayu lama An.Rev.SNI 14.6.7.2002
395 Err:509 Err:509
396 Pelaburan bidang kayu dengan politur A.4.7.1.7.
397 Pelaburan bidang kayu dengan cat residu dan ter A.4.7.1.8.
398 Pelaburan bidang kayu dengan vernis A.4.7.1.9.
399 Pengecatan tembok baru A.4.7.1.10.
400 Pengecatan dinding exterior A.4.7.1.10a.
401 Pengecatan tembok lama A.4.7.1.11.
402 Pengecatan permukaan baja dengan meni besi A.4.7.1.16.
403 Coating batu alam Daftar harga
404 Waterproofing atap dak Daftar harga
405 Plat expose compound An. Dihitung
406 (K3) Memasang 1 buah titik lampu A.8.4.6.1.
407 Memasang lampu SL 20 watt An. Dihitung
408 Err:509 Err:509
409 Sparingan Instalasi Listrik (Pipa 5/8", kabel NYM 2x2,5, T dus, Over Dus, dll Harga Satuan
410 Err:509 Err:509
411 Err:509 Err:509
412 Err:509 Err:509
413 Memasang lampu downlight ukuran 4" An. Dihitung
414 Memasang lampu downlight SL 18 Watt Harga Satuan
415 Memasang downlight ukuran 4" dg lampu SL 18 watt Harga Satuan
416 Pasang kabel pembagi Harga Satuan
417 (K3) Memasang 1 buah MCB A.8.4.6.2.
418 Pasang Box MCB An. Dihitung
419 Pasang listrik baru 22000 watt Harga Satuan
420 Pasang listrik baru 2200 watt Harga Satuan
421 Instalasi jaringan AC Harga Satuan
422 Sparingan Instalasi Listrik (Pipa 5/8", kabel NYM 2x2,5, T dus, Over Dus, dll Harga Satuan
423 Memasang paving block natural tebal 6 cm A.4.4.3.64.
424 Memasang paving block berwarna tebal 6 cm A.4.4.3.66.
425 Memasang paving block natural tebal 8 cm A.4.4.3.65.
426 Memasang paving block berwarna tebal 8 cm A.4.4.3.67.
427 Memasang paving tb. 8 cm, K.250, polos An. Dihitung
428 Memasang paving tb. 8 cm, K.250, warna An. Dihitung
429 Memasang paving tb. 8 cm, K.175, polos An. Dihitung
430 Memasang paving tb. 8 cm, K.175, warna An. Dihitung
431 Memasang paving Holland (10,5x21x6cm), K.225 An. Dihitung
432 Pemboran Pilot Hole Ø 4" An. Dihitung 3
433 Pemboran reaming Ø 8" An. Dihitung 5
434 Pemboran reaming Ø 8" An. Dihitung 5
435 Pemasangan Pipa Casing dan Screen An. Dihitung 6
436 Gravel Pack An. Dihitung 7
437 Electric Well Logging An. Dihitung 4
438 Pumping Test An. Dihitung 8
439 Pumping Test An. Dihitung 8
440 Penyempurnaan Sumur ( Developing ) An. Dihitung 9
441 Penyempurnaan Sumur ( Developing ) An. Dihitung 9
442 Accessories Perpipaan di Reservoir An. Dihitung 10
443 Tutup Pengaman Panel dari Tralis Besi An. Dihitung 11
444 Tutup Manhole An. Dihitung 12
445 Perlengkapan Whell Head Cover An. Dihitung 13
446 Penyambungan Daya PLN 3500 watt An. Dihitung 14
447 Pembuatan Kran Umum An. Dihitung 15
448 Memasang pipa PVC S. 12.5 Ø 2", distribusi An. Dihitung 19
449 Memasang pipa PVC S. 12.50 Ø 2" An. Dihitung 17
450 Pemasangan Pompa Submersible & Pipa GI Med. 1,5" An. Dihitung 18
451 Memasang Jaringan SR An. Dihitung 16
452 Pemasangan tiang listrik komplit Harga Satuan
453 Pasang sekru seng Dihitung
454 Pemasangan Reyling tangga "stainlees" tinggi 1 m' Harga Satuan
455 Pemasangan pagar besi dan cat Harga Satuan
456 Pemasangan pintu besi dan cat Harga Satuan
457 Pemasangan pagar besi hollow Harga Satuan
458 Pemasangan pintu pagar besi hollow Harga Satuan
459 Pemasangan pagar besi stainless bulat Harga Satuan
460 Pemasangan pagar besi stainless kotak Harga Satuan
461 Pemasangan pagar besi stainless & plat Harga Satuan
462 Pemasangan pintu pagar besi stainless Harga Satuan
463 Sewa brak direksi keet Dihitung
464 Pembongkaran bangunan lama Daftar harga
465 Pembersihan lokasi akibat pelaksanaan pekerjaan Dihitung
466 Papan Nama Proyek Daftar harga
467 Marmer Prasasti Daftar harga
468 Penebangan pohon Harga Satuan
469 Memasang dinding keramik uk. (20x25) cm An.Dihitung
470 Memasang rangka atap (usuk/reng) genteng kayu bangkiray An.Dihitung
471 Memasang rangka atap (usuk/reng) genteng kayu kruing An.Dihitung
472 Memasang paving An.Dihitung
473 Err:509 Err:509
474 Memasang lantai granit tile warna muda ( 60 x 60 ) cm An.Dihitung
475 Err:509 Err:509
476 Memasang lantai keramik ukuran ( 33 x 33 ) cm An.Dihitung
477 Memasang lantai keramik ukuran 30/30 cm dof An.Dihitung
478 Err:509 Err:509
479 Memasang lantai keramik uk. (20x20) cm An. Dihitung
480 Err:509 Daftar harga
481 Memasang lantai keramik uk. (40x40) cm tekstur warna An. Dihitung
482 Memasang dinding keramik interluk uk. (30x60) cm An. Dihitung
483 Pemadatan tanah Daftar harga
484 Memasang pintu alluminium strip lebar 8 cm Daftar harga
485 Pasang genteng glasur Jatiwangi Dihitung
486 Pasang genteng bubung glasur Jatiwangi Dihitung
487 Pemindahan dan pemasangan Jaringan Listrik lama Daftar harga
488 Memasang 1 buah MCB Dihitung
489 Memasang 1 buah titik lampu Dihitung
490 Pasang jet pam Daftar harga
491 Pemindahan dan pemasangan PDAM lama Daftar harga
492 Pasang instalasi penangkal petir 1 split lengkap Daftar harga
493 Pasang Drop ceilling plafond Daftar harga
494 Pasang usuk reng baja ringan Daftar harga
495 Urugan batu split Daftar harga
496 Ijuk Daftar harga
497 Memasang bekisting untuk lantai bahan kayu lama Dihitung
498 Pasang rangka atap baja ringan, bentang 15,5 m' Daftar harga
499 Batu pecah 2/3 cm (split), cruser Daftar harga
500
501
502
503
504
505
506
507
508
509
510
511
512
513
ERJAAN
ARANGANYAR

HARGA SAT UPAH VOL.

4 5 6

265,267.50 69,000.00 ls
11,921.50 11,921.50 m2
57,571.24 15,895.00 m'
520,170.64 520,170.64 m3
1,040,341.28 1,040,341.28 m3
57,375.75 57,375.75 m3
70,223.85 70,223.85 m3
83,255.01 83,255.01 m3
76,378.96 76,378.96 m3
115,666.80 115,666.80 m3
92,258.85 92,258.85 m3
4,130.15 4,130.15 m2
25,153.80 25,153.80 m3
41,301.50 41,301.50 m3
41,301.50 41,301.50 m3
81,258.30 20,310.00 m3
215,502.30 20,310.00 m3
300,358.52 92,840.00 m3
226,533.36 92,840.00 m3
100,530.45 10,965.00 m2
84,301.50 41,301.50 m3
240,322.75 18,275.00 m3
985,134.00 168,000.00 m3
940,329.50 168,000.00 m3
909,243.20 168,000.00 m3
887,400.30 168,000.00 m3
857,432.70 168,000.00 m3
Err:509 168,000.00 m3
828,558.94 168,000.00 m3
805,005.22 168,000.00 m3
535,511.52 87,360.00 m3
2,660,974.85 307,785.00 m3
884,664.57 234,359.00 m3
277,737.05 58,610.00 m2
266,066.98 58,610.00 m2
257,614.58 58,610.00 m2
254,114.40 58,610.00 m2
254,764.15 58,610.00 m2
241,786.10 58,610.00 m2
134,325.93 29,305.00 m2
128,444.28 29,305.00 m2
125,271.80 29,305.00 m2
123,288.65 29,305.00 m2
122,542.85 29,305.00 m2
120,265.90 29,305.00 m2
121,576.70 29,305.00 m2
Err:509 29,305.00 m2
Err:509 29,305.00 m2
440,692.09 37,093.00 m2
445,059.54 37,093.00 m2
233,965.37 32,404.00 m2
236,954.22 32,404.00 m2
211,722.45 29,305.00 m2
214,493.78 29,305.00 m2
533,535.15 29,305.00 m2
533,535.15 29,305.00 m2
185,794.60 33,600.00 m2
313,185.15 29,305.00 m2
652,185.15 29,305.00 m2
64,568.20 33,600.00 m2
58,285.40 33,600.00 m2
55,709.00 33,600.00 m2
53,833.20 33,600.00 m2
52,929.20 33,600.00 m2
52,138.20 33,600.00 m2
51,754.00 33,600.00 m2
51,369.80 33,600.00 m2
52,520.14 35,166.00 m2
51,229.68 35,166.00 m2
Err:509 35,166.00 m2
Err:509 35,166.00 m2
77,994.86 44,962.00 m2
63,452.89 35,133.00 m2
71,960.66 44,962.00 m2
70,853.26 44,962.00 m2
69,700.66 44,962.00 m2
Err:509 49,280.00 m2
34,041.25 16,885.00 m2
49,594.57 39,884.00 m'
16,258,423.05 50,485.00 m2
71,173.05 50,485.00 m2
40,979.45 29,305.00 m2
23,470.10 16,885.00 m2
11,215.25 7,925.00 m2
50,448.85 33,600.00 m2
29,902.63 22,400.00 m2
Err:509 10,000.00 Err:509
- - m3
18,238,143.50 2,371,250.00 m3
15,538,347.50 2,371,250.00 m3
- - m3
34,726,143.00 2,032,500.00 m3
25,891,803.00 2,032,500.00 m3
12,639,615.00 2,032,500.00 m3
134,925.39 118,603.00 m2
134,925.39 118,603.00 m2
1,175,392.10 338,750.00 m2
1,469,870.10 338,750.00 m2
905,457.70 338,750.00 m2
781,792.76 271,000.00 m2
958,479.56 271,000.00 m2
Err:509 Err:509 Err:509
390,132.50 338,750.00 m2
738,375.90 237,125.00 m2
785,857.14 271,000.00 m2
1,905,366.45 250,485.00 m2
829,086.65 271,000.00 m2
855,616.79 287,978.00 m2
- - m3
17,348,664.00 1,355,000.00 m3
11,274,123.00 1,355,000.00 m3
31,520,107.00 1,355,000.00 m3
1,827,323.00 1,355,000.00 m3
35,252,977.25 2,269,625.00 m3
- - m3
18,335,182.25 2,269,625.00 m3
12,260,641.25 2,269,625.00 m3
- - m2
0.00 0.00 m2
0.00 0.00 m2
53,398.15 15,895.00 m2
53,398.15 15,895.00 m2
- - m2
- - m2
- - m2
142,816.18 19,074.00 m2
- - m2
184,229.55 42,795.00 m2
- - m2
190,585.80 40,780.00 m2
- - m'
129,305.22 24,885.00 m'
169,065.85 24,885.00 m'
Err:509 Err:509 Err:509
- - m'
194,668.94 24,885.00 m'
168,161.85 24,885.00 m'
300,639.89 50,853.00 m2
424,510.49 50,853.00 m2
395,985.90 67,750.00 m2
423,146.58 203,250.00 m2
64,289.09 8,493.00 m2
133,358.08 11,400.00 m2
891,401.30 137,640.00 m3
926,153.59 137,640.00 m3
953,475.97 137,640.00 m3
833,652.78 100,040.00 m3
Err:509 Err:509 Err:509
1,016,646.25 137,640.00 m3
1,039,504.84 137,640.00 m3
1,055,135.03 137,640.00 m3
1,082,137.23 137,640.00 m3
1,090,474.43 137,640.00 m3
1,164,424.67 175,070.00 m3
1,175,402.71 175,070.00 m3
1,167,821.10 175,070.00 m3
7,593.60 6,720.00 m'
8,955.25 7,925.00 m'
10,124.80 8,960.00 m
152,648.31 10,887.00 10 kg
15,264.83 1,088.70 kg
147,846.94 7,788.00 kg
138,152.67 3,809.00 kg
146,832.20 59,280.00 m2
156,030.40 59,280.00 m2
Err:509 Err:509 Err:509
280,059.20 75,240.00 m2
286,500.20 75,240.00 m2
325,259.20 75,240.00 m2
97,775.14 59,280.00 m2
308,105.80 75,240.00 m2
256,634.30 75,240.00 m2
81,893.59 14,893.00 m2
4,012,367.84 596,608.00 m3
3,816,672.55 596,608.00 m3
3,762,556.85 596,608.00 m3
4,941,326.15 674,255.00 m3
3,977,543.50 674,255.00 m3
3,923,427.80 674,255.00 m3
7,897,609.55 839,235.00 m3
6,737,044.94 839,235.00 m3
5,372,569.94 839,235.00 m3
4,690,332.44 839,235.00 m3
4,636,216.74 839,235.00 m3
6,027,521.70 730,770.00 m3
5,084,459.48 730,770.00 m3
4,402,221.98 730,770.00 m3
4,348,106.28 730,770.00 m3
5,312,000.05 596,875.00 m3
4,272,933.04 596,875.00 m3
4,218,817.34 596,875.00 m3
3,938,311.79 596,875.00 m3
5,154,210.24 596,608.00 m2
4,170,351.26 596,608.00 m3
5,691,442.75 674,255.00 m3
73,624.02 17,663.00 m3
117,263.49 17,663.00 m'
101,060.42 29,165.00 m'
91,533.39 29,165.00 m'
28,563.01 8,567.00 m2
33,535.01 8,567.00 m2
Err:509 19,074.00 m2
31,791.42 27,084.00 m2
Err:509 15,895.00 m2
Err:509 15,895.00 m2
Err:509 127,160.00 m2
Err:509 Err:509 Err:509
51,238.72 11,400.00 m2
26,862.36 9,537.00 m'
Err:509 79,475.00 m2
Err:509 7,988.00 m'
Err:509 41,595.00 m2
85,516.14 38,778.00 m2
25,449.86 9,297.00 kg
29,608.26 9,297.00 kg
330,857.22 14,694.00 kg
979,333.71 162,657.00 m2
85,676.60 4,480.00 cm
486,665.01 100,677.00 m2
726,099.58 181,566.00 m2
1,549,431.14 68,178.00 m2
83,895.72 74,244.00 m2
696,023.50 154,950.00 m2
152,300.04 6,658.80 m'
196,695.37 13,166.70 m2
834,685.80 13,276.00 m2
Err:509 13,276.00 m2
2,628,086.20 13,276.00 m2
61,328.49 54,273.00 m2
687,154.39 258,726.00 m2
161,912.84 15,495.00 m2
293,642.93 30,261.00 m2
746,433.93 162,657.00 m2
285,613.15 8,755.00 set
684,503.15 8,755.00 set
100,490.11 31,061.00 m'
51,785.64 36,168.00 m'
58,799.55 28,085.00 m2
59,082.05 28,085.00 m2
62,178.25 30,325.00 m2
67,613.55 28,085.00 m2
69,065.60 29,120.00 m2
76,868.25 30,325.00 m2
77,896.55 28,085.00 m2
82,286.60 29,120.00 m2
0.00 0.00 m2
82,286.60 29,120.00 m2
454,421.14 56,170.00 m2
0.00 0.00 m2
77,896.55 28,085.00 m2
82,286.60 29,120.00 m2
213,660.40 26,880.00 m2
192,026.55 28,085.00 m2
176,076.60 29,120.00 m2
19,310.01 13,986.00 m'
18,437.08 13,986.00 m'
18,437.08 13,986.00 m'
32,477.33 13,986.00 m'
35,720.43 13,986.00 m'
31,742.83 13,986.00 m'
43,698.23 13,986.00 m'
37,731.83 13,986.00 m'
100,616.33 13,986.00 m'
103,531.73 13,986.00 m'
19,764.83 13,986.00 m'
19,764.83 13,986.00 m'
19,764.83 13,986.00 m'
19,764.83 13,986.00 m'
19,764.83 13,986.00 m'
47,030.60 40,320.00 m2
153,778.88 78,400.00 m2
160,389.38 78,400.00 m2
0.00 0.00 m2
0.00 0.00 m2
0.00 0.00 m2
187,919.00 78,400.00 m2
224,242.85 117,685.00 m2
149,417.08 78,400.00 m2
21,645.15 16,300.00 m'
19,855.80 16,300.00 m'
135,326.54 116,253.00 m'
452,089.84 78,400.00 m2
117,985.56 27,062.00 m2
44,888.12 19,074.00 m2
541,891.50 79,800.00 m2
130,176.00 79,800.00 m2
Err:509 112,000.00 m2
Err:509 100,800.00 m2
Err:509 100,800.00 m2
172,726.15 100,800.00 m2
174,929.65 100,800.00 m2
172,726.15 100,800.00 m2
0.00 0.00 m2
3,829,918.04 145,600.00 m2
191,874.00 112,000.00 m2
249,715.88 78,400.00 m2
222,369.88 78,400.00 m2
222,369.88 78,400.00 m2
351,641.88 78,400.00 m2
49,644.29 23,283.00 m2
327,982.50 37,900.00 m2
21,011.22 18,594.00 m2
19,341.08 12,396.00 m2
22,909.62 19,074.00 m2
165,895.30 56,170.00 m2
163,710.46 56,170.00 m2
195,062.15 56,170.00 m2
202,006.71 64,940.00 m2
35,826.65 16,300.00 m'
42,324.15 16,300.00 m'
45,233.90 16,300.00 m'
39,244.90 16,300.00 m'
0.00 0.00 m'
58,784.30 16,300.00 m'
95,553.93 13,986.00 m'
106,943.77 17,140.50 m2
106,655.05 16,885.00 m2
177,619.05 17,185.00 m2
Err:509 Err:509 Err:509
169,457.06 44,142.00 m'
69,678.06 43,342.00 m'
98,174.40 15,960.00 m2
0.00 0.00 m2
104,712.58 17,066.00 m'
0.00 0.00 m'
0.00 0.00 m2
0.00 0.00 m'
88,659.80 15,960.00 m2
37,593.97 16,529.00 m'
79,891.00 13,680.00 m2
43,469.97 16,529.00 m'
150,000.00 m2
45,000.00 m'
173,566.87 15,960.00 m2
173,473.08 17,066.00 m'
32,965.49 14,893.00 m2
Err:509 0.00 Err:509
1,653,359.50 313,050.00 bh
367,148.30 206,810.00 bh
2,977,606.50 154,950.00 bh
1,070,200.40 207,860.00 bh
78,583.59 69,543.00 bh
939,758.85 102,525.00 bh
2,072,476.50 618,850.00 bh
96,778.85 9,645.00 bh
613,109.75 298,825.00 bh
761,620.00 298,825.00 bh
35,607.80 13,428.00 m'
65,271.06 22,887.00 m'
18,722.41 7,656.00 m'
21,349.66 7,656.00 m'
23,539.03 7,656.00 m'
44,503.92 11,484.00 m'
67,711.30 11,484.00 m'
84,225.12 17,185.50 m'
93,675.31 17,023.50 m'
153,409.37 17,185.50 m'
694,763.55 28,935.00 bh
63,890.20 35,415.00 bh
121,147.30 16,210.00 bh
107,841.55 19,435.00 bh
163,900.85 10,045.00 bh
323,230.85 10,045.00 bh
50,000.00 bh
165,226.34 77,350.00 m'
43,583.65 15,680.00 m'
350,000.00 m2
20,000.00 m'
0.00 ls
3,500,000.00 500,000.00 bh
0.00 unit
0.00 unit
47,962.85 42,445.00 bh
Err:509 Err:509 Err:509
31,098.45 14,520.75 bh
34,488.45 14,520.75 bh
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
26,917.45 14,520.75 bh
33,019.45 14,520.75 bh
Err:509 Err:509 Err:509
22,272.30 8,910.00 bh
Err:509 Err:509 Err:509
19,899.30 8,910.00 bh
22,272.30 8,910.00 bh
21,877.93 19,361.00 bh
127,096.52 14,524.80 m2
Err:509 Err:509 Err:509
344,153.82 16,460.90 m2
136,984.02 14,524.80 m2
150,657.02 14,524.80 m2
868,000.00 m2
8,686,000.00 ls
Err:509 11,195.00 m2
Err:509 Err:509 Err:509
Err:509 9,607.00 m2
3,023.88 1,136.00 m2
Err:509 24,387.00 m2
20,989.41 6,954.70 m2
64,878.05 6,914.20 m2
15,561.00 5,670.80 m2
Err:509 18,682.50 m2
35,000.00 m2
52,000.00 m2
13,593.90 m2
0.00 0.00 Err:509
53,460.30 7,310.00 bh
Err:509 Err:509 Err:509
5,000,000.00 - ls
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 bh
Err:509 - bh
Err:509 - bh
20,000.00 - m'
Err:509 Err:509 bh
Err:509 Err:509 bh
35,000,000.00 - ls
3,500,000.00 - ls
110,000.00 - m'
5,750,000.00 - ls
168,443.79 59,305.30 m2
81,704.99 59,305.30 m2
791,695.29 75,555.30 m2
693,543.49 75,555.30 m2
189,320.20 27,740.00 m2
194,970.20 27,740.00 m2
158,810.20 27,740.00 m2
164,460.20 27,740.00 m2
109,773.85 0.00 m2
203,761.60 m'
147,141.07 ( tanah padas ) m'
208,218.49 ( tanah sulit ) m'
105,655.00 m'
20,093.66 m'
34,691.00 m'
109,610.00 jam
Err:509 ( u/ 36 jam ) 36 jam
585,114.00 jam
Err:509 ( u/ 18 jam ) 18 jam
4,670,826.98 ls
1,780,737.62 ls
1,038,619.16 unit
3,903,020.00 unit
6,159,630.00 unit
#REF! unit
57,904.62 m'
52,974.06 m'
33,785,870.00 unit
555,992.54 unit
4,500,000.00 titik
20,000.00 m'
550,000.00 m'
600,000.00 m2
750,000.00 m2
400,000.00 m2
400,000.00 m2
550,000.00 m2
650,000.00 m2
850,000.00 m2
850,000.00 m2
2,500,000.00 ls
2,000,000.00 ls
2,000,000.00 ls
Err:509 ls
Err:509 ls
200,000.00 bh
161,326.71 64,940.00 m2
270,822.81 15,895.00 m2
173,630.15 15,895.00 m2
134,936.29 29,652.65 m2
Err:509 Err:509 Err:509
238,949.49 56,170.00 m2
Err:509 Err:509 Err:509
Err:509 56,170.00 m2
159,465.60 56,170.00 m2
Err:509 Err:509 Err:509
157,657.60 56,170.00 m2
Err:509 ls
175,468.66 56,170.00 m2
361,619.21 64,940.00 m2
500,000.00 ls
1,600,000.00 unit
133,323.05 17,185.00 m2
144,597.06 44,142.00 m'
500,000.00 unit
Err:509 Err:509 ttk
Err:509 Err:509 ttk
2,000,000.00 unit
500,000.00 unit
2,500,000.00 unit
45,000.00 m'
100,000.00 m2
220,000.00 m3
13,000.00 kg
161,725.60 75,240.00 m2
275,000.00 m²
220,000.00 m³
KETERANGAN :
TIDAK ADA DI ANALISA BARU
ADA HARGA YANG BLM ADA DI DAFTAR HARGA
ANALISA JANGGAL
INDUK/KAYU KELAS I, II, III BLM NGELINK
PENGEMBANGAN
LINK BAHAN MENYESUAIKAN MUTU PAVING

PEKERJAAN PERSIAPAN

ANALISA PEKERJAAN TANAH

PEKERJAAN PONDASI
640,000.00
723,200.00

530,000.00
598,900.00

PEKERJAAN DINDING
PEKERJAAN PLESTERAN
Err:509
PEKERJAAN KAYU

Err:509

PEKERJAAN LANGIT-LANGIT

Err:509
PEKERJAAN BETON
K 100, slump ( 12+2), w/c=0,87
K 125, slump ( 12+2), w/c=0,78
K 150, slump ( 12+2), w/c=0,72
K 100, slump ( 3-6), w/c=0,87
Err:509 K 175, slump ( 12+2), w/c=0,66
K 200 slump ( 12+2), w/c=0,61
K 225, slump ( 12+2), w/c=0,58
K 250, slump ( 12+2), w/c=0,56
K 275, slump ( 12+2), w/c=0,53
K 300, slump ( 12+2), w/c=0,52
K 325, slump ( 12+2), w/c=0,49
K 350, slump ( 12+2), w/c=0,48

Err:509
PEKERJAAN LANGIT-LANGIT

Err:509

PEKERJAAN BESI DAN ALUMINIUM


PENUTUP LANTAI DAN DINDING

warna tua
PEKERJAAN PENUTUP ATAP

Magas dan glasur 25


Err:509 Morando 18
beton besar 11
Err:509
PEKERJAAN SANITASI

Kelarangen

berubah

PEKERJAAN KUNCI DAN KACA


Err:509

Err:509
Err:509
Err:509

Err:509

PEKERJAAN KACA
Err:509 sealent???

PEKERJAAN PENGECATAN
Err:509

PEKERJAAN KELISTRIKAN
Err:509 CEK ANALISA!!!!

Err:509

Err:509
Err:509
Err:509

CEK ANALISA!!!!

PEKERJAAN PAVING
penyesuaian harga paving
0
SUMUR DALAM

PEKERJAAN BESI PAGAR

PEKERJAAN PERSIAPAN

Err:509

Err:509

Err:509
TAHUN ANGGARAN : 2019
Err:509 : Err:509

PEKERJAAN PERSIAPAN

69 Memasang lantai keramik uk. (40x40) cm tekstur warna


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Keramik tekstur warna buah 6.560 11,200.00
PC kg 9.800 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 0.130 13,000.00

B Tenaga Kerja Pekerja OH 0.500 65,000.00


Tukang Batu OH 0.250 77,000.00
Kepala Tukang OH 0.026 89,000.00
Mandor OH 0.026 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

11 Memasang lantai granit tile warna muda ( 60 x 60 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Granit 60/60 buah 2.946 43,835.62
PC kg 10.000 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 0.150 13,000.00
B Tenaga Kerja Pekerja OH 0.500 65,000.00
Tukang Batu OH 0.250 77,000.00
Kepala Tukang OH 0.026 89,000.00
Mandor OH 0.026 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

70 Memasang dinding keramik interluk uk. (30x60) cm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Keramik interluk. 30/60 buah 1.050 225,000.00
PC kg 9.300 1,250.00
Pasir Pasang m3 0.018 260,000.00
Semen Warna kg 0.194 13,000.00

B Tenaga Kerja Pekerja OH 0.400 65,000.00


Tukang Batu OH 0.450 77,000.00
Kepala Tukang OH 0.030 89,000.00
Mandor OH 0.020 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

71 Pasang genteng glasur Jatiwangi


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Genteng glasur Buah 18.00 5,600.00

B Tenaga Kerja Pekerja OH 0.150 65,000.00


Tukang Kayu OH 0.075 81,000.00
Kepala Tukang OH 0.008 89,000.00
Mandor OH 0.008 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

72 Pasang genteng bubung glasur Jatiwangi


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Genteng bubung glasur Jatiwangi Buah 5.000 13,100.00
Semen portland Kg 8.000 1,250.00
Pasir pasang m3 0.032 260,000.00

B Tenaga Kerja Pekerja OH 0.400 65,000.00


Tukang Kayu OH 0.200 81,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.002 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

73 Memasang 1 buah MCB


ttk
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pipa listrik 5/8" btg 2.000 8,000.00
Kabel m' 10.000 6,500.00
MCB bh 1.000 58,000.00

B Tenaga Kerja Tukang listrik OH 1.000 Err:509

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

76 Memasang bekisting untuk lantai bahan kayu lama


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.000 1,628,000.00
Paku 5 cm - 12 cm kg 0.400 16,000.00
Minyak Bekisting ltr 0.200 7,400.00
Balok kayu kelas II m3 0.000 1,900,000.00
Plywood tebal 9 mm lbr 0.000 146,000.00
Dolken kayu galam, btg 6.000 10,000.00
Ø (8 - 10) cm, panj 4 m

B Tenaga Kerja Pekerja OH 0.660 65,000.00


Tukang Kayu OH 0.330 81,000.00
Kepala Tukang OH 0.033 89,000.00
Mandor OH 0.033 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
PEKERJAAN TANAH
1 Menggali tanah biasa sedalam 2 m'
m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Tenaga Kerja Pekerja OH 0.900 65,000.00
Mandor OH 0.045 81,000.00

B Peralatan

C Jumlah harga tenaga, bahan dan peralatan


D Overhead & profit 10% + 3% x
E Jumlah harga per-satuan pekerjaan
4 (K3) Memadatkan tanah ( per 20 cm )
m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Tenaga Kerja Pekerja OH 0.500 65,000.00
Mandor OH 0.050 81,000.00

B Peralatan

C Jumlah harga tenaga, bahan dan peralatan


D Overhead & profit 10% + 3% x
E Jumlah harga per-satuan pekerjaan

PEKERJAAN PONDASI, PAS. DINDING, & PLESTERAN


PEKERJAAN BETON
PEKERJAAN KERAMIK
1 Memasang lantai keramik uk. (40x40) cm
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Keramik, polos buah 6.630 9,803.92
PC kg 9.800 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 0.130 13,000.00

B Tenaga Kerja Pekerja OH 0.500 65,000.00


Tukang Batu OH 0.250 77,000.00
Kepala Tukang OH 0.026 89,000.00
Mandor OH 0.026 81,000.00
C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

2 Memasang lantai keramik uk. (20x20) cm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Keramik 20/20 buah 1.050 54,000.00
PC kg 10.400 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 0.500 13,000.00

B Tenaga Kerja Pekerja OH 0.700 65,000.00


Tukang Batu OH 0.350 77,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.035 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

3 Memasang lantai keramik uk. (20x20) cm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Keramik 20/20 m2 1.050 54,000.00
PC kg 10.400 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 0.150 13,000.00

B Tenaga Kerja Pekerja OH 0.500 65,000.00


Tukang Batu OH 0.250 77,000.00
Kepala Tukang OH 0.026 89,000.00
Mandor OH 0.026 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
3 Memasang dinding keramik uk. (20x20) cm
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Keramik dind. 20/20 buah 26.500
PC kg 9.300
Pasir Pasang m3 0.018
Semen Warna kg 1.940

B Tenaga Kerja Pekerja OH 0.900


Tukang Batu OH 0.450
Kepala Tukang OH 0.045
Mandor OH 0.045

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

4 Memasang dinding terawang (roster) tanah/genting


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Terawang (roster) Buah 25.000 9,000.00
PC kg 11.000 1,250.00
Pasir Pasang m3 0.035 260,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.100 77,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

PEKERJAAN PINTU JENDELA


1 Memasang kusen pintu/jendela alluminium
m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Profil allumunium m 1.100 103,000.00
Skrup fisher buah 2.000 5,400.00
Sealant tube 0.060 67,000.00

B Tenaga Kerja Pekerja OH 0.043 65,000.00


Tukang khusus allumunium OH 0.043 77,000.00
Kepala Tukang OH 0.0043 89,000.00
Mandor OH 0.0021 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

2 Pasang kusen pintu dan jendela, kayu jati lokal


m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok Kayu Jati Lokal m3 1.200 17,373,000.00
Paku 10 cm kg 1.250 16,000.00
Lem Kayu kg 1.000 13,000.00

B Tenaga Kerja Pekerja OH 6.000 65,000.00


Tukang kayu OH 18.000 81,000.00
Kepala tukang OH 1.800 89,000.00
Mandor OH 0.300 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
3 Membuat dan memasang pintu panil , kayu jati lokal
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.040 17,373,000.00
Lem kayu kg 0.500 13,000.00

B Tenaga Kerja Pekerja OH 1.000 65,000.00


Tukang kayu OH 3.000 81,000.00
Kepala tukang OH 0.300 89,000.00
Mandor OH 0.050 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

4 Memasang jendela & boven kaca rangka aluminium coklat


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ram pintu 5 x 2,5 cm m 4.100 119,000.00
Kaca bening tebal 5 mm m2 1.100 Err:509
Profil alumunium m 4.500 7,700.00
Sealent Tube 0.270 67,000.00
Aksesoris 10% bahan ls 1.000 Err:509

B Tenaga Kerja Pekerja OH 0.085 65,000.00


Tukang allumunium/kaca OH 0.085 77,000.00
Kepala tukang OH 0.009 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

5 Memasang pintu KM/WC PVC


set
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pintu PVC bh 1.000 597,000.00

B Tenaga Kerja Pekerja OH 0.010 65,000.00


Tukang batu OH 0.100 77,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
PEKERJAAN PLAFOND
1 Memasang 1 m2 rangka plafond galvanis ukuran (60x80) cm
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Hollow 3,8/3,8 galvanis m' 1.600 Err:509
Hollow 1,8/3,8 galvanis m' 1.200 Err:509
Kawat D 4 mm kg 0.150 Err:509
ramset bh 1.050 1,600.00

B Tenaga Kerja Pekerja OH 0.150 65,000.00


Tukang besi OH 0.300 77,000.00
Kepala tukang OH 0.030 89,000.00
Mandor OH 0.075 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
3 Memasang rk. plafond besi hollow uk. (60x80) cm
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Hollow 3,8/3,8 m' 3.500 8,200.00
Assesoris ls 1.000 8,200.00
(perkuatan, las, dll)

B Tenaga Kerja Pekerja OH 0.250 65,000.00


Tukang besi OH 0.250 77,000.00
Kepala tukang OH 0.025 89,000.00
Mandor OH 0.013 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

Err:509 Memasang list plafond gypsum profil


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan List gypsum profil m' 1.050 13,000.00
Tepung gypsum kg 0.150 3,900.00

B Tenaga Kerja Pekerja OH 0.060 65,000.00


Tukang kayu OH 0.060 81,000.00
Kepala tukang OH 0.006 89,000.00
Mandor OH 0.003 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
PEKERJAAN SANITASI & PLUMBING
1 Memasang kloset duduk/monoblok
bh
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kloset duduk/monoblok unit 1.000 1,085,000.00
Perlengkapan ls 1.000 65,100.00
( 6% harga kloset )

B Tenaga Kerja Pekerja OH 3.300 65,000.00


Tukang batu OH 1.100 77,000.00
Kepala tukang OH 0.010 89,000.00
Mandor OH 0.160 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

2 Pasang Jet shower


bh
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Jet shower bh 1.000 130,000.00
Seal tape bh 1.000 5,000.00

B Tenaga Kerja Pekerja OH 0.010 65,000.00


Tukang pipa OH 0.100 81,000.00
Kepala tukang OH 0.010 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% 3% x
F Jumlah harga per satuan pekerjaan

3 Pasang shower komplit


bh
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Shower bh 1.000 271,000.00
Seal tape bh 1.000 5,000.00

B Tenaga Kerja Pekerja OH 0.010 65,000.00


Tukang pipa OH 0.100 81,000.00
Kepala tukang OH 0.010 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
4 Memasang wastafel
bh
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Wastafel unit 1.000 651,000.00
Perlengkapan bh 1.000 78,120.00
( 12% harga wastafel )
PC kg 6.000 1,250.00
Pasir pasang m3 0.010 260,000.00

B Tenaga Kerja Pekerja OH 1.200 65,000.00


Tukang batu OH 1.450 77,000.00
Kepala tukang OH 0.150 89,000.00
Mandor OH 0.060 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
5 Pasang avour stainless
bh
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Avour stainless bh 1.000 76,000.00

B Tenaga Kerja Pekerja OH 0.025 65,000.00


Tukang pipa OH 0.100 81,000.00
Kepala tukang OH 0.100 89,000.00
Mandor OH 0.010 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

6 Memasang kran diameter 1/2" atau 3/4", biasa


bh
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kran air 3/4 bh 1.000 21,000.00
Seal tape bh 0.025 5,000.00

B Tenaga Kerja Pekerja OH 0.010 65,000.00


Tukang batu OH 0.400 77,000.00
Kepala tukang OH 0.040 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

7 Memasang pipa PVC tipe AW diameter 3/4"


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pipa PVC 3/4" m 1.200 7,250.00
Perlengkapan bh 1.000 2,537.50
( 35% harga pipa PVC )
B Tenaga Kerja Pekerja OH 0.036 65,000.00
Tukang batu OH 0.060 77,000.00
Kepala tukang OH 0.006 89,000.00
Mandor OH 0.002 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

8 Memasang pipa PVC tipe AW diameter 2"


m'
Harga Satuan
Kebutuhan Satuan Indeks
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pipa PVC 2" m 1.200 31,250.00
Perlengkapan bh 1.000 10,937.50
( 35% harga pipa PVC )
B Tenaga Kerja Pekerja OH 0.054 65,000.00
Tukang batu OH 0.090 77,000.00
Kep.Tukang OH 0.009 89,000.00
Mandor OH 0.0030 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

9 Memasang pipa PVC tipe AW diameter 2,5"


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pipa PVC 2,5" m 1.200 37,000.00
Perlengkapan bh 1.000 12,950.00
( 35% harga pipa PVC )
B Tenaga Kerja Pekerja OH 0.081 65,000.00
Tukang batu OH 0.135 77,000.00
Kep.Tukang OH 0.014 89,000.00
Mandor OH 0.0040 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
9 Memasang pipa PVC tipe AW diameter 3"
m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pipa PVC 3" m 1.200 42,500.00
Perlengkapan bh 1.000 14,875.00
( 35% harga pipa PVC )
B Tenaga Kerja Pekerja OH 0.081 65,000.00
Tukang batu OH 0.135 77,000.00
Kepala tukang OH 0.0135 77,000.00
Mandor OH 0.004 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

PEKERJAAN ELECTRICAL
1 Pasang Box MCB
bh
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Box MCB bh 1.000 19,000.00

B Tenaga Kerja Pekerja OH 0.080 65,000.00


Tukang listrik OH 0.250 Err:509
Mandor OH 0.050 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

2 (K3) Memasang 1 buah titik lampu


ttk
Harga Satuan
Kebutuhan Satuan Indeks
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pipa listrik 5/8" btg 3.000
Kabel m' 24.000
T Dus bh 3.000
L Bow bh 4.000
Las Dop bh 3.000
Klem bh 24.000
Mongkok bh 1.000
Saklar bh 1.000
Fitting bh 1.000

B Tenaga Kerja Tukang listrik OH 1.000

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

2 (K3) Memasang 1 buah titik lampu


ttk
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pipa listrik 5/8" btg 3.000
Kabel m' 24.000
T Dus bh 3.000
L Bow bh 4.000
Las Dop bh 3.000
Klem bh 24.000
Mongkok bh 1.000
Saklar bh 1.000
Fitting bh 1.000

B Tenaga Kerja Tukang listrik OH 1.000

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

74 Memasang 1 buah titik lampu


ttk
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Fitting btg 1.000 Err:509
Kayu dudukan fitting m' 1.000 Err:509
Kabel bh 10.000 6,500.00

B Tenaga Kerja Pekerja OH 0.080 65,000.00


Tukang listrik OH 0.100 Err:509
Mandor OH 0.050 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

2 (K3) Memasang 1 buah MCB


ttk
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pipa listrik 5/8" btg 3.000 8,000.00
Kabel m' 15.000 6,500.00
T Dus bh 1.000 -
L Bow bh 2.000 -
Klem biasa bh 24.000 -
MCB bh 1.000 58,000.00

B Tenaga Kerja Tukang listrik OH 1.000 Err:509

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
PEKERJAAN CAT

16 Pengecatan dinding exterior


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plamir kg 0.100 19,000.00
Cat dasar kg 0.100 135,000.00
Cat penutup 2x kg 0.260 135,000.00

B Tenaga Kerja Pekerja OH 0.020 65,000.00


Tukang cat OH 0.063 77,000.00
Kepala Tukang OH 0.0063 89,000.00
Mandor OH 0.003 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
Err:509 Pengecatan permukaan baja dengan meni besi
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Meni besi m2 0.100 27,000.00
Kuwas kg 0.010 Err:509

B Tenaga Kerja Pekerja OH 0.020 65,000.00


Tukang cat OH 0.200 77,000.00
Kep.Tukang OH 0.020 89,000.00
Mandor OH 0.0025 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

### Membuat pintu besi plat baja tebal 2 mm, rangka baja siku
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Besi siku L kg 15.000 14,700.00
Besi plat baja kg 15.700 14,700.00
Kawat las kg 0.050 27,000.00
Aksesoris 10% bahan ls 1.000 45,264.00

B Tenaga Kerja Pekerja OH 1.050 65,000.00


Tukang las biasa OH 1.050 77,000.00
Kepala Tukang OH 0.105 89,000.00
Mandor OH 0.052 81,000.00

C Peralatan
D Jumlah harga tenaga, bahan dan peralatan
E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

4 Membuat pintu besi plat baja t: 2 mm rangkap, rk. baja siku


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Besi siku L 30.30.3 kg 15.000 14,700.00
Besi plat baja kg 32.800 14,700.00
Kawat las kg 0.050 27,000.00

B Tenaga Kerja Pekerja OH 1.050 65,000.00


Tukang las biasa OH 1.050 77,000.00
Kepala Tukang OH 0.105 89,000.00
Mandor OH 0.052 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

PEKERJAAN ATAP
1 Pasang aluminium foil/sisalation
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Aluminium foil/sisalation m2 1.050 13,600.00

B Tenaga Kerja Pekerja OH 0.150 65,000.00


Tukang Kayu OH 0.050 81,000.00
Kepala Tukang OH 0.005 89,000.00
Mandor OH 0.008 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
5 Memasang glass blok
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Glass blok Buah 25.000 21,000.00
PC kg 11.000 1,250.00
Pasir Pasang m3 0.035 260,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.100 77,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

2 Memasang plint keramik uk. (10x40) cm


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint keramik art buah 2.650 6,000.00
PC kg 1.140 1,250.00
Pasir Pasang m3 0.003 260,000.00
Semen Warna kg 0.025 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

4 Memasang plint keramik uk. (10x20) cm


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint keramik buah 5.300 4,000.00
PC kg 1.140 1,250.00
Pasir Pasang m3 0.003 260,000.00
Semen Warna kg 0.025 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

5 Memasang 1 m' "step nose" uk. (10x40) cm


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Keramik stepnose 10x40 buah 2.650 13,000.00
PC kg 0.570 1,250.00
Pasir Pasang m3 0.0015 260,000.00
Semen Warna kg 0.013 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

6 Pasang batu andesit 3x30


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu andesit m2 1.100 190,000.00
PC kg 11.750 1,250.00
Pasir Pasang m3 0.035 260,000.00

B Tenaga Kerja Pekerja OH 0.700 65,000.00


Tukang Batu OH 0.350 77,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.035 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

7 Memasang saluran U.20 cm


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu merah bh 20.000 800.00
PC kg 3.920 1,250.00
Pasir pasang m3 0.056 260,000.00
Pasir urug m3 0.024 142,000.00
Buis beton bh 1.000 30,000.00

B Tenaga Kerja Pekerja OH 1.000 65,000.00


Tukang batu OH 0.050 77,000.00
Kepala tukang OH 0.050 89,000.00
Mandor OH 0.050 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

8 Memasang pipa beton diameter 15-20 cm


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu merah m3 0.027 800.00
PC kg 3.920 1,250.00
Pasir pasang m3 0.056 260,000.00
Pasir urug m3 0.024 142,000.00
Pipa tanah d.15 cm bh 1.100 -

B Tenaga Kerja Pekerja OH 0.140 65,000.00


Tukang batu OH 0.070 77,000.00
Kepala tukang OH 0.007 89,000.00
Mandor OH 0.007 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

PEKERJAAN KERAMIK
1 Memasang lantai keramik uk. (60x60) cm
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Keramik 60/60 buah 2.946 21,404.11
PC kg 9.600 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 0.150 13,000.00

B Tenaga Kerja Pekerja OH 0.500 65,000.00


Tukang Batu OH 0.250 77,000.00
Kepala Tukang OH 0.026 89,000.00
Mandor OH 0.026 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

1 Memasang lantai keramik uk. (60x60) cm, exterior texture


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Keramik exterioir texture buah 2.946 30,821.92
PC kg 9.600 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 0.150 13,000.00

B Tenaga Kerja Pekerja OH 0.500 65,000.00


Tukang Batu OH 0.250 77,000.00
Kepala Tukang OH 0.026 89,000.00
Mandor OH 0.026 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

2 Memasang dinding keramik uk. (30x60) cm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Keramik dind. 30/60 buah 2.800 33,928.57
PC kg 9.300 1,250.00
Pasir Pasang m3 0.018 260,000.00
Semen Warna kg 0.194 13,000.00

B Tenaga Kerja Pekerja OH 0.400 65,000.00


Tukang Batu OH 0.450 77,000.00
Kepala Tukang OH 0.030 89,000.00
Mandor OH 0.020 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

2 Memasang pintu kaca es rangka alluminium coklat


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ram pintu 5 x 2,5 cm m 4.100 119,000.00
Kaca es tebal 5 mm m2 1.100 108,000.00
Profil allumunium m 4.500 7,700.00
Sealent Tube 0.270 67,000.00
Aksesoris 10% bahan ls 1.000 65,944.00

B Tenaga Kerja Pekerja OH 0.085 65,000.00


Tukang allumunium/kaca OH 0.085 77,000.00
Kepala Tukang OH 0.009 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

6 Memasang pipa PVC tipe AW diameter 4"


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pipa PVC m 1.200 76,500.00
Perlengkapan bh 1.000 26,775.00
( 35% harga pipa PVC )
B Tenaga Kerja Pekerja OH 0.081 65,000.00
Tukang batu OH 0.135 77,000.00
Kepala tukang OH 0.0135 89,000.00
Mandor OH 0.004 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
2 Pasang genteng keramik
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Genteng Keramik Buah 14.00 10,000.00

B Tenaga Kerja Pekerja OH 0.150 65,000.00


Tukang Kayu OH 0.075 81,000.00
Kepala Tukang OH 0.008 89,000.00
Mandor OH 0.008 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

3 Pasang genteng bubung keramik


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Genteng bubung keramik Buah 5.000 17,500.00
Semen portland Kg 8.000 1,250.00
Pasir pasang m3 0.032 260,000.00

B Tenaga Kerja Pekerja OH 0.400 65,000.00


Tukang Kayu OH 0.200 81,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.002 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
7 Memasang paving Holland (10,5x21x6cm), K.225
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Paving tebal 6 cm m2 1.000 81,000.00
Pasir Pasang m3 0.025 260,000.00

B Tenaga Kerja Pekerja OH 0.010 65,000.00


Tukang batu OH 0.100 77,000.00
Kep.Tukang OH 0.010 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

6 Memasang hospital plint


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Hospital plint buah 3.530 19,000.00
PC kg 1.140 1,250.00
Pasir Pasang m3 0.003 260,000.00
Semen Warna kg 0.100 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.009 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

Karanganyar,

CV. BROMAS
ANTO DW

5 Memasang atap onduline


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Atap onduline m2 0.748 173,000.00
Sekrup bh 9.150 900.00

B Tenaga Kerja Pekerja OH 0.140 65,000.00


Tukang kayu OH 0.070 81,000.00
Kepala tukang OH 0.007 89,000.00
Mandor OH 0.007 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

5 Memasang kerpus onduline


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kerpus onduline m' 1.300 97,000.00
Sekrup bh 11.500 900.00

B Tenaga Kerja Pekerja OH 0.084 65,000.00


Tukang kayu OH 0.125 81,000.00
Kepala tukang OH 0.013 89,000.00
Mandor OH 0.004 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

1 Administrasi dan dokumentasi


ls
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kertas folio 70 gr rim 1.000 40,000.00
Ball point bh 4.000 3,000.00
Kertas sampul lb 15.000 1,250.00
Cuci cetak bh 1.000 45,000.00
Tinta print refill bh 1.000 50,000.00

B Tenaga Kerja Administratur OH 1.000 69,000.00

C Jumlah harga tenaga, bahan dan peralatan


D Overhead & profit 10% + 3% x
E Jumlah harga per satuan pekerjaan

1 Pembersihan lapangan dan perataan


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Tenaga Kerja Pekerja OH 0.100 65,000.00
Mandor OH 0.050 81,000.00

B Peralatan

C Jumlah harga tenaga, bahan dan peralatan


D Overhead & profit 10% + 3% x
E Jumlah harga per-satuan pekerjaan
23 Memasang rangka atap (usuk/reng) genteng kayu kruing
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kaso 5/7 cm m3 0.014
Reng 2/3 cm m3 0.036
Paku 5 cm&10 cm kg 0.250

B Tenaga Kerja Pekerja OH 0.100


Tukang Kayu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.005

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
26 Memasang langit-langit asbes semen, tebal 4 mm, 5 mm, 6 mm
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Eternit asbes semen m2 1.100 15,000.00
Paku tripleks kg 0.010 21,000.00

B Tenaga Kerja Pekerja OH 0.030 65,000.00


Tukang kayu OH 0.070 81,000.00
Kepala tukang OH 0.007 89,000.00
Mandor OH 0.004 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
37 Memasang handel jendela
bh
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Handel bh 1.000 10,800.00

B Tenaga Kerja Tukang kayu OH 0.100 81,000.00


Mandor OH 0.010 81,000.00
C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
16 Memasang lantai keramik uk. (30x30) cm
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Keramik doos 1.050
PC kg 10.000
Pasir Pasang m3 0.045
Semen Warna kg 0.500

B Tenaga Kerja Pekerja OH 0.700


Tukang batu OH 0.350
Kepala tukang OH 0.035
Mandor OH 0.035

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
52 Memasang pintu multiplex rangka alluminium coklat
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ram pintu 5 x 2,5 cm m 4.100 380,000.00
multiplex 12 mm lbr 0.350 179,000.00
Profil allumunium m 4.500 103,000.00
Sealent Tube 0.270 67,000.00
Aksesoris 10% bahan ls 1.000 210,224.00

B Tenaga Kerja Pekerja OH 0.085 65,000.00


Tukang allumunium/kaca OH 0.085 77,000.00
Kepala tukang OH 0.009 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

54 Memasang dinding batu paras


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Paras m2 1.100 108,000.00
PC kg 11.750 1,250.00
Pasir Pasang m3 0.035 260,000.00

B Tenaga Kerja Pekerja OH 0.700 65,000.00


Tukang batu OH 0.350 77,000.00
Kepala tukang OH 0.035 89,000.00
Mandor OH 0.035 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

55 Memasang dinding batu tempel hitam/lempeng


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu tempel hitam m2 1.100 86,000.00
PC kg 11.750 1,250.00
Pasir Pasang m3 0.035 260,000.00

B Tenaga Kerja Pekerja OH 0.700 65,000.00


Tukang batu OH 0.350 77,000.00
Kepala tukang OH 0.035 89,000.00
Mandor OH 0.035 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

Plat expose compound


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Tepung gypsum kg 2.500 3,900.00

B Tenaga Kerja Pekerja OH 0.020 65,000.00


Tukang kayu OH 0.010 81,000.00
Kepala tukang OH 0.001 89,000.00
Mandor OH 0.001 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
20 Membuat dan memasang pintu dan jendela kaca , kayu jati lokal
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.024 17,373,000.00
Lem kayu kg 0.300 13,000.00

B Tenaga Kerja Pekerja OH 0.800 65,000.00


Tukang kayu OH 2.400 81,000.00
Kepala tukang OH 0.240 89,000.00
Mandor OH 0.040 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

21 Memasang konstruksi kuda-kuda konvensional kayu kruing


m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok Kayu Kruing m3 1.1000 7,600,000.00
Besi strip tb 5 mm kg 15.000 11,500.00
Paku 12 cm kg 5.600 16,000.00

B Tenaga Kerja Pekerja OH 4.000 65,000.00


Tukang kayu OH 12.000 81,000.00
Kepala tukang OH 1.200 89,000.00
Mandor OH 0.200 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

73,472.00 55000
12,250.00
11,700.00
1,690.00
99,112.00
32,500.00
19,250.00
2,314.00
2,106.00
56,170.00

-
(A+B+C) 155,282.00
D 20,186.66
(D+E) 175,468.66

An.Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

129,139.73 2.91666667 2.9458333 1.0100571


12,500.00
11,700.00
1,950.00
155,289.73
32,500.00
19,250.00
2,314.00
2,106.00
56,170.00

-
(A+B+C) 211,459.73
D 27,489.76
(D+E) 238,949.49

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

236,250.00
11,625.00
4,680.00
2,522.00
255,077.00
26,000.00
34,650.00
2,670.00
1,620.00
64,940.00

-
(A+B+C) 320,017.00
D 41,602.21
(D+E) 361,619.21

Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

100,800.00 18.18
100,800.00
9,750.00
6,075.00
712.00
648.00
17,185.00

-
(A+B+C) 117,985.00
D 15,338.05
(D+E) 133,323.05

Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

65,500.00 5.000
10,000.00 8.000
8,320.00 0.032
83,820.00
26,000.00 0.400
16,200.00 0.200
1,780.00 0.020
162.00 0.002
44,142.00

-
(A+B+C) 127,962.00
D 16,635.06
(D+E) 144,597.06

Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

16,000.00
65,000.00
58,000.00
139,000.00
Err:509
Err:509

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

-
6,400.00
1,480.00
-
-
60,000.00

67,880.00
42,900.00
26,730.00
2,937.00
2,673.00
75,240.00

-
(A+B+C) 143,120.00
D 18,605.60
(D+E) 161,725.60
A.2.3.1.2.

Jumlah Total Harga


( Rp. ) ( Rp. )

58,500.00
3,645.00
62,145.00

-
(A+B) 62,145.00
C 8,078.85
(C+D) 70,223.85
A.2.3.1.10.

Jumlah Total Harga


( Rp. ) ( Rp. )

32,500.00
4,050.00
36,550.00

-
(A+B) 36,550.00
C 4,751.50
(C+D) 41,301.50
An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

65,000.00 6.25
12,250.00
11,700.00
1,690.00
90,640.00
32,500.00
19,250.00
2,314.00
2,106.00
56,170.00

-
(A+B+C) 146,810.00
D 19,085.30
(D+E) 165,895.30

A.4.4.3.36.

Jumlah Total Harga


( Rp. ) ( Rp. )

56,700.00 26.5
13,000.00 10.4
11,700.00 0.045
6,500.00 1.62
87,900.00
45,500.00
26,950.00
3,115.00
2,835.00
78,400.00

-
(A+B+C) 166,300.00
D 21,619.00
(D+E) 187,919.00

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

56,700.00 26.5
13,000.00 10.4
11,700.00 0.045
1,950.00 1.62
83,350.00
32,500.00
19,250.00
2,314.00
2,106.00
56,170.00

-
(A+B+C) 139,520.00
D 18,137.60
(D+E) 157,657.60
A.4.4.3.54.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

A.2.2.1.23.a.

Jumlah Total Harga


( Rp. ) ( Rp. )

225,000.00
13,750.00
9,100.00
247,850.00
19,500.00
7,700.00
890.00
1,215.00
29,305.00

-
(A+B+C) 277,155.00
D 36,030.15
(D+E) 313,185.15

A.4.2.1.11.

Jumlah Total Harga


( Rp. ) ( Rp. )

113,300.00
10,800.00
4,020.00
128,120.00
2,795.00
3,311.00
382.70
170.10
6,658.80

-
(A+B+C) 134,778.80
D 17,521.24
(D+E) 152,300.04

A.4.6.1.2b.

Jumlah Total Harga


( Rp. ) ( Rp. )

20,847,600.00
20,000.00
13,000.00
20,880,600.00
390,000.00
1,458,000.00
160,200.00
24,300.00
2,032,500.00

-
(A+B+C) 22,913,100.00
D 2,978,703.00
(D+E) 25,891,803.00
A.4.6.1.5c.

Jumlah Total Harga


( Rp. ) ( Rp. )

694,920.00
6,500.00
701,420.00
65,000.00
243,000.00
26,700.00
4,050.00
338,750.00

-
(A+B+C) 1,040,170.00
D 135,222.10
(D+E) 1,175,392.10

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

487,900.00
Err:509
34,650.00
18,090.00
Err:509
Err:509
5,525.00
6,545.00
801.00
405.00
13,276.00

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

597,000.00
597,000.00
650.00
7,700.00
405.00
8,755.00

-
(A+B+C) 605,755.00
D 78,748.15
(D+E) 684,503.15
Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

Err:509
Err:509
Err:509
1,680.00
Err:509
9,750.00
23,100.00
2,670.00
6,075.00
41,595.00

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509
A.4.2.1.20.

Jumlah Total Harga


( Rp. ) ( Rp. )

28,700.00
8,200.00 4.1666667

36,900.00
16,250.00
19,250.00
2,225.00
1,053.00
38,778.00

-
(A+B+C) 75,678.00
D 9,838.14
(D+E) 85,516.14

Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

13,650.00
585.00
14,235.00
3,900.00
4,860.00
534.00
243.00
9,537.00

-
(A+B+C) 23,772.00
D 3,090.36
(D+E) 26,862.36
A.5.1.1.1.

Jumlah Total Harga


( Rp. ) ( Rp. )

1,085,000.00
65,100.00

1,150,100.00
214,500.00
84,700.00
890.00
12,960.00
313,050.00

-
(A+B+C) 1,463,150.00
D 190,209.50
(D+E) 1,653,359.50

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

130,000.00
5,000.00
135,000.00
650.00
8,100.00
890.00
405.00
10,045.00

-
(A+B+C) 145,045.00
D 18,855.85
(D+E) 163,900.85

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

271,000.00
5,000.00
276,000.00
650.00
8,100.00
890.00
405.00
10,045.00

-
(A+B+C) 286,045.00
D 37,185.85
(D+E) 323,230.85
A.5.1.1.5.

Jumlah Total Harga


( Rp. ) ( Rp. )

651,000.00
78,120.00

7,500.00
2,600.00
739,220.00
78,000.00
111,650.00
13,350.00
4,860.00
207,860.00

-
(A+B+C) 947,080.00
D 123,120.40
(D+E) 1,070,200.40
An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

76,000.00
76,000.00
1,625.00
8,100.00
8,900.00
810.00
19,435.00

-
(A+B+C) 95,435.00
D 12,406.55
(D+E) 107,841.55

A.5.1.1.19.

Jumlah Total Harga


( Rp. ) ( Rp. )

21,000.00
125.00
21,125.00
650.00
30,800.00
3,560.00
405.00
35,415.00

-
(A+B+C) 56,540.00
D 7,350.20
(D+E) 63,890.20

A.5.1.1.26.

Jumlah Total Harga


( Rp. ) ( Rp. )

8,700.00
2,537.50
11,237.50
2,340.00
4,620.00
534.00
162.00
7,656.00

-
(A+B+C) 18,893.50
D 2,456.16
(D+E) 21,349.66

A.5.1.1.29.

Jumlah Total Harga


( Rp. ) ( Rp. )

37,500.00
10,937.50
48,437.50
3,510.00
6,930.00
801.00
243.00
11,484.00

-
(A+B+C) 59,921.50
D 7,789.80
(D+E) 67,711.30

A.5.1.1.30.

Jumlah Total Harga


( Rp. ) ( Rp. )

44,400.00
12,950.00
57,350.00
5,265.00
10,395.00
1,201.50
324.00
17,185.50

-
(A+B+C) 74,535.50
D 9,689.62
(D+E) 84,225.12
A.5.1.1.31.

Jumlah Total Harga


( Rp. ) ( Rp. )

51,000.00
14,875.00
65,875.00
5,265.00
10,395.00
1,039.50
324.00
17,023.50

-
(A+B+C) 82,898.50
D 10,776.81
(D+E) 93,675.31

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

19,000.00
19,000.00
5,200.00
Err:509
4,050.00
Err:509

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

A.8.4.6.1.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

A.8.4.6.1.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

Err:509
Err:509
65,000.00
Err:509
5,200.00
Err:509
4,050.00
Err:509

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

A.8.4.6.2.

Jumlah Total Harga


( Rp. ) ( Rp. )

24,000.00
97,500.00
-
-
-
58,000.00
179,500.00
Err:509
Err:509

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509
A.4.7.1.10a.

Jumlah Total Harga


( Rp. ) ( Rp. )

1,900.00
13,500.00
35,100.00
50,500.00
1,300.00
4,851.00
560.70
202.50
6,914.20

-
(A+B+C) 57,414.20
D 7,463.85
(D+E) 64,878.05
A.4.7.1.16.

Jumlah Total Harga


( Rp. ) ( Rp. )

2,700.00
Err:509
Err:509
1,300.00
15,400.00
1,780.00
202.50
18,682.50

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

220,500.00
230,790.00 15.7
1,350.00
45,264.00
497,904.00
68,250.00
80,850.00
9,345.00
4,212.00
162,657.00
-
(A+B+C) 660,561.00
D 85,872.93
(D+E) 746,433.93

A.4.2.1.4.

Jumlah Total Harga


( Rp. ) ( Rp. )

220,500.00
482,160.00 15.7
1,350.00
704,010.00
68,250.00
80,850.00
9,345.00
4,212.00
162,657.00

-
(A+B+C) 866,667.00
D 112,666.71
(D+E) 979,333.71

A.4.5.2.43.

Jumlah Total Harga


( Rp. ) ( Rp. )

14,280.00
14,280.00
9,750.00
4,050.00
445.00
648.00
14,893.00

-
(A+B+C) 29,173.00
D 3,792.49
(D+E) 32,965.49
#REF!
#REF!
#REF!

#REF!
#REF!
An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

525,000.00
13,750.00
9,100.00
547,850.00
19,500.00
7,700.00
890.00
1,215.00
29,305.00

-
(A+B+C) 577,155.00
D 75,030.15
(D+E) 652,185.15

A.4.4.3.39a.

Jumlah Total Harga


( Rp. ) ( Rp. )

15,900.00
1,425.00
780.00
325.00
18,430.00
5,850.00
6,930.00
3,115.00
405.00
16,300.00

-
(A+B+C) 34,730.00
D 4,514.90
(D+E) 39,244.90

A.4.4.3.39.

Jumlah Total Harga


( Rp. ) ( Rp. )

21,200.00
1,425.00
780.00
325.00
23,730.00
5,850.00
6,930.00
3,115.00
405.00
16,300.00

-
(A+B+C) 40,030.00
D 5,203.90
(D+E) 45,233.90

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

34,450.00
712.50
390.00
169.00
35,721.50
5,850.00
6,930.00
3,115.00
405.00
16,300.00

-
(A+B+C) 52,021.50
D 6,762.80
(D+E) 58,784.30

A.4.4.3.58b.
Jumlah Total Harga
( Rp. ) ( Rp. )

209,000.00
14,687.50
9,100.00
232,787.50
45,500.00
26,950.00
3,115.00
2,835.00
78,400.00

-
(A+B+C) 311,187.50
D 40,454.38
(D+E) 351,641.88

A.5.1.1.35b.

Jumlah Total Harga


( Rp. ) ( Rp. )

16,000.00
4,900.00
14,560.00
3,408.00
30,000.00
68,868.00
65,000.00
3,850.00
4,450.00
4,050.00
77,350.00

-
(A+B+C) 146,218.00
D 19,008.34
(D+E) 165,226.34

A.5.1.1.35.

Jumlah Total Harga


( Rp. ) ( Rp. )

21.60
4,900.00
14,560.00
3,408.00
-
22,889.60
9,100.00
5,390.00
623.00
567.00
15,680.00

-
(A+B+C) 38,569.60
D 5,014.05
(D+E) 43,583.65

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

63,056.51 2.7777778
12,000.00
11,700.00
1,950.00
88,706.51
32,500.00
19,250.00
2,314.00
2,106.00
56,170.00

-
(A+B+C) 144,876.51
D 18,833.95
(D+E) 163,710.46

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

90,801.37
12,000.00
11,700.00
1,950.00
116,451.37
32,500.00
19,250.00
2,314.00
2,106.00
56,170.00

-
(A+B+C) 172,621.37
D 22,440.78
(D+E) 195,062.15

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

95,000.00 2.777778
11,625.00
4,680.00
2,522.00
113,827.00
26,000.00
34,650.00
2,670.00
1,620.00
64,940.00

-
(A+B+C) 178,767.00
D 23,239.71
(D+E) 202,006.71

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

487,900.00
118,800.00
34,650.00
18,090.00
65,944.00
725,384.00
5,525.00
6,545.00
801.00
405.00
13,276.00

-
(A+B+C) 738,660.00
D 96,025.80
(D+E) 834,685.80

A.5.1.1.32.

Jumlah Total Harga


( Rp. ) ( Rp. )

91,800.00
26,775.00
118,575.00
5,265.00
10,395.00
1,201.50
324.00
17,185.50

-
(A+B+C) 135,760.50
D 17,648.87
(D+E) 153,409.37
A.4.5.2.2.

Jumlah Total Harga


( Rp. ) ( Rp. )

140,000.00
140,000.00
9,750.00
6,075.00
712.00
648.00
17,185.00

-
(A+B+C) 157,185.00
D 20,434.05
(D+E) 177,619.05

A.4.5.2.5.

Jumlah Total Harga


( Rp. ) ( Rp. )

87,500.00
10,000.00
8,320.00
105,820.00
26,000.00
16,200.00
1,780.00
162.00
44,142.00

-
(A+B+C) 149,962.00
D 19,495.06
(D+E) 169,457.06
An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

81,000.00
6,500.00
87,500.00
650.00
7,700.00
890.00
405.00
9,645.00

-
(A+B+C) 97,145.00
D 12,628.85
(D+E) 109,773.85

A.4.4.3.25.

Jumlah Total Harga


( Rp. ) ( Rp. )

67,070.00
1,425.00
780.00
1,300.00
70,575.00
5,850.00
6,930.00
801.00
405.00
13,986.00

-
(A+B+C) 84,561.00
D 10,992.93
(D+E) 95,553.93

Karanganyar, ………………………… 2019

PERENCANA
CV. BROMAS DAMAR KAURIPAN
ANTO DWI STYAWAN, ST.
DIREKTUR

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

129,404.00
8,235.00
137,639.00
9,100.00
5,670.00
623.00
567.00
15,960.00

-
(A+B+C) 153,599.00
D 19,967.87
(D+E) 173,566.87

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

126,100.00
10,350.00
136,450.00
5,460.00
10,125.00
1,157.00
324.00
17,066.00

-
(A+B+C) 153,516.00
D 19,957.08
(D+E) 173,473.08

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

40,000.00
12,000.00
18,750.00
45,000.00
50,000.00
165,750.00
69,000.00
69,000.00
(A+B) 234,750.00
C 30,517.50
(C+D) 265,267.50

A.2.2.1.9.

Jumlah Total Harga


( Rp. ) ( Rp. )

6,500.00
4,050.00
10,550.00

-
(A+B) 10,550.00
C 1,371.50
(C+D) 11,921.50
AHSP'13 7,794,638.30
AHSP'12 6,520,122.60
Selisih 1,274,515.70

A.4.6.1.16b.

Jumlah Total Harga


( Rp. ) ( Rp. )
AHSP'13 AHSP'12
- 0.014 - 0.014
- 0.036 0.032 0.0036
- 0.250 - 0.250
-
- 0.100 - 0.100
- 0.100 - 0.100
- 0.010 - 0.010
- 0.005 - 0.005
-

-
(A+B+C) -
D -
(D+E) -

AHSP'13 271,171.75
AHSP'12 106,417.75
Selisih 164,754.00
A.4.5.1.1.

Jumlah Total Harga


( Rp. ) ( Rp. )

16,500.00
210.00
16,710.00
1,950.00
5,670.00
623.00
324.00
8,567.00

-
(A+B+C) 25,277.00
D 3,286.01
(D+E) 28,563.01
An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

10,800.00
10,800.00
8,100.00
810.00
8,910.00

-
(A+B+C) 19,710.00
D 2,562.30
(D+E) 22,272.30
A.4.4.3.35.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -
Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

1,558,000.00
62,650.00
463,500.00
18,090.00
210,224.00
2,312,464.00
5,525.00
6,545.00
801.00
405.00
13,276.00

-
(A+B+C) 2,325,740.00
D 302,346.20
(D+E) 2,628,086.20

A.4.4.3.57.

Jumlah Total Harga


( Rp. ) ( Rp. )

118,800.00
14,687.50
9,100.00
142,587.50
45,500.00
26,950.00
3,115.00
2,835.00
78,400.00

-
(A+B+C) 220,987.50
D 28,728.38
(D+E) 249,715.88

A.4.4.3.58.
Jumlah Total Harga
( Rp. ) ( Rp. )

94,600.00
14,687.50
9,100.00
118,387.50
45,500.00
26,950.00
3,115.00
2,835.00
78,400.00

-
(A+B+C) 196,787.50
D 25,582.38
(D+E) 222,369.88

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

9,750.00
9,750.00
1,300.00
810.00
89.00
81.00
2,280.00

-
(A+B+C) 12,030.00
D 1,563.90
(D+E) 13,593.90

Err:509

Err:509
Err:509
Err:509
Err:509

A.4.6.1.6c.

Jumlah Total Harga


( Rp. ) ( Rp. )

416,952.00
3,900.00
420,852.00
52,000.00
194,400.00
21,360.00
3,240.00
271,000.00

-
(A+B+C) 691,852.00
D 89,940.76
(D+E) 781,792.76

A.4.6.1.13b.

Jumlah Total Harga


( Rp. ) ( Rp. )

8,360,000.00
172,500.00
89,600.00
8,622,100.00
260,000.00
972,000.00
106,800.00
16,200.00
1,355,000.00

-
(A+B+C) 9,977,100.00
D 1,297,023.00
(D+E) 11,274,123.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
BIDANG KECIPTA KARYAAN
WILAYAH I
TAHUN 2017
ANALISA PEKERJAAN TANAH

3 Menggali tanah biasa sedalam 3 meter


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Tenaga Kerja Pekerja OH 1.050 65,000.00
Mandor OH 0.067 81,000.00

B Peralatan

C Jumlah harga tenaga, bahan dan peralatan


D Overhead & profit 10% + 3% x
E Jumlah harga per-satuan pekerjaan

4 Menggali tanah keras sedalam 1 meter


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Tenaga Kerja Pekerja OH 1.000 65,000.00
Mandor OH 0.032 81,000.00

B Peralatan

C Jumlah harga tenaga, bahan dan peralatan


D Overhead & profit 10% + 3% x
E Jumlah harga per-satuan pekerjaan

5 Menggali tanah cadas sedalam 1 meter


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Tenaga Kerja Pekerja OH 1.500 65,000.00
Mandor OH 0.060 81,000.00

B Peralatan

C Jumlah harga tenaga, bahan dan peralatan


D Overhead & profit 10% + 3% x
E Jumlah harga per-satuan pekerjaan

6 Menggali tanah lumpur sedalam 1 meter


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Tenaga Kerja Pekerja OH 1.200 65,000.00
Mandor OH 0.045 81,000.00

B Peralatan

C Jumlah harga tenaga, bahan dan peralatan


D Overhead & profit 10% + 3% x
E Jumlah harga per-satuan pekerjaan

7 Mengerjakan stripping tebing 1 meter


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Tenaga Kerja Pekerja OH 0.050 65,000.00
Mandor OH 0.005 81,000.00

B Peralatan

C Jumlah harga tenaga, bahan dan peralatan


D Overhead & profit 10% + 3% x
E Jumlah harga per-satuan pekerjaan

8 (K3) Membuang tanah sejauh 30 meter


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Tenaga Kerja Pekerja OH 0.330 65,000.00
Mandor OH 0.010 81,000.00

B Peralatan

C Jumlah harga tenaga, bahan dan peralatan


D Overhead & profit 10% + 3% x
E Jumlah harga per-satuan pekerjaan
12 Memasang Lapisan pudel campuran 1 Kp : 3 PP : 7 TL
m3

Harga Satuan
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kapur Padam m3 0.135 244,000.00
Pasir Pasang m3 0.400 260,000.00
Tanah Liat m3 0.948 38,000.00

B Tenaga Kerja Pekerja Oh 0.800 65,000.00


Tukang Batu Oh 0.400 77,000.00
Kepala Tukang Oh 0.040 89,000.00
Mandor Oh 0.080 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per-satuan pekerjaan

13 Memasang Lapisan pudel campuran 1 Kp : 5 TL


m3

Harga Satuan
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kapur Padam m3 0.248 244,000.00
Tanah Liat m3 1.240 38,000.00

B Tenaga Kerja Pekerja Oh 0.800 65,000.00


Tukang Batu Oh 0.400 77,000.00
Kepala Tukang Oh 0.040 89,000.00
Mandor Oh 0.080 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per-satuan pekerjaan

14 Memasang lapisan ijuk tebal 10 cm untuk bidang resapan


m2

Harga Satuan
Kebutuhan Satuan Indeks
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ijuk kg 6.000 13,000.00

B Tenaga Kerja Pekerja OH 0.150 65,000.00


Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per-satuan pekerjaan

15 Mengurug sirtu padat


m3

Harga Satuan
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Sirtu m3 1.200 162,000.00

B Tenaga Kerja Pekerja OH 0.250 65,000.00


Mandor OH 0.025 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per-satuan pekerjaan
PEKERJAAN PONDASI

1 Memasang pondasi batu belah, campuran 1 PC : 3 PP


m3
Harga Satuan
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Belah 15/20 cm m3 1.200 271,000.00
PC kg 202.000 1,250.00
Pasir Pasang m3 0.485 260,000.00

B Tenaga Kerja Pekerja OH 1.500 65,000.00


Tukang Batu OH 0.750 77,000.00
Kepala Tukang OH 0.075 89,000.00
Mandor OH 0.075 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

2 Memasang pondasi batu belah, campuran 1 PC : 4 PP


m3
Harga Satuan
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Belah 15/20 cm m3 1.200 271,000.00
PC kg 163.000 1,250.00
Pasir Pasang m3 0.520 260,000.00

B Tenaga Kerja Pekerja OH 1.500 65,000.00


Tukang Batu OH 0.750 77,000.00
Kepala Tukang OH 0.075 89,000.00
Mandor OH 0.075 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

3 Memasang pondasi batu belah, campuran 1 PC : 5 PP


m3
Harga Satuan
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Belah 15/20 cm m3 1.200 271,000.00
PC kg 136.000 1,250.00
Pasir Pasang m3 0.544 260,000.00

B Tenaga Kerja Pekerja OH 1.500 65,000.00


Tukang Batu OH 0.750 77,000.00
Kepala Tukang OH 0.075 89,000.00
Mandor OH 0.075 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

4 Memasang pondasi batu belah, campuran 1 PC : 6 PP


m3
Harga Satuan
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Belah 15/20 cm m3 1.200 271,000.00
PC kg 117.000 1,250.00
Pasir Pasang m3 0.561 260,000.00

B Tenaga Kerja Pekerja OH 1.500 65,000.00


Tukang Batu OH 0.750 77,000.00
Kepala Tukang OH 0.075 89,000.00
Mandor OH 0.075 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

6 Memasang pondasi batu belah, campuran 1 KP : 1 SM : 2 PP


m3

Harga Satuan
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Belah 15/20 cm m3 1.200 271,000.00
Kapur Padam m3 0.170 244,000.00
Semen Merah m3 0.170 Err:509
Pasir Pasang m3 0.340 260,000.00

B Tenaga Kerja Pekerja OH 1.500 65,000.00


Tukang Batu OH 0.750 77,000.00
Kepala Tukang OH 0.075 89,000.00
Mandor OH 0.075 81,000.00
C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

8 Memasang pondasi batu belah, campuran 1/4 PC : 1 KP : 4 PP


m3

Harga Satuan
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Belah 15/20 cm m3 1.200 271,000.00
PC kg 41.000 1,250.00
Kapur Padam m3 0.131 244,000.00
Pasir Pasang m3 0.523 260,000.00

B Tenaga Kerja Pekerja OH 1.500 65,000.00


Tukang Batu OH 0.750 77,000.00
Kepala Tukang OH 0.075 89,000.00
Mandor OH 0.075 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

9 (K3) Memasang batu kosong ( anstamping )


m3

Harga Satuan
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Belah 15/20 cm m3 1.200 271,000.00
Pasir urug m3 0.432 142,000.00
B Tenaga Kerja Pekerja OH 0.780 65,000.00
Tukang Batu OH 0.390 77,000.00
Kepala Tukang OH 0.039 89,000.00
Mandor OH 0.039 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

10 Memasang pondasi siklop,


60 % beton campuran 1 PC : 2 PB : 3 KR dan 40 % batu belah
m3

Harga Satuan
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Belah 15/20 cm m3 0.480 271,000.00
PC kg 194.000 1,250.00
Pasir Beton m3 0.312 260,000.00
Kerikil m3 0.468 220,000.00
Besi Beton kg 126.000 11,500.00
Kawat Beton kg 1.800 23,000.00

B Tenaga Kerja Pekerja OH 3.400 65,000.00


Tukang Batu OH 0.850 77,000.00
Kepala Tukang OH 0.085 89,000.00
Mandor OH 0.170 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

11 Memasang pondasi sumuran, diameter 100 cm


m3

Harga Satuan
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Belah 15/20 cm m3 0.450 271,000.00
PC kg 194.000 1,250.00
Pasir Beton m3 0.312 260,000.00
Kerikil m3 0.468 220,000.00

B Tenaga Kerja Pekerja OH 2.400 65,000.00


Tukang Batu OH 0.800 77,000.00
Kepala Tukang OH 0.080 89,000.00
Mandor OH 0.119 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
PEKERJAAN DINDING

1 Membuat dinding bata merah tebal 1 bata , camp 1 PC : 2 PP


m2

Harga Satuan
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Merah Buah 140.000 800.00
PC kg 43.500 1,250.00
Pasir Pasang m3 0.080 260,000.00

B Tenaga Kerja Pekerja OH 0.600 65,000.00


Tukang Batu OH 0.200 77,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.030 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

2 Membuat dinding bata merah tebal 1 bata , camp 1 PC : 3 PP


m2

Harga Satuan
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Merah Buah 140.000 800.00
PC kg 32.950 1,250.00
Pasir Pasang m3 0.091 260,000.00

B Tenaga Kerja Pekerja OH 0.600 65,000.00


Tukang Batu OH 0.200 77,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.030 81,000.00
C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

3 Membuat dinding bata merah tebal 1 bata , camp 1 PC : 4 PP


m2

Harga Satuan
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Merah Buah 140.000 800.00
PC kg 26.550 1,250.00
Pasir Pasang m3 0.093 260,000.00

B Tenaga Kerja Pekerja OH 0.600 65,000.00


Tukang Batu OH 0.200 77,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.030 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

4 Membuat dinding bata merah tebal 1 bata , camp 1 PC : 5 PP


m2

Harga Satuan
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Merah Buah 140.000 800.00
PC kg 22.200 1,250.00
Pasir Pasang m3 0.102 260,000.00

B Tenaga Kerja Pekerja OH 0.600 65,000.00


Tukang Batu OH 0.200 77,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.030 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

5 Membuat dinding bata merah tebal 1 bata , camp 1 PC : 6 PP


m2
Harga Satuan
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Merah Buah 140.000 800.00
PC kg 18.500 1,250.00
Pasir Pasang m3 0.122 260,000.00

B Tenaga Kerja Pekerja OH 0.600 65,000.00


Tukang Batu OH 0.200 77,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.030 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

6 Membuat dinding bata merah tebal 1 bata , camp 1 PC : 3 KP : 10 PP


m2
Harga Satuan
No. Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Merah Buah 140.000 800.00
PC kg 10.080 1,250.00
Pasir Pasang m3 0.093 260,000.00
Kapur Pasang m3 0.028 244,000.00

B Tenaga Kerja Pekerja OH 0.600 65,000.00


Tukang Batu OH 0.200 77,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.030 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

7 Membuat dinding bata merah tebal 1/2 bata , camp 1 PC : 2 PP


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Merah Buah 70.000 800.00
PC kg 18.950 1,250.00
Pasir Pasang m3 0.038 260,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.100 77,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

8 Membuat dinding bata merah tebal 1/2 bata , camp 1 PC : 3 PP


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Merah Buah 70.000 800.00
PC kg 14.370 1,250.00
Pasir Pasang m3 0.040 260,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.100 77,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

10 Membuat dinding bata merah tebal 1/2 bata , camp 1 PC : 5 PP


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Merah Buah 70.000 800.00
PC kg 9.680 1,250.00
Pasir Pasang m3 0.045 260,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.100 77,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
11 Membuat dinding bata merah tebal 1/2 bata , camp 1 PC : 6 PP
m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Merah Buah 70.000 800.00
PC kg 8.320 1,250.00
Pasir Pasang m3 0.049 260,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.100 77,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
14 Membuat dinding bata merah tebal 1/2 bata , camp 1 KP : 1 SM : 1 PP
m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Merah Buah 70.000 800.00
Semen Merah kg 0.018 Err:509
Pasir Pasang m3 0.018 260,000.00
Kapur Pasang m3 0.018 244,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.100 77,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

15 Memasang dinding bt merah tebal 1/2 bata , camp 1 KP : 1 SM : 2 PP


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu Merah Buah 70.000 800.00
Semen Merah kg 0.014 Err:509
Pasir Pasang m3 0.028 260,000.00
Kapur Pasang m3 0.014 244,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.100 77,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

16 Memasang dinding HB/CB 20 , camp 1 PC : 3 PP


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan HB 20 buah 12.500 9,800.00
Semen kg 30.320 1,250.00
Pasir Pasang m3 0.728 260,000.00
Angkur Ø = 8 mm kg 0.280 11,500.00

B Tenaga Kerja Pekerja OH 0.350 65,000.00


Tukang Batu OH 0.150 77,000.00
Kepala Tukang OH 0.015 89,000.00
Mandor OH 0.018 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

17 Memasang dinding HB/CB 20 , camp 1 PC : 4 PP


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan HB 20 buah 12.500 9,800.00
Semen kg 24.260 1,250.00
Pasir Pasang m3 0.772 260,000.00
Angkur Ø = 8 mm kg 0.280 11,500.00

B Tenaga Kerja Pekerja OH 0.350 65,000.00


Tukang Batu OH 0.150 77,000.00
Kepala Tukang OH 0.015 89,000.00
Mandor OH 0.018 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

18 Memasang dinding HB/CB 15 , camp 1 PC : 3 PP


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan HB 15 buah 12.500 -
Semen kg 22.740 1,250.00
Pasir Pasang m3 0.550 260,000.00
Angkur Ø = 8 mm kg 0.280 11,500.00

B Tenaga Kerja Pekerja OH 0.320 65,000.00


Tukang Batu OH 0.120 77,000.00
Kepala Tukang OH 0.012 89,000.00
Mandor OH 0.016 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
19 Memasang dinding HB/CB 15 , camp 1 PC : 4 PP
m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan HB 15 buah 12.500 -
Semen kg 18.200 1,250.00
Pasir Pasang m3 0.582 260,000.00
Angkur Ø = 8 mm kg 0.280 11,500.00

B Tenaga Kerja Pekerja OH 0.320 65,000.00


Tukang Batu OH 0.120 77,000.00
Kepala Tukang OH 0.012 89,000.00
Mandor OH 0.016 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

20 Memasang dinding HB/CB 10 , camp 1 PC : 3 PP


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan HB 10 ( Bataco tebal 10) buah 12.500 3,300.00
PC kg 15.160 1,250.00
Pasir Pasang m3 0.364 260,000.00
Angkur Ø = 8 mm kg 0.280 11,500.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.100 77,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

21 Memasang dinding HB 10 , camp 1 PC : 4 PP


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan HB 10 ( Bataco tebal 10) Buah 12.500 3,300.00
PC kg 12.130 1,250.00
Pasir Pasang m3 0.388 260,000.00
Angkur Ø = 8 mm kg 0.280 11,500.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.100 77,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.015 81,000.00
C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

22 Memasang dinding terawang ( roster ), camp. 1 PC : 3 PP


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Terawang ( roster ) Buah 30.000 14,000.00
PC kg 11.000 1,250.00
Pasir Pasang m3 0.035 260,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.100 77,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

23 Memasang dinding terawang ( roster ) camp 1 PC : 4 PP


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Terawang ( roster ) beton Buah 30.000 14,000.00
PC kg 11.000 1,250.00
Pasir Pasang m3 0.035 260,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.100 77,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
24 Memasang dinding bata berongga ekspose ukuran , camp. 1 PC : 3 PP
m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Bata berongga ekspose Buah 70.000 1,500.00
PC kg 14.000 1,250.00
Pasir Pasang m3 0.032 260,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.150 77,000.00
Kepala Tukang OH 0.015 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

PEKERJAAN PLESTERAN

1 Memasang plesteran 1 PC : 1 PP, tebal 15 mm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 15.504 1,250.00
Pasir Pasang m3 0.016 260,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.150 77,000.00
Kepala Tukang OH 0.015 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

2 Memasang plesteran 1 PC : 2 PP, tebal 15 mm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 10.224 1,250.00
Pasir Pasang m3 0.020 260,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.150 77,000.00
Kepala Tukang OH 0.015 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

4 Memasang plesteran 1 PC : 4 PP, tebal 15 mm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 6.240 1,250.00
Pasir Pasang m3 0.024 260,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.150 77,000.00
Kepala Tukang OH 0.015 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

5 Memasang plesteran 1 PC : 5 PP, tebal 15 mm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 5.184 1,250.00
Pasir Pasang m3 0.026 260,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.150 77,000.00
Kepala Tukang OH 0.015 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

6 Memasang plesteran 1 PC : 6 PP, tebal 15 mm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 4.416 1,250.00
Pasir Pasang m3 0.027 260,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.150 77,000.00
Kepala Tukang OH 0.015 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

7 Memasang plesteran 1 PC : 7 PP, tebal 15 mm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 3.936 1,250.00
Pasir Pasang m3 0.028 260,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.150 77,000.00
Kepala Tukang OH 0.015 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

9 Memasang plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 5.760 1,250.00
Kapur Padam m3 0.003 244,000.00
Pasir Pasang m3 0.013 260,000.00
B Tenaga Kerja Pekerja OH 0.360 65,000.00
Tukang Batu OH 0.120 77,000.00
Kepala Tukang OH 0.012 89,000.00
Mandor OH 0.018 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

10 Memasang plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 3.000 1,250.00
Kapur Padam m3 0.005 244,000.00
Pasir Pasang m3 0.020 260,000.00

B Tenaga Kerja Pekerja OH 0.360 65,000.00


Tukang Batu OH 0.120 77,000.00
Kepala Tukang OH 0.012 89,000.00
Mandor OH 0.018 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

11 Memasang plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Semen Merah m3 0.009 Err:509
Kapur Padam m3 0.009 244,000.00
Pasir Pasang m3 0.009 260,000.00

B Tenaga Kerja Pekerja OH 0.360 65,000.00


Tukang Batu OH 0.120 77,000.00
Kepala Tukang OH 0.012 89,000.00
Mandor OH 0.018 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

12 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Semen Merah m3 0.007 Err:509
Kapur Padam m3 0.007 244,000.00
Pasir Pasang m3 0.015 260,000.00

B Tenaga Kerja Pekerja OH 0.360 65,000.00


Tukang Batu OH 0.120 77,000.00
Kepala Tukang OH 0.012 89,000.00
Mandor OH 0.018 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

13 Memasang plesteran 1 PC : 2 PP, tebal 20 mm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 13.632 1,250.00
Pasir Pasang m3 0.027 260,000.00

B Tenaga Kerja Pekerja OH 0.400 65,000.00


Tukang Batu OH 0.200 77,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.022 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 3 m

14 Memasang plesteran 1 PC : 3 PP, tebal 20 mm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 10.368 1,250.00
Pasir Pasang m3 0.031 260,000.00

B Tenaga Kerja Pekerja OH 0.260 65,000.00


Tukang Batu OH 0.200 77,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.013 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
15 Memasang plesteran 1 PC : 4 PP, tebal 20 mm
m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 8.320 1,250.00
Pasir Pasang m3 0.032 260,000.00

B Tenaga Kerja Pekerja OH 0.400 65,000.00


Tukang Batu OH 0.200 77,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.022 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

16 Memasang plesteran 1 PC : 5 PP, tebal 20 mm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 6.912 1,250.00
Pasir Pasang m3 0.035 260,000.00

B Tenaga Kerja Pekerja OH 0.400 65,000.00


Tukang Batu OH 0.200 77,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.022 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

17 Memasang plesteran 1 PC : 6 PP, tebal 20 mm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 5.888 1,250.00
Pasir Pasang m3 0.036 260,000.00

B Tenaga Kerja Pekerja OH 0.400 65,000.00


Tukang Batu OH 0.200 77,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.022 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

18 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Semen Merah m3 0.009 Err:509
Kapur Padam m3 0.009 244,000.00
Pasir Pasang m3 0.018 260,000.00

B Tenaga Kerja Pekerja OH 0.440 65,000.00


Tukang Batu OH 0.220 77,000.00
Kepala Tukang OH 0.022 89,000.00
Mandor OH 0.022 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

19 Memasang Berapen 1 PC : 5 PP, tebal 15 mm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 5.184 1,250.00
Pasir Pasang m3 0.026 260,000.00

B Tenaga Kerja Pekerja OH 0.150 65,000.00


Tukang Batu OH 0.075 77,000.00
Kepala Tukang OH 0.008 89,000.00
Mandor OH 0.008 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

20 Memasang Plesteran Skoning 1 PC : 3 PP, tebal 10 mm


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 0.500 1,250.00
Pasir Pasang m3 0.013 260,000.00

B Tenaga Kerja Pekerja OH 0.080 65,000.00


Tukang Batu OH 0.400 77,000.00
Kepala Tukang OH 0.040 89,000.00
Mandor OH 0.004 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

21 Memasang Plesteran Granit 1 PC : 2 Granit, tebal 10 mm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 10.000 1,250.00
Batu Granit kg 15.000 955,000.00

B Tenaga Kerja Pekerja OH 0.450 65,000.00


Tukang Batu OH 0.225 77,000.00
Kepala Tukang OH 0.023 89,000.00
Mandor OH 0.023 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

22 Memasang Plesteran Teraso, 1 PC : 2 Batu Teraso, tebal 10 mm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 10.000 1,250.00
Batu Teraso kg 15.000 -

B Tenaga Kerja Pekerja OH 0.450 65,000.00


Tukang Batu OH 0.225 77,000.00
Kepala Tukang OH 0.023 89,000.00
Mandor OH 0.023 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

23 Memasang Plesteran Ciprat 1 PC : 2 PP


m2
Harga Satuan
Kebutuhan Satuan Indeks
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 4.320 1,250.00
Pasir Pasang m3 0.006 260,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.100 77,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

24 Memasang finishing siar pasangan dinding bata merah ( = 20 M' )


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 3.108 1,250.00

B Tenaga Kerja Pekerja OH 0.150 65,000.00


Tukang Batu OH 0.075 77,000.00
Kepala Tukang OH 0.008 89,000.00
Mandor OH 0.008 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

25 Memasang finishing siar pasangan dinding conblock ekspose ( = 8 M' )


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 1.600 1,250.00

B Tenaga Kerja Pekerja OH 0.070 65,000.00


Tukang Batu OH 0.035 77,000.00
Kepala Tukang OH 0.004 89,000.00
Mandor OH 0.004 81,000.00

C Peralatan
D Jumlah harga tenaga, bahan dan peralatan
E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

26 Memasang finishing siar pasangan batu kali adukan 1 PC : 2 PP


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 6.340 1,250.00
Pasir Pasang m3 0.012 260,000.00

B Tenaga Kerja Pekerja OH 0.300 65,000.00


Tukang Batu OH 0.150 77,000.00
Kepala Tukang OH 0.015 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
PEKERJAAN KAYU

1 Pasang kusen pintu dan kusen jendela, kayu kelas I


m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok kayu kelas I m3 1.100
Paku 10 cm kg 1.250
Lem Kayu kg 1.000

B Tenaga Kerja Pekerja OH 7.000


Tukang Kayu OH 21.000
Kepala Tukang OH 2.100
Mandor OH 0.350

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

2 Pasang kusen pintu dan jendela kayu bangkiray


m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok Kayu BK m3 1.100 12,487,000.00
Paku 10 cm kg 1.250 16,000.00
Lem Kayu kg 1.000 13,000.00

B Tenaga Kerja Pekerja OH 7.000 65,000.00


Tukang kayu OH 21.000 81,000.00
Kepala tukang OH 2.100 89,000.00
Mandor OH 0.350 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
4 Pasang kusen pintu dan kusen jendela, kayu kelas II atau III
m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok kayu kelas II / III m3 1.200
Paku 10 cm kg 1.250
Lem Kayu kg 1.000

B Tenaga Kerja Pekerja OH 6.000


Tukang Kayu OH 18.000
Kepala Tukang OH 1.800
Mandor OH 0.300

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

5 Pasang kusen pintu dan jendela kayu jati hutan


m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok Kayu Jati m3 1.200 23,888,000.00
Paku 10 cm kg 1.250 16,000.00
Lem Kayu kg 1.000 13,000.00

B Tenaga Kerja Pekerja OH 6.000 65,000.00


Tukang kayu OH 18.000 81,000.00
Kepala tukang OH 1.800 89,000.00
Mandor OH 0.300 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

7 Pasang kusen pintu dan jendela, kayu kruing


m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok Kayu Kruing m3 1.200 7,600,000.00
Paku 10 cm kg 1.250 16,000.00
Lem Kayu kg 1.000 13,000.00

B Tenaga Kerja Pekerja OH 6.000 65,000.00


Tukang kayu OH 18.000 81,000.00
Kepala tukang OH 1.800 89,000.00
Mandor OH 0.300 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

8 Pasang pintu klamp standar, kayu kelas II


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.040
Paku 5 cm - 7 cm kg 0.050 16,000.00

B Tenaga Kerja Pekerja OH 0.350 65,000.00


Tukang Kayu OH 1.050 81,000.00
Kepala Tukang OH 0.105 89,000.00
Mandor OH 0.018 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
9 Membuat dan memasang pintu klamp sederhana, kayu kelas III
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.040
Paku 5 cm - 7 cm kg 0.050 16,000.00

B Tenaga Kerja Pekerja OH 0.350 65,000.00


Tukang Kayu OH 1.050 81,000.00
Kepala Tukang OH 0.105 89,000.00
Mandor OH 0.018 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

11 Membuat dan memasang pintu panil , kayu jati hutan


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.040 23,888,000.00
Lem kayu kg 0.500 13,000.00

B Tenaga Kerja Pekerja OH 1.000 65,000.00


Tukang kayu OH 3.000 81,000.00
Kepala tukang OH 0.300 89,000.00
Mandor OH 0.050 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

14 Membuat dan memasang pintu dan jendela kaca , kayu jati hutan
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.024 23,888,000.00
Lem kayu kg 0.300 13,000.00

B Tenaga Kerja Pekerja OH 0.800 65,000.00


Tukang kayu OH 2.400 81,000.00
Kepala tukang OH 0.240 89,000.00
Mandor OH 0.040 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

16 Membuat dan memasang pintu dan jendela jalusi, kayu kelas I atau II
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.064
Lem kayu kg 0.500 13,000.00

B Pekerja OH 1.000 65,000.00


Tenaga Kerja Tukang Kayu OH 3.000 81,000.00
Kepala Tukang OH 0.300 89,000.00
Mandor OH 0.050 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
17 Membuat daun pintu kayu lapis ( plywood) rangkap, rangka tertutup ky kelas II
( lebar sampai 90 cm )
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.025 13,573,000.00
Paku 1 cm-2,5 cm kg 0.030 16,000.00
Lem kayu kg 0.500 13,000.00
Plywood tbl 4 mm Lembar 1.000 70,000.00
Ukrn 90 x 220 cm

B Tenaga Kerja Pekerja OH 0.700 65,000.00


Tukang Kayu OH 2.100 81,000.00
Kepala Tukang OH 0.210 89,000.00
Mandor OH 0.035 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

18 Membuat pintu plywood rangkap, rangka ekspose kayu kelas I atau II


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.0256 13,573,000.00
Paku 1 cm-2,5 cm kg 0.030 16,000.00
Lem kayu kg 0.500 13,000.00
Plywood tbl 4 mm Lembar 1.000 70,000.00
Ukrn 90 x 220 cm

B Tenaga Kerja Pekerja OH 0.800 65,000.00


Tukang Kayu OH 2.400 81,000.00
Kepala Tukang OH 0.240 89,000.00
Mandor OH 0.040 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

19 Memasang jalusi kusen, kelas I atau Kelas II


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.060 23,888,000.00
Paku 1 - 2,5 cm kg 0.150 16,000.00

B Tenaga Kerja Pekerja OH 0.670 65,000.00


Tukang Kayu OH 2.000 81,000.00
Kepala Tukang OH 0.200 89,000.00
Mandor OH 0.335 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

20 Memasang teakwood rangkap, rangka expose kayu kelas I


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.025 13,573,000.00
Paku 1 cm-2,5 cm kg 0.030 16,000.00
Lem kayu kg 0.300 13,000.00
Teakwood tb 4 mm Lembar 1.000 119,000.00
Ukrn 90 x 220 cm

B Tenaga Kerja Pekerja OH 0.800 65,000.00


Tukang Kayu OH 2.400 81,000.00
Kepala Tukang OH 0.240 89,000.00
Mandor OH 0.040 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

21 Memasang teakwood rangkap lapis formika, rangka expose kayu kelas II


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.025 13,573,000.00
Paku 1 cm-2,5 cm kg 0.030 16,000.00
Lem kayu kg 0.800 13,000.00
Teakwood tb 4 mm Lembar 1.000 119,000.00
Ukrn 90 x 220 cm
Formika Lembar 0.500 0

B Tenaga Kerja Pekerja OH 0.850 65,000.00


Tukang Kayu OH 2.550 81,000.00
Kepala Tukang OH 0.255 89,000.00
Mandor OH 0.043 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
22 Memasang konstruksi kuda-kuda , kayu kelas I, II dan III
m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok kayu m3 1.1000
Besi strip tb 5 mm kg 15.000
Paku 12 cm kg 5.600

B Tenaga Kerja Pekerja OH 4.000


Tukang Kayu OH 12.000
Kepala Tukang OH 1.200
Mandor OH 0.200

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

23 Memasang konstruksi kuda-kuda konvensional kayu bangkiray


m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok Kayu Bangkiray m3 1.1000 12,487,000.00
Besi strip tb 5 mm kg 15.000 11,500.00
Paku 12 cm kg 5.600 16,000.00

B Tenaga Kerja Pekerja OH 4.000 65,000.00


Tukang kayu OH 12.000 81,000.00
Kepala tukang OH 1.200 89,000.00
Mandor OH 0.200 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
25 Memasang konstruksi kuda-kuda konvensional Kayu Jati hutan
m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok Kayu Jati m3 1.100 23,888,000.00
Besi strip tb 5 mm kg 15.000 11,500.00
Paku 12 cm kg 5.600 16,000.00

B Tenaga Kerja Pekerja OH 4.000 65,000.00


Tukang Kayu OH 12.000 81,000.00
Kepala Tukang OH 1.200 89,000.00
Mandor OH 0.200 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

26 Memasang konstruksi kuda-kuda konvensional, Kayu lama


m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok Kayu
Besi strip tb 5 mm kg 15.000 11,500.00
Paku 12 cm kg 5.600 16,000.00

B Tenaga Kerja Pekerja OH 4.000 65,000.00


Tukang Kayu OH 12.000 81,000.00
Kepala Tukang OH 1.200 89,000.00
Mandor OH 0.200 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

27 Memasang konstruksi kuda-kuda ekspose, kayu kelas I


m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok kayu m3 1.2000 23,888,000.00
Besi strip tb 5 mm kg 15.000 11,500.00
Paku 12 cm kg 5.600 16,000.00

B Tenaga Kerja Pekerja OH 6.700 65,000.00


Tukang Kayu OH 20.100 81,000.00
Kepala Tukang OH 2.010 89,000.00
Mandor OH 0.335 81,000.00
C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

28 Memasang konstruksi gording, kayu kelas II


m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok kayu m3 1.1000
Besi strip tb 5 mm kg 15.000
Paku 12 cm kg 3.000

B Tenaga Kerja Pekerja OH 6.700


Tukang Kayu OH 20.100
Kepala Tukang OH 2.010
Mandor OH 0.335

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

29 Memasang konstruksi gording, kayu bangkiray


m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok kayu m3 1.1000 12,487,000.00
Besi strip tb 5 mm kg 15.000 11,500.00
Paku 12 cm kg 3.000 16,000.00

B Tenaga Kerja Pekerja OH 6.700 65,000.00


Tukang Kayu OH 20.100 81,000.00
Kepala Tukang OH 2.010 89,000.00
Mandor OH 0.335 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
31 Memasang rangka atap (usuk/reng) genteng kayu kelas II
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kaso 5/7 cm m3 0.014
Reng 2/3 cm m3 0.036
Paku 5 cm&10 cm kg 0.250

B Tenaga Kerja Pekerja OH 0.100


Tukang Kayu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.005

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

32 Memasang rangka atap (usuk/reng) genteng kayu bangkiray


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kaso 5/7 cm m3 0.014
Reng 2/3 cm m3 0.036
Paku 5 cm&10 cm kg 0.250

B Tenaga Kerja Pekerja OH 0.100


Tukang Kayu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.005

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
32 Memasang rangka atap (usuk/reng) genteng kayu bangkiray
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kaso 5/7 cm m3 0.014 12,487,000.00
Reng 2/3 cm m3 0.0036 12,487,000.00
Paku 5 cm&10 cm kg 0.250 16,000.00

B Tenaga Kerja Pekerja OH 0.100 65,000.00


Tukang Kayu OH 0.100 81,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

34 Memasang rangka atap (usuk lama/reng baru) kayu kruing


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kaso 5/7 cm m3 0.014
Reng 2/3 cm m3 0.0036 7,600,000.00
Paku 5 cm&10 cm kg 0.250 16,000.00

B Tenaga Kerja Pekerja OH 0.100 65,000.00


Tukang Kayu OH 0.100 81,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

35 Memasang rangka atap genteng beton, kayu kelas II


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kaso 5/7 cm m3 0.014
Reng 3/4 cm m3 0.057
Paku 5 cm&10 cm kg 0.250

B Tenaga Kerja Pekerja OH 0.100


Tukang Kayu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.005

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

36 Memasang rangka atap genteng beton, kayu kruing


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kaso 5/7 cm m3 0.014
Reng 3/4 cm m3 0.057
Paku 5 cm&10 cm kg 0.250

B Tenaga Kerja Pekerja OH 0.100


Tukang Kayu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.005

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

37 Memasang rangka atap sirap, kayu kelas II


m2
Harga Satuan
Kebutuhan Satuan Indeks
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas II m3 0.014
Paku 5 cm&10 cm kg 0.057

B Tenaga Kerja Pekerja OH 0.120


Tukang Kayu OH 0.120
Kepala Tukang OH 0.012
Mandor OH 0.006

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

38 Memasang rangka atap sirap, kayu kruing


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kruing m3 0.014 7,600,000.00
Paku 5 cm&10 cm kg 0.057 16,000.00

B Tenaga Kerja Pekerja OH 0.120 65,000.00


Tukang Kayu OH 0.120 81,000.00
Kepala Tukang OH 0.012 89,000.00
Mandor OH 0.006 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

39 Memasang langit-langit ( 50 x 100 ) cm kayu kelas II atau III


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kaso 5/7 cm m3 0.0154
Paku 7 - 10 cm kg 0.200

B Tenaga Kerja Pekerja OH 0.150


Tukang Kayu OH 0.300
Kepala Tukang OH 0.030
Mandor OH 0.075

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
41 Memasang langit-langit ( 60 x 60 ) cm kayu kelas II atau III
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kaso 5/7 cm m3 0.0163
Paku 7 - 10 cm kg 0.250

B Tenaga Kerja Pekerja OH 0.200


Tukang Kayu OH 0.300
Kepala Tukang OH 0.030
Mandor OH 0.010

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

42 Memasang langit-langit ( 60 x 60 ) cm kayu kruing


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kaso 5/7 cm m3 0.0163 7,600,000.00
Paku 7 - 10 cm kg 0.250 16,000.00

B Tenaga Kerja Pekerja OH 0.200 65,000.00


Tukang Kayu OH 0.300 81,000.00
Kepala Tukang OH 0.030 89,000.00
Mandor OH 0.010 81,000.00

C Peralatan
D Jumlah harga tenaga, bahan dan peralatan
E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

43 Memasang lisplank ukuran ( 3 x 20 ) cm, kayu klas I / II


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.0108
Paku 5 dan 7 cm kg 0.100

B Tenaga Kerja Pekerja OH 0.100


Tukang Kayu OH 0.200
Kepala Tukang OH 0.020
Mandor OH 0.005

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

44 Memasang lisplank ukuran (3x20) cm, kayu kruing


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.0108 8,143,000.00
Paku 5 dan 7 cm kg 0.100 16,000.00

B Tenaga Kerja Pekerja OH 0.100 65,000.00


Tukang Kayu OH 0.200 81,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

45 Memasang lisplank ukuran (3x20) cm, kayu kamper


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.0108 11,401,000.00
Paku 5 dan 7 cm kg 0.100 16,000.00

B Tenaga Kerja Pekerja OH 0.100 65,000.00


Tukang Kayu OH 0.200 81,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

47 Memasang lisplank ukuran (3x30) cm, kayu kelas I atau II


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.011
Paku 5 dan 7 cm kg 0.050

B Tenaga Kerja Pekerja OH 0.100


Tukang Kayu OH 0.200
Kepala Tukang OH 0.020
Mandor OH 0.005

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

48 Memasang lisplank ukuran ( 3 x 30 ) cm, kayu bangkiray


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.011 13,573,000.00
Paku 5 dan 7 cm kg 0.050 16,000.00
B Tenaga Kerja Pekerja OH 0.100 65,000.00
Tukang Kayu OH 0.200 81,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

49 Memasang lisplank ukuran ( 3 x 30 ) cm, kayu kamper


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.011 11,401,000.00
Paku 5 dan 7 cm kg 0.050 16,000.00

B Tenaga Kerja Pekerja OH 0.100 65,000.00


Tukang Kayu OH 0.200 81,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

50 Memasang rangka dinding pemisah ( 60 x 120 ) cm kayu kruing ( kelas II atau III )
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok kayu m3 0.028 7,600,000.00
Paku 5 dan 7 cm kg 0.150 16,000.00

B Tenaga Kerja Pekerja OH 0.150 65,000.00


Tukang Kayu OH 0.450 81,000.00
Kepala Tukang OH 0.045 89,000.00
Mandor OH 0.008 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

51 Memasang dinding pemisah teakwood rangkap, rangka kayu kelas II


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok kayu 6/12 m3 0.0280 7,600,000.00
Paku 5 dan 10 cm kg 0.150 16,000.00
Teakwood tb 4 mm lembar 0.860 119,000.00
ukuran 120 x 240
Lem kayu kg 0.560 13,000.00

B Tenaga Kerja Pekerja OH 0.150 65,000.00


Tukang Kayu OH 0.450 81,000.00
Kepala Tukang OH 0.045 89,000.00
Mandor OH 0.008 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

52 Memasang dinding pemisah plywood rangkap, rangka kayu kelas II


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Balok kayu 6/12 m3 0.0280 7,600,000.00
Paku 5 dan 10 cm kg 0.150 16,000.00
Plywood tb 4 mm lembar 0.860 70,000.00
ukuran 120 x 240
Lem kayu kg 0.560 13,000.00

B Tenaga Kerja Pekerja OH 0.200 65,000.00


Tukang Kayu OH 0.600 81,000.00
Kepala Tukang OH 0.060 89,000.00
Mandor OH 0.010 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

53 Memasang dinding lambriziring dari papan kayu kelas I


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu m3 0.007 23,888,000.00
Paku 5 dan 10 cm kg 0.100 16,000.00
Paku skrup 10 cm kg 0.150 16,000.00

B Tenaga Kerja Pekerja OH 0.600 65,000.00


Tukang Kayu OH 1.800 81,000.00
Kepala Tukang OH 0.180 89,000.00
Mandor OH 0.030 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

54 Memasang dinding lambriziring dari plywood ukuran ( 120 x 240 ) cm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plywood tb 4 mm Lembar 0.400 119,000.00
Paku 1 & 2,5 cm Kg 0.050 16,000.00

B Tenaga Kerja Pekerja OH 0.025 65,000.00


Tukang Kayu OH 0.075 81,000.00
Kepala Tukang OH 0.008 89,000.00
Mandor OH 0.001 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

55 Memasang dinding dinding bilik, rangka kayu kelas III atau IV


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Bilik Bambu m2 1.500 -
Kaso 5/7 cm m3 0.014 7,600,000.00
Paku kg 0.012 16,000.00
List Kayu 2/4 m3 0.003 8,000.00

B Tenaga Kerja Pekerja OH 0.100 65,000.00


Tukang Kayu OH 0.050 81,000.00
Kepala Tukang OH 0.005 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
PEKERJAAN BETON

Catatan : Bobot isi pasir 1,400.00 kg/m3


Bobot isi kerikil 1,350.00 kg/m3
Bukling factor pasir 0.20

2 Membuat beton mutu f'c = 9,8 Mpa (mutu K125)


m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 276.000 1,250.00
Pasir Beton kg 828.000 185.71
Kerikil ( maks 30 mm ) kg 1012.000 162.96
Air ltr 215.000 85.00
B Tenaga Kerja Pekerja OH 1.650 65,000.00
Tukang Batu OH 0.275 77,000.00
Kepala Tukang OH 0.028 89,000.00
Mandor OH 0.083 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

3 Membuat beton mutu f'c =12,2 Mpa


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 299.000 1,250.00
Pasir Beton kg 799.000 185.71
Kerikil ( maks 30 mm ) kg 1017.000 162.96
Air ltr 215.000 85.00

B Tenaga Kerja Pekerja OH 1.650 65,000.00


Tukang Batu OH 0.275 77,000.00
Kepala Tukang OH 0.028 89,000.00
Mandor OH 0.083 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
6 Membuat beton mutu f'c = 16,9 Mpa
m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 352.000 1,250.00
Pasir Beton kg 731.000 185.71
Kerikil ( maks 30 mm ) kg 1031.000 162.96
Air ltr 215.000 85.00

B Tenaga Kerja Pekerja OH 1.650 65,000.00


Tukang Batu OH 0.275 77,000.00
Kepala Tukang OH 0.028 89,000.00
Mandor OH 0.083 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
8 Membuat beton mutu f'c = 21,7 Mpa
m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 384.000 1,250.00
Pasir Beton kg 692.000 185.71
Kerikil ( maks 30 mm ) kg 1039.000 162.96
Air ltr 215.000 85.00

B Tenaga Kerja Pekerja OH 1.650 65,000.00


Tukang Batu OH 0.275 77,000.00
Kepala Tukang OH 0.028 89,000.00
Mandor OH 0.083 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

9 Membuat beton mutu f'c = 24,0 Mpa


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 406.000 1,250.00
Pasir Beton kg 684.000 185.71
Kerikil ( maks 30 mm ) kg 1026.000 162.96
Air ltr 215.000 85.00

B Tenaga Kerja Pekerja OH 1.650 65,000.00


Tukang Batu OH 0.275 77,000.00
Kepala Tukang OH 0.028 89,000.00
Mandor OH 0.083 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
10 Membuat beton mutu f'c = 26,4 Mpa
m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 413.000 1,250.00
Pasir Beton kg 681.000 185.71
Kerikil ( maks 30 mm ) kg 1021.000 162.96
Air ltr 215.000 85.00

B Tenaga Kerja Pekerja OH 1.650 65,000.00


Tukang Batu OH 0.275 77,000.00
Kepala Tukang OH 0.028 89,000.00
Mandor OH 0.083 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

11 Membuat beton mutu f'c = 28,8 Mpa


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 439.000 1,250.00
Pasir Beton kg 670.000 185.71
Kerikil ( maks 30 mm ) kg 1006.000 162.96
Air ltr 215.000 85.00

B Tenaga Kerja Pekerja OH 2.100 65,000.00


Tukang Batu OH 0.350 77,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.105 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

12 Membuat beton mutu f'c = 31,2 Mpa ( K 350 ), slump ( 120 + 20 )mm
m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 448.000 1,250.00
Pasir Beton kg 667.000 185.71
Kerikil ( maks 30 mm ) kg 1000.000 162.96
Air ltr 215.000 85.00

B Tenaga Kerja Pekerja OH 2.100 65,000.00


Tukang Batu OH 0.350 77,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.105 81,000.00
C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

13 Membuat beton kedap air dengan strorox - 100


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan PC kg 400.000 1,250.00
Pasir Beton m3 0.480 260,000.00
Kerikil ( 2 cm / 3 cm ) m3 0.800 220,000.00
Strorox - 100 kg 1.200 48,000.00

B Tenaga Kerja Pekerja OH 2.100 65,000.00


Tukang Batu OH 0.350 77,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.105 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

14 Membuat PVC Waterstop lebar 150 mm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Waterstop lebar 150 mm m 1.050 0

B Tenaga Kerja Pekerja OH 0.060 65,000.00


Tukang Batu / pipa OH 0.030 77,000.00
Kepala Tukang OH 0.003 89,000.00
Mandor OH 0.003 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

15 Membuat PVC Waterstop lebar 200 mm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Waterstop lebar 200 mm m 1.050 0

B Tenaga Kerja Pekerja OH 0.070 65,000.00


Tukang Batu / pipa OH 0.035 77,000.00
Kepala Tukang OH 0.004 89,000.00
Mandor OH 0.004 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

16 Membuat PVC Waterstop lebar 230 mm - 320 mm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan W.Stop lbr 230 - 320 mm m 1.050 0

B Tenaga Kerja Pekerja OH 0.080 65,000.00


Tukang batu OH 0.040 77,000.00
Kepala Tukang OH 0.004 89,000.00
Mandor OH 0.004 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

18 Memasang 10 kg kabel presstressed polos / strands


kg

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Besi Beton ( polos/ulir ) kg 10.500 11,500.00
Kawat Beton kg 0.100 23,000.00

B Tenaga Kerja Pekerja OH 0.050 65,000.00


Tukang Besi OH 0.050 77,000.00
Kepala Tukang OH 0.005 89,000.00
Mandor OH 0.003 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
Pembesian 1 kg dengan besi polos atau besi ulir 0.10 147,846.94

19 Memasang 10 kg jaring kawat baja / wire mesh


kg

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Jaring kawat baja dilas kg 10.200 11,500.00
Kawat Beton kg 0.050 23,000.00

B Tenaga Kerja Pekerja OH 0.025 65,000.00


Tukang Besi OH 0.025 77,000.00
Kepala Tukang OH 0.002 89,000.00
Mandor OH 0.001 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
Pembesian 1 kg dengan besi polos atau besi ulir 0.10 138,152.67
27 (K3) Memasang bekisting untuk tangga
m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.030 1,628,000.00
Paku 5 cm - 10 cm kg 0.400 16,000.00
Minyak Bekisting ltr 0.150 7,400.00
Balok kayu kelas II m3 0.015 1,628,000.00
Plywood tebal 9 mm lbr 0.350 146,000.00
Dolken kayu galam, btg 2.000 10,000.00
Ø (8 - 10) cm, panj 4 m

B Tenaga Kerja Pekerja OH 0.660 65,000.00


Tukang Kayu OH 0.330 81,000.00
Kepala Tukang OH 0.033 89,000.00
Mandor OH 0.033 81,000.00

C Peralatan
D Jumlah harga tenaga, bahan dan peralatan
E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

28 Memasang jembatan untuk pengecoran beton


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III ( papan ) m3 0.0264 1,628,000.00
Paku 5 cm - 12 cm kg 0.600 16,000.00
Dolken kayu galam(kaso) btg 0.500 10,000.00
Ø (8 - 10) cm, panj 4 m

B Tenaga Kerja Pekerja OH 0.150 65,000.00


Tukang Kayu OH 0.050 81,000.00
Kepala Tukang OH 0.005 89,000.00
Mandor OH 0.008 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

29 Membuat pondasi beton bertulang ( 150 kg besi + bekisting )


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.200 1,628,000.00
Paku 5 cm - 12 cm kg 1.500 16,000.00
Minyak bekisting ltr 0.400 7,400.00
Besi beton polos kg 157.500 11,500.00
Kawat beton kg 2.250 23,000.00
PC kg 336.000 1,250.00
Pasir beton m3 0.540 260,000.00
Kerikil m3 0.810 220,000.00

B Tenaga Kerja Pekerja OH 5.300 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.300 81,000.00
Tukang Besi OH 1.050 77,000.00
Kepala Tukang OH 0.262 89,000.00
Mandor OH 0.265 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
30 Membuat pondasi beton K.225 (150 kg besi + bekisting)
m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.067 1,628,000.00
Paku 5 cm - 12 cm kg 1.500 16,000.00
Minyak bekisting ltr 0.400 7,400.00
Besi beton polos kg 157.500 11,500.00
Kawat beton kg 2.250 23,000.00
PC kg 371.000 1,250.00
Pasir beton m3 0.499 260,000.00
Kerikil m3 0.776 220,000.00
Air ltr 215.000 85.00

B Tenaga Kerja Pekerja OH 5.300 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.300 81,000.00
Tukang Besi OH 1.050 77,000.00
Kepala Tukang OH 0.262 89,000.00
Mandor OH 0.265 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

31 Membuat pondasi beton K.175 (150 kg besi + bekisting)


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.067 1,628,000.00
Paku 5 cm - 12 cm kg 1.500 16,000.00
Minyak bekisting ltr 0.400 7,400.00
Besi beton polos kg 157.500 11,500.00
Kawat beton kg 2.250 23,000.00
PC kg 326.000 1,250.00
Pasir beton m3 0.543 260,000.00
Kerikil m3 0.762 220,000.00
Air ltr 215.000 85.00

B Tenaga Kerja Pekerja OH 5.300 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.300 81,000.00
Tukang Besi OH 1.050 77,000.00
Kepala Tukang OH 0.262 89,000.00
Mandor OH 0.265 81,000.00
C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

32 Membuat sloof beton bertulang ( 200 kg besi + bekisting )


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.270 1,628,000.00
Paku 5 cm - 12 cm kg 2.000 16,000.00
Minyak bekisting ltr 0.600 7,400.00
Besi beton polos kg 210.000 11,500.00
Kawat beton kg 3.000 23,000.00
PC kg 336.000 1,250.00
Pasir beton m3 0.540 260,000.00
Kerikil m3 0.810 220,000.00

B Tenaga Kerja Pekerja OH 5.650 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.560 81,000.00
Tukang Besi OH 1.400 77,000.00
Kepala Tukang OH 0.323 89,000.00
Mandor OH 0.283 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

33 Membuat sloof beton K.225 ( 150 kg besi + bekisting )


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.090 1,628,000.00
Paku 5 cm - 12 cm kg 2.000 16,000.00
Minyak bekisting ltr 0.600 7,400.00
Besi beton polos kg 157.500 11,500.00
Kawat beton kg 3.000 23,000.00
PC kg 371.000 1,250.00
Pasir beton m3 0.499 260,000.00
Kerikil m3 0.776 220,000.00
Air ltr 215.000 85.00

B Tenaga Kerja Pekerja OH 5.650 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.560 81,000.00
Tukang Besi OH 1.400 77,000.00
Kepala Tukang OH 0.323 89,000.00
Mandor OH 0.283 81,000.00
C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

34 Membuat sloof beton K.175 ( 150 kg besi + bekisting )


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.090 1,628,000.00
Paku 5 cm - 12 cm kg 2.000 16,000.00
Minyak bekisting ltr 0.600 7,400.00
Besi beton polos kg 157.500 11,500.00
Kawat beton kg 3.000 23,000.00
PC kg 326.000 1,250.00
Pasir beton m3 0.543 260,000.00
Kerikil m3 0.762 220,000.00
Air ltr 215.000 85.00

B Tenaga Kerja Pekerja OH 5.650 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.560 81,000.00
Tukang Besi OH 1.400 77,000.00
Kepala Tukang OH 0.323 89,000.00
Mandor OH 0.283 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

35 Membuat kolom beton bertulang ( 300 kg besi + bekisting )


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.4000 1,628,000.00
Paku 5 cm - 12 cm kg 4.000 16,000.00
Minyak bekisting ltr 2.000 7,400.00
Besi beton polos kg 315.000 11,500.00
Kawat beton kg 4.500 23,000.00
PC kg 336.000 1,250.00
Pasir beton m3 0.540 260,000.00
Kerikil m3 0.810 220,000.00
Kayu kelas II balok m3 0.150 1,628,000.00
Plywood 9 mm lbr 3.500 146,000.00
Dolken kayu galam btg 20.000 10,000.00
Ø ( 8-10) cm, p = 4 m

B Tenaga Kerja Pekerja OH 7.050 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.650 81,000.00
Tukang Besi OH 2.100 77,000.00
Kepala Tukang OH 0.403 89,000.00
Mandor OH 0.353 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

36 Membuat kolom beton K.225 ( 300 kg besi + bekisting )


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.1333 1,628,000.00
Paku 5 cm - 12 cm kg 4.000 16,000.00
Minyak bekisting ltr 2.000 7,400.00
Besi beton polos kg 315.000 11,500.00
Kawat beton kg 4.500 23,000.00
PC kg 371.000 1,250.00
Pasir beton m3 0.499 260,000.00
Kerikil m3 0.776 220,000.00
Air ltr 215.000 85.00
Kayu kelas II balok m3 0.050 1,628,000.00
Plywood 9 mm lbr 1.167 146,000.00
Dolken kayu galam btg 6.667 10,000.00
Ø ( 8-10) cm, p = 4 m

B Tenaga Kerja Pekerja OH 7.050 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.650 81,000.00
Tukang Besi OH 2.100 77,000.00
Kepala Tukang OH 0.403 89,000.00
Mandor OH 0.353 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

37 Membuat kolom beton K.225 (200 kg besi + bekisting)


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.1333 1,628,000.00
Paku 5 cm - 12 cm kg 4.000 16,000.00
Minyak bekisting ltr 2.000 7,400.00
Besi beton polos kg 210.000 11,500.00
Kawat beton kg 4.500 23,000.00
PC kg 371.000 1,250.00
Pasir beton m3 0.499 260,000.00
Kerikil m3 0.776 220,000.00
Air ltr 215.000 85.00
Kayu kelas II balok m3 0.050 1,628,000.00
Plywood 9 mm lbr 1.167 146,000.00
Dolken kayu galam btg 6.667 10,000.00
Ø ( 8-10) cm, p = 4 m
B Tenaga Kerja Pekerja OH 7.050 65,000.00
Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.650 81,000.00
Tukang Besi OH 2.100 77,000.00
Kepala Tukang OH 0.403 89,000.00
Mandor OH 0.353 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

38 Membuat kolom beton K.225 (150 kg besi + bekisting)


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.1333 1,628,000.00
Paku 5 cm - 12 cm kg 4.000 16,000.00
Minyak bekisting ltr 2.000 7,400.00
Besi beton polos kg 157.500 11,500.00
Kawat beton kg 4.500 23,000.00
PC kg 371.000 1,250.00
Pasir beton m3 0.499 260,000.00
Kerikil m3 0.776 220,000.00
Air ltr 215.000 85.00
Kayu kelas II balok m3 0.050 1,628,000.00
Plywood 9 mm lbr 1.167 146,000.00
Dolken kayu galam btg 6.667 10,000.00
Ø ( 8-10) cm, p = 4 m

B Tenaga Kerja Pekerja OH 7.050 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.650 81,000.00
Tukang Besi OH 2.100 77,000.00
Kepala Tukang OH 0.403 89,000.00
Mandor OH 0.353 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

39 Membuat kolom beton K.175 (150 kg besi + bekisting)


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.1333 1,628,000.00
Paku 5 cm - 12 cm kg 4.000 16,000.00
Minyak bekisting ltr 2.000 7,400.00
Besi beton polos kg 157.500 11,500.00
Kawat beton kg 4.500 23,000.00
PC kg 326.000 1,250.00
Pasir beton m3 0.543 260,000.00
Kerikil m3 0.762 220,000.00
Air ltr 215.000 85.00
Kayu kelas II balok m3 0.050 1,628,000.00
Plywood 9 mm lbr 1.167 146,000.00
Dolken kayu galam btg 6.667 10,000.00
Ø ( 8-10) cm, p = 4 m

B Tenaga Kerja Pekerja OH 7.050 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.650 81,000.00
Tukang Besi OH 2.100 77,000.00
Kepala Tukang OH 0.403 89,000.00
Mandor OH 0.353 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
40 Membuat balok beton bertulang ( 200 kg besi + bekisting )
m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.320 1,628,000.00
Paku 5 cm - 12 cm kg 3.200 16,000.00
Minyak bekisting ltr 1.600 7,400.00
Besi beton polos kg 210.000 11,500.00
Kawat beton kg 3.000 23,000.00
PC kg 336.000 1,250.00
Pasir beton m3 0.540 260,000.00
Kerikil m3 0.810 220,000.00
Kayu kelas II balok m3 0.140 1,628,000.00
Plywood 9 mm lbr 2.800 146,000.00
Dolken kayu galam btg 16.000 10,000.00
Ø ( 8-10) cm, p = 4 m

B Tenaga Kerja Pekerja OH 6.350 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.650 81,000.00
Tukang Besi OH 1.400 77,000.00
Kepala Tukang OH 0.333 89,000.00
Mandor OH 0.318 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

41 Membuat balok beton K.225 ( 200 kg besi + bekisting )


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.107 1,628,000.00
Paku 5 cm - 12 cm kg 3.200 16,000.00
Minyak bekisting ltr 1.600 7,400.00
Besi beton polos kg 210.000 11,500.00
Kawat beton kg 3.000 23,000.00
PC kg 371.000 1,250.00
Pasir beton m3 0.499 260,000.00
Kerikil m3 0.776 220,000.00
Air ltr 215.000 85.00
Kayu kelas II balok m3 0.047 1,628,000.00
Plywood 9 mm lbr 0.933 146,000.00
Dolken kayu galam btg 5.333 10,000.00
Ø ( 8-10) cm, p = 4 m

B Tenaga Kerja Pekerja OH 6.350 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.650 81,000.00
Tukang Besi OH 1.400 77,000.00
Kepala Tukang OH 0.333 89,000.00
Mandor OH 0.318 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

42 Membuat balok beton K.225 ( 150 kg besi + bekisting )


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.107 1,628,000.00
Paku 5 cm - 12 cm kg 3.200 16,000.00
Minyak bekisting ltr 1.600 7,400.00
Besi beton polos kg 157.500 11,500.00
Kawat beton kg 3.000 23,000.00
PC kg 371.000 1,250.00
Pasir beton m3 0.499 260,000.00
Kerikil m3 0.776 220,000.00
Air ltr 215.000 85.00
Kayu kelas II balok m3 0.047 1,628,000.00
Plywood 9 mm lbr 0.933 146,000.00
Dolken kayu galam btg 5.333 10,000.00
Ø ( 8-10) cm, p = 4 m

B Tenaga Kerja Pekerja OH 6.350 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.650 81,000.00
Tukang Besi OH 1.400 77,000.00
Kepala Tukang OH 0.333 89,000.00
Mandor OH 0.318 81,000.00
C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

43 Membuat balok beton K.175 ( 150 kg besi + bekisting )


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.107 1,628,000.00
Paku 5 cm - 12 cm kg 3.200 16,000.00
Minyak bekisting ltr 1.600 7,400.00
Besi beton polos kg 157.500 11,500.00
Kawat beton kg 3.000 23,000.00
PC kg 326.000 1,250.00
Pasir beton m3 0.543 260,000.00
Kerikil m3 0.762 220,000.00
Air ltr 215.000 85.00
Kayu kelas II balok m3 0.047 1,628,000.00
Plywood 9 mm lbr 0.933 146,000.00
Dolken kayu galam btg 5.333 10,000.00
Ø ( 8-10) cm, p = 4 m

B Tenaga Kerja Pekerja OH 6.350 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.650 81,000.00
Tukang Besi OH 1.400 77,000.00
Kepala Tukang OH 0.333 89,000.00
Mandor OH 0.318 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
44 Membuat plat beton bertulang ( 150 kg besi + bekisting )
m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.320 1,628,000.00
Paku 5 cm - 12 cm kg 3.200 16,000.00
Minyak bekisting ltr 1.600 7,400.00
Besi beton polos kg 157.000 11,500.00
Kawat beton kg 2.250 23,000.00
PC kg 336.000 1,250.00
Pasir beton m3 0.540 260,000.00
Kerikil m3 0.810 220,000.00
Kayu kelas II balok m3 0.120 1,628,000.00
Plywood 9 mm lbr 2.800 146,000.00
Dolken kayu galam btg 32.000 10,000.00
Ø ( 8-10) cm, p = 4 m

B Tenaga Kerja Pekerja OH 5.300 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.300 81,000.00
Tukang Besi OH 1.050 77,000.00
Kepala Tukang OH 0.265 89,000.00
Mandor OH 0.265 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

45 Membuat plat beton K.225 ( 150 kg besi + bekisting )


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.107 1,628,000.00
Paku 5 cm - 12 cm kg 3.200 16,000.00
Minyak bekisting ltr 1.600 7,400.00
Besi beton polos kg 157.000 11,500.00
Kawat beton kg 2.250 23,000.00
PC kg 371.000 1,250.00
Pasir beton m3 0.499 260,000.00
Kerikil m3 0.776 220,000.00
Air ltr 215.000 85.00
Kayu kelas II balok m3 0.040 1,628,000.00
Plywood 9 mm lbr 0.933 146,000.00
Dolken kayu galam btg 10.667 10,000.00
Ø ( 8-10) cm, p = 4 m

B Tenaga Kerja Pekerja OH 5.300 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.300 81,000.00
Tukang Besi OH 1.050 77,000.00
Kepala Tukang OH 0.265 89,000.00
Mandor OH 0.265 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

46 Membuat plat beton K.175 ( 150 kg besi + bekisting )


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.107 1,628,000.00
Paku 5 cm - 12 cm kg 3.200 16,000.00
Minyak bekisting ltr 1.600 7,400.00
Besi beton polos kg 157.000 11,500.00
Kawat beton kg 2.250 23,000.00
PC kg 326.000 1,250.00
Pasir beton m3 0.543 260,000.00
Kerikil m3 0.762 220,000.00
Air ltr 215.000 85.00
Kayu kelas II balok m3 0.040 1,628,000.00
Plywood 9 mm lbr 0.933 146,000.00
Dolken kayu galam btg 10.667 10,000.00
Ø ( 8-10) cm, p = 4 m

B Tenaga Kerja Pekerja OH 5.300 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.300 81,000.00
Tukang Besi OH 1.050 77,000.00
Kepala Tukang OH 0.265 89,000.00
Mandor OH 0.265 81,000.00

C Peralatan
D Jumlah harga tenaga, bahan dan peralatan
E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

47 Membuat plat beton K.225 ( 125 kg besi + bekisting )


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.107 1,628,000.00
Paku 5 cm - 12 cm kg 3.200 16,000.00
Minyak bekisting ltr 1.600 7,400.00
Besi beton polos kg 131.250 11,500.00
Kawat beton kg 2.250 23,000.00
PC kg 371.000 1,250.00
Pasir beton m3 0.499 260,000.00
Kerikil m3 0.776 220,000.00
Air ltr 215.000 85.00
Kayu kelas II balok m3 0.040 1,628,000.00
Plywood 9 mm lbr 0.933 146,000.00
Dolken kayu galam btg 10.667 10,000.00
Ø ( 8-10) cm, p = 4 m

B Tenaga Kerja Pekerja OH 5.300 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.300 81,000.00
Tukang Besi OH 1.050 77,000.00
Kepala Tukang OH 0.265 89,000.00
Mandor OH 0.265 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
48 Membuat dinding beton bertulang ( 150 kg besi + bekisting )
m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.240 1,628,000.00
Paku 5 cm - 12 cm kg 3.200 16,000.00
Minyak bekisting ltr 1.600 7,400.00
Besi beton polos kg 157.500 11,500.00
Kawat beton kg 2.250 23,000.00
PC kg 336.000 1,250.00
Pasir beton m3 0.540 260,000.00
Kerikil m3 0.810 220,000.00
Kayu kelas II balok m3 0.160 1,628,000.00
Plywood 9 mm lbr 2.800 146,000.00
Dolken kayu galam btg 24.000 10,000.00
Ø ( 8-10) cm, p = 4 m

B Tenaga Kerja Pekerja OH 5.300 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.300 81,000.00
Tukang Besi OH 1.050 77,000.00
Kepala Tukang OH 0.262 89,000.00
Mandor OH 0.265 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

48 Membuat dinding beton K.175 ( 150 kg besi + bekisting )


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.080 1,628,000.00
Paku 5 cm - 12 cm kg 3.200 16,000.00
Minyak bekisting ltr 1.600 7,400.00
Besi beton polos kg 157.500 11,500.00
Kawat beton kg 2.250 23,000.00
PC kg 326.000 1,250.00
Pasir beton m3 0.543 260,000.00
Kerikil m3 0.762 220,000.00
Air ltr 215.000 85.00
Kayu kelas II balok m3 0.053 1,628,000.00
Plywood 9 mm lbr 0.933 146,000.00
Dolken kayu galam btg 8.000 10,000.00
Ø ( 8-10) cm, p = 4 m

B Tenaga Kerja Pekerja OH 5.300 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.300 81,000.00
Tukang Besi OH 1.050 77,000.00
Kepala Tukang OH 0.262 89,000.00
Mandor OH 0.265 81,000.00
C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

49 Membuat dinding beton bertulang ( 200 kg besi + bekisting )


m3

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.2500 1,628,000.00
Paku 5 cm - 12 cm kg 3.000 16,000.00
Minyak bekisting ltr 1.200 7,400.00
Besi beton polos kg 210.000 11,500.00
Kawat beton kg 3.000 23,000.00
PC kg 336.000 1,250.00
Pasir beton m3 0.540 260,000.00
Kerikil m3 0.810 220,000.00
Kayu kelas II balok m3 0.105 1,628,000.00
Plywood 9 mm lbr 2.500 146,000.00
Dolken kayu galam btg 14.000 10,000.00
Ø ( 8-10) cm, p = 4 m

B Tenaga Kerja Pekerja OH 5.650 65,000.00


Tukang Batu OH 0.275 77,000.00
Tukang Kayu OH 1.560 81,000.00
Tukang Besi OH 1.400 77,000.00
Kepala Tukang OH 0.323 89,000.00
Mandor OH 0.283 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
50 Membuat kolom praktis beton bertulang ( 11 x 11 ) cm
m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.002 1,628,000.00
Paku 5 cm - 12 cm kg 0.010 16,000.00
Besi beton polos kg 3.000 11,500.00
Kawat beton kg 0.045 23,000.00
PC kg 4.000 1,250.00
Pasir beton m3 0.006 260,000.00
Kerikil m3 0.009 220,000.00

B Tenaga Kerja Pekerja OH 0.180 65,000.00


Tukang Batu OH 0.020 77,000.00
Tukang Kayu OH 0.020 81,000.00
Tukang Besi OH 0.020 77,000.00
Kepala Tukang OH 0.006 89,000.00
Mandor OH 0.009 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

51 Membuat kolom praktis beton bertulang 11/11 cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.020 1,628,000.00
Paku 5 cm - 12 cm kg 0.010 16,000.00
Besi beton polos kg 3.000 11,500.00
Kawat beton kg 0.450 23,000.00
PC kg 4.000 1,250.00
Pasir beton m3 0.006 260,000.00
Kerikil m3 0.009 220,000.00

B Tenaga Kerja Pekerja OH 0.180 65,000.00


Tukang Batu OH 0.020 77,000.00
Tukang Kayu OH 0.020 81,000.00
Tukang Besi OH 0.020 77,000.00
Kepala Tukang OH 0.006 89,000.00
Mandor OH 0.009 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

52 Membuat ring balok beton bertulang ( 10 x 15 ) cm


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.003 1,628,000.00
Paku 5 cm - 12 cm kg 0.020 16,000.00
Besi beton polos kg 3.600 11,500.00
Kawat beton kg 0.050 23,000.00
PC kg 5.500 1,250.00
Pasir beton m3 0.009 260,000.00
Kerikil m3 0.015 220,000.00

B Tenaga Kerja Pekerja OH 0.297 65,000.00


Tukang Batu OH 0.033 77,000.00
Tukang Kayu OH 0.033 81,000.00
Tukang Besi OH 0.033 77,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

53 Membuat ring balok beton bertulang 10/15 cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu kelas III m3 0.001 1,628,000.00
Paku 5 cm - 12 cm kg 0.020 16,000.00
Besi beton polos kg 3.150 11,500.00
Kawat beton kg 0.050 23,000.00
PC kg 5.500 1,250.00
Pasir beton m3 0.009 260,000.00
Kerikil m3 0.015 220,000.00

B Tenaga Kerja Pekerja OH 0.297 65,000.00


Tukang Batu OH 0.033 77,000.00
Tukang Kayu OH 0.033 81,000.00
Tukang Besi OH 0.033 77,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
PEKERJAAN LANGIT-LANGIT

Memasang 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm dan 6 mm

3 Memasang langit-langit akustik ukuran ( 30 x 30 ) cm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Langit-2 akustik 30/30 Lembar 12.000 -
Paku tripleks kg 0.050 Err:509

B Tenaga Kerja Pekerja OH 0.120 65,000.00


Tukang Kayu OH 0.120 81,000.00
Kepala Tukang OH 0.012 89,000.00
Mandor OH 0.006 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

4 Memasang langit-langit akustik ukuran ( 30 x 60 ) cm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Langit-2 akustik 30/60 Lembar 5.800 -
Paku tripleks kg 0.050 21,000.00

B Tenaga Kerja Pekerja OH 0.120 65,000.00


Tukang Kayu OH 0.120 81,000.00
Kepala Tukang OH 0.102 89,000.00
Mandor OH 0.006 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

5 Memasang langit-langit akustik ukuran ( 60 x 120 ) cm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Langit-2 akustik 60/120 Lembar 1.500 -
Paku tripleks kg 0.050 Err:509

B Tenaga Kerja Pekerja OH 0.100 65,000.00


Tukang Kayu OH 0.100 81,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

6 Memasang langit-langit tripleks uk ( 120 x 240 ) cm, tebal 3 mm, 4 mm dan 6 mm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Langit-langit tripleks Lembar 0.375 65,000.00
Paku tripleks kg 0.030 Err:509

B Tenaga Kerja Pekerja OH 0.100 65,000.00


Tukang Kayu OH 0.100 81,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

7 Memasang langit-langit lambriziring kayu, tebal 9 mm.


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kayu papan, tb. 9 mm m3 0.015 0.00
Paku tripleks kg 0.010 Err:509

B Tenaga Kerja Pekerja OH 0.800 65,000.00


Tukang kayu OH 0.800 81,000.00
Kepala Tukang OH 0.080 89,000.00
Mandor OH 0.040 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

9 Memasang langit-langit GRC ukuran ( 120 x 240 ) , tb. 5 mm.


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan GRC Lembar 0.364 86,000.00
Paku skrup kg 0.110 24,000.00

B Tenaga Kerja Pekerja OH 0.100 65,000.00


Tukang Kayu OH 0.050 81,000.00
Kepala Tukang OH 0.005 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

11 Memasang langit-langit akustik ukuran ( 60 x 120 ) cm + rangka alluminium


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Profil allumi T m' 3.600 -
Bahan Kawat D 4 mm kg 0.150 Err:509
Ramset buah 1.050 -
langit-langit akustik lembar 1.500 -
Ukuran 60 x 120

B Tenaga Kerja Pekerja OH 0.500 65,000.00


Tukang Kayu OH 0.500 81,000.00
Kepala Tukang OH 0.050 89,000.00
Mandor OH 0.025 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
PEKERJAAN BESI DAN ALUMINIUM
3 Mengerjakan 100 kg pekerjaan perakitan
kg
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Solar Liter 1.000 12,000.00
Minyak Pelumas Liter 0.100 21,000.00

B Tenaga Kerja Pekerja OH 0.100 65,000.00


Tukang besi konstruksi OH 0.100 77,000.00
Kepala Tukang OH 0.001 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan Sewa Alat Jam 0.800 330,000.00

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
5 Mengerjakan 10 cm pengelasan dengan las listrik
cm

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kawat las listrik kg 0.400 27,000.00
Solar Liter 0.300 12,000.00
Minyak pelumas Liter 0.040 21,000.00

B Tenaga Kerja Pekerja OH 0.040 65,000.00


Tukang besi konstruksi OH 0.020 77,000.00
Kepala Tukang OH 0.002 89,000.00
Mandor OH 0.002 81,000.00

C Peralatan Sewa Alat Jam 0.170 330,000.00


D Jumlah harga tenaga, bahan dan peralatan
E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
Pengelasan 1 cm 0.10 85,676.60

6 Membuat rangka jendela besi scuare tube


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Besi scuare tube m 4.760 -
Besi lis kaca 1x1 cm m 4.522 -
Pengelasan cm 20.000 16,500.00

B Tenaga Kerja Pekerja OH 0.650 65,000.00


Tukang las biasa OH 0.650 77,000.00
Kepala Tukang OH 0.065 89,000.00
Mandor OH 0.032 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

7 Memasang pintu rolling door besi


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pintu gulung besi m2 1.000 461,000.00

B Tenaga Kerja Pekerja OH 1.200 65,000.00


Tukang las biasa OH 1.200 77,000.00
Kepala Tukang OH 0.120 89,000.00
Mandor OH 0.006 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

8 Memasang pintu lipat (folding door) bahan besi


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pintu Lipat m2 1.000 1,303,000.00

B Tenaga Kerja Pekerja OH 0.440 65,000.00


Tukang besi OH 0.440 77,000.00
Kepala Tukang OH 0.044 89,000.00
Mandor OH 0.022 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

9 Memasang sunscreen alluminium


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Sunscreen alluminium m2 1.000 -

B Tenaga Kerja Pekerja OH 0.080 65,000.00


Tukang OH 0.800 77,000.00
Kepala Tukang OH 0.080 89,000.00
Mandor OH 0.004 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

10 Memasang rolling door alluminium


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Rolling door alluminium m2 1.000 461,000.00

B Tenaga Kerja Pekerja OH 1.000 65,000.00


Tukang khusus allumunium OH 1.000 77,000.00
Kepala Tukang OH 0.100 89,000.00
Mandor OH 0.050 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
12 Memasang pintu alluminium strip lebar 8 cm
m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Profil alluminium m 4.400 7,700.00
Alluminium strip m 14.600 8,700.00

B Tenaga Kerja Pekerja OH 0.085 65,000.00


Tukang khusus allumunium OH 0.085 77,000.00
Kepala Tukang OH 0.0085 89,000.00
Mandor OH 0.0042 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
14 Memasang venetions blinds dan vertical blinds
m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Venetions blinds dan m2 1.000 0
vertical blinds (tirai)

B Tenaga Kerja Pekerja OH 0.350 65,000.00


Tukang OH 0.350 77,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.018 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

15 Memasang terali besi strip ( 2 x 3 ) mm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Besi Strip kg 6.177 19,000.00
Pengelasan cm 27.080 8,567.66

B Tenaga Kerja Pekerja OH 1.670 65,000.00


Tukang las OH 1.670 77,000.00
Kepala Tukang OH 0.167 89,000.00
Mandor OH 0.083 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

16 Memasang kawat nyamuk


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kawat Nyamuk m2 1.100 0
Pengelasan cm 11.110 8,567.66
Baja strip 0,2x 2 cm kg 1.716 19,000.00

B Tenaga Kerja Pekerja OH 0.100 65,000.00


Tukang OH 0.100 77,000.00
Kepala Tukang OH 0.010 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
17 Memasang jendela nako dan tralis
m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Jendela nako m2 1.100 86,000.00
(rangka + kaca 5 mm)
Paku skrup 1-2,5 cm Buah 10.000 200.00
Besi Strip m 7.000 19,000.00

B Tenaga Kerja Pekerja OH 0.200 65,000.00


Tukang OH 0.200 77,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.001 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

18 Memasang talang datar / jurai seng bjls 28 lebar 90 cm


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Seng Plat m 1.050 54,000.00
Paku 1 - 2,5 cm kg 0.015 16,000.00
Papan kayu kelas II m3 0.019 48,858.00
atau III

B Tenaga Kerja Pekerja OH 0.200 65,000.00


Tukang OH 0.200 81,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.001 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

19 Memasang talang 1/2 lingkaran D -15 cm seng plat BJLS 30 lebar 45 cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Seng Plat, lb. 45 cm m 1.050 0
Paku 1 - 2,5 cm kg 0.010 16,000.00
Besi Strip kg 0.500 19,000.00
B Tenaga Kerja Pekerja OH 0.150 65,000.00
Tukang OH 0.300 77,000.00
Kepala Tukang OH 0.030 89,000.00
Mandor OH 0.008 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

PENUTUP LANTAI DAN DINDING

1 Memasang lantai ubin PC abu-abu ukuran ( 40 x 40 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin abu-abu 40/40 buah 6.630 0.00
PC kg 9.800 1,250.00
Pasir Pasang m3 0.045 260,000.00

B Tenaga Kerja Pekerja OH 0.250 65,000.00


Tukang Batu OH 0.125 77,000.00
Kepala Tukang OH 0.013 89,000.00
Mandor OH 0.013 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
2 Memasang lantai ubin PC abu-abu ukuran ( 30 x 30 ) cm
m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin abu-abu 30/30 buah 11.870 -
PC kg 10.000 1,250.00
Pasir Pasang m3 0.045 260,000.00

B Tenaga Kerja Pekerja OH 0.250 65,000.00


Tukang Batu OH 0.125 77,000.00
Kepala Tukang OH 0.013 89,000.00
Mandor OH 0.013 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

3 Memasang lantai ubin PC abu-abu ukuran ( 20 x 20 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin abu-abu 20/20 buah 26.500 0.00
PC kg 10.400 1,250.00
Pasir Pasang m3 0.045 260,000.00

B Tenaga Kerja Pekerja OH 0.270 65,000.00


Tukang Batu OH 0.135 77,000.00
Kepala Tukang OH 0.014 89,000.00
Mandor OH 0.014 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

4 Memasang lantai ubin warna ( 40 x 40 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Warna 40/40 buah 6.630 0.00
PC kg 9.800 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 0.600 13,000.00

B Tenaga Kerja Pekerja OH 0.250 65,000.00


Tukang Batu OH 0.125 77,000.00
Kepala Tukang OH 0.013 89,000.00
Mandor OH 0.013 81,000.00

C Peralatan
D Jumlah harga tenaga, bahan dan peralatan
E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

5 Memasang lantai ubin warna ( 30 x 30 ) cm


m2

Harga Satuan
No Kebutuhan Satuan 0.5 Bahan / Upah
( Rp. )
A Bahan Ubin Warna 30/30 buah 11.870 0.00
PC kg 10.000 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 0.600 13,000.00

B Tenaga Kerja Pekerja OH 0.260 65,000.00


Tukang Batu OH 0.130 77,000.00
Kepala Tukang OH 0.013 89,000.00
Mandor OH 0.013 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

6 Memasang lantai ubin warna ( 20 x 20 ) cm


m2

Harga Satuan
No Kebutuhan Satuan 2.4 Bahan / Upah
( Rp. )
A Bahan Ubin Warna 20/20 buah 26.500 0.00
PC kg 10.400 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 1.000 13,000.00

B Tenaga Kerja Pekerja OH 0.270 65,000.00


Tukang Batu OH 0.135 77,000.00
Kepala Tukang OH 0.014 89,000.00
Mandor OH 0.014 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

7 Memasang lantai ubin teraso ( 40 x 40 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Teraso 40/40 buah 6.630 0.00
PC kg 9.800 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 1.300 13,000.00
B Tenaga Kerja Pekerja OH 0.250 65,000.00
Tukang Batu OH 0.125 77,000.00
Kepala Tukang OH 0.013 89,000.00
Mandor OH 0.013 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

8 Memasang lantai ubin teraso ( 30 x 30 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Teraso 30/30 buah 11.870 0.00
PC kg 10.000 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 1.500 13,000.00

B Tenaga Kerja Pekerja OH 0.260 65,000.00


Tukang Batu OH 0.130 77,000.00
Kepala Tukang OH 0.013 89,000.00
Mandor OH 0.013 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

9 Memasang lantai granit tile warna muda( 40 x 40 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Granit 40/40 buah 6.630
PC kg 9.800
Pasir Pasang m3 0.045
Semen Warna kg 1.300

B Tenaga Kerja Pekerja OH 0.500


Tukang Batu OH 0.250
Kepala Tukang OH 0.026
Mandor OH 0.026

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

10 Memasang lantai ubin granit ( 30 x 30 ) cm


m2

Harga Satuan
Kebutuhan Satuan Indeks
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Granit 30/30 buah 11.870 0.00
PC kg 10.000 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 1.500 13,000.00

B Tenaga Kerja Pekerja OH 0.260 65,000.00


Tukang Batu OH 0.130 77,000.00
Kepala Tukang OH 0.013 89,000.00
Mandor OH 0.013 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

11 Memasang lantai granit tile warna tua ( 60 x 60 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Granit 60/60 buah 2.946 108,561.64
PC kg 10.000 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 0.150 13,000.00

B Tenaga Kerja Pekerja OH 0.500 65,000.00


Tukang Batu OH 0.250 77,000.00
Kepala Tukang OH 0.026 89,000.00
Mandor OH 0.026 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
12 Memasang lantai ubin granit ( 60 x 60 ) cm, import
m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Granit 60/60 buah 2.946
PC kg 10.000
Pasir Pasang m3 0.045
Semen Warna kg 1.500

B Tenaga Kerja Pekerja OH 0.260


Tukang Batu OH 0.130
Kepala Tukang OH 0.013
Mandor OH 0.013

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

13 Memasang lantai ubin teralux ukuran ( 40 x 40 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Teralux kerang 40/40 buah 6.630 -
PC kg 9.800 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 1.300 13,000.00

B Tenaga Kerja Pekerja OH 0.250 65,000.00


Tukang Batu OH 0.125 77,000.00
Kepala Tukang OH 0.013 89,000.00
Mandor OH 0.013 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

14 Memasang lantai ubin teralux ukuran ( 30 x 30 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Teralux kerang 30/30 buah 11.870 0.00
PC kg 10.000 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 1.500 13,000.00

B Tenaga Kerja Pekerja OH 0.260 65,000.00


Memasang 1 m3 konstr
Tukang Batu OH 0.130 77,000.00
Kepala Tukang OH 0.013 89,000.00
Mandor OH 0.013 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

15 Memasang lantai ubin teralux marmer ukuran ( 60 x 60 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Teralux marmer 60/60 buah 3.100 38,387.10
PC kg 9.600 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 1.500 13,000.00

B Tenaga Kerja Pekerja OH 0.240 65,000.00


Tukang Batu OH 0.120 77,000.00
Kepala Tukang OH 0.012 89,000.00
Mandor OH 0.012 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

16 Memasang lantai ubin teralux marmer ukuran ( 40 x 40 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Teralux marmer 40/40 buah 6.630 15,233.79
PC kg 9.800 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 1.300 13,000.00

B Tenaga Kerja Pekerja OH 0.250 65,000.00


Tukang Batu OH 0.125 77,000.00
Kepala Tukang OH 0.013 89,000.00
Mandor OH 0.013 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

17 Memasang lantai ubin teralux marmer ukuran ( 30 x 30 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Teralux marmer 30/30 buah 11.870 6,992.42
PC kg 10.000 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 1.500 13,000.00

B Tenaga Kerja Pekerja OH 0.260 65,000.00


Tukang Batu OH 0.130 77,000.00
Kepala Tukang OH 0.013 89,000.00
Mandor OH 0.013 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

18 Memasang plint ubin PC abu-abu ukuran ( 15 x 20 ) cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint ubin abu-2 15/20 buah 5.300 0.00
PC kg 1.650 1,250.00
Pasir Pasang m3 0.004 260,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.009 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

19 Memasang plint ubin PC abu-abu ukuran ( 10 x 30 ) cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint Ubin abu-2 10/30 buah 3.530 0.00
PC kg 1.240 1,250.00
Pasir Pasang m3 0.003 260,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.009 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

20 Memasang plint ubin PC abu-abu ukuran ( 10 x 40 ) cm


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint Ubin abu-2 10/40 buah 2.650 0.00
PC kg 1.240 1,250.00
Pasir Pasang m3 0.003 260,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.009 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

21 Memasang plint ubin PC warna ukuran ( 10 x 20 ) cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint Ubin PC warna 10/20 buah 2.650 4,000.00
PC kg 1.140 1,250.00
Pasir Pasang m3 0.003 260,000.00
Semen Warna kg 0.150 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.009 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

22 Memasang plint ubin PC warna ukuran ( 10 x 30 ) cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint Ubin PC warna 10/30 buah 3.530 4,000.00
PC kg 1.140 1,250.00
Pasir Pasang m3 0.003 260,000.00
Semen Warna kg 0.100 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.009 89,000.00
Mandor OH 0.005 81,000.00
C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

23 Memasang plint ubin PC warna ukuran ( 10 x 40 ) cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint Ubin PC warna 10/40 buah 2.650 4,000.00
PC kg 1.140 1,250.00
Pasir Pasang m3 0.003 260,000.00
Semen Warna kg 0.100 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.009 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

24 Memasang plint ubin teraso ukuran ( 10 x 30 ) cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint Ubin Teraso 10/30 buah 3.530 6,000.00
PC kg 1.140 1,250.00
Pasir Pasang m3 0.003 260,000.00
Semen Warna kg 0.100 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.009 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

25 Memasang plint ubin teraso ukuran ( 10 x 40 ) cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint Ubin Teraso 10/40 buah 2.650 6,000.00
PC kg 1.140 1,250.00
Pasir Pasang m3 0.003 260,000.00
Semen Warna kg 0.100 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.009 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

26 Memasang plint ubin granit ukuran ( 10 x 40 ) cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint ubin granit 10/40 buah 2.650 27,000.00
PC kg 1.140 1,250.00
Pasir Pasang m3 0.003 260,000.00
Semen Warna kg 0.100 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.009 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

27 Memasang plint ubin granit ukuran ( 10 x 30 ) cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint ubin granit buah 3.530 21,000.00
PC kg 1.140 1,250.00
Pasir Pasang m3 0.003 260,000.00
Semen Warna kg 0.100 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.009 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

28 Memasang plint ubin teralux kerang ukuran ( 10 x 40 ) cm


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint ubin teralux kr 10/40 buah 2.630 -
PC kg 1.140 1,250.00
Pasir Pasang m3 0.003 260,000.00
Semen Warna kg 0.100 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.009 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

29 Memasang plint ubin teralux kerang uk. ( 10 x 30 ) cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint ubin teralux kr 10/30 buah 3.530 -
PC kg 1.140 1,250.00
Pasir Pasang m3 0.003 260,000.00
Semen Warna kg 0.100 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.009 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

29 Memasang plint keramik uk. (10 x 30) cm


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint keramik 10/30 buah 3.530 5,000.00
PC kg 1.140 1,250.00
Pasir Pasang m3 0.003 260,000.00
Semen Warna kg 0.100 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan
D Jumlah harga tenaga, bahan dan peralatan
E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

30 Memasang plint ubin teralux marmer uk. (10 x 60) cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint ubin trlx marmer 10/60 buah 1.700 -
PC kg 1.140 1,250.00
Pasir Pasang m3 0.003 260,000.00
Semen Warna kg 0.100 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.009 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

30 Memasang plint keramik uk. (10 x 60) cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint keramik 10/60 buah 1.700 7,000.00
PC kg 1.140 1,250.00
Pasir Pasang m3 0.003 260,000.00
Semen Warna kg 0.100 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

31 Memasang plint ubin teralux marmer ukuran (10 x 40) cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint ubin trlx marmer 10/40 buah 2.650 -
PC kg 1.140 1,250.00
Pasir Pasang m3 0.003 260,000.00
Semen Warna kg 0.100 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.009 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

32 Memasang plint ubin teralux marmer ukuran ( 10 x 30 ) cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint ubin trlx marmer 10/30 buah 3.530 -
PC kg 1.140 1,250.00
Pasir Pasang m3 0.003 260,000.00
Semen Warna kg 0.100 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.009 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

33 Memasang lantai teraso cor di tempat tebal 3 cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Bahan Teraso cor, tb.3 cm m3 0.036
Semen Warna kg 0.100 13,000.00

B Tenaga Kerja Pekerja OH 0.360 65,000.00


Tukang Batu OH 0.180 77,000.00
Kepala Tukang OH 0.018 89,000.00
Mandor OH 0.018 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

34 Memasang lantai keramik artistik ukuran ( 10 x 20 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin keramik arts 10/20 buah 53.000 -
PC kg 8.190 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 2.750 13,000.00

B Tenaga Kerja Pekerja OH 0.700 65,000.00


Tukang Batu OH 0.350 77,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.035 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

35 Memasang lantai keramik artistik ukuran ( 10 x 10 ) cm atau ( 5 x20 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin keramik arts 10/10 buah 106.000 -
PC kg 8.190 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 3.200 13,000.00

B Tenaga Kerja Pekerja OH 0.700 65,000.00


Tukang Batu OH 0.350 77,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.035 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

36 Memasang lantai keramik ukuran ( 33 x 33 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Keramik doos 1.050
PC kg 8.190
Pasir Pasang m3 0.045
Semen Warna kg 0.500

B Tenaga Kerja Pekerja OH 0.700


Tukang Batu OH 0.350
Kepala Tukang OH 0.035
Mandor OH 0.035

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
36 Memasang lantai keramik ukuran ( 33 x 33 ) cm
m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Keramik doos 1.050 Err:509
PC kg 8.190 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 0.150 13,000.00

B Tenaga Kerja Pekerja OH 0.500 65,000.00


Tukang Batu OH 0.250 77,000.00
Kepala Tukang OH 0.026 89,000.00
Mandor OH 0.026 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

37 Memasang lantai keramik ukuran 30/30 cm dof


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Keramik dof doos 1.050
PC kg 10.000
Pasir Pasang m3 0.045
Semen Warna kg 0.500

B Tenaga Kerja Pekerja OH 0.700


Tukang Batu OH 0.350
Kepala Tukang OH 0.035
Mandor OH 0.035

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

37 Memasang lantai keramik ukuran 30/30 cm dof


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Keramik dof doos 1.050 56,000.00
PC kg 10.000 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 0.150 13,000.00

B Tenaga Kerja Pekerja OH 0.500 65,000.00


Tukang Batu OH 0.250 77,000.00
Kepala Tukang OH 0.026 89,000.00
Mandor OH 0.026 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

40 Memasang lantai keramik ukuran ( 10 x 33 ) cm, variasi / border


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Ubin Keramik 10/30 buah 33.000 -
PC kg 9.800 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 4.370 13,000.00

B Tenaga Kerja Pekerja OH 1.050 65,000.00


Tukang Batu OH 0.525 77,000.00
Kepala Tukang OH 0.053 89,000.00
Mandor OH 0.053 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

41 Memasang lantai mosaik ukuran ( 30 x 30 ) cm, campuran spesi 1 PC : 3 PP


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Lantai mosaik 30/30 buah 11.870 -
PC kg 14.150 1,250.00
Pasir Pasang m3 0.039 260,000.00
Semen Warna kg 2.000 13,000.00

B Tenaga Kerja Pekerja OH 0.700 65,000.00


Tukang Batu OH 0.350 77,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.035 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
42 Memasang plint keramik uk. (10x60) cm
m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint keramik art buah 5.300
PC kg 1.140
Pasir Pasang m3 0.003
Semen Warna kg 0.025

B Tenaga Kerja Pekerja OH 0.090


Tukang Batu OH 0.090
Kepala Tukang OH 0.035
Mandor OH 0.005

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

43 Memasang plint keramik ukuran ( 10 x 10 ) cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint keramik art 10/10 buah 10.600 -
PC kg 1.140 1,250.00
Pasir Pasang m3 0.003 260,000.00
Semen Warna kg 0.050 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

44 Memasang plint keramik ukuran ( 5 x 20 ) cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Plint keramik art 5/20 buah 5.300 -
PC kg 0.570 1,250.00
Pasir Pasang m3 0.0015 260,000.00
Semen Warna kg 0.013 13,000.00

B Tenaga Kerja Pekerja OH 0.090 65,000.00


Tukang Batu OH 0.090 77,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

45 Memasang plint internal cove artistik ukuran( 5 x 5 x 20 ) cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Internal cove 5/5/20 buah 5.300 -
PC kg 1.140 1,250.00
Pasir Pasang m3 0.003 260,000.00
Semen Warna kg 0.100 13,000.00

B Tenaga Kerja Pekerja OH 0.750 65,000.00


Tukang Batu OH 0.750 77,000.00
Kepala Tukang OH 0.075 89,000.00
Mandor OH 0.038 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

46 Memasang lantai marmer ukuran ( 100 x 100 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Marmer buah 1.060 281,132.08
PC kg 8.190 1,250.00
Pasir Pasang m3 0.045 260,000.00
Semen Warna kg 0.134 13,000.00

B Tenaga Kerja Pekerja OH 0.700 65,000.00


Tukang Batu OH 0.350 77,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.035 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

47 Memasang lantai karpet


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Karpet m2 1.050 54,000.00
Lem kg 0.350 59,000.00

B Tenaga Kerja Pekerja OH 0.170 65,000.00


Tukang Kayu OH 0.170 81,000.00
Kepala Tukang OH 0.017 89,000.00
Mandor OH 0.009 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

48 Memasang underlayer / rubber corrugated


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Uderlayer m2 1.050 -
Lem kg 0.350 59,000.00
B Tenaga Kerja Pekerja OH 0.120 65,000.00
Tukang Kayu OH 0.120 81,000.00
Kepala Tukang OH 0.012 89,000.00
Mandor OH 0.006 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

49 Memasang lantai parquet kayu


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Parquet m2 1.050 347,000.00
Lem kg 0.600 59,000.00

B Tenaga Kerja Pekerja OH 0.700 65,000.00


Tukang Kayu OH 0.350 81,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.035 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

50 Memasang lantai kayu (gymfloor)


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Gymfloor m2 1.050 -
Lem kg 0.600 59,000.00

B Tenaga Kerja Pekerja OH 0.700 65,000.00


Tukang Kayu OH 0.350 81,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.035 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

51 Memasang dinding porselen ukuran ( 11 x 11 ) cm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Porselen doos 1.050 Err:509
PC kg 9.300 1,250.00
Pasir Pasang m3 0.018 260,000.00
Semen Warna kg 0.500 13,000.00

B Tenaga Kerja Pekerja OH 1.000 65,000.00


Tukang Batu OH 0.500 77,000.00
Kepala Tukang OH 0.050 89,000.00
Mandor OH 0.050 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

52 Memasang dinding porselen ukuran ( 10 x 20 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Porselen buah 53.000 Err:509
PC kg 9.300 1,250.00
Pasir Pasang m3 0.018 260,000.00
Semen Warna kg 2.750 13,000.00

B Tenaga Kerja Pekerja OH 0.900 65,000.00


Tukang Batu OH 0.450 77,000.00
Kepala Tukang OH 0.045 89,000.00
Mandor OH 0.045 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

53 Memasang dinding porselen ukuran ( 20 x 20 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Porselen buah 26.000 Err:509
PC kg 9.300 1,250.00
Pasir Pasang m3 0.018 260,000.00
Semen Warna kg 1.940 13,000.00

B Tenaga Kerja Pekerja OH 0.900 65,000.00


Tukang Batu OH 0.450 77,000.00
Kepala Tukang OH 0.045 89,000.00
Mandor OH 0.045 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

54 Memasang dinding keramik artistik ukuran ( 10 x 20 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Keramik dind. Artistik 10/20 buah 53.000 -
PC kg 9.300 1,250.00
Pasir Pasang m3 0.018 260,000.00
Semen Warna kg 2.750 13,000.00

B Tenaga Kerja Pekerja OH 0.900 65,000.00


Tukang Batu OH 0.450 77,000.00
Kepala Tukang OH 0.045 89,000.00
Mandor OH 0.045 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

55 Memasang dinding keramik artistik ukuran ( 5 x 20 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Keramik dind. Artistik 5/20 buah 106.000 -
PC kg 9.300 1,250.00
Pasir Pasang m3 0.018 260,000.00
Semen Warna kg 2.900 13,000.00

B Tenaga Kerja Pekerja OH 0.900 65,000.00


Tukang Batu OH 0.450 77,000.00
Kepala Tukang OH 0.045 89,000.00
Mandor OH 0.045 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

56 Memasang dinding keramik ukuran ( 10 x 20 ) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Keramik 10/20 buah 53.000 0.00
PC kg 9.300 1,250.00
Pasir Pasang m3 0.018 260,000.00
Semen Warna kg 2.750 13,000.00

B Tenaga Kerja Pekerja OH 0.900 65,000.00


Tukang Batu OH 0.450 77,000.00
Kepala Tukang OH 0.045 89,000.00
Mandor OH 0.045 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

Memasang 1 m2 dinding keramik ukuran ( 20 x 20 ) cm

58 Memasang dinding marmer ukuran (100 x 100) cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Marmer m2 1.060 2,986,000.00
Paku 12 cm buah 3.003 16,000.00
PC kg 12.440 1,250.00
Pasir Pasang m3 0.025 260,000.00
Semen Warna Kg 0.650 13,000.00

B Tenaga Kerja Pekerja OH 1.300 65,000.00


Tukang Batu OH 0.650 77,000.00
Kepala Tukang OH 0.065 89,000.00
Mandor OH 0.065 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
59 Memasang dinding bata pelapis ukuran ( 3 x 7 x 24 ) cm
m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Bata pelapis dinding 3/7/24 m2 63.000 -
PC kg 12.440 1,250.00
Pasir Pasang m3 0.025 260,000.00
Semen Warna Kg 2.750 13,000.00

B Tenaga Kerja Pekerja OH 1.000 65,000.00


Tukang Batu OH 0.500 77,000.00
Kepala Tukang OH 0.050 89,000.00
Mandor OH 0.050 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
62 Pasang batu lempeng tdk beraturan tanpa nat
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Bt lempeng tdk beraturan m2 1.100 86,000.00
PC kg 11.750 1,250.00
Pasir Pasang m3 0.035 260,000.00

B Tenaga Kerja Pekerja OH 0.700 65,000.00


Tukang Batu OH 0.350 77,000.00
Kepala Tukang OH 0.035 89,000.00
Mandor OH 0.035 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

64 Memasang lantai vinyl ukuran ( 30 x 30 ) cm KL I


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Vinyl Buah 11.870 -
Lem vinyl kg 0.350 59,000.00

B Tenaga Kerja Pekerja OH 0.150 65,000.00


Tukang Batu OH 0.150 77,000.00
Kepala Tukang OH 0.015 89,000.00
Mandor OH 0.008 81,000.00

C Peralatan
D Jumlah harga tenaga, bahan dan peralatan
E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

65 Memasang wallpaper, lebar 50 cm


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Wall paper m 2.200 108,000.00
Lem kg 0.250 59,000.00

B Tenaga Kerja Pekerja OH 0.350 65,000.00


Tukang Batu OH 0.175 77,000.00
Kepala Tukang OH 0.017 89,000.00
Mandor OH 0.002 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

66 Memasang floor hardener


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Floor hardener kg 5.000 -

B Tenaga Kerja Pekerja OH 0.120 65,000.00


Tukang Batu OH 0.120 77,000.00
Kepala Tukang OH 0.012 89,000.00
Mandor OH 0.006 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

67 Memasang plint vinil karet ukuran ( 15 x 30 ) cm dengan perekat


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Vinyl karet buah 1.760 -
Lem vinyl Kg 0.080 59,000.00
B Tenaga Kerja Pekerja OH 0.080 65,000.00
Tukang Batu OH 0.080 77,000.00
Kepala Tukang OH 0.008 89,000.00
Mandor OH 0.004 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

68 Memasang plint kayu kelas II ukuran ( 2 x 10 ) cm


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Papan kayu kl II 2/10 cm m3 0.003 0.00
Paku skrup 5 cm Kg 0.050 24,000.00

B Tenaga Kerja Pekerja OH 0.120 65,000.00


Tukang Kayu OH 0.120 81,000.00
Kepala Tukang OH 0.012 89,000.00
Mandor OH 0.006 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
RJAAN

A.2.3.1.3.

Jumlah Total Harga


( Rp. ) ( Rp. )

68,250.00
5,427.00
73,677.00

-
(A+B) 73,677.00
C 9,578.01
(C+D) 83,255.01

A.2.3.1.4.

Jumlah Total Harga


( Rp. ) ( Rp. )

65,000.00
2,592.00
67,592.00

-
(A+B) 67,592.00
C 8,786.96
(C+D) 76,378.96

A.2.3.1.5.

Jumlah Total Harga


( Rp. ) ( Rp. )

97,500.00
4,860.00
102,360.00

-
(A+B) 102,360.00
C 13,306.80
(C+D) 115,666.80

A.2.3.1.6.

Jumlah Total Harga


( Rp. ) ( Rp. )

78,000.00
3,645.00
81,645.00

-
(A+B) 81,645.00
C 10,613.85
(C+D) 92,258.85

A.2.3.1.7.

Jumlah Total Harga


( Rp. ) ( Rp. )

3,250.00
405.00
3,655.00

-
(A+B) 3,655.00
C 475.15
(C+D) 4,130.15

A.2.3.1.8.
Jumlah Total Harga
( Rp. ) ( Rp. )

21,450.00
810.00
22,260.00

-
(A+B) 22,260.00
C 2,893.80
(C+D) 25,153.80
A.2.3.1.12.

Jumlah Total Harga


( Rp. ) ( Rp. )

32,940.00
104,000.00
36,024.00
172,964.00
52,000.00
30,800.00
3,560.00
6,480.00
92,840.00

-
(A+B+C) 265,804.00
D 34,554.52
(D+E) 300,358.52

T.6.13.2008

Jumlah Total Harga


( Rp. ) ( Rp. )

60,512.00
47,120.00
107,632.00
52,000.00
30,800.00
3,560.00
6,480.00
92,840.00

-
(A+B+C) 200,472.00
D 26,061.36
(D+E) 226,533.36

A.2.3.1.13.

Jumlah Total Harga


( Rp. ) ( Rp. )

78,000.00
78,000.00
9,750.00
1,215.00
10,965.00

-
(A+B+C) 88,965.00
D 11,565.45
(D+E) 100,530.45

A.2.3.1.14.

Jumlah Total Harga


( Rp. ) ( Rp. )

194,400.00
194,400.00
16,250.00
2,025.00
18,275.00

-
(A+B+C) 212,675.00
D 27,647.75
(D+E) 240,322.75
A.3.2.1.1.
Jumlah Total Harga
( Rp. ) ( Rp. )

325,200.00
252,500.00
126,100.00
703,800.00
97,500.00
57,750.00
6,675.00
6,075.00
168,000.00

-
(A+B+C) 871,800.00
D 113,334.00
(D+E) 985,134.00

A.3.2.1.2.

Jumlah Total Harga


( Rp. ) ( Rp. )

325,200.00
203,750.00
135,200.00
664,150.00
97,500.00
57,750.00
6,675.00
6,075.00
168,000.00

-
(A+B+C) 832,150.00
D 108,179.50
(D+E) 940,329.50 735,279.14 205,050.36

A.3.2.1.3.

Jumlah Total Harga


( Rp. ) ( Rp. )

325,200.00
170,000.00
141,440.00
636,640.00
97,500.00
57,750.00
6,675.00
6,075.00
168,000.00

-
(A+B+C) 804,640.00
D 104,603.20
(D+E) 909,243.20

A.3.2.1.4.
Jumlah Total Harga
( Rp. ) ( Rp. )

325,200.00
146,250.00
145,860.00
617,310.00
97,500.00
57,750.00
6,675.00
6,075.00
168,000.00

-
(A+B+C) 785,310.00
D 102,090.30
(D+E) 887,400.30

A.3.2.1.6.

Jumlah Total Harga


( Rp. ) ( Rp. )

325,200.00
41,480.00
Err:509
88,400.00
Err:509
97,500.00
57,750.00
6,675.00
6,075.00
168,000.00
-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

A.3.2.1.8.

Jumlah Total Harga


( Rp. ) ( Rp. )

325,200.00
51,250.00
31,964.00
135,980.00
544,394.00
97,500.00
57,750.00
6,675.00
6,075.00
168,000.00

-
(A+B+C) 712,394.00
D 92,611.22
(D+E) 805,005.22

A.3.2.1.9.

Jumlah Total Harga


( Rp. ) ( Rp. )

325,200.00
61,344.00
386,544.00
50,700.00
30,030.00
3,471.00
3,159.00
87,360.00

-
(A+B+C) 473,904.00
D 61,607.52
(D+E) 535,511.52

A.3.2.1.10.

Jumlah Total Harga


( Rp. ) ( Rp. )

130,080.00
242,500.00
81,120.00
102,960.00
1,449,000.00
41,400.00
2,047,060.00
221,000.00
65,450.00
7,565.00
13,770.00
307,785.00

-
(A+B+C) 2,354,845.00
D 306,129.85
(D+E) 2,660,974.85

A.3.2.1.11.

Jumlah Total Harga


( Rp. ) ( Rp. )

121,950.00
242,500.00
81,120.00
102,960.00
548,530.00
156,000.00
61,600.00
7,120.00
9,639.00
234,359.00

-
(A+B+C) 782,889.00
D 101,775.57
(D+E) 884,664.57
A.4.4.1.1.

Jumlah Total Harga


( Rp. ) ( Rp. )

112,000.00
54,375.00
20,800.00
187,175.00
39,000.00
15,400.00
1,780.00
2,430.00
58,610.00

-
(A+B+C) 245,785.00
D 31,952.05
(D+E) 277,737.05

A.4.4.1.2.

Jumlah Total Harga


( Rp. ) ( Rp. )

112,000.00
41,187.50
23,660.00
176,847.50
39,000.00
15,400.00
1,780.00
2,430.00
58,610.00
-
(A+B+C) 235,457.50
D 30,609.48
(D+E) 266,066.98

A.4.4.1.3.

Jumlah Total Harga


( Rp. ) ( Rp. )

112,000.00
33,187.50
24,180.00
169,367.50
39,000.00
15,400.00
1,780.00
2,430.00
58,610.00

-
(A+B+C) 227,977.50
D 29,637.08
(D+E) 257,614.58

A.4.4.1.4.

Jumlah Total Harga


( Rp. ) ( Rp. )

112,000.00
27,750.00
26,520.00
166,270.00
39,000.00
15,400.00
1,780.00
2,430.00
58,610.00

-
(A+B+C) 224,880.00
D 29,234.40
(D+E) 254,114.40

A.4.4.1.5.

Jumlah Total Harga


( Rp. ) ( Rp. )

112,000.00
23,125.00
31,720.00
166,845.00
39,000.00
15,400.00
1,780.00
2,430.00
58,610.00

-
(A+B+C) 225,455.00
D 29,309.15
(D+E) 254,764.15

A.4.4.1.6

Jumlah Total Harga


( Rp. ) ( Rp. )

112,000.00
12,600.00
24,050.00
6,710.00
155,360.00
39,000.00
15,400.00
1,780.00
2,430.00
58,610.00

-
(A+B+C) 213,970.00
D 27,816.10
(D+E) 241,786.10

A.4.4.1.7.

Jumlah Total Harga


( Rp. ) ( Rp. )

56,000.00
23,687.50
9,880.00
89,567.50
19,500.00
7,700.00
890.00
1,215.00
29,305.00

-
(A+B+C) 118,872.50
D 15,453.43
(D+E) 134,325.93

A.4.4.1.8.

Jumlah Total Harga


( Rp. ) ( Rp. )

56,000.00
17,962.50
10,400.00
84,362.50
19,500.00
7,700.00
890.00
1,215.00
29,305.00

-
(A+B+C) 113,667.50
D 14,776.78
(D+E) 128,444.28

A.4.4.1.10.

Jumlah Total Harga


( Rp. ) ( Rp. )

56,000.00
12,100.00
11,700.00
79,800.00
19,500.00
7,700.00
890.00
1,215.00
29,305.00

-
(A+B+C) 109,105.00
D 14,183.65
(D+E) 123,288.65
A.4.4.1.11.

Jumlah Total Harga


( Rp. ) ( Rp. )

56,000.00
10,400.00
12,740.00
79,140.00
19,500.00
7,700.00
890.00
1,215.00
29,305.00

-
(A+B+C) 108,445.00
D 14,097.85
(D+E) 122,542.85
A.4.4.1.14.

Jumlah Total Harga


( Rp. ) ( Rp. )

56,000.00
Err:509
4,680.00
4,392.00
Err:509
19,500.00
7,700.00
890.00
1,215.00
29,305.00

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

A.4.4.1.15.

Jumlah Total Harga


( Rp. ) ( Rp. )

56,000.00
Err:509
7,280.00
3,416.00
Err:509
19,500.00
7,700.00
890.00
1,215.00
29,305.00

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

A.4.4.1.16.

Jumlah Total Harga


( Rp. ) ( Rp. )

122,500.00
37,900.00
189,280.00
3,220.00
352,900.00
22,750.00
11,550.00
1,335.00
1,458.00
37,093.00

-
(A+B+C) 389,993.00
D 50,699.09
(D+E) 440,692.09

A.4.4.1.17.

Jumlah Total Harga


( Rp. ) ( Rp. )

122,500.00
30,325.00
200,720.00
3,220.00
356,765.00
22,750.00
11,550.00
1,335.00
1,458.00
37,093.00

-
(A+B+C) 393,858.00
D 51,201.54
(D+E) 445,059.54

A.4.4.1.18.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
28,425.00
143,000.00
3,220.00
174,645.00
20,800.00
9,240.00
1,068.00
1,296.00
32,404.00

-
(A+B+C) 207,049.00
D 26,916.37
(D+E) 233,965.37
A.4.4.1.19.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
22,750.00
151,320.00
3,220.00
177,290.00
20,800.00
9,240.00
1,068.00
1,296.00
32,404.00

-
(A+B+C) 209,694.00
D 27,260.22
(D+E) 236,954.22

A.4.4.1.20.

Jumlah Total Harga


( Rp. ) ( Rp. )

41,250.00
18,950.00
94,640.00
3,220.00
158,060.00
19,500.00
7,700.00
890.00
1,215.00
29,305.00

-
(A+B+C) 187,365.00
D 24,357.45
(D+E) 211,722.45

A.4.4.1.21.

Jumlah Total Harga


( Rp. ) ( Rp. )

41,250.00
15,162.50
100,880.00
3,220.00
160,512.50
19,500.00
7,700.00
890.00
1,215.00
29,305.00

-
(A+B+C) 189,817.50
D 24,676.28
(D+E) 214,493.78

A.4.4.1.22.

Jumlah Total Harga


( Rp. ) ( Rp. )

420,000.00
13,750.00
9,100.00
442,850.00
19,500.00
7,700.00
890.00
1,215.00
29,305.00

-
(A+B+C) 472,155.00
D 61,380.15
(D+E) 533,535.15

A.4.4.1.23.

Jumlah Total Harga


( Rp. ) ( Rp. )

420,000.00
13,750.00
9,100.00
442,850.00
19,500.00
7,700.00
890.00
1,215.00
29,305.00

-
(A+B+C) 472,155.00
D 61,380.15
(D+E) 533,535.15
A.4.4.1.24.

Jumlah Total Harga


( Rp. ) ( Rp. )

105,000.00
17,500.00
8,320.00
130,820.00
19,500.00
11,550.00
1,335.00
1,215.00
33,600.00

-
(A+B+C) 164,420.00
D 21,374.60
(D+E) 185,794.60

A.4.4.2.1.
Jumlah Total Harga
( Rp. ) ( Rp. )

19,380.00
4,160.00
23,540.00
19,500.00
11,550.00
1,335.00
1,215.00
33,600.00

-
(A+B+C) 57,140.00
D 7,428.20
(D+E) 64,568.20

A.4.4.2.2.

Jumlah Total Harga


( Rp. ) ( Rp. )

12,780.00
5,200.00
17,980.00
19,500.00
11,550.00
1,335.00
1,215.00
33,600.00

-
(A+B+C) 51,580.00
D 6,705.40
(D+E) 58,285.40

A.4.4.2.4.
Jumlah Total Harga
( Rp. ) ( Rp. )

7,800.00
6,240.00
14,040.00
19,500.00
11,550.00
1,335.00
1,215.00
33,600.00

-
(A+B+C) 47,640.00
D 6,193.20
(D+E) 53,833.20

A.4.4.2.5.

Jumlah Total Harga


( Rp. ) ( Rp. )

6,480.00
6,760.00
13,240.00
19,500.00
11,550.00
1,335.00
1,215.00
33,600.00

-
(A+B+C) 46,840.00
D 6,089.20
(D+E) 52,929.20

A.4.4.2.6.

Jumlah Total Harga


( Rp. ) ( Rp. )

5,520.00
7,020.00
12,540.00
19,500.00
11,550.00
1,335.00
1,215.00
33,600.00

-
(A+B+C) 46,140.00
D 5,998.20
(D+E) 52,138.20

A.4.4.2.7.

Jumlah Total Harga


( Rp. ) ( Rp. )

4,920.00
7,280.00
12,200.00
19,500.00
11,550.00
1,335.00
1,215.00
33,600.00

-
(A+B+C) 45,800.00
D 5,954.00
(D+E) 51,754.00

A.4.4.2.9.

Jumlah Total Harga


( Rp. ) ( Rp. )

7,200.00
732.00
3,380.00
11,312.00
23,400.00
9,240.00
1,068.00
1,458.00
35,166.00

-
(A+B+C) 46,478.00
D 6,042.14
(D+E) 52,520.14

A.4.4.2.10.

Jumlah Total Harga


( Rp. ) ( Rp. )

3,750.00
1,220.00
5,200.00
10,170.00
23,400.00
9,240.00
1,068.00
1,458.00
35,166.00

-
(A+B+C) 45,336.00
D 5,893.68
(D+E) 51,229.68

A.4.4.2.11.

Jumlah Total Harga


( Rp. ) ( Rp. )

Err:509
2,196.00
2,340.00
Err:509
23,400.00
9,240.00
1,068.00
1,458.00
35,166.00

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

A.4.4.2.12.

Jumlah Total Harga


( Rp. ) ( Rp. )
Err:509
1,708.00
3,900.00
Err:509
23,400.00
9,240.00
1,068.00
1,458.00
35,166.00

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

A.4.4.2.13.

Jumlah Total Harga


( Rp. ) ( Rp. )

17,040.00
7,020.00
24,060.00
26,000.00
15,400.00
1,780.00
1,782.00
44,962.00

-
(A+B+C) 69,022.00
D 8,972.86
(D+E) 77,994.86

A.4.4.2.14.

Jumlah Total Harga


( Rp. ) ( Rp. )

12,960.00
8,060.00
21,020.00
16,900.00
15,400.00
1,780.00
1,053.00
35,133.00

-
(A+B+C) 56,153.00
D 7,299.89
(D+E) 63,452.89
A.4.4.2.15.

Jumlah Total Harga


( Rp. ) ( Rp. )

10,400.00
8,320.00
18,720.00
26,000.00
15,400.00
1,780.00
1,782.00
44,962.00

-
(A+B+C) 63,682.00
D 8,278.66
(D+E) 71,960.66

A.4.4.2.16.

Jumlah Total Harga


( Rp. ) ( Rp. )

8,640.00
9,100.00
17,740.00
26,000.00
15,400.00
1,780.00
1,782.00
44,962.00

-
(A+B+C) 62,702.00
D 8,151.26
(D+E) 70,853.26

A.4.4.2.17.

Jumlah Total Harga


( Rp. ) ( Rp. )

7,360.00
9,360.00
16,720.00
26,000.00
15,400.00
1,780.00
1,782.00
44,962.00

-
(A+B+C) 61,682.00
D 8,018.66
(D+E) 69,700.66

A.4.4.2.18.

Jumlah Total Harga


( Rp. ) ( Rp. )

Err:509
2,196.00
4,680.00
Err:509
28,600.00
16,940.00
1,958.00
1,782.00
49,280.00

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

A.4.4.2.19.

Jumlah Total Harga


( Rp. ) ( Rp. )

6,480.00
6,760.00
13,240.00
9,750.00
5,775.00
712.00
648.00
16,885.00

-
(A+B+C) 30,125.00
D 3,916.25
(D+E) 34,041.25

A.4.4.2.20.

Jumlah Total Harga


( Rp. ) ( Rp. )

625.00
3,380.00
4,005.00
5,200.00
30,800.00
3,560.00
324.00
39,884.00

-
(A+B+C) 43,889.00
D 5,705.57
(D+E) 49,594.57

A.4.4.2.21.

Jumlah Total Harga


( Rp. ) ( Rp. )

12,500.00
14,325,000.00
14,337,500.00
29,250.00
17,325.00
2,047.00
1,863.00
50,485.00

-
(A+B+C) 14,387,985.00
D 1,870,438.05
(D+E) 16,258,423.05

A.4.4.2.22.

Jumlah Total Harga


( Rp. ) ( Rp. )

12,500.00
-
12,500.00
29,250.00
17,325.00
2,047.00
1,863.00
50,485.00

-
(A+B+C) 62,985.00
D 8,188.05
(D+E) 71,173.05

A.4.4.2.23.

Jumlah Total Harga


( Rp. ) ( Rp. )

5,400.00
1,560.00
6,960.00
19,500.00
7,700.00
890.00
1,215.00
29,305.00

-
(A+B+C) 36,265.00
D 4,714.45
(D+E) 40,979.45

A.4.4.2.24.

Jumlah Total Harga


( Rp. ) ( Rp. )

3,885.00
3,885.00
9,750.00
5,775.00
712.00
648.00
16,885.00

-
(A+B+C) 20,770.00
D 2,700.10
(D+E) 23,470.10

A.4.4.2.25.

Jumlah Total Harga


( Rp. ) ( Rp. )

2,000.00
2,000.00
4,550.00
2,695.00
356.00
324.00
7,925.00

-
(A+B+C) 9,925.00
D 1,290.25
(D+E) 11,215.25

A.4.4.2.26.

Jumlah Total Harga


( Rp. ) ( Rp. )

7,925.00
3,120.00
11,045.00
19,500.00
11,550.00
1,335.00
1,215.00
33,600.00

-
(A+B+C) 44,645.00
D 5,803.85
(D+E) 50,448.85
A.4.6.1.1.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

A.4.6.1.1a.

Jumlah Total Harga


( Rp. ) ( Rp. )

13,735,700.00
20,000.00
13,000.00
13,768,700.00
455,000.00
1,701,000.00
186,900.00
28,350.00
2,371,250.00

-
(A+B+C) 16,139,950.00
D 2,098,193.50
(D+E) 18,238,143.50
A.4.6.1.2.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

A.4.6.1.2a.

Jumlah Total Harga


( Rp. ) ( Rp. )

28,665,600.00
20,000.00
13,000.00
28,698,600.00
390,000.00
1,458,000.00
160,200.00
24,300.00
2,032,500.00

-
(A+B+C) 30,731,100.00
D 3,995,043.00
(D+E) 34,726,143.00

A.4.6.1.2c.

Jumlah Total Harga


( Rp. ) ( Rp. )

9,120,000.00
20,000.00
13,000.00
9,153,000.00
390,000.00
1,458,000.00
160,200.00
24,300.00
2,032,500.00

-
(A+B+C) 11,185,500.00
D 1,454,115.00
(D+E) 12,639,615.00

A.4.6.1.3.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
800.00
800.00
22,750.00
85,050.00
9,345.00
1,458.00
118,603.00

-
(A+B+C) 119,403.00
D 15,522.39
(D+E) 134,925.39
A.4.6.1.4.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
800.00
800.00
22,750.00
85,050.00
9,345.00
1,458.00
118,603.00

-
(A+B+C) 119,403.00
D 15,522.39
(D+E) 134,925.39

A.4.6.1.5b.

Jumlah Total Harga


( Rp. ) ( Rp. )

955,520.00
6,500.00
962,020.00
65,000.00
243,000.00
26,700.00
4,050.00
338,750.00

-
(A+B+C) 1,300,770.00
D 169,100.10
(D+E) 1,469,870.10

A.4.6.1.6b.
Jumlah Total Harga
( Rp. ) ( Rp. )

573,312.00
3,900.00
577,212.00
52,000.00
194,400.00
21,360.00
3,240.00
271,000.00

-
(A+B+C) 848,212.00
D 110,267.56
(D+E) 958,479.56

A.4.6.1.7.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
6,500.00
6,500.00
65,000.00
243,000.00
26,700.00
4,050.00
338,750.00

-
(A+B+C) 345,250.00
D 44,882.50
(D+E) 390,132.50
A.4.6.1.8.

Jumlah Total Harga


( Rp. ) ( Rp. )

339,325.00
480.00
6,500.00
70,000.00

416,305.00
45,500.00
170,100.00
18,690.00
2,835.00
237,125.00

-
(A+B+C) 653,430.00
D 84,945.90
(D+E) 738,375.90

A.4.6.1.9.

Jumlah Total Harga


( Rp. ) ( Rp. )

347,468.80
480.00
6,500.00
70,000.00

424,448.80
52,000.00
194,400.00
21,360.00
3,240.00
271,000.00

-
(A+B+C) 695,448.80
D 90,408.34
(D+E) 785,857.14

A.4.6.1.10.

Jumlah Total Harga


( Rp. ) ( Rp. )

1,433,280.00
2,400.00
1,435,680.00
43,550.00
162,000.00
17,800.00
27,135.00
250,485.00

-
(A+B+C) 1,686,165.00
D 219,201.45
(D+E) 1,905,366.45

A.4.6.1.11.

Jumlah Total Harga


( Rp. ) ( Rp. )

339,325.00
480.00
3,900.00
119,000.00

462,705.00
52,000.00
194,400.00
21,360.00
3,240.00
271,000.00

-
(A+B+C) 733,705.00
D 95,381.65
(D+E) 829,086.65

A.4.6.1.12.

Jumlah Total Harga


( Rp. ) ( Rp. )

339,325.00
480.00
10,400.00
119,000.00

-
469,205.00
55,250.00
206,550.00
22,695.00
3,483.00
287,978.00

-
(A+B+C) 757,183.00
D 98,433.79
(D+E) 855,616.79
A.4.6.1.13.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

A.4.6.1.13a.

Jumlah Total Harga


( Rp. ) ( Rp. )

13,735,700.00
172,500.00
89,600.00
13,997,800.00
260,000.00
972,000.00
106,800.00
16,200.00
1,355,000.00

-
(A+B+C) 15,352,800.00
D 1,995,864.00
(D+E) 17,348,664.00
A.4.6.1.13c.

Jumlah Total Harga


( Rp. ) ( Rp. )

26,276,800.00
172,500.00
89,600.00
26,538,900.00
260,000.00
972,000.00
106,800.00
16,200.00
1,355,000.00

-
(A+B+C) 27,893,900.00
D 3,626,207.00
(D+E) 31,520,107.00

A.4.6.1.13d.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
172,500.00
89,600.00
262,100.00
260,000.00
972,000.00
106,800.00
16,200.00
1,355,000.00

-
(A+B+C) 1,617,100.00
D 210,223.00
(D+E) 1,827,323.00

A.4.6.1.14.

Jumlah Total Harga


( Rp. ) ( Rp. )

28,665,600.00
172,500.00
89,600.00
28,927,700.00
435,500.00
1,628,100.00
178,890.00
27,135.00
2,269,625.00

-
(A+B+C) 31,197,325.00
D 4,055,652.25
(D+E) 35,252,977.25

A.4.6.1.15.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

A.4.6.1.15a.

Jumlah Total Harga


( Rp. ) ( Rp. )
AHSP'13 AHSP'12
13,735,700.00 1.100 - 1.100
172,500.00 15.000 - 15.000
48,000.00 3.000 - 3.000
13,956,200.00
435,500.00 6.700 4.300 2.400
1,628,100.00 20.100 12.900 7.200
178,890.00 2.010 1.290 0.720
27,135.00 0.335 0.215 0.120
2,269,625.00

-
(A+B+C) 16,225,825.00
D 2,109,357.25
(D+E) 18,335,182.25

AHSP'13 14,631,138.30
AHSP'12 13,356,622.60
Selisih 1,274,515.70
A.4.6.1.16.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

A.4.6.1.16a. 0.003

Jumlah Total Harga


( Rp. ) ( Rp. )
AHSP'13 AHSP'12
- 0.014 - 0.014
- 0.036 0.032 0.0036
- 0.250 - 0.250
-
- 0.100 - 0.100
- 0.100 - 0.100
- 0.010 - 0.010
- 0.005 - 0.005
-

-
(A+B+C) -
D -
(D+E) -

AHSP'13 581,921.75
AHSP'12 215,801.75
Selisih 366,120.00
An.Dihitung 0.003

Jumlah Total Harga


( Rp. ) ( Rp. )
AHSP'13 AHSP'12
174,818.00 0.014 - 0.014
44,953.20 0.036 0.032 0.0036
4,000.00 0.250 - 0.250
223,771.20
6,500.00 0.100 - 0.100
8,100.00 0.100 - 0.100
890.00 0.010 - 0.010
405.00 0.005 - 0.005
15,895.00

-
(A+B+C) 239,666.20
D 31,156.61
(D+E) 270,822.81

AHSP'13 581,921.75
AHSP'12 215,801.75
Selisih 366,120.00

K.6.16.2008.c

Jumlah Total Harga


( Rp. ) ( Rp. )

-
27,360.00
4,000.00
31,360.00
6,500.00
8,100.00
890.00
405.00
15,895.00

-
(A+B+C) 47,255.00
D 6,143.15
(D+E) 53,398.15

A.4.6.1.17.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

A.4.6.1.17a.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

A.4.6.1.18.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

A.4.6.1.18a.

Jumlah Total Harga


( Rp. ) ( Rp. )

106,400.00
912.00
107,312.00
7,800.00
9,720.00
1,068.00
486.00
19,074.00

-
(A+B+C) 126,386.00
D 16,430.18
(D+E) 142,816.18

A.4.6.1.19.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -
A.4.6.1.20.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

A.4.6.1.20a.

Jumlah Total Harga


( Rp. ) ( Rp. )

123,880.00
4,000.00
127,880.00
13,000.00
24,300.00
2,670.00
810.00
40,780.00

-
(A+B+C) 168,660.00
D 21,925.80
(D+E) 190,585.80

A.4.6.1.21.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

A.4.6.1.21a.

Jumlah Total Harga


( Rp. ) ( Rp. )

87,944.40
1,600.00
89,544.40
6,500.00
16,200.00
1,780.00
405.00
24,885.00

-
(A+B+C) 114,429.40
D 14,875.82
(D+E) 129,305.22

A.4.6.1.21b.

Jumlah Total Harga


( Rp. ) ( Rp. )
123,130.80
1,600.00
124,730.80
6,500.00
16,200.00
1,780.00
405.00
24,885.00

-
(A+B+C) 149,615.80
D 19,450.05
(D+E) 169,065.85

A.4.6.1.22.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

A.4.6.1.22a.

Jumlah Total Harga


( Rp. ) ( Rp. )

146,588.40
800.00
147,388.40
6,500.00
16,200.00
1,780.00
405.00
24,885.00

-
(A+B+C) 172,273.40
D 22,395.54
(D+E) 194,668.94

A.4.6.1.22b.

Jumlah Total Harga


( Rp. ) ( Rp. )

123,130.80
800.00
123,930.80
6,500.00
16,200.00
1,780.00
405.00
24,885.00

-
(A+B+C) 148,815.80
D 19,346.05
(D+E) 168,161.85

A.4.6.1.23.

Jumlah Total Harga


( Rp. ) ( Rp. )

212,800.00
2,400.00
215,200.00
9,750.00
36,450.00
4,005.00
648.00
50,853.00

-
(A+B+C) 266,053.00
D 34,586.89
(D+E) 300,639.89

A.4.6.1.24.

Jumlah Total Harga


( Rp. ) ( Rp. )

212,800.00
2,400.00
102,340.00

7,280.00
324,820.00
9,750.00
36,450.00
4,005.00
648.00
50,853.00

-
(A+B+C) 375,673.00
D 48,837.49
(D+E) 424,510.49

A.4.6.1.25.

Jumlah Total Harga


( Rp. ) ( Rp. )

212,800.00
2,400.00
60,200.00

7,280.00
282,680.00
13,000.00
48,600.00
5,340.00
810.00
67,750.00

-
(A+B+C) 350,430.00
D 45,555.90
(D+E) 395,985.90

A.4.6.1.26.

Jumlah Total Harga


( Rp. ) ( Rp. )

167,216.00
1,600.00
2,400.00
171,216.00
39,000.00
145,800.00
16,020.00
2,430.00
203,250.00

-
(A+B+C) 374,466.00
D 48,680.58
(D+E) 423,146.58

A.4.6.1.27.

Jumlah Total Harga


( Rp. ) ( Rp. )

47,600.00
800.00
48,400.00
1,625.00
6,075.00
712.00
81.00
8,493.00

-
(A+B+C) 56,893.00
D 7,396.09
(D+E) 64,289.09

A.4.6.1.28.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
106,400.00
192.00
24.00
106,616.00
6,500.00
4,050.00
445.00
405.00
11,400.00

-
(A+B+C) 118,016.00
D 15,342.08
(D+E) 133,358.08
A.4.1.1.2.

Jumlah Total Harga


( Rp. ) ( Rp. )

345,000.00
153,771.43
164,918.52
18,275.00
681,964.95
107,250.00
21,175.00
2,492.00
6,723.00
137,640.00

-
(A+B+C) 819,604.95
D 106,548.64
(D+E) 926,153.59

A.4.1.1.3.

Jumlah Total Harga


( Rp. ) ( Rp. )

373,750.00
148,385.71
165,733.33
18,275.00
706,144.04
107,250.00
21,175.00
2,492.00
6,723.00
137,640.00

-
(A+B+C) 843,784.04
D 109,691.93
(D+E) 953,475.97
A.4.1.1.6.

Jumlah Total Harga


( Rp. ) ( Rp. )

440,000.00
135,757.14
168,014.81
18,275.00
762,046.95
107,250.00
21,175.00
2,492.00
6,723.00
137,640.00

-
(A+B+C) 899,686.95
D 116,959.30
(D+E) 1,016,646.25
A.4.1.1.8.

Jumlah Total Harga


( Rp. ) ( Rp. )

480,000.00
128,514.29
169,318.52
18,275.00
796,107.81
107,250.00
21,175.00
2,492.00
6,723.00
137,640.00

-
(A+B+C) 933,747.81
D 121,387.22
(D+E) 1,055,135.03

A.4.1.1.9.

Jumlah Total Harga


( Rp. ) ( Rp. )

507,500.00
127,028.57
167,200.00
18,275.00
820,003.57
107,250.00
21,175.00
2,492.00
6,723.00
137,640.00

-
(A+B+C) 957,643.57
D 124,493.66
(D+E) 1,082,137.23
A.4.1.1.10.

Jumlah Total Harga


( Rp. ) ( Rp. )

516,250.00
126,471.43
166,385.19
18,275.00
827,381.62
107,250.00
21,175.00
2,492.00
6,723.00
137,640.00

-
(A+B+C) 965,021.62
D 125,452.81
(D+E) 1,090,474.43

A.4.1.1.11.

Jumlah Total Harga


( Rp. ) ( Rp. )

548,750.00
124,428.57
163,940.74
18,275.00
855,394.31
136,500.00
26,950.00
3,115.00
8,505.00
175,070.00

-
(A+B+C) 1,030,464.31
D 133,960.36
(D+E) 1,164,424.67

A.4.1.1.12.

Jumlah Total Harga


( Rp. ) ( Rp. )

560,000.00
123,871.43
162,962.96
18,275.00
865,109.39
136,500.00
26,950.00
3,115.00
8,505.00
175,070.00

-
(A+B+C) 1,040,179.39
D 135,223.32
(D+E) 1,175,402.71

A.4.1.1.13.

Jumlah Total Harga


( Rp. ) ( Rp. )

500,000.00
124,800.00
176,000.00
57,600.00

858,400.00
136,500.00
26,950.00
3,115.00
8,505.00
175,070.00

-
(A+B+C) 1,033,470.00
D 134,351.10
(D+E) 1,167,821.10

A.4.1.1.14.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
3,900.00
2,310.00
267.00
243.00
6,720.00

-
(A+B+C) 6,720.00
D 873.60
(D+E) 7,593.60

A.4.1.1.15.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
4,550.00
2,695.00
356.00
324.00
7,925.00

-
(A+B+C) 7,925.00
D 1,030.25
(D+E) 8,955.25

A.4.1.1.16.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
5,200.00
3,080.00
356.00
324.00
8,960.00

-
(A+B+C) 8,960.00
D 1,164.80
(D+E) 10,124.80

A.4.1.1.18.

Jumlah Total Harga


( Rp. ) ( Rp. )
120,750.00
2,300.00
123,050.00
3,250.00
3,850.00
445.00
243.00
7,788.00

-
(A+B+C) 130,838.00
D 17,008.94
(D+E) 147,846.94
14,784.69

A.4.1.1.19.

Jumlah Total Harga


( Rp. ) ( Rp. )

117,300.00
1,150.00
118,450.00
1,625.00
1,925.00
178.00
81.00
3,809.00

-
(A+B+C) 122,259.00
D 15,893.67
(D+E) 138,152.67
13,815.27
A.4.1.1.26.

Jumlah Total Harga


( Rp. ) ( Rp. )

48,840.00
6,400.00
1,110.00
24,420.00
51,100.00
20,000.00

151,870.00
42,900.00
26,730.00
2,937.00
2,673.00
75,240.00
-
(A+B+C) 227,110.00
D 29,524.30
(D+E) 256,634.30

A.4.1.1.27.

Jumlah Total Harga


( Rp. ) ( Rp. )

42,979.20
9,600.00
5,000.00

57,579.20
9,750.00
4,050.00
445.00
648.00
14,893.00

-
(A+B+C) 72,472.20
D 9,421.39
(D+E) 81,893.59

Bt.6.28.2008

Jumlah Total Harga


( Rp. ) ( Rp. )

325,600.00
24,000.00
2,960.00
1,811,250.00
51,750.00
420,000.00
140,400.00
178,200.00
2,954,160.00
344,500.00
21,175.00
105,300.00
80,850.00
23,318.00
21,465.00
596,608.00

-
(A+B+C) 3,550,768.00
D 461,599.84
(D+E) 4,012,367.84
Bt.6.28.2008.a

Jumlah Total Harga


( Rp. ) ( Rp. )

108,533.33
24,000.00
2,960.00
1,811,250.00
51,750.00
463,750.00
129,740.00
170,720.00
18,275.00
2,780,978.33
344,500.00
21,175.00
105,300.00
80,850.00
23,318.00
21,465.00
596,608.00

-
(A+B+C) 3,377,586.33
D 439,086.22
(D+E) 3,816,672.55

Bt.6.28.2008.b

Jumlah Total Harga


( Rp. ) ( Rp. )

108,533.33
24,000.00
2,960.00
1,811,250.00
51,750.00
407,500.00
141,180.00
167,640.00
18,275.00
2,733,088.33
344,500.00
21,175.00
105,300.00
80,850.00
23,318.00
21,465.00
596,608.00

-
(A+B+C) 3,329,696.33
D 432,860.52
(D+E) 3,762,556.85

Bt.6.29.2008

Jumlah Total Harga


( Rp. ) ( Rp. )

439,560.00
32,000.00
4,440.00
2,415,000.00
69,000.00
420,000.00
140,400.00
178,200.00
3,698,600.00
367,250.00
21,175.00
126,360.00
107,800.00
28,747.00
22,923.00
674,255.00

-
(A+B+C) 4,372,855.00
D 568,471.15
(D+E) 4,941,326.15

Bt.6.29.2008.a

Jumlah Total Harga


( Rp. ) ( Rp. )

146,520.00
32,000.00
4,440.00
1,811,250.00
69,000.00
463,750.00
129,740.00
170,720.00
18,275.00
2,845,695.00
367,250.00
21,175.00
126,360.00
107,800.00
28,747.00
22,923.00
674,255.00

-
(A+B+C) 3,519,950.00
D 457,593.50
(D+E) 3,977,543.50

Bt.6.29.2008.b

Jumlah Total Harga


( Rp. ) ( Rp. )

146,520.00
32,000.00
4,440.00
1,811,250.00
69,000.00
407,500.00
141,180.00
167,640.00
18,275.00
2,797,805.00
367,250.00
21,175.00
126,360.00
107,800.00
28,747.00
22,923.00
674,255.00

-
(A+B+C) 3,472,060.00
D 451,367.80
(D+E) 3,923,427.80

Bt.6.30.2008

Jumlah Total Harga


( Rp. ) ( Rp. )

651,200.00
64,000.00
14,800.00
3,622,500.00
103,500.00
420,000.00
140,400.00
178,200.00
244,200.00
511,000.00
200,000.00

6,149,800.00
458,250.00
21,175.00
133,650.00
161,700.00
35,867.00
28,593.00
839,235.00

-
(A+B+C) 6,989,035.00
D 908,574.55
(D+E) 7,897,609.55

Bt.6.30.2008.a

Jumlah Total Harga


( Rp. ) ( Rp. )

217,066.67
64,000.00
14,800.00
3,622,500.00
103,500.00
463,750.00
129,740.00
170,720.00
18,275.00
81,400.00
170,333.33
66,666.67

5,122,751.67
458,250.00
21,175.00
133,650.00
161,700.00
35,867.00
28,593.00
839,235.00

-
(A+B+C) 5,961,986.67
D 775,058.27
(D+E) 6,737,044.94

Bt.6.30.2008.b

Jumlah Total Harga


( Rp. ) ( Rp. )

217,066.67
64,000.00
14,800.00
2,415,000.00
103,500.00
463,750.00
129,740.00
170,720.00
18,275.00
81,400.00
170,333.33
66,666.67
3,915,251.67
458,250.00
21,175.00
133,650.00
161,700.00
35,867.00
28,593.00
839,235.00

-
(A+B+C) 4,754,486.67
D 618,083.27
(D+E) 5,372,569.94

Bt.6.30.2008.c

Jumlah Total Harga


( Rp. ) ( Rp. )

217,066.67
64,000.00
14,800.00
1,811,250.00
103,500.00
463,750.00
129,740.00
170,720.00
18,275.00
81,400.00
170,333.33
66,666.67

3,311,501.67
458,250.00
21,175.00
133,650.00
161,700.00
35,867.00
28,593.00
839,235.00

-
(A+B+C) 4,150,736.67
D 539,595.77
(D+E) 4,690,332.44

Bt.6.30.2008.d

Jumlah Total Harga


( Rp. ) ( Rp. )

217,066.67
64,000.00
14,800.00
1,811,250.00
103,500.00
407,500.00
141,180.00
167,640.00
18,275.00
81,400.00
170,333.33
66,666.67

3,263,611.67
458,250.00
21,175.00
133,650.00
161,700.00
35,867.00
28,593.00
839,235.00

-
(A+B+C) 4,102,846.67
D 533,370.07
(D+E) 4,636,216.74
Bt.6.31.2008

Jumlah Total Harga


( Rp. ) ( Rp. )

520,960.00
51,200.00
11,840.00
2,415,000.00
69,000.00
420,000.00
140,400.00
178,200.00
227,920.00
408,800.00
160,000.00

4,603,320.00
412,750.00
21,175.00
133,650.00
107,800.00
29,637.00
25,758.00
730,770.00

-
(A+B+C) 5,334,090.00
D 693,431.70
(D+E) 6,027,521.70

Bt.6.31.2008.a

Jumlah Total Harga


( Rp. ) ( Rp. )

173,653.33
51,200.00
11,840.00
2,415,000.00
69,000.00
463,750.00
129,740.00
170,720.00
18,275.00
75,973.33
136,266.67
53,333.33

3,768,751.66
412,750.00
21,175.00
133,650.00
107,800.00
29,637.00
25,758.00
730,770.00

-
(A+B+C) 4,499,521.66
D 584,937.82
(D+E) 5,084,459.48

Bt.6.31.2008.b

Jumlah Total Harga


( Rp. ) ( Rp. )

173,653.33
51,200.00
11,840.00
1,811,250.00
69,000.00
463,750.00
129,740.00
170,720.00
18,275.00
75,973.33
136,266.67
53,333.33

3,165,001.66
412,750.00
21,175.00
133,650.00
107,800.00
29,637.00
25,758.00
730,770.00

-
(A+B+C) 3,895,771.66
D 506,450.32
(D+E) 4,402,221.98

Bt.6.31.2008.c

Jumlah Total Harga


( Rp. ) ( Rp. )

173,653.33
51,200.00
11,840.00
1,811,250.00
69,000.00
407,500.00
141,180.00
167,640.00
18,275.00
75,973.33
136,266.67
53,333.33

3,117,111.66
412,750.00
21,175.00
133,650.00
107,800.00
29,637.00
25,758.00
730,770.00

-
(A+B+C) 3,847,881.66
D 500,224.62
(D+E) 4,348,106.28
Bt.6.32.2008

Jumlah Total Harga


( Rp. ) ( Rp. )

520,960.00
51,200.00
11,840.00
1,805,500.00
51,750.00
420,000.00
140,400.00
178,200.00
195,360.00
408,800.00
320,000.00

4,104,010.00
344,500.00
21,175.00
105,300.00
80,850.00
23,585.00
21,465.00
596,875.00

-
(A+B+C) 4,700,885.00
D 611,115.05
(D+E) 5,312,000.05

Bt.6.32.2008.a

Jumlah Total Harga


( Rp. ) ( Rp. )

173,653.33
51,200.00
11,840.00
1,805,500.00
51,750.00
463,750.00
129,740.00
170,720.00
18,275.00
65,120.00
136,266.67
106,666.67

3,184,481.67
344,500.00
21,175.00
105,300.00
80,850.00
23,585.00
21,465.00
596,875.00

-
(A+B+C) 3,781,356.67
D 491,576.37
(D+E) 4,272,933.04

Bt.6.32.2008.b

Jumlah Total Harga


( Rp. ) ( Rp. )

173,653.33
51,200.00
11,840.00
1,805,500.00
51,750.00
407,500.00
141,180.00
167,640.00
18,275.00
65,120.00
136,266.67
106,666.67

3,136,591.67
344,500.00
21,175.00
105,300.00
80,850.00
23,585.00
21,465.00
596,875.00
-
(A+B+C) 3,733,466.67
D 485,350.67
(D+E) 4,218,817.34

Bt.6.32.2008.c

Jumlah Total Harga


( Rp. ) ( Rp. )

173,653.33
51,200.00
11,840.00
1,509,375.00
51,750.00
463,750.00
129,740.00
170,720.00
18,275.00
65,120.00
136,266.67
106,666.67

2,888,356.67
344,500.00
21,175.00
105,300.00
80,850.00
23,585.00
21,465.00
596,875.00

-
(A+B+C) 3,485,231.67
D 453,080.12
(D+E) 3,938,311.79
Bt.6.33.2008

Jumlah Total Harga


( Rp. ) ( Rp. )

390,720.00
51,200.00
11,840.00
1,811,250.00
51,750.00
420,000.00
140,400.00
178,200.00
260,480.00
408,800.00
240,000.00

3,964,640.00
344,500.00
21,175.00
105,300.00
80,850.00
23,318.00
21,465.00
596,608.00

-
(A+B+C) 4,561,248.00
D 592,962.24
(D+E) 5,154,210.24

Bt.6.33.2008.a

Jumlah Total Harga


( Rp. ) ( Rp. )

130,240.00
51,200.00
11,840.00
1,811,250.00
51,750.00
407,500.00
141,180.00
167,640.00
18,275.00
86,826.67
136,266.67
80,000.00

3,093,968.34
344,500.00
21,175.00
105,300.00
80,850.00
23,318.00
21,465.00
596,608.00
-
(A+B+C) 3,690,576.34
D 479,774.92
(D+E) 4,170,351.26

Bt.6.34.2008

Jumlah Total Harga


( Rp. ) ( Rp. )

407,000.00
48,000.00
8,880.00
2,415,000.00
69,000.00
420,000.00
140,400.00
178,200.00
170,940.00
365,000.00
140,000.00

4,362,420.00
367,250.00
21,175.00
126,360.00
107,800.00
28,747.00
22,923.00
674,255.00

-
(A+B+C) 5,036,675.00
D 654,767.75
(D+E) 5,691,442.75
Bt.6.35.2008

Jumlah Total Harga


( Rp. ) ( Rp. )

3,256.00
160.00
34,500.00
1,035.00
5,000.00
1,560.00
1,980.00
47,491.00
11,700.00
1,540.00
1,620.00
1,540.00
534.00
729.00
17,663.00

-
(A+B+C) 65,154.00
D 8,470.02
(D+E) 73,624.02

A.4.1.1.35.

Jumlah Total Harga


( Rp. ) ( Rp. )

32,560.00
160.00
34,500.00
10,350.00
5,000.00
1,560.00
1,980.00
86,110.00
11,700.00
1,540.00
1,620.00
1,540.00
534.00
729.00
17,663.00

-
(A+B+C) 103,773.00
D 13,490.49
(D+E) 117,263.49

A.4.1.1.36.
Jumlah Total Harga
( Rp. ) ( Rp. )

4,884.00
320.00
41,400.00
1,150.00
6,875.00
2,340.00
3,300.00
60,269.00
19,305.00
2,541.00
2,673.00
2,541.00
890.00
1,215.00
29,165.00

-
(A+B+C) 89,434.00
D 11,626.42
(D+E) 101,060.42

Bt.6.36.2008.a

Jumlah Total Harga


( Rp. ) ( Rp. )

1,628.00
320.00
36,225.00
1,150.00
6,875.00
2,340.00
3,300.00
51,838.00
19,305.00
2,541.00
2,673.00
2,541.00
890.00
1,215.00
29,165.00

-
(A+B+C) 81,003.00
D 10,530.39
(D+E) 91,533.39
A.4.5.1.2.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
Err:509
Err:509
7,800.00
9,720.00
1,068.00
486.00
19,074.00

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

A.4.5.1.3.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
1,050.00
1,050.00
7,800.00
9,720.00
9,078.00
486.00
27,084.00

-
(A+B+C) 28,134.00
D 3,657.42
(D+E) 31,791.42

A.4.5.1.4.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
Err:509
Err:509
6,500.00
8,100.00
890.00
405.00
15,895.00

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

A.4.5.1.5.

Jumlah Total Harga


( Rp. ) ( Rp. )

24,375.00
Err:509
Err:509
6,500.00
8,100.00
890.00
405.00
15,895.00

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

A.4.5.1.6.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
Err:509
Err:509
52,000.00
64,800.00
7,120.00
3,240.00
127,160.00

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

L.6.7.2008.a
Jumlah Total Harga
( Rp. ) ( Rp. )

31,304.00
2,640.00
33,944.00
6,500.00
4,050.00
445.00
405.00
11,400.00

-
(A+B+C) 45,344.00
D 5,894.72
(D+E) 51,238.72

A.4.5.1.8.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
Err:509
-
-
-
Err:509
32,500.00
40,500.00
4,450.00
2,025.00
79,475.00

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509
A.4.2.1.3.

Jumlah Total Harga


( Rp. ) ( Rp. )

12,000.00
2,100.00
14,100.00
6,500.00
7,700.00
89.00
405.00
14,694.00
264,000.00
264,000.00
(A+B+C) 292,794.00
D 38,063.22
(D+E) 330,857.22
A.4.2.1.5.

Jumlah Total Harga


( Rp. ) ( Rp. )

10,800.00
3,600.00
840.00
15,240.00
2,600.00
1,540.00
178.00
162.00
4,480.00
56,100.00
56,100.00
(A+B+C) 75,820.00
D 9,856.60
(D+E) 85,676.60
8,567.66

A.4.2.1.6.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
330,000.00
330,000.00
42,250.00
50,050.00
5,785.00
2,592.00
100,677.00

-
(A+B+C) 430,677.00
D 55,988.01
(D+E) 486,665.01

A.4.2.1.7.

Jumlah Total Harga


( Rp. ) ( Rp. )

461,000.00
461,000.00
78,000.00
92,400.00
10,680.00
486.00
181,566.00

-
(A+B+C) 642,566.00
D 83,533.58
(D+E) 726,099.58

A.4.2.1.8.

Jumlah Total Harga


( Rp. ) ( Rp. )

1,303,000.00
1,303,000.00
28,600.00
33,880.00
3,916.00
1,782.00
68,178.00

-
(A+B+C) 1,371,178.00
D 178,253.14
(D+E) 1,549,431.14

A.4.2.1.9.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
5,200.00
61,600.00
7,120.00
324.00
74,244.00

-
(A+B+C) 74,244.00
D 9,651.72
(D+E) 83,895.72

A.4.2.1.10.

Jumlah Total Harga


( Rp. ) ( Rp. )

461,000.00
461,000.00
65,000.00
77,000.00
8,900.00
4,050.00
154,950.00

-
(A+B+C) 615,950.00
D 80,073.50
(D+E) 696,023.50
A.4.2.1.12.

Jumlah Total Harga


( Rp. ) ( Rp. )

33,880.00
127,020.00
160,900.00
5,525.00
6,545.00
756.50
340.20
13,166.70

-
(A+B+C) 174,066.70
D 22,628.67
(D+E) 196,695.37
A.4.2.1.14.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
22,750.00
26,950.00
3,115.00
1,458.00
54,273.00

-
(A+B+C) 54,273.00
D 7,055.49
(D+E) 61,328.49

A.4.2.1.15.

Jumlah Total Harga


( Rp. ) ( Rp. )

117,363.00
232,012.23
349,375.23
108,550.00
128,590.00
14,863.00
6,723.00
258,726.00

-
(A+B+C) 608,101.23
D 79,053.16
(D+E) 687,154.39

A.4.2.1.16.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
95,186.70
32,604.00
127,790.70
6,500.00
7,700.00
890.00
405.00
15,495.00

-
(A+B+C) 143,285.70
D 18,627.14
(D+E) 161,912.84
A.4.2.1.17.

Jumlah Total Harga


( Rp. ) ( Rp. )

94,600.00
-
2,000.00
133,000.00
229,600.00
13,000.00
15,400.00
1,780.00
81.00
30,261.00

-
(A+B+C) 259,861.00
D 33,781.93
(D+E) 293,642.93

A.4.2.1.18.

Jumlah Total Harga


( Rp. ) ( Rp. )

56,700.00
240.00
928.30

57,868.30
13,000.00
16,200.00
1,780.00
81.00
31,061.00

-
(A+B+C) 88,929.30
D 11,560.81
(D+E) 100,490.11

A.4.2.1.19.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
160.00
9,500.00
9,660.00
9,750.00
23,100.00
2,670.00
648.00
36,168.00

-
(A+B+C) 45,828.00
D 5,957.64
(D+E) 51,785.64

A.4.4.3.1.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
12,250.00
11,700.00
23,950.00
16,250.00
9,625.00
1,157.00
1,053.00
28,085.00

-
(A+B+C) 52,035.00
D 6,764.55
(D+E) 58,799.55
A.4.4.3.2.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
12,500.00
11,700.00
24,200.00
16,250.00
9,625.00
1,157.00
1,053.00
28,085.00

-
(A+B+C) 52,285.00
D 6,797.05
(D+E) 59,082.05

A.4.4.3.3.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
13,000.00
11,700.00
24,700.00
17,550.00
10,395.00
1,246.00
1,134.00
30,325.00

-
(A+B+C) 55,025.00
D 7,153.25
(D+E) 62,178.25

A.4.4.3.4.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
12,250.00
11,700.00
7,800.00
31,750.00
16,250.00
9,625.00
1,157.00
1,053.00
28,085.00

-
(A+B+C) 59,835.00
D 7,778.55
(D+E) 67,613.55

A.4.4.3.5.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
12,500.00
11,700.00
7,800.00
32,000.00
16,900.00
10,010.00
1,157.00
1,053.00
29,120.00

-
(A+B+C) 61,120.00
D 7,945.60
(D+E) 69,065.60

A.4.4.3.6.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
13,000.00
11,700.00
13,000.00
37,700.00
17,550.00
10,395.00
1,246.00
1,134.00
30,325.00

-
(A+B+C) 68,025.00
D 8,843.25
(D+E) 76,868.25

A.4.4.3.7.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
12,250.00
11,700.00
16,900.00
40,850.00
16,250.00
9,625.00
1,157.00
1,053.00
28,085.00

-
(A+B+C) 68,935.00
D 8,961.55
(D+E) 77,896.55

A.4.4.3.8.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
12,500.00
11,700.00
19,500.00
43,700.00
16,900.00
10,010.00
1,157.00
1,053.00
29,120.00

-
(A+B+C) 72,820.00
D 9,466.60
(D+E) 82,286.60

A.4.4.3.9.

Jumlah Total Harga


( Rp. ) ( Rp. )

- 6.5625 1.01028571
-
-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

A.4.4.3.10.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
12,500.00
11,700.00
19,500.00
43,700.00
16,900.00
10,010.00
1,157.00
1,053.00
29,120.00

-
(A+B+C) 72,820.00
D 9,466.60
(D+E) 82,286.60

An.Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

319,822.60 2.9166666667 2.94583333 1.0100571


12,500.00
11,700.00
1,950.00
345,972.60
32,500.00
19,250.00
2,314.00
2,106.00
56,170.00

-
(A+B+C) 402,142.60
D 52,278.54
(D+E) 454,421.14
TL.6.10.2008.b

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

A.4.4.3.11.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
12,250.00
11,700.00
16,900.00
40,850.00
16,250.00
9,625.00
1,157.00
1,053.00
28,085.00

-
(A+B+C) 68,935.00
D 8,961.55
(D+E) 77,896.55

A.4.4.3.12.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
12,500.00
11,700.00
19,500.00
43,700.00
16,900.00
10,010.00
1,157.00
1,053.00
29,120.00

-
(A+B+C) 72,820.00
D 9,466.60
(D+E) 82,286.60

A.4.4.3.13.

Jumlah Total Harga


( Rp. ) ( Rp. )

119,000.00
12,000.00
11,700.00
19,500.00
162,200.00
15,600.00
9,240.00
1,068.00
972.00
26,880.00

-
(A+B+C) 189,080.00
D 24,580.40
(D+E) 213,660.40

A.4.4.3.14.

Jumlah Total Harga


( Rp. ) ( Rp. )

101,000.00
12,250.00
11,700.00
16,900.00
141,850.00
16,250.00
9,625.00
1,157.00
1,053.00
28,085.00

-
(A+B+C) 169,935.00
D 22,091.55
(D+E) 192,026.55

A.4.4.3.15.

Jumlah Total Harga


( Rp. ) ( Rp. )
83,000.00
12,500.00
11,700.00
19,500.00
126,700.00
16,900.00
10,010.00
1,157.00
1,053.00
29,120.00

-
(A+B+C) 155,820.00
D 20,256.60
(D+E) 176,076.60

A.4.4.3.16.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
2,062.50
1,040.00
3,102.50
5,850.00
6,930.00
801.00
405.00
13,986.00

-
(A+B+C) 17,088.50
D 2,221.51
(D+E) 19,310.01

A.4.4.3.17.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
1,550.00
780.00
2,330.00
5,850.00
6,930.00
801.00
405.00
13,986.00

-
(A+B+C) 16,316.00
D 2,121.08
(D+E) 18,437.08

A.4.4.3.18.
Jumlah Total Harga
( Rp. ) ( Rp. )

-
1,550.00
780.00
2,330.00
5,850.00
6,930.00
801.00
405.00
13,986.00

-
(A+B+C) 16,316.00
D 2,121.08
(D+E) 18,437.08

A.4.4.3.19.

Jumlah Total Harga


( Rp. ) ( Rp. )

10,600.00
1,425.00
780.00
1,950.00
14,755.00
5,850.00
6,930.00
801.00
405.00
13,986.00

-
(A+B+C) 28,741.00
D 3,736.33
(D+E) 32,477.33

A.4.4.3.20.

Jumlah Total Harga


( Rp. ) ( Rp. )

14,120.00
1,425.00
780.00
1,300.00
17,625.00
5,850.00
6,930.00
801.00
405.00
13,986.00

-
(A+B+C) 31,611.00
D 4,109.43
(D+E) 35,720.43

A.4.4.3.21.

Jumlah Total Harga


( Rp. ) ( Rp. )

10,600.00
1,425.00
780.00
1,300.00
14,105.00
5,850.00
6,930.00
801.00
405.00
13,986.00

-
(A+B+C) 28,091.00
D 3,651.83
(D+E) 31,742.83

A.4.4.3.22.

Jumlah Total Harga


( Rp. ) ( Rp. )

21,180.00
1,425.00
780.00
1,300.00
24,685.00
5,850.00
6,930.00
801.00
405.00
13,986.00

-
(A+B+C) 38,671.00
D 5,027.23
(D+E) 43,698.23

A.4.4.3.23.

Jumlah Total Harga


( Rp. ) ( Rp. )

15,900.00
1,425.00
780.00
1,300.00
19,405.00
5,850.00
6,930.00
801.00
405.00
13,986.00

-
(A+B+C) 33,391.00
D 4,340.83
(D+E) 37,731.83

A.4.4.3.24.

Jumlah Total Harga


( Rp. ) ( Rp. )

71,550.00
1,425.00
780.00
1,300.00
75,055.00
5,850.00
6,930.00
801.00
405.00
13,986.00

-
(A+B+C) 89,041.00
D 11,575.33
(D+E) 100,616.33

A.4.4.3.25.

Jumlah Total Harga


( Rp. ) ( Rp. )

74,130.00
1,425.00
780.00
1,300.00
77,635.00
5,850.00
6,930.00
801.00
405.00
13,986.00

-
(A+B+C) 91,621.00
D 11,910.73
(D+E) 103,531.73

A.4.4.3.26.
Jumlah Total Harga
( Rp. ) ( Rp. )

-
1,425.00
780.00
1,300.00
3,505.00
5,850.00
6,930.00
801.00
405.00
13,986.00

-
(A+B+C) 17,491.00
D 2,273.83
(D+E) 19,764.83

A.4.4.3.27.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
1,425.00
780.00
1,300.00
3,505.00
5,850.00
6,930.00
801.00
405.00
13,986.00

-
(A+B+C) 17,491.00
D 2,273.83
(D+E) 19,764.83

A.4.4.3.27.a.

Jumlah Total Harga


( Rp. ) ( Rp. )

17,650.00
1,425.00
780.00
1,300.00
21,155.00
5,850.00
6,930.00
3,115.00
405.00
16,300.00

-
(A+B+C) 37,455.00
D 4,869.15
(D+E) 42,324.15

A.4.4.3.28.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
1,425.00
780.00
1,300.00
3,505.00
5,850.00
6,930.00
801.00
405.00
13,986.00

-
(A+B+C) 17,491.00
D 2,273.83
(D+E) 19,764.83

A.4.4.3.28.a.

Jumlah Total Harga


( Rp. ) ( Rp. )

11,900.00
1,425.00
780.00
1,300.00
15,405.00
5,850.00
6,930.00
3,115.00
405.00
16,300.00

-
(A+B+C) 31,705.00
D 4,121.65
(D+E) 35,826.65

A.4.4.3.29.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
1,425.00
780.00
1,300.00
3,505.00
5,850.00
6,930.00
801.00
405.00
13,986.00

-
(A+B+C) 17,491.00
D 2,273.83
(D+E) 19,764.83

A.4.4.3.30.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
1,425.00
780.00
1,300.00
3,505.00
5,850.00
6,930.00
801.00
405.00
13,986.00

-
(A+B+C) 17,491.00
D 2,273.83
(D+E) 19,764.83

A.4.4.3.31.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
1,300.00
1,300.00
23,400.00
13,860.00
1,602.00
1,458.00
40,320.00

-
(A+B+C) 41,620.00
D 5,410.60
(D+E) 47,030.60

A.4.4.3.32.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
10,237.50
11,700.00
35,750.00
57,687.50
45,500.00
26,950.00
3,115.00
2,835.00
78,400.00

-
(A+B+C) 136,087.50
D 17,691.38
(D+E) 153,778.88

A.4.4.3.33.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
10,237.50
11,700.00
41,600.00
63,537.50
45,500.00
26,950.00
3,115.00
2,835.00
78,400.00

-
(A+B+C) 141,937.50
D 18,451.88
(D+E) 160,389.38

A.4.4.3.34.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -
An.Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

Err:509
10,237.50
11,700.00
1,950.00
Err:509
32,500.00
19,250.00
2,314.00
2,106.00
56,170.00

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

A.4.4.3.35.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

An.Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

58,800.00
12,500.00
11,700.00
1,950.00
84,950.00
32,500.00
19,250.00
2,314.00
2,106.00
56,170.00

-
(A+B+C) 141,120.00
D 18,345.60
(D+E) 159,465.60

A.4.4.3.37.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
12,250.00
11,700.00
56,810.00
80,760.00
68,250.00
40,425.00
4,717.00
4,293.00
117,685.00

-
(A+B+C) 198,445.00
D 25,797.85
(D+E) 224,242.85

A.4.4.3.38.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
17,687.50
10,140.00
26,000.00
53,827.50
45,500.00
26,950.00
3,115.00
2,835.00
78,400.00

-
(A+B+C) 132,227.50
D 17,189.58
(D+E) 149,417.08
A.4.4.3.39b.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

A.4.4.3.40.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
1,425.00
780.00
650.00
2,855.00
5,850.00
6,930.00
3,115.00
405.00
16,300.00

-
(A+B+C) 19,155.00
D 2,490.15
(D+E) 21,645.15

A.4.4.3.41.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
712.50
390.00
169.00
1,271.50
5,850.00
6,930.00
3,115.00
405.00
16,300.00

-
(A+B+C) 17,571.50
D 2,284.30
(D+E) 19,855.80

A.4.4.3.42.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
1,425.00
780.00
1,300.00
3,505.00
48,750.00
57,750.00
6,675.00
3,078.00
116,253.00

-
(A+B+C) 119,758.00
D 15,568.54
(D+E) 135,326.54

A.4.4.3.43.

Jumlah Total Harga


( Rp. ) ( Rp. )

298,000.00
10,237.50
11,700.00
1,742.00
321,679.50
45,500.00
26,950.00
3,115.00
2,835.00
78,400.00

-
(A+B+C) 400,079.50
D 52,010.34
(D+E) 452,089.84

A.4.4.3.44.

Jumlah Total Harga


( Rp. ) ( Rp. )

56,700.00
20,650.00
77,350.00
11,050.00
13,770.00
1,513.00
729.00
27,062.00

-
(A+B+C) 104,412.00
D 13,573.56
(D+E) 117,985.56

A.4.4.3.45.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
20,650.00
20,650.00
7,800.00
9,720.00
1,068.00
486.00
19,074.00

-
(A+B+C) 39,724.00
D 5,164.12
(D+E) 44,888.12

A.4.4.3.46.

Jumlah Total Harga


( Rp. ) ( Rp. )

364,350.00
35,400.00
399,750.00
45,500.00
28,350.00
3,115.00
2,835.00
79,800.00

-
(A+B+C) 479,550.00
D 62,341.50
(D+E) 541,891.50

A.4.4.3.47.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
35,400.00
35,400.00
45,500.00
28,350.00
3,115.00
2,835.00
79,800.00

-
(A+B+C) 115,200.00
D 14,976.00
(D+E) 130,176.00

A.4.4.3.48.
Jumlah Total Harga
( Rp. ) ( Rp. )

Err:509
11,625.00
4,680.00
6,500.00
Err:509
65,000.00
38,500.00
4,450.00
4,050.00
112,000.00

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

A.4.4.3.49.

Jumlah Total Harga


( Rp. ) ( Rp. )

Err:509
11,625.00
4,680.00
35,750.00
Err:509
58,500.00
34,650.00
4,005.00
3,645.00
100,800.00

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

A.4.4.3.50.

Jumlah Total Harga


( Rp. ) ( Rp. )

Err:509
11,625.00
4,680.00
25,220.00
Err:509
58,500.00
34,650.00
4,005.00
3,645.00
100,800.00

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

A.4.4.3.51.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
11,625.00
4,680.00
35,750.00
52,055.00
58,500.00
34,650.00
4,005.00
3,645.00
100,800.00

-
(A+B+C) 152,855.00
D 19,871.15
(D+E) 172,726.15

A.4.4.3.52.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
11,625.00
4,680.00
37,700.00
54,005.00
58,500.00
34,650.00
4,005.00
3,645.00
100,800.00

-
(A+B+C) 154,805.00
D 20,124.65
(D+E) 174,929.65

A.4.4.3.53.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
11,625.00
4,680.00
35,750.00
52,055.00
58,500.00
34,650.00
4,005.00
3,645.00
100,800.00

-
(A+B+C) 152,855.00
D 19,871.15
(D+E) 172,726.15

A.4.4.3.55.

Jumlah Total Harga


( Rp. ) ( Rp. )

3,165,160.00
48,048.00
15,550.00
6,500.00
8,450.00
3,243,708.00
84,500.00
50,050.00
5,785.00
5,265.00
145,600.00

-
(A+B+C) 3,389,308.00
D 440,610.04
(D+E) 3,829,918.04
A.4.4.3.56.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
15,550.00
6,500.00
35,750.00
57,800.00
65,000.00
38,500.00
4,450.00
4,050.00
112,000.00

-
(A+B+C) 169,800.00
D 22,074.00
(D+E) 191,874.00
A.4.4.3.58a.

Jumlah Total Harga


( Rp. ) ( Rp. )

94,600.00
14,687.50
9,100.00
118,387.50
45,500.00
26,950.00
3,115.00
2,835.00
78,400.00

-
(A+B+C) 196,787.50
D 25,582.38
(D+E) 222,369.88

A.4.4.3.59.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
20,650.00
20,650.00
9,750.00
11,550.00
1,335.00
648.00
23,283.00
-
(A+B+C) 43,933.00
D 5,711.29
(D+E) 49,644.29

A.4.4.3.60.

Jumlah Total Harga


( Rp. ) ( Rp. )

237,600.00
14,750.00
252,350.00
22,750.00
13,475.00
1,513.00
162.00
37,900.00

-
(A+B+C) 290,250.00
D 37,732.50
(D+E) 327,982.50

A.4.4.3.61.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
7,800.00
9,240.00
1,068.00
486.00
18,594.00

-
(A+B+C) 18,594.00
D 2,417.22
(D+E) 21,011.22

A.4.4.3.62.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
4,720.00
4,720.00
5,200.00
6,160.00
712.00
324.00
12,396.00

-
(A+B+C) 17,116.00
D 2,225.08
(D+E) 19,341.08

A.4.4.3.63.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
1,200.00
1,200.00
7,800.00
9,720.00
1,068.00
486.00
19,074.00

-
(A+B+C) 20,274.00
D 2,635.62
(D+E) 22,909.62
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
BIDANG KECIPTA KARYAAN
WILAYAH I
TAHUN 2017
PEKERJAAN PERSIAPAN

3 Bongkaran dinding tembok bata merah


m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Tenaga Kerja Pekerja OH 6.667 65,000.00
Mandor OH 0.333 81,000.00

B Peralatan

C Jumlah harga tenaga, bahan dan peralatan


D Overhead & profit 10% + 3% x
E Jumlah harga per-satuan pekerjaan
4 Bongkaran beton bertulang
m3
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Tenaga Kerja Pekerja OH 13.334 65,000.00
Mandor OH 0.666 81,000.00

B Peralatan

C Jumlah harga tenaga, bahan dan peralatan


D Overhead & profit 10% + 3% x
E Jumlah harga per-satuan pekerjaan

PEKERJAAN PENUTUP ATAP

2 Pasang genteng Kodok Kebumen


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Genteng kodok Buah 25.000 3,100.00

B Tenaga Kerja Pekerja OH 0.150 65,000.00


Tukang Batu OH 0.075 77,000.00
Kepala Tukang OH 0.008 89,000.00
Mandor OH 0.008 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

5 Pasang genteng bubung Kodok Kebumen


m'

Harga Satuan
Kebutuhan Satuan Indeks
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Genteng bubung Buah 5.000 -
Semen portland Kg 8.000 1,250.00
Pasir pasang m3 0.032 260,000.00

B Tenaga Kerja Pekerja OH 0.400 65,000.00


Tukang Batu OH 0.200 77,000.00
Kepala Tukang OH 0.020 89,000.00
Mandor OH 0.002 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

7 Pasang atap asbes gelombang (2,00x0,92 m') x 5 mm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Asbes gelombang lbr 0.600 114,000.00
Paku sekrup kg 0.120 21,000.00

B Tenaga Kerja Pekerja OH 0.140 65,000.00


Tukang kayu OH 0.070 81,000.00
Kep.Tukang OH 0.007 89,000.00
Mandor OH 0.007 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

8 Pasang atap asbes gelombang ( 3,00 x 1,08 m' ) x 6 mm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah

A Bahan Asbes gelombang lbr 0.370 -


Paku sekrup kg 0.120

B Tenaga Kerja Pekerja OH 0.140


Tukang kayu OH 0.070
Kep.Tukang OH 0.007
Mandor OH 0.007

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

10 Pasang bubung stel gelombang 0,92 m


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Bubung stel gelombang lbr 2.400 31,000.00
Paku sekrup 3,5" biji 6.000 200.00

B Tenaga Kerja Pekerja OH 0.084 65,000.00


Tukang Kayu OH 0.125 81,000.00
Kepala Tukang OH 0.013 89,000.00
Mandor OH 0.004 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
12 Pasang bubung stel gelombang 1,08 m'
m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Bubung asbes lbr 2.050
Paku sekrup 3,5" biji 6.000

B Tenaga Kerja Pekerja OH 0.084


Tukang Kayu OH 0.125
Kepala Tukang OH 0.013
Mandor OH 0.004

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

13 Pasang atap sirap


m2

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Genteng sirap Buah 60.00
Paku biasa kg 0.200
B Tenaga Kerja Pekerja OH 0.150
Tukang Kayu OH 0.075
Kepala Tukang OH 0.008
Mandor OH 0.008

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

14 Pasang genteng bubung sirap


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Seng plat bjls 28 lbr 5.000
Paku biasa 1/2" - 1" Kg 8.000
Paku biasa 2" - 5" kg 0.032
Kayu papan tb. 3 cm m3 0.032

B Tenaga Kerja Pekerja OH 0.400


Tukang Kayu OH 0.200
Kepala Tukang OH 0.020
Mandor OH 0.002

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

15 Pasang atap seng gelombang


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Seng gelombang bjls 28 lbr 0.700 81,000.00
Paku biasa 1/2" - 1" kg 0.020 16,000.00

B Tenaga Kerja Pekerja OH 0.120 65,000.00


Tukang kayu OH 0.060 81,000.00
Kep.Tukang OH 0.006 89,000.00
Mandor OH 0.006 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

16 Pasang atap nok seng


m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Seng bjls 28 lbr 0.300 71,000.00
Paku biasa 1/2" - 1" kg 0.040 16,000.00
B Tenaga Kerja Pekerja OH 0.150 65,000.00
Tukang Kayu OH 0.070 81,000.00
Kepala Tukang OH 0.007 89,000.00
Mandor OH 0.006 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
PEKERJAAN SANITASI
2 Memasang kloset jongklok porselin
bh
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kloset jongkok unit 1.000 108,000.00
PC kg 6.000 1,250.00
Pasir pasang m3 0.010 260,000.00

B Tenaga Kerja Pekerja OH 1.000 65,000.00


Tukang batu OH 1.500 77,000.00
Kepala tukang OH 0.150 89,000.00
Mandor OH 0.160 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

3 Memasang urinoir
bh
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Urinoir bh 1.000 1,900,000.00
Perlengkapan 1.000 570,000.00
( 30% harga kloset )
PC kg 6.000 1,250.00
Pasir pasang m3 0.010 260,000.00

B Tenaga Kerja Pekerja OH 1.000 65,000.00


Tukang batu OH 1.000 77,000.00
Kepala tukang OH 0.100 89,000.00
Mandor OH 0.050 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
5 Memasang bathcuip porselin
bh

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Bathcuip unit 1.000 -
Perlengkapan ls 1.000 -
( 20% harga bathcuip )

B Tenaga Kerja Pekerja OH 0.075 65,000.00


Tukang batu OH 0.750 77,000.00
Kep.Tukang OH 0.075 89,000.00
Mandor OH 0.003 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

6 Memasang bak fiberglass, vol. 0,5 m3 air


bh

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Bak fiberglass bh 1.000 651,000.00
Perlengkapan m3 1.000 78,120.00
( 12% harga badkip )

B Tenaga Kerja Pekerja OH 0.150 65,000.00


Tukang batu OH 0.075 77,000.00
Kep.Tukang OH 0.750 89,000.00
Mandor OH 0.250 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

6 Memasang bak fiberglass, vol. 1,0 m3 air


bh
Harga Satuan
Kebutuhan Satuan Indeks
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Bak fiberglass bh 1.000 1,085,000.00
Perlengkapan ls 1.000 130,200.00
( 12% harga badkip )

B Tenaga Kerja Pekerja OH 3.000 65,000.00


Tukang batu OH 4.500 77,000.00
Kepala tukang OH 0.050 89,000.00
Mandor OH 0.900 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

6 Memasang floor drain


bh
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Floor drain unit 1.000 76,000.00

B Tenaga Kerja Pekerja OH 0.010 65,000.00


Tukang batu OH 0.100 77,000.00
Kepala tukang OH 0.010 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

7 Memasang bak kontrol pas. Batu bata ( 45 x 45 x 50 cm)


bh

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu bata buah 70.000 800.00
PC kg 77.000 1,250.00
Pasir pasang m3 0.130 260,000.00
Batu kerikil m3 0.020 220,000.00
Besi beton kg 2.600 11,500.00
Pasir beton m3 0.090 260,000.00
Baja tulangan kg 2.600

B Tenaga Kerja Pekerja OH 3.200 65,000.00


Tukang batu OH 1.150 77,000.00
Kep.Tukang OH 0.011 89,000.00
Mandor OH 0.016 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
8 Memasang bak kontrol pas. Batu bata ( 60 x 60 x 65 cm)
bh

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Batu bata buah 123.000 800.00
PC kg 114.000 1,250.00
Pasir pasang m3 0.184 260,000.00
Batu kerikil m3 0.033 220,000.00
Baja tulangan kg 4.850 11,500.00
Pasir beton m3 0.090 260,000.00

B Tenaga Kerja Pekerja OH 3.200 65,000.00


Tukang batu OH 1.150 77,000.00
Kepala tukang OH 0.011 89,000.00
Mandor OH 0.016 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
11 Memasang pipa galvanis diameter 3/4"
m'
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pipa galvanis 3/4" m 1.200 11,666.67
Perlengkapan bh 1.000 4,083.33
( 35% harga pipa PVC )

B Tenaga Kerja Pekerja OH 0.054 65,000.00


Tukang batu OH 0.090 77,000.00
Kep.Tukang OH 0.009 89,000.00
Mandor OH 0.0270 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

12 Memasang pipa galvanis diameter 1,5"


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pipa galvanis 1,5" m 1.200 22,500.00
Perlengkapan bh 1.000 7,875.00
( 35% harga pipa PVC )

B Tenaga Kerja Pekerja OH 0.108 65,000.00


Tukang batu OH 0.180 77,000.00
Kep.Tukang OH 0.018 89,000.00
Mandor OH 0.0050 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

13 Memasang pipa PVC tipe AW diameter 1/2"


m'

Harga Satuan
Kebutuhan Satuan Indeks
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pipa PVC 1/2" m 1.200 5,750.00
Perlengkapan bh 1.000 2,012.50
( 35% harga pipa PVC )
B Tenaga Kerja Pekerja OH 0.036 65,000.00
Tukang batu OH 0.060 77,000.00
Kep.Tukang OH 0.006 89,000.00
Mandor OH 0.0020 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

15 Memasang pipa PVC tipe AW diameter 1"


m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pipa PVC 1" m 1.200 8,500.00
Perlengkapan bh 1.000 2,975.00
( 35% harga pipa PVC )
B Tenaga Kerja Pekerja OH 0.036 65,000.00
Tukang batu OH 0.060 77,000.00
Kep.Tukang OH 0.006 89,000.00
Mandor OH 0.0020 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
16 Memasang pipa PVC tipe AW diameter 1 1/2"
m'

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pipa PVC 1 1/2" m 1.200 18,000.00
Perlengkapan bh 1.000 6,300.00
( 35% harga pipa PVC )
B Tenaga Kerja Pekerja OH 0.054 65,000.00
Tukang batu OH 0.090 77,000.00
Kep.Tukang OH 0.009 89,000.00
Mandor OH 0.0030 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
23 Pasang stop kran bahan kuningan ukuran 3/4 "
bh
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Stop kran kuningan bh 1.000 81,000.00
Seal tape bh 2.000 5,000.00

B Tenaga Kerja Pekerja OH 0.050 65,000.00


Tukang pipa OH 0.150 81,000.00
Mandor OH 0.010 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
24 Pasang Shower
bh
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Shower bh 1.000 271,000.00
Seal tape bh 1.000 5,000.00

B Tenaga Kerja Pekerja OH 0.025 65,000.00


Tukang pipa OH 0.100 81,000.00
Kepala tukang OH 0.100 89,000.00
Mandor OH 0.010 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

25 Memasang bak cuci piring stainlessteel


bh
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Bak cuci stainles steel unit 1.000 434,000.00
Water drain + asesories buah 1.000 151,900.00

B Tenaga Kerja Pekerja OH 0.030 65,000.00


Tukang batu OH 0.300 77,000.00
Kep.Tukang OH 0.030 89,000.00
Mandor OH 0.015 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
PEKERJAAN KUNCI DAN KACA

1 Memasang kunci tanam biasa


bh

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kunci tanam biasa bh 1.000 -

B Tenaga Kerja Pekerja OH 0.010 65,000.00


Tukang kayu OH 0.500 81,000.00
Kep.Tukang OH 0.010 89,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
2 Memasang engsel pintu, sedang
bh

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Engsel pintu bh 1.000 13,000.00

B Tenaga Kerja Pekerja OH 0.015 65,000.00


Tukang kayu OH 0.150 81,000.00
Kep.Tukang OH 0.015 89,000.00
Mandor OH 0.00075 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

2 Memasang engsel pintu, super


bh

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Engsel pintu bh 1.000 16,000.00

B Tenaga Kerja Pekerja OH 0.015 65,000.00


Tukang kayu OH 0.150 81,000.00
Kep.Tukang OH 0.015 89,000.00
Mandor OH 0.00075 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
4 Memasang hak angin, sedang
bh

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Hak angin bh 1.000 9,300.00

B Tenaga Kerja Pekerja OH 0.015 65,000.00


Tukang kayu OH 0.150 81,000.00
Kep.Tukang OH 0.015 89,000.00
Mandor OH 0.00075 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

4 Memasang hak angin, super


bh

Harga Satuan
Kebutuhan Satuan Indeks
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Hak angin bh 1.000 14,700.00

B Tenaga Kerja Pekerja OH 0.015 65,000.00


Tukang kayu OH 0.150 81,000.00
Kep.Tukang OH 0.015 89,000.00
Mandor OH 0.00075 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

6 Memasang pegangan pintu / door holder


bh

Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pegangan pintu/door holder bh 1.000 -

B Tenaga Kerja Pekerja OH 0.020 65,000.00


Tukang kayu OH 0.200 81,000.00
Kep.Tukang OH 0.020 89,000.00
Mandor OH 0.001 81,000.00
C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

2 Memasang grendel, sedang


bh
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Grendel bh 1.000 8,700.00

B Tenaga Kerja Tukang kayu OH 0.100 81,000.00


Mandor OH 0.010 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

2 Memasang grendel, super


bh
Harga Satuan
Kebutuhan Satuan Indeks
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Grendel bh 1.000 10,800.00

B Tenaga Kerja Tukang kayu OH 0.100 81,000.00


Mandor OH 0.010 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

7 Pasang kaca tebal 3 mm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kaca 3 mm m2 1.100 86,000.00
Sealent kg 0.050 67,000.00

B Tenaga Kerja Pekerja OH 0.015 65,000.00


Tukang kayu OH 0.150 81,000.00
Kep.Tukang OH 0.015 89,000.00
Mandor OH 0.0008 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

8 Pasang kaca rayban tebal 5 mm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kaca rayband 5 mm m2 1.100 97,000.00
Sealent kg 0.050 -

B Tenaga Kerja Pekerja OH 0.015 65,000.00


Tukang kayu OH 0.150 81,000.00
Kep.Tukang OH 0.015 89,000.00
Mandor OH 0.0008 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

8 Pasang kaca es tebal 5 mm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kaca es 5 mm m2 1.100 108,000.00
Sealent kg 0.050 -

B Tenaga Kerja Pekerja OH 0.015 65,000.00


Tukang kayu OH 0.150 81,000.00
Kep.Tukang OH 0.015 89,000.00
Mandor OH 0.0008 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

9 Pasang kaca tebal 8 mm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Kaca 8 mm m2 1.100 260,000.00
Sealent kg 0.070 30,000.00

B Tenaga Kerja Pekerja OH 0.017 65,000.00


Tukang kayu OH 0.170 81,000.00
Kep.Tukang OH 0.017 89,000.00
Mandor OH 0.0009 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
PEKERJAAN PENGECATAN
3 Pelaburan bidang kayu dengan politur
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Politur ltr 0.150 76,000.00
Politur jadi ltr 0.372 86,000.00
Amplas lbr 2.000 Err:509

B Tenaga Kerja Pekerja OH 0.040 65,000.00


Tukang cat OH 0.060 89,000.00
Kep.Tukang OH 0.016 89,000.00
Mandor OH 0.003 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

4 Pelaburan bidang kayu dengan cat residu dan ter


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Residu / Ter ltr 0.350 4,400.00

B Tenaga Kerja Pekerja OH 0.010 65,000.00


Tukang cat OH - 77,000.00
Kep.Tukang OH - 89,000.00
Mandor OH 0.006 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

5 Pelaburan bidang kayu dengan vernis


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Vernis ltr 0.150 162,000.00
Dempul kg 0.050 21,000.00
Ampelas lbr 0.100 Err:509

B Tenaga Kerja Pekerja OH 0.160 65,000.00


Tukang cat OH 0.1600 77,000.00
Kep.Tukang OH 0.0160 89,000.00
Mandor OH 0.0030 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
RJAAN

A.2.2.1.14.

Jumlah Total Harga


( Rp. ) ( Rp. )

433,355.00
26,973.00
460,328.00

-
(A+B) 460,328.00
C 59,842.64
(C+D) 520,170.64
A.2.2.1.13.

Jumlah Total Harga


( Rp. ) ( Rp. )

866,710.00
53,946.00
920,656.00

-
(A+B) 920,656.00
C 119,685.28
(C+D) 1,040,341.28

At.8.6.2.2002

Jumlah Total Harga


( Rp. ) ( Rp. )

77,500.00
77,500.00
9,750.00
5,775.00
712.00
648.00
16,885.00

-
(A+B+C) 94,385.00
D 12,270.05
(D+E) 106,655.05

At.8.6.5.2002

Jumlah Total Harga


( Rp. ) ( Rp. )

-
10,000.00
8,320.00
18,320.00
26,000.00
15,400.00
1,780.00
162.00
43,342.00

-
(A+B+C) 61,662.00
D 8,016.06
(D+E) 69,678.06

A.4.5.2.10.

Jumlah Total Harga


( Rp. ) ( Rp. )

68,400.00
2,520.00
70,920.00
9,100.00
5,670.00
623.00
567.00
15,960.00

-
(A+B+C) 86,880.00
D 11,294.40
(D+E) 98,174.40

A.4.5.2.17.
Jumlah Total Harga
( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

A.4.5.2.22.

Jumlah Total Harga


( Rp. ) ( Rp. )

74,400.00
1,200.00
75,600.00
5,460.00
10,125.00
1,157.00
324.00
17,066.00

-
(A+B+C) 92,666.00
D 12,046.58
(D+E) 104,712.58
A.4.5.2.24.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

At.8.6.33.2002

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

At.8.6.37.2002

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
-
-
-
-
-
-
-
-

-
(A+B+C) -
D -
(D+E) -

A.4.5.2.39.

Jumlah Total Harga


( Rp. ) ( Rp. )

56,700.00
320.00
57,020.00
7,800.00
4,860.00
534.00
486.00
13,680.00

-
(A+B+C) 70,700.00
D 9,191.00
(D+E) 79,891.00

A.4.5.2.40.

Jumlah Total Harga


( Rp. ) ( Rp. )

21,300.00
640.00
21,940.00
9,750.00
5,670.00
623.00
486.00
16,529.00

-
(A+B+C) 38,469.00
D 5,000.97
(D+E) 43,469.97
A.5.1.1.2.

Jumlah Total Harga


( Rp. ) ( Rp. )

108,000.00
7,500.00
2,600.00
118,100.00
65,000.00
115,500.00
13,350.00
12,960.00
206,810.00

-
(A+B+C) 324,910.00
D 42,238.30
(D+E) 367,148.30

A.5.1.1.4.

Jumlah Total Harga


( Rp. ) ( Rp. )

1,900,000.00
570,000.00

7,500.00
2,600.00
2,480,100.00
65,000.00
77,000.00
8,900.00
4,050.00
154,950.00

-
(A+B+C) 2,635,050.00
D 342,556.50
(D+E) 2,977,606.50
A.5.1.1.6.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-

-
4,875.00
57,750.00
6,675.00
243.00
69,543.00

-
(A+B+C) 69,543.00
D 9,040.59
(D+E) 78,583.59

Sn.11.6.11.2002

Jumlah Total Harga


( Rp. ) ( Rp. )

651,000.00
78,120.00

729,120.00
9,750.00
5,775.00
66,750.00
20,250.00
102,525.00

-
(A+B+C) 831,645.00
D 108,113.85
(D+E) 939,758.85

A.5.1.1.7.

Jumlah Total Harga


( Rp. ) ( Rp. )

1,085,000.00
130,200.00

1,215,200.00
195,000.00
346,500.00
4,450.00
72,900.00
618,850.00

-
(A+B+C) 1,834,050.00
D 238,426.50
(D+E) 2,072,476.50

A.5.1.1.14.

Jumlah Total Harga


( Rp. ) ( Rp. )

76,000.00
76,000.00
650.00
7,700.00
890.00
405.00
9,645.00

-
(A+B+C) 85,645.00
D 11,133.85
(D+E) 96,778.85

A.5.1.1.16.

Jumlah Total Harga


( Rp. ) ( Rp. )

56,000.00
96,250.00
33,800.00
4,400.00
29,900.00
23,400.00
-
243,750.00
208,000.00
88,550.00
979.00
1,296.00
298,825.00

-
(A+B+C) 542,575.00
D 70,534.75
(D+E) 613,109.75
A.5.1.1.17.

Jumlah Total Harga


( Rp. ) ( Rp. )

98,400.00
142,500.00
47,840.00
7,260.00
55,775.00
23,400.00
375,175.00
208,000.00
88,550.00
979.00
1,296.00
298,825.00

-
(A+B+C) 674,000.00
D 87,620.00
(D+E) 761,620.00
A.5.1.1.20.

Jumlah Total Harga


( Rp. ) ( Rp. )

14,000.00
4,083.33

18,083.33
3,510.00
6,930.00
801.00
2,187.00
13,428.00

-
(A+B+C) 31,511.33
D 4,096.47
(D+E) 35,607.80

A.5.1.1.22.

Jumlah Total Harga


( Rp. ) ( Rp. )

27,000.00
7,875.00

34,875.00
7,020.00
13,860.00
1,602.00
405.00
22,887.00

-
(A+B+C) 57,762.00
D 7,509.06
(D+E) 65,271.06

A.5.1.1.25.

Jumlah Total Harga


( Rp. ) ( Rp. )

6,900.00
2,012.50
8,912.50
2,340.00
4,620.00
534.00
162.00
7,656.00

-
(A+B+C) 16,568.50
D 2,153.91
(D+E) 18,722.41

A.5.1.1.27.

Jumlah Total Harga


( Rp. ) ( Rp. )

10,200.00
2,975.00
13,175.00
2,340.00
4,620.00
534.00
162.00
7,656.00

-
(A+B+C) 20,831.00
D 2,708.03
(D+E) 23,539.03
A.5.1.1.28.

Jumlah Total Harga


( Rp. ) ( Rp. )

21,600.00
6,300.00
27,900.00
3,510.00
6,930.00
801.00
243.00
11,484.00

-
(A+B+C) 39,384.00
D 5,119.92
(D+E) 44,503.92
An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

81,000.00
10,000.00
91,000.00
3,250.00
12,150.00
810.00
16,210.00

-
(A+B+C) 107,210.00
D 13,937.30
(D+E) 121,147.30
An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

271,000.00
5,000.00
276,000.00
1,625.00
8,100.00
8,900.00
810.00
19,435.00

-
(A+B+C) 295,435.00
D 38,406.55
(D+E) 333,841.55

A.5.1.1.12.

Jumlah Total Harga


( Rp. ) ( Rp. )

434,000.00
151,900.00
585,900.00
1,950.00
23,100.00
2,670.00
1,215.00
28,935.00

-
(A+B+C) 614,835.00
D 79,928.55
(D+E) 694,763.55
A.4.6.2.2.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
650.00
40,500.00
890.00
405.00
42,445.00

-
(A+B+C) 42,445.00
D 5,517.85
(D+E) 47,962.85
Kc.12.6.5.2002.a

Jumlah Total Harga


( Rp. ) ( Rp. )

13,000.00
13,000.00
975.00
12,150.00
1,335.00
60.75
14,520.75

-
(A+B+C) 27,520.75
D 3,577.70
(D+E) 31,098.45

Kc.12.6.5.2002.b

Jumlah Total Harga


( Rp. ) ( Rp. )

16,000.00
16,000.00
975.00
12,150.00
1,335.00
60.75
14,520.75

-
(A+B+C) 30,520.75
D 3,967.70
(D+E) 34,488.45
Kc.12.6.9.2002.a

Jumlah Total Harga


( Rp. ) ( Rp. )

9,300.00
9,300.00
975.00
12,150.00
1,335.00
60.75
14,520.75

-
(A+B+C) 23,820.75
D 3,096.70
(D+E) 26,917.45

Kc.12.6.9.2002.b

Jumlah Total Harga


( Rp. ) ( Rp. )

14,700.00
14,700.00
975.00
12,150.00
1,335.00
60.75
14,520.75

-
(A+B+C) 29,220.75
D 3,798.70
(D+E) 33,019.45

A.4.6.2.12.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
-
1,300.00
16,200.00
1,780.00
81.00
19,361.00
-
(A+B+C) 19,361.00
D 2,516.93
(D+E) 21,877.93

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

8,700.00
8,700.00
8,100.00
810.00
8,910.00

-
(A+B+C) 17,610.00
D 2,289.30
(D+E) 19,899.30

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

10,800.00
10,800.00
8,100.00
810.00
8,910.00

-
(A+B+C) 19,710.00
D 2,562.30
(D+E) 22,272.30

A.4.6.2.16.

Jumlah Total Harga


( Rp. ) ( Rp. )

94,600.00
3,350.00
97,950.00
975.00
12,150.00
1,335.00
64.80
14,524.80

-
(A+B+C) 112,474.80
D 14,621.72
(D+E) 127,096.52

A.4.6.2.17a.

Jumlah Total Harga


( Rp. ) ( Rp. )

106,700.00
-
106,700.00
975.00
12,150.00
1,335.00
64.80
14,524.80

-
(A+B+C) 121,224.80
D 15,759.22
(D+E) 136,984.02

A.4.6.2.17b.

Jumlah Total Harga


( Rp. ) ( Rp. )

118,800.00
-
118,800.00
975.00
12,150.00
1,335.00
64.80
14,524.80

-
(A+B+C) 133,324.80
D 17,332.22
(D+E) 150,657.02

A.4.6.2.18.

Jumlah Total Harga


( Rp. ) ( Rp. )

286,000.00
2,100.00
288,100.00
1,105.00
13,770.00
1,513.00
72.90
16,460.90

-
(A+B+C) 304,560.90
D 39,592.92
(D+E) 344,153.82
A.4.7.1.7.

Jumlah Total Harga


( Rp. ) ( Rp. )

11,400.00
31,992.00
Err:509
Err:509
2,600.00
5,340.00
1,424.00
243.00
9,607.00

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

A.4.7.1.8.

Jumlah Total Harga


( Rp. ) ( Rp. )

1,540.00
1,540.00
650.00
-
-
486.00
1,136.00

-
(A+B+C) 2,676.00
D 347.88
(D+E) 3,023.88

A.4.7.1.9.

Jumlah Total Harga


( Rp. ) ( Rp. )

24,300.00
1,050.00
Err:509

Err:509
10,400.00
12,320.00
1,424.00
243.00
24,387.00

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
BIDANG KECIPTA KARYAAN
WILAYAH I
TAHUN 2017

PEKERJAAN KELISTRIKAN

2 Memasang lampu SL 20 watt


bh
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Lampu SL 20 watt bh 1.000 40,000.00

B Tenaga Kerja Pekerja OH 0.100 65,000.00


Mandor OH 0.0100 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
7 Memasang lampu downlight ukuran 4"
bh
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Downligh 4" bh 1.000 32,000.00

B Tenaga Kerja Err:509 OH 0.100 Err:509


Mandor OH 0.010 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

8 Pasang MCB
bh
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan MCB bh 1.000 135,000.00

B Tenaga Kerja Pekerja OH 0.080 65,000.00


Err:509 OH 0.250 Err:509
Mandor OH 0.050 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
PEKERJAAN LAIN-LAIN

2 Memasang pintu PVC


set
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pintu PVC bh 1.000 244,000.00

B Tenaga Kerja Pekerja OH 0.010 65,000.00


Tukang batu OH 0.100 77,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

2 Memasang pintu PVC


set
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Pintu PVC bh 1.000 244,000.00

B Tenaga Kerja Pekerja OH 0.010 65,000.00


Tukang batu OH 0.100 77,000.00
Mandor OH 0.005 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

4 Memasang paving
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Paving m2 1.010 76,000.00
Pasir Pasang m3 0.050 260,000.00

B Tenaga Kerja Pekerja OH 0.125 65,000.00


Tukang batu OH 0.250 77,000.00
Kep.Tukang OH 0.025 89,000.00
Mandor OH 0.001 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

4 Memasang paving block natural tebal 6 cm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Paving tebal 6 cm m2 1.010 76,000.00
Pasir Pasang m3 0.050 260,000.00

B Tenaga Kerja Pekerja OH 0.250 65,000.00


Tukang batu OH 0.500 77,000.00
Kep.Tukang OH 0.050 89,000.00
Mandor OH 0.001 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

4 Memasang paving block berwarna tebal 6 cm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Paving tebal 6 cm m2 1.010
Pasir Beton m3 0.050 260,000.00

B Tenaga Kerja Pekerja OH 0.250 65,000.00


Tukang batu OH 0.500 77,000.00
Kep.Tukang OH 0.050 89,000.00
Mandor OH 0.001 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

3 Memasang paving block natural tebal 8 cm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Paving tebal 8 cm m2 1.010 86,000.00
Pasir Beton m3 2.070 260,000.00
B Tenaga Kerja Pekerja OH 0.500 65,000.00
Tukang batu OH 0.500 77,000.00
Kep.Tukang OH 0.050 89,000.00
Mandor OH 0.001 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

3 Memasang paving block berwarna tebal 8 cm


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Paving tebal 8 cm m2 1.010
Pasir Beton m3 2.070 260,000.00

B Tenaga Kerja Pekerja OH 0.500 65,000.00


Tukang batu OH 0.500 77,000.00
Kep.Tukang OH 0.050 89,000.00
Mandor OH 0.001 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
3 Memasang paving tb. 8 cm, K.250, polos
m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Paving tebal 8 cm m2 1.000 119,000.00
Pasir Pasang m3 0.080 260,000.00

B Tenaga Kerja Pekerja OH 0.150 65,000.00


Tukang batu OH 0.200 77,000.00
Kep.Tukang OH 0.020 89,000.00
Mandor OH 0.010 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

3 Memasang paving tb. 8 cm, K.250, warna


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Paving tebal 8 cm m2 1.000 124,000.00
Pasir Pasang m3 0.080 260,000.00

B Tenaga Kerja Pekerja OH 0.150 65,000.00


Tukang batu OH 0.200 77,000.00
Kep.Tukang OH 0.020 89,000.00
Mandor OH 0.010 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

3 Memasang paving tb. 8 cm, K.175, polos


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Paving tebal 8 cm m2 1.000 92,000.00
Pasir Pasang m3 0.080 260,000.00

B Tenaga Kerja Pekerja OH 0.150 65,000.00


Tukang batu OH 0.200 77,000.00
Kep.Tukang OH 0.020 89,000.00
Mandor OH 0.010 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan

3 Memasang paving tb. 8 cm, K.175, warna


m2
Harga Satuan
No Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
A Bahan Paving tebal 8 cm m2 1.000 97,000.00
Pasir Pasang m3 0.080 260,000.00

B Tenaga Kerja Pekerja OH 0.150 65,000.00


Tukang batu OH 0.200 77,000.00
Kep.Tukang OH 0.020 89,000.00
Mandor OH 0.010 81,000.00

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3% x
F Jumlah harga per satuan pekerjaan
RJAAN

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

40,000.00
40,000.00
6,500.00
810.00
7,310.00

-
(A+B+C) 47,310.00
D 6,150.30
(D+E) 53,460.30
An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

32,000.00
32,000.00
Err:509
810.00
Err:509

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

135,000.00
135,000.00
5,200.00
Err:509
4,050.00
Err:509

-
(A+B+C) Err:509
D Err:509
(D+E) Err:509
An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

244,000.00
244,000.00
650.00
7,700.00
405.00
8,755.00

-
(A+B+C) 252,755.00
D 32,858.15
(D+E) 285,613.15

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

244,000.00
244,000.00
650.00
7,700.00
405.00
8,755.00

-
(A+B+C) 252,755.00
D 32,858.15
(D+E) 285,613.15

An.Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

76,760.00 harga menyesuaikan


13,000.00
89,760.00
8,125.00
19,250.00
2,225.00
52.65
29,652.65

-
(A+B+C) 119,412.65
D 15,523.64
(D+E) 134,936.29

A.4.4.3.64.

Jumlah Total Harga


( Rp. ) ( Rp. )

76,760.00
13,000.00
89,760.00
16,250.00
38,500.00
4,450.00
105.30
59,305.30

-
(A+B+C) 149,065.30
D 19,378.49
(D+E) 168,443.79

A.4.4.3.66.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
13,000.00
13,000.00
16,250.00
38,500.00
4,450.00
105.30
59,305.30

-
(A+B+C) 72,305.30
D 9,399.69
(D+E) 81,704.99

A.4.4.3.65.

Jumlah Total Harga


( Rp. ) ( Rp. )

86,860.00
538,200.00
625,060.00
32,500.00
38,500.00
4,450.00
105.30
75,555.30

-
(A+B+C) 700,615.30
D 91,079.99
(D+E) 791,695.29

A.4.4.3.67.

Jumlah Total Harga


( Rp. ) ( Rp. )

-
538,200.00
538,200.00
32,500.00
38,500.00
4,450.00
105.30
75,555.30

-
(A+B+C) 613,755.30
D 79,788.19
(D+E) 693,543.49
An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

119,000.00
20,800.00
139,800.00
9,750.00
15,400.00
1,780.00
810.00
27,740.00

-
(A+B+C) 167,540.00
D 21,780.20
(D+E) 189,320.20

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

124,000.00
20,800.00
144,800.00
9,750.00
15,400.00
1,780.00
810.00
27,740.00

-
(A+B+C) 172,540.00
D 22,430.20
(D+E) 194,970.20

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

92,000.00
20,800.00
112,800.00
9,750.00
15,400.00
1,780.00
810.00
27,740.00

-
(A+B+C) 140,540.00
D 18,270.20
(D+E) 158,810.20

An. Dihitung

Jumlah Total Harga


( Rp. ) ( Rp. )

97,000.00
20,800.00
117,800.00
9,750.00
15,400.00
1,780.00
810.00
27,740.00

-
(A+B+C) 145,540.00
D 18,920.20
(D+E) 164,460.20
1 1 M2 memasang usuk holo 4/4 cm dan reng 2/4 cm

Harga Satuan
Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
Bahan Holo 4/4 tebal 1,2 mm m 4.000 12,500.00
Holo 2/4 tebal 1,2 mm m 5.000 9,166.67
Kawat las ls 1.000 12,500.00
Tenaga Kerja Pekerja OH 0.150 28,000.00
Tukang besi OH 0.300 36,500.00
Kepala Tukang OH 0.030 42,500.00
Mandor OH 0.008 37,500.00
Jumlah harga per satuan pekerjaan

2 1 M2 memasang atap sirap asbes

Harga Satuan
Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
Bahan Sirap Asbes m2 1.000 50,000.00
Tenaga Kerja Pekerja OH 0.200 28,000.00
Tukang kayu OH 0.100 36,500.00
Kepala Tukang OH 0.010 42,500.00
Mandor OH 0.010 37,500.00
Jumlah harga per satuan pekerjaan

3 1 M2 memasang kerpus sirap asbes

Harga Satuan
Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
Bahan Kerpus Sirap Asbes m2 1.100 25,000.00
Tenaga Kerja Pekerja OH 0.200 28,000.00
Tukang kayu OH 0.100 36,500.00
Kepala Tukang OH 0.010 42,500.00
Mandor OH 0.010 37,500.00
Jumlah harga per satuan pekerjaan

4 Memasang 1 m' lisplank ukuran ( 2.5 x 25 ) cm, kayu kelas I atau II ( SNI 2007 )

Harga Satuan
Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
Bahan Papan kayu bangkirai m3 0.011 8,200,000.00
Paku 5 dan 7 cm kg 0.100 14,000.00
Tenaga Kerja Pekerja OH 0.100 28,000.00
Tukang Kayu OH 0.200 36,500.00
Kepala Tukang OH 0.020 42,500.00
Mandor OH 0.005 37,500.00
Jumlah harga per satuan pekerjaan

5 1 M' memasang gording pipa hitam Diametrer 1,5 "

Harga Satuan
Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
Bahan Pipa hitam D 1.5 " m 1.100 Err:509
Tenaga Kerja Pekerja OH 0.150 28,000.00
Tukang besi OH 0.300 36,500.00
Kepala Tukang OH 0.030 42,500.00
Mandor OH 0.008 37,500.00
Jumlah harga per satuan pekerjaan

3 1 M2 pasang atap onduline

Harga Satuan
Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
Bahan Atap Onduline M2 1.000
Sekrup Bh 19.000
Tenaga Kerja Pekerja OH 0.150
Tukang Kayu OH 0.075
Kepala Tukang OH 0.008
Mandor OH 0.008
Jumlah harga per satuan pekerjaan

4 1 M' pasang kerpus onduline

Harga Satuan
Kebutuhan Satuan Indeks Bahan / Upah
( Rp. )
Bahan Kerpus Onduline M 1.000
Sekrup BH 9.000
Tenaga Kerja Pekerja OH 0.400
Tukang Kayu OH 0.200
Kepala Tukang OH 0.020
Mandor OH 0.002
Jumlah harga per satuan pekerjaan
Jumlah
( Rp. )

50,000.000
45,833.333
12,500.000
4,200.000
10,950.000
1,275.000
300.000
125,058.333

Jumlah
( Rp. )

50,000.000
5,600.000
3,650.000
425.000
375.000
60,050.000

Jumlah
( Rp. )

27,500.000
5,600.000
3,650.000
425.000
375.000
37,550.000

Jumlah
( Rp. )

88,560.00
1,400.00
2,800.00
7,300.00
850.00
187.50
101,097.50

Jumlah
( Rp. )

Err:509
4,200.000
10,950.000
1,275.000
300.000
Err:509

Jumlah
( Rp. )

Jumlah
( Rp. )

-
RENCANA ANGGARAN BIAYA (

PROGRAM : PENGUATAN SARANA DAN PRASARANA KELEMBAG


KEGIATAN : PEMBANGUNAN GEDUNG DAN GUDANG BALAI PEL
VOLUME : - GEDUNG ASRAMA 52 X 12 M2 (LANTAI 1)
- GEDUNG GUDANG 15 X 10 M2
LOKASI : UPT BALAI PELATIHAN KERJA KABUPATEN KARAN
KABUPATEN : KARANGANYAR
TAHUN ANGGARAN : 2015

No. Uraian Pekerjaan Volume Sat. Analysa

1 2 3 4

A. PEKERJAAN PERSIAPAN
1 Err:509 1.00 Err:509 Err:509
2 Penyempurnaan Sumur ( Developing ) 1.00 18 jam An. Dihitung 9
3 Err:509 1.00 Err:509 Err:509
4 Accessories Perpipaan di Reservoir 1.00 ls An. Dihitung 10
5 Tutup Pengaman Panel dari Tralis Besi 1.00 ls An. Dihitung 11
6 Pengukuran dan pemasangan bouwplank 128.00 m' A.2.2.1.4.

B. PEMBANGUNAN GEDUNG ASRAMA


LANTAI 01
I. PEKERJAAN TANAH
1 Menggali tanah biasa sedalam 2 m' 105.00 m3 A.2.3.1.2.
2 Menggali tanah biasa sedalam 1 m' 86.49 m3 A.2.3.1.1.
3 Pengurugan kembali galian tanah 191.49 m3 A.2.3.1.9.
4 Urug tanah padat 695.30 m3 An. Dihitung
5 (K3) Memadatkan tanah ( per 20 cm ) 191.49 m3 A.2.3.1.10.
6 Mengurug pasir urug 114.33 m3 A.2.3.1.11.

II. PEKERJAAN PONDASI, PASANGAN DINDING, & PLESTERAN


1 Memasang pondasi batu belah, campuran 1 PC : 6 PP 326.74 m3 A.3.2.1.4.
2 Membuat dinding bata merah tebal 1/2 bata , camp 1 PC : 6 PP 965.59 m2 A.4.4.1.11.
3 Memasang plesteran 1 PC : 5 PP, tebal 15 mm 1,931.18 m2 A.4.4.2.5.
No. Uraian Pekerjaan Volume Sat. Analysa

1 2 3 4

4 Memasang glass blok 590.10 m2 An. Dihitung


5 Memasang finishing siar pasangan dinding bata merah ( = 20 M' 2,521.28 m2 A.4.4.2.24.
6 Memasang finishing siar pasangan dinding conblock ekspose ( = 748.00 m2 A.4.4.2.25.
7 Pemboran reaming Ø 8" 1.00 m' An. Dihitung 5

III. PEKERJAAN BETON


A. BETON FOOTPLAT
1 Membuat beton mutu f'c = 14,5 Mpa (K 175), lantai kerja 7.00 m3 A.4.1.1.1.
2 Membuat beton mutu f'c =12,2 Mpa 41.17 m3 A.4.1.1.3.
3 Membuat PVC Waterstop lebar 150 mm 6,916.56 m' A.4.1.1.14.
4 Memasang lantai keramik ukuran ( 33 x 33 ) cm 268.80 m2 An.Dihitung
B. BETON SLOOF
1 Membuat beton mutu f'c =12,2 Mpa 17.16 m3 A.4.1.1.3.
2 Membuat PVC Waterstop lebar 150 mm 3,003.00 m' A.4.1.1.14.
3 Memasang lantai keramik ukuran ( 33 x 33 ) cm 228.85 m2 An.Dihitung
C. BETON KOLOM
1 Membuat beton mutu f'c =12,2 Mpa 22.66 m3 A.4.1.1.3.
2 Membuat PVC Waterstop lebar 150 mm 3,965.50 m' A.4.1.1.14.
3 Memasang lantai keramik ukuran ( 33 x 33 ) cm 302.40 m2 An.Dihitung
D. BETON BALOK
1 Membuat beton mutu f'c =12,2 Mpa 37.99 m3 A.4.1.1.3.
2 Membuat PVC Waterstop lebar 150 mm 6,560.87 m' A.4.1.1.14.
3 Memasang 10 kg kabel presstressed polos / strands 521.01 kg A.4.1.1.18.
No. Uraian Pekerjaan Volume Sat. Analysa

1 2 3 4

E. BETON PLAT
1 Membuat beton mutu f'c =12,2 Mpa 91.68 m3 A.4.1.1.3.
2 Membuat PVC Waterstop lebar 150 mm 11,918.40 m' A.4.1.1.14.
3 (K3) Memasang bekisting untuk sloof 764.00 m2 A.4.1.1.21.
F. BETON PRAKTIS 15/15
1 Membuat beton mutu f'c = 7,4 Mpa (mutu K 100) 2.27 m3 A.4.1.1.1.
2 Membuat PVC Waterstop lebar 150 mm 340.50 m' A.4.1.1.14.
3 Memasang lantai keramik ukuran ( 33 x 33 ) cm 47.33 m2 An.Dihitung
G. BETON BALOK LATAI 12/12, LISTPLANK DAN TOPI
1 Membuat beton mutu f'c = 7,4 Mpa (mutu K 100) 10.62 m3 A.4.1.1.1.
2 Membuat PVC Waterstop lebar 150 mm 1,593.00 m' A.4.1.1.14.

3 Memasang lantai keramik ukuran ( 33 x 33 ) cm 145.59 m2 An.Dihitung

H. RABAT BETON
1 Memasang dinding dinding bilik, rangka kayu kelas III atau IV 39.26 m2 A.4.6.1.28.

IV. PEKERJAAN KERAMIK


1 Pasang batu lempeng tdk beraturan tanpa nat 788.50 m2 A.4.4.3.58a.
2 Memasang plint ubin teralux marmer ukuran (10 x 40) cm 45.14 m' A.4.4.3.29.
3 Memasang lantai kayu (gymfloor) 136.37 m2 A.4.4.3.47.
4 Memasang paving 36.48 m2 An.Dihitung
5 Memasang paving tb. 8 cm, K.175, warna 9.00 m2 An. Dihitung

V. PEKERJAAN PINTU JENDELA


1 Kaca tempered 12 mm + komplit 1.00 ls Daftar harga
2 Kaca framelist 8 mm 3.53 m2 Daftar harga
3 Membuat rangka jendela besi scuare tube 369.04 m2 A.4.2.1.6.
4 Pasang kusen pintu dan jendela kayu kamper 0.70 m3 A.4.6.1.1b.
5 Pasang kusen pintu dan jendela, kayu kruing 45.76 m3 A.4.6.1.2c.
6 Memasang sunscreen alluminium 37.27 m2 A.4.2.1.9.
7 Memasang bak kontrol pas. Batu bata ( 45 x 45 x 50 cm) 78.00 bh A.5.1.1.16.
8 Memasang pipa PVC tipe AW diameter 1 1/2" 26.00 m' A.5.1.1.28.
9 Penebangan pohon 14.00 bh Harga Satuan
No. Uraian Pekerjaan Volume Sat. Analysa

1 2 3 4

VI. PEKERJAAN PLAFOND


1 Err:509 Err:509 Err:509 Err:509
2 Memasang langit-langit akustik ukuran ( 30 x 30 ) cm 546.46 m2 A.4.5.1.2.
3 Memasang langit-langit akustik ukuran ( 60 x 120 ) cm 629.30 m2 A.4.5.1.4.

VII. PEKERJAAN SANITASI & PLUMBING


1 Err:509 14.00 Err:509 Err:509
2 Memasang wastafel 12.00 bh A.5.1.1.5.
3 Memasang dinding keramik uk. (20x25) cm 12.00 m2 An.Dihitung
4 Pasang atap asbes gelombang (2,00x0,92 m') x 5 mm 13.00 m2 A.4.5.2.10.
5 Memasang urinoir 14.00 bh A.5.1.1.4.
6 Err:509 12.00 Err:509 Err:509
7 Memasang kloset jongklok porselin 14.00 bh A.5.1.1.2.
8 Pasang atap Multiroof( 0.3mm) 117.60 m2 Daftar harga
9 Pasang aluminium foil/sisalation 300.00 m2 A.4.5.2.43.
10 Memasang kerpus onduline 13.00 m' An. Dihitung
11 Pasang sekru seng 3.00 m' Dihitung
12 Pasang listrik baru 22000 watt 3.00 ls Harga Satuan
No. Uraian Pekerjaan Volume Sat. Analysa

1 2 3 4

VIII. PEKERJAAN ELECTRICAL


1 Memasang paving tb. 8 cm, K.175, polos 4.00 m2 An. Dihitung
2 Memasang lantai granit tile warna muda ( 60 x 60 ) cm 13.00 m2 An.Dihitung
3 Memasang kunci tanam biasa 70.00 bh A.4.6.2.2.
4 Memasang engsel pintu, super 15.00 bh Kc.12.6.5.2002.b
5 Err:509 16.00 Err:509 Err:509
6 Err:509 13.00 Err:509 Err:509
7 Memasang paving tb. 8 cm, K.250, warna 98.00 m2 An. Dihitung
8 Memasang lantai keramik ukuran 30/30 cm dof 1.00 m2 An.Dihitung

IX. PEKERJAAN CAT


1 Pembuatan groundtank ( 2 m x 2 m x 3 m ) 1,890.96 ls Dihitung
2 Tandon air stainless 1 m3 630.32 bh Harga Satuan
3 Pengecatan plafond 546.46 ls Dihitung
4 Memasang saluran U.20 cm 96.24 m' A.5.1.1.35b.

C. PEMBANGUNAN GUDANG
I. PEKERJAAN TANAH
1 Menggali tanah biasa sedalam 1 m' 24.60 m3 A.2.3.1.1.
2 Pengurugan kembali galian tanah 24.60 m3 A.2.3.1.9.
3 Urug tanah padat 24.56 m3 An. Dihitung
4 (K3) Memadatkan tanah ( per 20 cm ) 49.16 m3 A.2.3.1.10.
5 Mengurug pasir urug 14.01 m3 A.2.3.1.11.

II. PEKERJAAN PONDASI, PASANGAN DINDING, & PLESTERAN


1 Memasang pondasi batu belah, campuran 1 PC : 6 PP 17.00 m3 A.3.2.1.4.
2 Membuat dinding bata merah tebal 1/2 bata , camp 1 PC : 6 PP 190.47 m2 A.4.4.1.11.
3 Memasang plesteran 1 PC : 5 PP, tebal 15 mm 380.94 m2 A.4.4.2.5.
4 Memasang glass blok 48.00 m2 An. Dihitung
5 Memasang finishing siar pasangan dinding bata merah ( = 20 M' 428.94 m2 A.4.4.2.24.
6 Memasang paving 6.00 m2 An.Dihitung
7 Memasang paving tb. 8 cm, K.175, warna 150.00 m2 An. Dihitung
No. Uraian Pekerjaan Volume Sat. Analysa

1 2 3 4

III. PEKERJAAN BETON


A. BETON FOOTPLAT DAN KOLOM
1 Membuat beton mutu f'c = 14,5 Mpa (K 175), lantai kerja 0.40 m3 A.4.1.1.1.
2 Membuat beton mutu f'c =12,2 Mpa 3.36 m3 A.4.1.1.3.
3 Membuat PVC Waterstop lebar 150 mm 588.00 m' A.4.1.1.14.
4 Memasang 10 kg kabel presstressed polos / strands 28.80 kg A.4.1.1.18.
B. BETON SLOOF
1 Membuat beton mutu f'c = 7,4 Mpa (mutu K 100) 1.50 m3 A.4.1.1.1.
2 Membuat PVC Waterstop lebar 150 mm 262.50 m' A.4.1.1.14.
3 Memasang lantai keramik ukuran ( 33 x 33 ) cm 12.50 m2 An.Dihitung
C. BETON KOLOM 15/25
1 Membuat beton mutu f'c = 7,4 Mpa (mutu K 100) 2.07 m3 A.4.1.1.1.
2 Membuat PVC Waterstop lebar 150 mm 310.50 m' A.4.1.1.14.
3 Memasang 10 kg kabel presstressed polos / strands 30.36 kg A.4.1.1.18.
C. BETON BALOK LATAI 12/12
1 Membuat beton mutu f'c = 7,4 Mpa (mutu K 100) 1.20 m3 A.4.1.1.1.
2 Membuat PVC Waterstop lebar 150 mm 180.00 m' A.4.1.1.14.
3 Memasang lantai keramik ukuran ( 33 x 33 ) cm 12.00 m2 An.Dihitung
D. BETON PLAT TOPI
1 Membuat beton mutu f'c = 7,4 Mpa (mutu K 100) 0.84 m3 A.4.1.1.1.
2 Membuat PVC Waterstop lebar 150 mm 109.20 m' A.4.1.1.14.
3 Memasang lantai keramik ukuran ( 33 x 33 ) cm 8.47 m2 An.Dihitung
No. Uraian Pekerjaan Volume Sat. Analysa

1 2 3 4

E. BETON RING BALOK


1 Membuat beton mutu f'c = 7,4 Mpa (mutu K 100) 1.20 m3 A.4.1.1.1.
2 Membuat PVC Waterstop lebar 150 mm 180.00 m' A.4.1.1.14.
3 Memasang lantai keramik ukuran ( 33 x 33 ) cm 12.50 m2 An.Dihitung
F. RABAT BETON
1 Memasang dinding dinding bilik, rangka kayu kelas III atau IV 14.63 m2 A.4.6.1.28.

IV. PEKERJAAN PINTU JENDELA


### 1 (K3) Memasang 1 buah MCB 10.29 bh A.8.4.6.2.
2 Membuat rangka jendela besi scuare tube 53.76 m2 A.4.2.1.6.
3 Pasang kusen pintu dan jendela kayu kamper 0.06 m3 A.4.6.1.1b.
4 Pasang kusen pintu dan jendela, kayu kruing 6.16 m3 A.4.6.1.2c.
5 Memasang bak kontrol pas. Batu bata ( 45 x 45 x 50 cm) 12.00 bh A.5.1.1.16.
6 Memasang pipa PVC tipe AW diameter 1 1/2" 2.00 m' A.5.1.1.28.
7 Memasang sunscreen alluminium 6.81 m2 A.4.2.1.9.

V. PEKERJAAN ATAP
1 Pasang genteng keramik 238.00 m2 A.4.5.2.2.
2 Pasang genteng Kodok Kebumen 238.00 m2 At.8.6.2.2002
### 3 Memasang wallpaper, lebar 50 cm 238.00 m2 A.4.4.3.60.
### 4 Memasang plint kayu kelas II ukuran ( 2 x 10 ) cm 33.00 m2 A.4.4.3.63.
5 Memasang langit-langit ( 60 x 60 ) cm kayu kruing 58.00 m2 A.4.6.1.20a.

VI. PEKERJAAN ELECTRICAL


1 Memasang kunci tanam biasa 8.00 bh A.4.6.2.2.
2 Memasang engsel pintu, super 2.00 bh Kc.12.6.5.2002.b
3 Err:509 1.00 Err:509 Err:509
4 Memasang paving tb. 8 cm, K.250, warna 8.00 m2 An. Dihitung

VII. PEKERJAAN CAT


1 Pembuatan groundtank ( 2 m x 2 m x 3 m ) 321.84 ls Dihitung
2 Tandon air stainless 1 m3 107.24 bh Harga Satuan
No. Uraian Pekerjaan Volume Sat. Analysa

1 2 3 4

3 Memasang saluran U.20 cm 12.76 m' A.5.1.1.35b.


4 Sumur resapan 20.58 unit Harga Satuan
YA ( RAB )

MBAGAAN PELATIHAN
I PELATIHAN KERJA (DBHCHT)

ARANGANYAR

Harga Jumlah Harga


Satuan Harga Semua
Rp. Rp. Rp.
5 6 7

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
4,670,826.98 4,670,826.98
1,780,737.62 1,780,737.62
57,571.24 7,369,118.72
JUMLAH A. Err:509

70,223.85 7,373,504.25
57,375.75 4,962,428.62
41,301.50 7,908,824.24
81,258.30 56,498,895.99
41,301.50 7,908,824.24
215,502.30 24,638,377.96
JUMLAH I. 109,290,855.30

887,400.30 289,949,174.02
122,542.85 118,326,150.53
52,929.20 102,215,812.46
Harga Jumlah Harga
Satuan Harga Semua
Rp. Rp. Rp.
5 6 7

652,185.15 384,854,457.02
23,470.10 59,174,693.73
11,215.25 8,389,007.00
147,141.07 147,141.07
JUMLAH II. 963,056,435.83

891,401.30 6,239,809.10
953,475.97 39,254,605.68
7,593.60 52,521,590.02
Err:509 Err:509

953,475.97 16,361,647.65
7,593.60 22,803,580.80
Err:509 Err:509

953,475.97 21,605,765.48
7,593.60 30,112,420.80
Err:509 Err:509

953,475.97 36,222,552.10
7,593.60 49,820,622.43
147,846.94 77,029,734.21
Harga Jumlah Harga
Satuan Harga Semua
Rp. Rp. Rp.
5 6 7

953,475.97 87,414,676.93
7,593.60 90,503,562.24
156,030.40 119,207,225.60

891,401.30 2,023,480.95
7,593.60 2,585,620.80
Err:509 Err:509

891,401.30 9,466,681.81
7,593.60 12,096,604.80
Err:509 Err:509

133,358.08 5,235,638.22
JUMLAH III. Err:509

222,369.88 175,338,650.38
19,764.83 892,184.43
130,176.00 17,752,101.12
134,936.29 4,922,475.86
164,460.20 1,480,141.80
JUMLAH IV. 200,385,553.59

8,686,000.00 8,686,000.00
868,000.00 3,064,040.00
486,665.01 179,598,855.29
15,538,347.50 10,876,843.25
12,639,615.00 578,388,782.40
83,895.72 3,126,793.48
613,109.75 47,822,560.50
44,503.92 1,157,101.92
200,000.00 2,800,000.00
Harga Jumlah Harga
Satuan Harga Semua
Rp. Rp. Rp.
5 6 7

JUMLAH V. 835,520,976.84

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
JUMLAH VI. Err:509

Err:509 Err:509
1,070,200.40 12,842,404.80
161,326.71 1,935,920.52
98,174.40 1,276,267.20
2,977,606.50 41,686,491.00
Err:509 Err:509
367,148.30 5,140,076.20
150,000.00 17,640,000.00
32,965.49 9,889,647.00
173,473.08 2,255,150.04
20,000.00 60,000.00
35,000,000.00 105,000,000.00
JUMLAH VII. Err:509
Harga Jumlah Harga
Satuan Harga Semua
Rp. Rp. Rp.
5 6 7

158,810.20 635,240.80
238,949.49 3,106,343.37
47,962.85 3,357,399.50
34,488.45 517,326.75
Err:509 Err:509
Err:509 Err:509
194,970.20 19,107,079.60
159,465.60 159,465.60
JUMLAH VIII. Err:509

- -
3,500,000.00 2,206,120,000.00
- -
165,226.34 15,901,382.96
JUMLAH IX. 2,222,021,382.96

57,375.75 1,411,443.45
41,301.50 1,016,016.90
81,258.30 1,995,703.85
41,301.50 2,030,381.74
215,502.30 3,019,187.22
JUMLAH I. 9,472,733.16

887,400.30 15,085,805.10
122,542.85 23,340,736.64
52,929.20 20,162,849.45
652,185.15 31,304,887.20
23,470.10 10,067,264.69
134,936.29 809,617.74
164,460.20 24,669,030.00
Harga Jumlah Harga
Satuan Harga Semua
Rp. Rp. Rp.
5 6 7

JUMLAH II. 125,440,190.82

891,401.30 356,560.52
953,475.97 3,203,679.26
7,593.60 4,465,036.80
147,846.94 4,257,991.87

891,401.30 1,337,101.95
7,593.60 1,993,320.00
Err:509 Err:509

891,401.30 1,845,200.69
7,593.60 2,357,812.80
147,846.94 4,488,633.10

891,401.30 1,069,681.56
7,593.60 1,366,848.00
Err:509 Err:509

891,401.30 748,777.09
7,593.60 829,221.12
Err:509 Err:509
Harga Jumlah Harga
Satuan Harga Semua
Rp. Rp. Rp.
5 6 7

891,401.30 1,069,681.56
7,593.60 1,366,848.00
Err:509 Err:509

133,358.08 1,951,028.71
JUMLAH III. Err:509

Err:509 Err:509
486,665.01 26,163,110.94
15,538,347.50 932,300.85
12,639,615.00 77,860,028.40
613,109.75 7,357,317.00
44,503.92 89,007.84
83,895.72 571,329.85
JUMLAH IV. Err:509

177,619.05 42,273,333.90
106,655.05 25,383,901.90
327,982.50 78,059,835.00
22,909.62 756,017.46
190,585.80 11,053,976.40
JUMLAH V. 157,527,064.66

47,962.85 383,702.80
34,488.45 68,976.90
Err:509 Err:509
194,970.20 1,559,761.60
JUMLAH VI. Err:509

- -
3,500,000.00 375,340,000.00
Harga Jumlah Harga
Satuan Harga Semua
Rp. Rp. Rp.
5 6 7

165,226.34 2,108,288.10
- -
JUMLAH VII. 377,448,288.10
dalam lapis keramik & penutup beton/plat besi 0,60

269.81

Err:509
67,452,500.00

2,277.98
Err:509
Err:509
0.14
Err:509
Err:509
PERHITUNGAN VOLUME

PROGRAM : PENGUATAN SARANA DAN PRASARANA KELEMBAGAAN PELATIHAN


KEGIATAN : PEMBANGUNAN GEDUNG DAN GUDANG BALAI PELATIHAN KERJA (DBHCHT)
VOLUME : - GEDUNG ASRAMA 52 X 12 M2 (LANTAI 1)
LOKASI : UPT BALAI PELATIHAN KERJA KABUPATEN KARANGANYAR
KABUPATEN : KARANGANYAR
TAHUN ANGGARAN : 2015

NO. URAIAN

A. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank panjang lebar
104.00 + 24.00
Pengukuran dan pemasang
B. PEMBANGUNAN GEDUNG ASRAMA
LANTAI 01
I. PEKERJAAN TANAH
1 Menggali tanah biasa sedalam 2 m'
footplat 30 x 30 1.00 x 1.00 x 1.50 x 16
footplat 30 x 30 1.00 x 1.00 x 1.50 x 16
footplat 30 x 30 1.00 x 1.00 x 1.50 x 16
footplat 30 x 30 1.00 x 1.00 x 1.50 x 16
footplat 30 x 30 1.00 x 1.00 x 1.50 x 6
Menggali tanah bias

2 Menggali tanah biasa sedalam 1 m'


keliling pondasi teras 0.30 x 0.60 x 28.50 x 2
0.30 x 0.60 x 28.50 x 2
keliling dinding 0.30 x 0.60 x 28.50 x 2
0.30 x 0.60 x 28.50 x 2
0.30 x 0.60 x 7.00 x 1
0.30 x 0.60 x 7.00 x 1
0.30 x 0.60 x 7.00 x 1
0.30 x 0.60 x 7.00 x 1
melintang 0.30 x 0.60 x 12.00 x 6
0.30 x 0.60 x 12.00 x 6
km/wc ruang tidur 0.30 x 0.60 x 2.50 x 12
0.30 x 0.60 x 1.50 x 12
km/wc tangga 0.30 x 0.60 x 5.00 x 1
0.30 x 0.60 x 1.50 x 2
tangga 0.30 x 0.60 x 2.50 x 2
tangga darurat 0.30 x 0.60 x 2.50 x 1
0.30 x 0.60 x 2.50 x 2
teras 0.30 x 0.60 x 1.50 x 8
Menggali tanah bias
480.50
192.00
3 Pengurugan kembali galian tanah
footplat 30 x 30 0.70 x 0.70 x 1.20 x 16
footplat 30 x 30 0.70 x 0.70 x 1.20 x 16
footplat 30 x 30 0.70 x 0.70 x 1.20 x 16
footplat 30 x 30 0.70 x 0.70 x 1.20 x 16
footplat 30 x 30 0.70 x 0.70 x 1.20 x 6
pondasi 0.10 + 0.20 x 0.30 x 480.50
2
lantai ruang 1.20 x 47.00 x 12.00 x 1
1.20 x 2.50 x 7.00 x 2
teras 1.20 x 1.50 x 28.50 x 2
1.20 x 1.50 x 28.50 x 2
Pengurugan kemb

4 Urug tanah padat


886.79 - 191.49

5 (K3) Memadatkan tanah ( per 20 cm ) 886.79 + -


(K3) Memadatkan tana

6 Mengurug pasir urug


footplat 30 x 30 0.10 x 1.00 x 1.00 x 16
footplat 30 x 30 0.10 x 1.00 x 1.00 x 16
footplat 30 x 30 0.10 x 1.00 x 1.00 x 16
footplat 30 x 30 0.10 x 1.00 x 1.00 x 16
footplat 30 x 30 0.10 x 1.00 x 1.00 x 6
pondasi 0.10 x 0.60 x 480.50
lantai ruang 0.10 x 47.00 x 12.00 x 1
0.10 x 2.50 x 7.00 x 2
teras 0.10 x 1.50 x 28.50 x 2
0.10 x 1.50 x 28.50 x 2
0.10 x 1.50 x 2.50 x 4

II. PEKERJAAN PONDASI, PASANGAN DINDING, & PLESTERAN


1 Memasang pondasi batu belah, campuran 1 PC : 6 PP
teras 0.25 + 0.60 x 1.60 x 480.50
2
Memasang pondasi batu belah, campu
2 Membuat dinding bata merah tebal 1/2 bata , camp 1 PC : 6 PP
Lantai 1 3.43 x 322.00
Membuat dinding bata merah tebal 1/2 bata , ca

Dikurangi Kusen pintu & jendela


pintu utama & jendela tempered&frame list 2.50 x 2.60 x 1
1.90 x 0.90 x 2
pintu Kamar 2.245 x 0.89 x 12
pintu tangga darurat 2.245 x 0.89 x 2
pintu jendela 2.690 x 0.89 x 12
1.69 x 0.545 x 12
jendela kamar 1.69 x 1.68 x 12
bouvenlight 0.49 x 0.59 x 12
pintu KM/WC 0.82 x 2.06 x 14

Membuat dinding bata

3 Memasang plesteran 1 PC : 5 PP, tebal 15 mm


965.59 x 2
Memasang plesteran 1 PC : 5 P

4 Memasang glass blok


kolom 30 x 30 0.60 + 0.30 x 4.00 x 16
kolom 30 x 30 0.60 + 0.30 x 4.00 x 16
kolom 30 x 30 0.60 + 0.30 x 4.00 x 16
kolom 30 x 30 0.60 + 0.30 x 4.00 x 16
kolom 30 x 30 0.60 + 0.30 x 4.00 x 6
balok 25/45 0.66 + 0.30 x 12.00 x 8
0.66 + 0.30 x 7.00 x 2
balok 15/45 tangga 0.15 + 0.15 x 5.00 x 1
balok 20/40 memanjang 0.28 + 0.05 x 52.00 x 1
memanjang 0.28 + 0.05 x 42.00 x 4
lisplang teras 0.20 + 0.60 x 56.00 x 2
balok 20/45 konsul 0.20 + 0.66 x 2.50 x 32

5 Memasang finishing siar pasangan dinding bata merah ( = 20 M' )


1,931.18 + 590.10
Memasang finishing siar pasangan dinding bata m

6 Memasang finishing siar pasangan dinding conblock ekspose ( = 8 M' )


kolom 30 x 30 4.00 x 16 x 2
kolom 30 x 30 4.00 x 16 x 2
kolom 30 x 30 4.00 x 16 x 2
kolom 30 x 30 4.00 x 16 x 2
kolom 30 x 30 4.00 x 6 x 2
balok 20/40 memanjang 52.00 x 2
memanjang 42.00 x 2
Memasang finishing siar pasangan dinding conblock ek

7 Pemboran reaming Ø 8"

III. PEKERJAAN BETON


A. BETON FOOTPLAT
1 Membuat beton mutu f'c = 14,5 Mpa (K 175), lantai kerja
footplat 30 x 30 0.10 x 1.00 x 1.00 x 16
footplat 30 x 30 0.10 x 1.00 x 1.00 x 16
footplat 30 x 30 0.10 x 1.00 x 1.00 x 16
footplat 30 x 30 0.10 x 1.00 x 1.00 x 16
footplat 30 x 30 0.10 x 1.00 x 1.00 x 6
Membuat beton mutu f'c = 14,5 Mpa (K 1

2 Membuat beton mutu f'c = 14,5 Mpa (K 175), lantai kerja


footplat 30 x 30 foot 0.30 x 1.00 x 1.00 x 16
atas 0.30 x 0.30 x 3.20 x 16

footplat 30 x 30 foot 0.30 x 1.00 x 1.00 x 16


atas 0.30 x 0.30 x 3.20 x 16

footplat 30 x 30 foot 0.30 x 1.00 x 1.00 x 16


atas 0.30 x 0.30 x 3.20 x 16

footplat 30 x 30 foot 0.30 x 1.00 x 1.00 x 16


atas 0.30 x 0.30 x 3.20 x 16

footplat 30 x 30 foot 0.30 x 1.00 x 1.00 x 6


atas 0.30 x 0.30 x 3.20 x 6

Membuat beton mu

3 Membuat PVC Waterstop lebar 150 mm 168.00


41.17 x 168.00
175.00 Membuat PVC Waterstop
4 Memasang lantai keramik ukuran ( 33 x 33 ) cm
0.30 x 3.20 x 16.00 x 2
0.30 3.20 16.00 x 2
0.30 x 3.20 x 16.00 x 2
0.30 x 3.20 x 16.00 x 2
0.30 x 3.20 x 16.00 x 2
0.30 x 3.20 x 16.00 x 2
0.30 x 3.20 x 16.00 x 2
0.30 x 3.20 x 16.00 x 2
0.30 x 3.20 x 6.00 x 2
0.30 x 3.20 x 6.00 x 2

Memasang lantai keramik ukura


B. BETON SLOOF
1 Membuat beton mutu f'c =12,2 Mpa
Sloof (15/25) 0.15 x 0.25 x 366.50
Sloof (15/20) 0.15 x 0.20 x 114.00
Membuat

2 Membuat PVC Waterstop lebar 150 mm


17.16 x 175.00
Membuat PVC Waterstop

3 Memasang lantai keramik ukuran ( 33 x 33 ) cm


Sloof (15/25) 0.25 x 366.50 x 2
Sloof (15/20) 0.20 x 114.00 x 2

Memasang lantai keramik ukura

C. BETON KOLOM
1 Membuat beton mutu f'c =12,2 Mpa
kolom 30 x 30 0.30 x 0.30 x 3.60 x 16
kolom 30 x 30 0.30 x 0.30 x 3.60 x 16
kolom 30 x 30 0.30 x 0.30 x 3.60 x 16
kolom 30 x 30 0.30 x 0.30 3.60 x 16
kolom 30 x 30 0.30 x 0.30 3.60 x 6
kolom 30 x 30 tangga darurat lantai 2 0.30 x 0.30 2.69 x 6
Membuat beton mutu

2 Membuat PVC Waterstop lebar 150 mm


22.66 x 175.00
Membuat PVC Waterstop

3 Memasang lantai keramik ukuran ( 33 x 33 ) cm


kolom 30 x 30 0.30 x 3.60 x 16 x 2
0.30 x 3.60 x 16 x 2
kolom 30 x 30 0.30 x 3.60 x 16 x 2
0.30 x 3.60 x 16 x 2
kolom 30 x 30 0.30 x 3.60 x 16 x 2
0.30 x 3.60 x 16 x 2
kolom 30 x 30 0.30 x 3.60 x 16 x 2
0.30 x 3.60 x 16 x 2
kolom 30 x 30 0.30 x 3.60 x 6 x 2
0.30 x 3.60 x 6 x 2
kolom 30 x 30 tangga darurat lantai 2 0.30 x 2.69 x 6 x 2
0.30 x 2.69 x 6 x 2

Memasang lantai keramik ukura

D. BETON BALOK
1 Membuat beton mutu f'c = 19,3 Mpa (K 225), slump (12 + 2), w/c = 0,58
balok 25/45 A & B melintang 0.25 x 0.33 x 12.00 x 14
balok 25/45 A memanjang 0.25 x 0.33 x 5.00 x 6
Balok 20/30 C konsul 0.20 x 0.26 x 1.50 x 32
Balok 20/30 D memanjang 0.20 x 0.18 x 47.00 x 3
Balok 20/30 0.20 x 0.18 x 42.00 x 3
Balok 20/30 melintang 0.20 x 0.18 x 37.00 x 3
Balok 20/30 E tangga 0.20 x 0.18 x 7.00 x 2
Balok 15/30 F listplank 0.15 x 0.18 x 58.00 x 2
Balok 20/50 G drop of 0.20 x 0.38 x 1.775 x 2
Balok 15/50 H drop of 0.15 x 0.38 x 6.775 x 1
Balok 15/30 I urinoir/km/wc 0.15 x 0.18 x 2.50 x 3
Balok 15/30 J urinoir/km/wc 0.15 x 0.18 x 7.17 x 1
Balok 20/45 tangga 0.20 x 0.45 x 2.50 x 2
Balok 20/45 tangga 0.20 x 0.45 x 5.00 x 1
Membuat beton mutu f'c = 19,3 Mpa (K 225), slump (12

2 Membuat PVC Waterstop lebar 150 mm 170.00


37.99 x 172.70
175.00 Membuat PVC Waterstop

3 Memasang 10 kg kabel presstressed polos / strands


balok 25/45 A & B melintang 0.25 x 12.00 x 14 x 1
0.33 x 12.00 x 14 x 2
balok 25/45 A memanjang 0.25 x 5.00 x 6 x 1
0.33 x 5.00 x 6 2
Balok 20/30 C konsul 0.20 x 1.50 x 32 x 1
0.26 x 1.50 x 32 2
Balok 20/30 D memanjang 0.20 x 47.00 x 3 x 1
0.18 x 47.00 x 3 2
Balok 20/30 0.20 x 42.00 x 3 x 1
0.18 x 42.00 x 3 2
Balok 20/30 melintang 0.20 x 37.00 x 3 x 1
0.18 x 37.00 x 3 2
Balok 20/30 E tangga 0.20 x 7.00 x 2 x 1
0.18 x 7.00 x 2 2
Balok 15/30 F listplank 0.15 x 58.00 x 2 x 1
0.18 x 58.00 x 2 2
Balok 20/50 G drop of 0.20 x 1.775 x 2 x 1
0.38 x 1.775 x 2 2
Balok 15/50 H drop of 0.15 x 6.775 x 1 x 1
0.38 x 6.775 x 1 2
Balok 15/30 I urinoir/km/wc 0.15 x 2.500 x 3 x 1
0.18 x 2.500 x 3 2
Balok 15/30 J urinoir/km/wc 0.15 x 7.170 x 1 x 1
0.18 x 7.170 x 1 2
Balok 20/45 tangga 0.20 x 2.50 x 2 x 1
0.45 x 2.50 x 2 2
Balok 20/45 tangga 0.20 x 5.00 x 1 x 1
0.45 x 5.00 x 1 2
Memasang 10 kg kabel presstressed

E. BETON PLAT
1 Membuat beton mutu f'c = 19,3 Mpa (K 225), slump (12 + 2), w/c = 0,58
bangunan utama 0.12 x 47.00 x 15.00 x 1
teras samping 0.12 x 1.50 x 4.00 x 4
tangga darurat plat 0.12 x 2.50 x 7.00 x 2
Membuat beton mutu f'c =

2 Membuat PVC Waterstop lebar 150 mm 129.00


91.68 x 130.00
130.00 Membuat PVC Waterstop

3 (K3) Memasang bekisting untuk sloof


47.00 x 15.00 x 1
1.50 x 4.00 x 4
2.50 x 7.00 x 2
(K3) Memasang bekisti

F. BETON PRAKTIS 15/15


1 Membuat beton mutu f'c = 7,4 Mpa (mutu K 100)
Kolom Prkatis 0.12 x 0.12 x 3.43 x 46
Membuat beton mutu f'c = 7,4 Mp

2 Membuat PVC Waterstop lebar 150 mm


2.27 x 150.00
Membuat PVC Waterstop

3 Memasang lantai keramik ukuran ( 33 x 33 ) cm


0.15 x 3.43 x 46 x 2

Memasang lantai keramik ukura

G. BETON BALOK LATAI 12/12, LISTPLANK DAN TOPI


1 Membuat beton mutu f'c = 7,4 Mpa (mutu K 100)
Balok Latai 0.12 x 0.12 x 322.00
Samping topi 0.725 x 0.15 x 4.85 x
Samping 0.425 x 0.15 x 50.20 x 1
Listplank 0.08 x 0.30 x 58.00 x 2
Membuat beton mutu f'c = 7,4 Mp

2 Membuat PVC Waterstop lebar 150 mm


10.62 x 150.00
Membuat PVC Waterstop

3 Memasang lantai keramik ukuran ( 33 x 33 ) cm


Balok Latai 0.12 x 2 x 322.00
Samping topi 0.725 x 1 x 4.85 x -
0.15 x 1 x 4.85 x -
Samping 0.425 x 1 x 50.20 x 1
0.15 x 1 x 50.20 x 1
Listplank 0.30 x 2 x 58.00 x 2
0.08 x 1 x 58.00 x 2

Memasang lantai keramik ukura


H. RABAT BETON
1 Memasang dinding dinding bilik, rangka kayu kelas III atau IV
lantai ruang 0.05 x 47.00 x 12.00 x 1
0.05 x 2.50 x 7.00 x 2
teras 0.05 x 1.50 x 28.50 x 2
0.05 x 1.50 x 28.50 x 2
0.05 x 1.50 x 2.50 x 4
Memasang dinding dinding bilik, rangka kayu

IV. PEKERJAAN KERAMIK


1 Pasang batu lempeng tdk beraturan tanpa nat
lantai ruang 47.00 x 12.00 x 1
2.50 x 7.00 x 2
teras 1.50 x 28.50 x 2
1.50 x 28.50 x 2
teras samping 1.50 x 2.50 x 4
Pasang batu lempeng tdk bera

2 Memasang plint keramik ukuran (10x40) cm


lantai ruang 47.00 x 6 x 1
12.00 x 14 x 1
2.50 x 2 x 2
7.00 x 2 x 2
teras 1.50 x 1 x 2
28.50 1 2
1.50 x 1 x 2
28.50 x 1 x 2
Memasang plint keramik uku
2 Memasang plint ubin teralux marmer ukuran (10 x 40) cm
km/wc 1.35 x 2.35 x 12
km/wc 1.35 x 1.35 x 2
1.85 x 1.85 x 1
Memasang plint ubin teralux marmer ukur

3 Memasang lantai kayu (gymfloor)


km/wc 6.51 x 1.50 x 12
km/wc 4.51 x 1.50 x 2
3.77 x 1.50 x 1
Memasang lantai

4 Memasang paving lantai 1


684.00 3.80 x 1.80 x 2 x 2
228.00 3.80 x 1.20 x 1 x 2
912.00 buah 68.40 91.20
22.80
5 Memasang paving tb. 8 cm, K.175, warna
3.00 x 3
Memasang paving tb. 8 cm

4 Memasang plint keramik uk. (10x20) cm


km/wc 6.51 x 12
km/wc 4.51 x 2
3.77 x 1
Memasang plint keramik

5 Memasang 1 m' "step nose" uk. (10x40) cm


tangga utama 1.3175 x 10 x 2
1.565 x 10 x 1
1.125 x 20 x 2
Memasang 1 m' "step nose"
6 Pasang batu andesit 3x30
0.90 x 3.55 x 3
Pasang ba

7 Memasang saluran U.20 cm


104.00 + 24.00 + 2 - 17.00
Memasang s

8 Memasang saluran D.20 cm


1.50 x 8.00
Memasang s

V. PEKERJAAN PINTU JENDELA


1 Kaca tempered 12 mm + komplit
2 Kaca framelist 8 mm 1.92 x 0.92 x 2

3 Membuat rangka jendela besi scuare tube


pintu darurat 2.69 x 2 x 2
0.80 x 2 x 2

pintu Kamar 2.69 x 2 x 12


0.80 x 1 x 12

pintu jendela 2.69 x 2 x 12


0.80 x 2 x 12
1.69 x 1 x 12
0.50 x 3 x 12

jendela kamar 1.69 x 4 x 12


1.50 x 3 x 12

bouvenlight 0.49 x 2 x 12
0.50 x 2 x 12
Membuat rangka jendela be
4 Pasang kusen pintu dan jendela kayu kamper
pintu darurat 0.004356 x 2.69 x 2 x 2
0.0044 x 0.80 x 2 x 2

pintu Kamar 0.0044 x 2.69 x 2 x 12


0.0044 x 0.80 x 1 x 12

pintu jendela 0.0044 x 2.69 x 2 x 12


0.0044 x 0.80 x 1 x 12
Pasang kusen pintu dan jendel

5 Pasang kusen pintu dan jendela, kayu kruing


pintu darurat 0.80 x 2.20 x 2

pintu Kamar 0.80 x 2.20 x 12

pintu jendela 0.80 x 2.20 x 12


Pasang kusen pintu dan jende
6 Memasang sunscreen alluminium
pintu darurat 0.80 x 0.40 x 1 x 2

pintu jendela 0.80 x 0.40 x 1 x 12


0.50 0.40 x 1 12

jendela kamar 0.50 x 1.155 x 3 x 12


0.50 x 0.40 x 3 x 12

bouvenlight 0.50 x 0.40 x 1 x 12


Memasang sunscr
7 Memasang bak kontrol pas. Batu bata ( 45 x 45 x 50 2 12 12 x 3
8 Memasang pipa PVC tipe AW diameter 1 1/2" 2 12 12 x 1
9 Penebangan pohon 1 x 3 x 4 + 2.00

VI. PEKERJAAN PLAFOND


1 Err:509
lantai ruang kamar dan lorong 21.00 x 12.00 x 2
tangga utama 4.85 x 6.55 x 1
tangga darurat 2.275 x 2.35 x 2

2 Memasang langit-langit akustik ukuran ( 30 x 30 ) cm


lantai ruang 21.00 x 12.00 x 2
tangga utama 4.85 x 6.55 x 1
tangga darurat 2.28 x 2.35 x 2
Memasang langit-langit akustik ukura

3 Memasang langit-langit akustik ukuran ( 60 x 120 ) cm


21.00 x 2 x 6
12.00 x 2 x 14
4.85 x 1 x 2
6.55 x 1 x 2
2.28 x 2 x 2
2.35 x 2 x 2
Memasang langit-langit akustik ukuran

VII. PEKERJAAN SANITASI & PLUMBING


1 Err:509 1 x 3 x 4 + 2
2 Memasang wastafel 1 x 3 x 4
3 Memasang dinding keramik uk. (20x25) cm 1 x 3 x 4
4 Pasang atap asbes gelombang (2,00x0,92 m') x 5 mm 1 x 3 x 4 + 1
5 Memasang urinoir 1 x 3 x 4 + 2
6 Err:509 1 x 3 x 4
7 Memasang klo Kran 12 + 2
8 Pasang atap Multiroof( 0.3mm) 33.25 + 34.35 + 10.00 + 5.00
9 Pasang aluminium foil/sisalation 138.00 + 81.00 + 81.00
10 Memasang kerpus onduline 13.00
11 Pasang sekru seng 3
12 Pasang listrik baru 22000 wat 3

IX. PEKERJAAN ELECTRICAL


1 Memasang paving tb. 8 cm, K.175, polos 4.00
2 Memasang lantai granit tile warna muda ( 60 x 60 ) 7.00 + 2.00 + 4.00 +
3 Memasang kunci tanam biasa 48 + 12 + 8 + 6
4 Memasang engsel pintu, super 23
5 Err:509 16
6 Err:509 13
7 Memasang paving tb. 8 cm, K.250, warna 48 + 12 + 8 + 6
8 Memasang lantai keramik ukuran 30/30 cm dof

X. PEKERJAAN CAT
1 Pembuatan groundtank ( 2 m x 2 m x 3 m )
2 Tandon air stainless 1 m3
3 Pengecatan plafond
4 Memasang saluran U.20 cm
pintu darurat 0.83 x 2.23 x 2 2
pintu Kamar 0.83 x 2.23 x 12 x 2

pintu jendela 0.83 x 2.23 x 12 x 2


Memasang s

PEKERJAAN LAIN-LAIN
RAILING TANGGA
tangga utama 8.7675 x 2
tangga darurat 8.06 x 2
teras kamar 3.500 x 12

PEMBANGUNAN GUDANG
I. PEKERJAAN TANAH
1 Menggali tanah biasa sedalam 1 m'
footplat 30 x 30 1.00 x 1.00 x 0.90 x 4
keliling 0.70 x 0.60 x 25.00 x 2
Menggali tanah bias

2 Pengurugan kembali galian tanah


footplat 30 x 30 0.70 x 0.70 x 0.40 x 4
pondasi 0.10 + 0.20 x 0.30 x 50.00
2
lantai 14.85 x 9.85 x 0.30
Pengurugan kemb
3 Urug tanah padat
49.16 - 24.60

4 (K3) Memadatkan tanah ( per 20 cm )


49.16 + -
(K3) Memadatkan tana
5 Mengurug pasir urug
footplat 30 x 30 0.10 x 1.00 x 1.00 x 4
pondasi 0.05 x 0.90 x 50.00
lantai 0.05 x 14.85 x 9.85
rabat 0.05 x 1.50 x 27.00 x 2

II. PEKERJAAN PONDASI, PASANGAN DINDING, & PLESTERAN


1 Memasang pondasi batu belah, campuran 1 PC : 6 PP
0.25 + 0.60 x 0.80 x 50.00
2
Memasang pondasi batu belah, campu

2 Membuat dinding bata merah tebal 1/2 bata , camp 1 PC : 6 PP


4.60 x 50.00
Membuat dinding bata merah tebal 1/2 bata , ca
Dikurangi Kusen pintu & jendela
pintu utama besi 2.69 x 3.43 x 1
pintu kupu-2 2.69 x 1.49 x 2
jendela 2.68 x 1.09 x 4
bouvenlight 0.80 x 1.75 x 4
0.80 x 1.50 x 2
0.80 x 3.25 x 1
Membuat dinding bata

3 Memasang plesteran 1 PC : 5 PP, tebal 15 mm


190.47 x 2
Memasang plesteran 1 PC : 5 P

4 Memasang glass blok


kolom 30 x 30 0.90 x 5.00 x 4
kolom 15 x 20 0.50 x 5.00 x 12

5 Memasang finishing siar pasangan dinding bata merah ( = 20 M' )


380.94 + 48.00
Memasang finishing siar pasangan dinding bata m

6 Memasang paving
belakang 0.20 x 1.80 x 5
samping 0.20 x 1.80 x 6
depan 0.20 x 1.80 x 4
0.20 x 3.00 x 1
4.50
5.40
3.60
1.50
15.00
7 Memasang paving tb. 8 cm, K.175, warna
belakang 1.00 x 9.00 x 5
samping 1.00 x 9.00 x 6
depan 1.00 x 9.00 x 4
1.00 x 15.00 x 1
Memasang paving tb. 8 cm

III. PEKERJAAN BETON


A. BETON FOOTPLAT DAN KOLOM
1 Membuat beton mutu f'c = 14,5 Mpa (K 175), lantai kerja
footplat 30 x 30 0.10 x 1.00 x 1.00 x 4
Membuat beton mutu f'c = 14,5 Mpa (K 1

2 Membuat beton mutu f'c =12,2 Mpa


footplat 30 x 30 foot 0.30 x 1.00 x 1.00 x 4
atas 0.30 x 0.30 x 6.00 x 4
Membuat

3 Membuat PVC Waterstop lebar 150 mm


3.36 x 175.00
Membuat PVC Waterstop

4 Memasang 10 kg kabel presstressed polos / strands


0.30 x 6.00 x 4 x 4

B. BETON SLOOF
1 Membuat beton mutu f'c = 7,4 Mpa (mutu K 100)
Sloof (15/20) 0.15 x 0.20 x 50.00
Membuat beton mutu f'c = 7,4 Mp

2 Membuat PVC Waterstop lebar 150 mm


1.50 x 175.00
Membuat PVC Waterstop

3 Memasang lantai keramik ukuran ( 33 x 33 ) cm


Sloof (15/20) 0.25 x 50.00 x 2

Memasang lantai keramik ukura

C. BETON KOLOM 15/25


1 Membuat beton mutu f'c = 7,4 Mpa (mutu K 100)
kolom 15/25 0.15 x 0.25 x 4.60 x 12
Membuat beton mutu f'c = 7,4 Mp
2 Membuat PVC Waterstop lebar 150 mm
2.07 x 150.00
Membuat PVC Waterstop

3 Memasang 10 kg kabel presstressed polos / strands


kolom 15/25 0.15 x 4.60 x 12 x 2
0.25 x 4.60 x 12 x 1

Memasang 10 kg kabel presstressed

C. BETON BALOK LATAI 12/12


1 Membuat beton mutu f'c = 7,4 Mpa (mutu K 100)
Balok Latio 0.12 x 0.20 x 50.00
Membuat beton mutu f'c = 7,4 Mp

2 Membuat PVC Waterstop lebar 150 mm


1.20 x 150.00
Membuat PVC Waterstop

3 Memasang lantai keramik ukuran ( 33 x 33 ) cm


0.12 x 2 x 50.00

Memasang lantai keramik ukura

D. BETON PLAT TOPI


1 Membuat beton mutu f'c = 7,4 Mpa (mutu K 100)
0.10 x 0.70 x 2.08 x 4
0.10 x 0.70 x 1.89 x 2
Membuat beton mutu f'c = 7,4 Mp
2 Membuat PVC Waterstop lebar 150 mm
0.84 x 130.00
Membuat PVC Waterstop

3 Memasang lantai keramik ukuran ( 33 x 33 ) cm


0.70 x 2.08 X 4
0.70 x 1.89 X 2
Memasang lantai keramik ukura

E. BETON RING BALOK


1 Membuat beton mutu f'c = 7,4 Mpa (mutu K 100)
ringbalk 15/20 0.12 x 0.20 x 50.00
Membuat beton mutu f'c = 7,4 Mp

2 Membuat PVC Waterstop lebar 150 mm


1.20 x 150.00
Membuat PVC Waterstop

3 Memasang lantai keramik ukuran ( 33 x 33 ) cm


ringbalk 15/20 0.25 x 50.00 x 2

Memasang lantai keramik ukura

F. RABAT BETON
1 Memasang dinding dinding bilik, rangka kayu kelas III atau IV
rabat beton lantai 0.10 x 14.85 x 9.85
Memasang dinding dinding bilik, rangka kayu

IV. PEKERJAAN PINTU JENDELA


1 (K3) Memasang 1 buah MCB
3.00 x 3.43
(K3) Memasa
2 Membuat rangka jendela besi scuare tube
Pintu 2.69 x 2 x 2
1.69 x 2 x 2
0.40 x 1 x 2

Jendela 1.09 x 4 x 4
1.50 x 3 x 4
Membuat rangka jendela be

3 Pasang kusen pintu dan jendela kayu kamper


Pintu 0.004356 x 2.69 x 2 x 2
0.004356 x 1.69 x 2 x 2
Pasang kusen pintu dan jendel

4 Pasang kusen pintu dan jendela, kayu kruing


Pintu 1.40 x 2.20 x 2
Pasang kusen pintu dan jende

5 Memasang bak kontrol pas. Batu bata ( 45 x 45 x 50 2 x 6


6 Memasang pipa PVC tipe AW diameter 1 1/2" 2 x 1
7 Memasang sunscreen alluminium
Pintu 0.6775 x 0.40 x 2 x 2

Jendela 0.50 x 0.555 x 3 x 4


0.50 x 0.40 x 3 x 4
Memasang sunscr

V. PEKERJAAN ATAP
1 Pasang genteng keramik
5.00 + 17.00 x 7.00 x 2
2
- + 12.00 x 7.00 x 2
2
Pasang g

2 Pasang genteng Kodok Kebumen

Pasang genteng K
3 Memasang wallpaper, lebar 50 cm

Memasang wallpap
4 Memasang plint kayu kelas II ukuran ( 2 x 10 ) cm
5.00
7.00 x 4
Memasang plint kayu kelas II ukur
5 Memasang langit-langit ( 60 x 60 ) cm kayu kruing
17.00 x 2
12.00 x 2
Memasang langit-langit ( 60 x 60 )

VI. PEKERJAAN ELECTRICAL


1 Memasang kunci tanam biasa 8
2 Memasang engsel pintu, super 2
3 Err:509 1
4 Memasang paving tb. 8 cm, K.250, warna 8

VII. PEKERJAAN CAT


1 Pembuatan groundtank ( 2 m x 2 m x 3 m )
2 Tandon air stainless 1 m3
3 Memasang saluran U.20 cm
Pintu 1.43 x 2.23 x 2 x 2
Memasang s
4 Sumur resapan
3.00 x 3.43 x 1 x 2
(DBHCHT)

JUMLAH
VOLUME VOLUME

128.00
n dan pemasangan bouwplank 128.00

24.00
24.00
24.00
24.00
9.00
nggali tanah biasa sedalam 2 m' 105.00

pondasi bata merah


57.00 10.26 104.00
57.00 10.26 84.00
57.00 10.26 80.00
57.00 10.26
7.00 1.26 30.00
7.00 1.26 18.00
7.00 1.26 6.00
7.00 1.26
72.00 12.96
72.00 12.96
30.00 5.40
18.00 3.24
5.00 0.90
3.00 0.54
5.00 0.90
2.50 0.45
5.00 0.90
12.00 2.16
ggali tanah biasa sedalam 1 m' 86.49
322.00

9.41
9.41
9.41
9.41
3.53
21.62

676.80
42.00
102.60
102.60 100.00
engurugan kembali galian tanah 886.79
695.30
Urug tanah padat 695.30

886.79
Memadatkan tanah ( per 20 cm ) 886.79

1.60
1.60
1.60
1.60
0.60
28.83
56.40 lantai keramik
3.50
8.55
8.55
1.50 78.50
Mengurug pasir urug 114.33

326.74

atu belah, campuran 1 PC : 6 PP 326.74


1,104.46
ebal 1/2 bata , camp 1 PC : 6 PP 1,104.46

6.50
3.42
23.98
4.00
28.73
11.05
34.07
3.47
23.65
138.87
uat dinding bata merah tebal 1/2 bata , camp
965.59
1 PC : 6 PP

1,931.18
steran 1 PC : 5 PP, tebal 15 mm 1,931.18

57.60
57.60
57.60
57.60
21.60
92.16
13.44
1.50
17.16
55.44
89.60
68.80
Memasang glass blok 590.10

2,521.28
n dinding bata merah ( = 20 M' ) 2,521.28

128.00
128.00
128.00
128.00
48.00
104.00
84.00
ding conblock ekspose ( = 8 M' ) 748.00

1.00

1.60
1.60
1.60
1.60
0.60
= 14,5 Mpa (K 175), lantai kerja 7.00

4.80
4.61
9.41

4.80
4.61
9.41

4.80
4.61
9.41
4.80
4.61
9.41
1.80
1.73
3.53
41.17
mbuat beton mutu f'c = 14,5 Mpa (K 175), lantai
41.17 kerja

6,916.56
t PVC Waterstop lebar 150 mm 6,916.56
30.72 dipakai 3 kali
30.72
30.72
30.72
30.72
30.72
30.72
30.72
11.52
11.52
268.80
ai keramik ukuran ( 33 x 33 ) cm 89.60

13.74
3.42
Membuat beton mutu f'c =12,2 Mpa17.16

3,003.00
t PVC Waterstop lebar 150 mm 3,003.00

dipakai 3 kali
183.25
45.60
228.85
ai keramik ukuran ( 33 x 33 ) cm 76.28

5.18
5.18
5.18
5.18
1.94

uat beton mutu f'c =12,2 Mpa 22.66

3,965.50
t PVC Waterstop lebar 150 mm 3,965.50

34.56 dipakai 3 kali


34.56
34.56
34.56
34.56
34.56
34.56
34.56
12.96
12.96

302.40
ai keramik ukuran ( 33 x 33 ) cm 100.80

13.86
2.48
2.45
5.08 47.00
4.54 42.00
4.00 42.00
0.50
3.13
0.27
0.39
0.20
0.19
0.45
0.45
225), slump (12 + 2), w/c = 0,58 37.99

6,560.87
t PVC Waterstop lebar 150 mm 6,560.87

42.00
110.88
7.50
19.80
9.60
24.48
28.20
50.76
25.20
45.36
22.20
39.96
2.80
5.04
17.40
41.76
0.71
2.70
1.02
5.15
1.13
2.70
1.08
2.58
1.00
4.50
1.00
4.50
bel presstressed polos / strands 521.01

84.60 47.00
2.88
4.20
beton mutu f'c = 19,3 Mpa (K 225), slump (12
91.68
+ 2), w/c = 0,58

11,918.40
t PVC Waterstop lebar 150 mm 11,918.40

705.00
24.00
35.00
Memasang bekisting untuk sloof 764.00

2.27
mutu f'c = 7,4 Mpa (mutu K 100) 2.27

340.50
t PVC Waterstop lebar 150 mm 340.50

47.33 dipakai 3 kali


47.33
ai keramik ukuran ( 33 x 33 ) cm 15.78

4.64
-
3.20
2.78
mutu f'c = 7,4 Mpa (mutu K 100) 10.62

1,593.00
t PVC Waterstop lebar 150 mm 1,593.00

77.28 dipakai 3 kali

21.34
7.53
34.80
4.64
145.59
ai keramik ukuran ( 33 x 33 ) cm 48.53

28.20
1.75
4.28
4.28
0.75
lik, rangka kayu kelas III atau IV 39.26

518.86
35.00
85.50
85.50
15.00
mpeng tdk beraturan tanpa nat 739.86
788.50

282.00
168.00
10.00
28.00
3.00
57.00
3.00
57.00
lint keramik ukuran (10x40) cm 608.00
48.64
38.07
3.65
3.42
ux marmer ukuran (10 x 40) cm 45.14

117.18
13.53
5.66
emasang lantai kayu (gymfloor) 136.37

27.36
9.12
Memasang paving 36.48

9.00
g paving tb. 8 cm, K.175, warna 9.00

78.12
9.02
3.77
ng plint keramik uk. (10x20) cm 90.91

26.35
15.65
45.00
1 m' "step nose" uk. (10x40) cm 87.00

9.59
Pasang batu andesit 3x30 9.59

112.58
Memasang saluran U.20 cm 112.58

12.00
Memasang saluran D.20 cm 12.00

1.00
3.53
Kaca framelist 8 mm 3.53

10.76
3.20

64.56
9.60

64.56
19.20
20.28
18.00

81.12
54.00

11.76
12.00
angka jendela besi scuare tube 369.04
0.05
0.01

0.28
0.04

0.28
0.04
pintu dan jendela kayu kamper 0.70

3.52

21.12

21.12
n pintu dan jendela, kayu kruing 45.76
0.64

3.84
2.40

20.79
7.20

2.40
emasang sunscreen alluminium 37.27
78.00 78.00
26.00 26.00
14.00 14.00

504.00
31.77
10.69
Err:509 Err:509

504.00
31.77
10.69
git akustik ukuran ( 30 x 30 ) cm 546.46

252.00
336.00
9.70
13.10
9.10
9.40
t akustik ukuran ( 60 x 120 ) cm 629.30

14 14.00
12 12.00
12 12.00
13 13.00
14 14.00
12 12.00
14 14.00
35.00 118 117.60
300.00 300.00
13 13.00
3 3.00
3 3.00

4.00 4.00
13.00 13.00
24 98.00 98.00
23.00 23.00
16.00 16.00
13.00 13.00
24 98.00 98.00
- 1.00

1,890.96
630.32
546.46

7.40
44.42

44.42
Memasang saluran U.20 cm 96.24

17.54
16.12
42.00
RAILING TANGGA 75.66

3.60
21.00
ggali tanah biasa sedalam 1 m' 24.60

0.78
2 4.50

43.88
engurugan kembali galian tanah 49.16
24.56
Urug tanah padat 24.56

49.16
Memadatkan tanah ( per 20 cm ) 49.16

0.40
2.25
7.31
4.05
Mengurug pasir urug 14.01

17.00

atu belah, campuran 1 PC : 6 PP 17.00

230.00
ebal 1/2 bata , camp 1 PC : 6 PP 230.00

9.23
8.02
11.68
5.60
2.40
2.60 39.53
uat dinding bata merah tebal 1/2 bata , camp
190.47
1 PC : 6 PP

380.94
steran 1 PC : 5 PP, tebal 15 mm 380.94

18.00
30.00
Memasang glass blok 48.00

428.94
n dinding bata merah ( = 20 M' ) 428.94

1.80
2.16
1.44
0.60
Memasang paving 6.00

45.00
54.00
36.00
15.00
g paving tb. 8 cm, K.175, warna 150.00

0.40
= 14,5 Mpa (K 175), lantai kerja 0.40

1.20
2.16
Membuat beton mutu f'c =12,2 Mpa 3.36

588.00
t PVC Waterstop lebar 150 mm 588.00

28.80 dipakai 2 kali


28.80
footplat 30 x 30 14.40

1.50
mutu f'c = 7,4 Mpa (mutu K 100) 1.50

262.50
t PVC Waterstop lebar 150 mm 262.50

dipakai 2 kali
25.00
25.00
ai keramik ukuran ( 33 x 33 ) cm 12.50

2.07
mutu f'c = 7,4 Mpa (mutu K 100) 2.07
310.50
t PVC Waterstop lebar 150 mm 310.50

16.56 dipakai 2 kali


13.80
30.36
bel presstressed polos / strands 15.18

1.20
mutu f'c = 7,4 Mpa (mutu K 100) 1.20

180.00
t PVC Waterstop lebar 150 mm 180.00

12.00 dipakai 2 kali


12.00
ai keramik ukuran ( 33 x 33 ) cm 6.00

0.58
0.26
mutu f'c = 7,4 Mpa (mutu K 100) 0.84

109.20
t PVC Waterstop lebar 150 mm 109.20

5.82
2.65
ai keramik ukuran ( 33 x 33 ) cm 8.47

1.20
mutu f'c = 7,4 Mpa (mutu K 100) 1.20

180.00
t PVC Waterstop lebar 150 mm 180.00

dipakai 2 kali
25.00
25.00
ai keramik ukuran ( 33 x 33 ) cm 12.50

14.63
lik, rangka kayu kelas III atau IV 14.63

10.29
(K3) Memasang 1 buah MCB 10.29

10.76
6.76
0.80

17.44
18.00
angka jendela besi scuare tube 53.76

0.05
0.01
pintu dan jendela kayu kamper 0.06

6.16
n pintu dan jendela, kayu kruing 6.16

12.00 12.00
2.00 2.00

1.08

3.33
2.40
emasang sunscreen alluminium 6.81

154.00
84.00

Pasang genteng keramik 238.00

asang genteng Kodok Kebumen 238.00

masang wallpaper, lebar 50 cm 238.00

5.00
28.00
ayu kelas II ukuran ( 2 x 10 ) cm 33.00

34.00
24.00
angit ( 60 x 60 ) cm kayu kruing 58.00

8.00 8.00
2.00 2.00
1.00 1.00
8.00 8.00

321.70
107.24

12.76
Memasang saluran U.20 cm 12.76

20.58
Sumur resapan 20.58
USULAN HARGA SATUAN UPAH DAN BAHA
DINAS PEKERJAAN UMUM DAN PENAT
KABUPATEN KARANGANYA

1. WILAYAH I : KARANGANYAR, TASIKMADU, JATEN, KEBAKKRAMAT, COLOMADU, GONDANGREJO


2. WILAYAH II : JUMANTONO, JUMAPOLO, JATIPURO, MATESIH, KARANGPANDAN, MOJOGEDANG, KERJO,
3. WILAYAH III : JENAWI, TAWANGMANGU, JATIYOSO

I. HARGA UPAH

NO. URAIAN TENAGA SATUAN

1 2 3

1 Ass. Driller OH
2 Buruh semi terlatih OH
3 Buruh tak terlatih/Pekerja OH
4 Buruh terlatih OH
5 Crew Drilling OH
6 Driller OH
7 Geologis OH
8 Kepala tukang batu OH
9 Kepala tukang besi OH
10 Kepala tukang cat OH
11 Kepala tukang gali OH
12 Kepala tukang kayu OH
13 Koordinator logging OH
14 Mandor OH
15 Mekanik terlatih OH
16 Masinis/operator OH
17 Mekanik welder OH
18 Operator pompa OH
19 Operator semi terlatih/stoker OH
20 Operator terlatih OH
21 Pembantu geologis OH
22 Pembantu masinis/operator OH
23 Pembantu mekanik OH
24 Pembantu sopir OH
25 Penjaga malam OH
26 Sopir OH
27 Tukang batu OH
28 Tukang besi OH
29 Tukang cat OH
30 Tukang gali OH
31 Tukang kayu OH
32 Tukang las OH
33 Tukang listrik OH
34 Tukang masak aspal OH
35 Tukang pipa/pompa OH

II. HARGA BAHAN

NO. URAIAN TENAGA SATUAN

1 2 3

A. BAHAN BANGUNAN
1 Abu batu m³
2 Air ltr
3 Aluminium foil m2
4 Aluminium strip m'
5 Amplas besi/kayu lbr
6 Asbes bubungan gelombang m'
7 Asbes gelombang besar ( 100 x 200 ) lbr
8 Asbes gelombang kecil ( 100 x 120 ) lbr
9 Aspal curah kg
10 Aspal pen. 60/70 (kemasan drum) kg
11 Atap galvalum tebal 0,3 m²
12 Atap galvalum & laminasi m²
13 Atap galvalum rangka baja ringan m²
14 Atap galvalum rangka hollow m²
15 Atap kerpus onduline 0,5 m
16 Atap onduline lbr
17 Atap multiroof pasir lbr
18 Atap multiroof bubungan m'
19 Atap polycarbonat m²
20 Atap polycarbonat rangka besi tempa m²
21 Atap polycarbonat rangka hollow m²
22 Atap polycarbonat rangka stainleess m²
23 Automatic Water Level unit
24 Avour stainless bh
25 Baja konstruksi kg
26 Bambu apus 4 m' ljr
27 Bambu ori 4 m' ljr
28 Bataco bj
29 Batu andesit (20x20) m²
30 BATA RINGAN m³
31 Batu apung/kambang kg
32 Batu bata merah bj
33 Batu berongga ekspos bh
34 Batu blondos m³
35 Batu candi m²
36 Batu kali m³
37 Batu lempeng m²
38 Batu palimanan m²
39 Batu paras m²
40 Batu pecah ½/1 cm / Mesin m³
41 Batu pecah 1/2 cm / Mesin m³
42 Batu pecah 2/3 cm (split) / Mesin m³
43 Batu pecah 3/5 cm / Mesin m³
44 Batu pecah 2/3 cm m³
45 Batu pecah 3/5 cm m³
46 Batu pecah 5/7 cm m³
47 Batu pecah 10/15 cm m³
48 Batu pecah 15/20 cm m³
49 Baut baja kg
50 Besi beton kg
51 Besi Hollow 1,8/3,8 cm t:0,3 m'

1 2 3
52 Besi Hollow 3,8/3,8 cm t:0,3 m'
53 Besi Hollow galvanis 1,8/3,8 cm t:0,3 m'
54 Besi Hollow galvanis 3,8/3,8 cm t:0,3 m'
55 Besi profil siku kg
56 Besi teralis strip plat kg
57 Besi Wire Mesh M 5 (4,5 mm) uk. 2,1 x 5,4 lbr
58 Besi Wire Mesh M 6 (5,2 mm) uk. 2,1 x 5,4 lbr
59 Besi Wire Mesh M 6 (5,5 mm) uk. 2,1 x 5,4 lbr
60 Besi Wire Mesh M 6 (5,6 mm) uk. 2,1 x 5,4 lbr
61 Besi Wire Mesh M 7 (6,5 mm) uk. 2,1 x 5,4 lbr
62 Besi Wire Mesh M 8 (7,2 mm) uk. 2,1 x 5,4 lbr
63 Besi Wire Mesh M 8 (7,5 mm) uk. 2,1 x 5,4 lbr
64 Besi Wire Mesh M 8 (7,6 mm) uk. 2,1 x 5,4 lbr
65 Besi Wire Mesh M 10 (9,5 mm) uk. 2,1 x 5,4 lbr
66 Besi Wire Mesh M 12 (11,5 mm) uk. 2,1 x 5,4 lbr
67 Buis beton ½ Ø 20 cm m'
68 Buis beton ½ Ø 30 cm m'
69 Buis beton Ø 20 cm m'
70 Buis beton Ø 30 cm m'
71 Buis beton Ø 40 cm m'
72 Buis beton Ø 50 cm m'
73 Buis beton Ø 60 cm m'
74 Buis beton Ø 80 cm ½ m´ bj
75 Buis beton Ø 100 cm ½ m´ bj
76 Cat besi kg
77 Cat kayu (luar) kg
78 Cat kayu (dalam) kg
79 Cat tembok ( dalam ) kg
80 Cat tembok ( luar ) kg
81 Check valve Ø 1.5" bh
82 Closet duduk ex. INA/American Standard bh
83 Closet duduk ex. Toto bh
84 Closet duduk monoblock bh
85 Closet jongkok keramik bh
86 Closet jongkok ex. INA/American Standard bh
87 Dempul jadi/Wood Filler kg
88 Down light 4" bh
89 Engsel jendela biasa bh
90 Engsel jendela sedang bh
91 Engsel jendela super bh
92 Engsel pintu biasa bh
93 Engsel pintu sedang bh
94 Engsel pintu super bh
95 Eternit asbes ( 1,00 x 1,00 ) 3 mm lbr
96 Fiberglass (bak air) 0,50 m3 bh
97 Fiberglass (bak air) 1,00 m3 bh
98 Fitting porselin bh
99 Flang steel Ø 2" bh
100 Floor drain STAINLESS bh
101 Folding Gate tebal 1,20 mm m²
102 Folding Gate tebal 0,08 mm m²
103 Folding Gate tebal 0,06 mm m²
104 Folding Gate tebal 0,04 mm m²
105 Genting beton standard bh
106 Genting kerpus beton bh
107 Genteng ex. Mojolaban/Mantili bh
108 Genteng kerpus ex. Mojolaban bh
109 Genteng magas Kebumen bh
110 Genteng morando Kebumen bh

1 2 3
111 Genteng kerpus Kebumen bh
112 Genteng morando Jatiwangi bh
113 Genteng kerpus Jatiwangi bh
114 Genteng glasur Jatiwangi bh
115 Genteng kerpus glasur Jatiwangi bh
116 Genteng glasur Kebumen bh
117 Genteng kerpus glasur Kebumen bh
118 Genteng keramik bh
119 Genteng kerpus keramik bh
120 Glass Block 20x20 bh
121 Glass Block 30x30 bh
122 Granit tile 40 x 40 cm Warna tua m2
123 Granit tile 40 x 40 cm Warna muda m2
124 Granit tile 60 x 60 cm Warna tua m2
125 Granit tile 60 x 60 cm Warna muda m2
126 Granit tile 80 x 80 cm Warna tua m2
127 Granit tile 80 x 80 cm Warna muda m2
128 Granit tile 100 x 100 cm Warna tua m2
129 Granit tile 100 x 100 cm Warna muda m2
130 Granit/ubin 100 x 100 (batu granit) m2
131 Gravel Pack Ø 0,5 - 1,5 cm m³
132 Grease (paselin) kg
133 Grendel biasa bh
134 Grendel sedang bh
135 Grendel super bh
136 Grosok 2/3 cm m³
137 Grosok jagung m³
138 GRC (120 x 240 cm) t: 5 mm lbr
139 Gypsum board (120 x 240 cm) t: 6.5 mm lbr
140 Gypsum board (120 x 240 cm) t: 9 mm lbr
141 Hak angin biasa bh
142 Hak angin sedang bh
143 Hak angin super bh
144 Handle Jendela bh
145 Harplex 3 mm (1,00 x 1,00) lbr
146 HB. 20 ### bh
147 Hospital plint fiber bh
148 Hospital plint keramik bh
149 Ijuk kg
150 Jet sower bh
151 Kabel listrik 1.50 mm m'
152 Kabel listrik 2.50 mm m'
153 Kabel power unit
154 Kaca aluminium profil m'
155 Kaca aluminium patri m'
156 Kaca bening 3 mm m2
157 Kaca bening 5 mm m2
158 Kaca bening 6 cm m2
159 Kaca bening 8 mm m2
160 Kaca es 5 mm m2
161 Kaca framelist 8 mm unit
162 Kaca naco/daun bening m2
163 Kaca rayband 5 mm m2
164 Kaca tempered 12 mm + komplit unit
165 Kanstein beton (0,15x0,4x0,6) bh
166 Karpet biasa m2
167 Karpet tebal m2
168 Kawat bendrat kg
169 Kawat bronjong kg

1 2 3
170 Kawat duri (30 m') roll
171 Kawat D 4 mm kg
172 Kawat las listrik (lastok) kg
173 Kawur/kapur Pasang m³
174 Kayu bakar kg
175 Kayu begesting m³
176 Kayu begesteng steiger/dolken 4 M' bh
177 Kayu dudukan fitting bh
178 Kayu bangkiray Balok m³
179 Kayu bangkiray Papan m³
180 Kayu jati untuk Konstrusi Jembatan m³
181 Kayu jati untuk perquet m²
182 Kayu jati hutan untuk Kusen m³
183 Kayu jati hutan untuk Rangka Atap m³
184 Kayu jati lokal untuk Kusen m³
185 Kayu jati lokal untuk Rangka Atap m³
186 Kayu kamper Balok m³
187 Kayu kamper Papan m³
188 Kayu kruing Balok m³
189 Kayu kruing Papan m³
190 Kayu list profil m'
191 Kayu meranti 5/7 m³
192 Kayu meranti reng 2/3 m³
193 Kayu meranti papan 30 cm m³
194 Kayu perancah/sengon m³
195 Kayu sengon kaso 5/7 m³
196 Kayu sengon papan m³
197 Kayu sirap jati hutan pak
198 Keramik 20 x 20 m2
199 Keramik 20 x 25 dinding m2
200 Keramik 30 x 30 polos m2
201 Keramik 30 x 30 warna motif m2
202 Keramik 30 x 30 eksterior texture m2
203 Keramik 30 x 60 dinding m2
204 Keramik 40 x 40 polos m2
205 Keramik 40 x 40 warna motif m2
206 Keramik 40 x 40 eksterior texture m2
207 Keramik 40 x 40 (Platinum) m2
208 Keramik kayu m2
209 Keramik 10 x 40 cm stepnose bh
210 Kerikil sungai di Quary m³
211 Knie galvanis Ø 2" - 90º dan 45º bh
212 Kran air d 1" biasa bh
213 Kran air d 1" sedang bh
214 Kran air d 1" super bh
215 Kran air d 3/4" biasa bh
216 Kran air d 3/4" sedang bh
217 Kran air d 3/4" super bh
218 Kran air d 1/2" biasa bh
219 Kran air d 1/2" sedang bh
220 Kran air d 1/2" super bh
221 Kran tipe handle Ø 3/4" bh
222 Kusen aluminium coklat 4" m'
223 Kusen aluminium coklat 3" m'
224 Kusen aluminium motif kayu 4" m'
225 Kusen aluminium putih 4" m'
226 Kusen aluminium silver 4" m'
227 Kusen aluminium silver 3" m'
228 Kuwas bh

1 2 3
229 Lampu SL 18 watt bh
230 Lampu SL 20 watt bh
231 Lampu TL 20 watt komplit bh
232 Lem kayu kg
233 Lem kuning (ex. Aica Aibon) kg
234 Lem kuning putih (ex. Fox) kg
235 Lem wallpaper kg
236 List gypsum profil m
237 Marmer Tulung Agung 30 x 30 cm m2
238 Marmer Tulung Agung 40 x 40 cm m2
239 Marmer Tulung Agung 60 x 60 cm m2
240 Marmer Tulung Agung 80 x 80 cm m²
241 Marmer Tulung Agung 100 x 100 cm m²
242 Marmer ex. import m²
243 Marmer ex. import Italy m²
244 MCB 32 amper bh
245 MCB bh
246 MCB Box bh
247 Meni besi kg
248 Meni kayu kg
249 Minyak begesting ltr
250 Minyak bensin non subsidi ltr
251 Minyak pelumas ltr
252 Minyak pertamax ltr
253 Minyak premium ltr
254 Minyak solar non subsidi ltr
255 Multiplex 4 mm lbr
256 Multiplex 6 mm lbr
257 Multiplex 8 mm lbr
258 Multiplex 9 mm lbr
259 Multiplek 12 mm lbr
260 Pagar BRC (ting. 0,9 m x pj. 2,4 m x d. 6 mm ) lbr
261 Paku eternit kg
262 Paku pacing kg
263 Paku pacing bj
264 Paku reng kg
265 Paku sekrup kg
266 Paku sekrup bj
267 Paku sekrup fisher/dynebolt/ramset bj
268 Paku sekrup onduline bj
269 Paku triplek 2 cm kg
270 Paku usuk kg
271 Pasang rangka atap baja ringan m2
272 Portland Cement (PC) 40 Kg kg
273 PC putih (40 Kg) kg
274 PC warna (40 Kg) kg
275 Panel control lengkap unit
276 Pasir beton woro m³
277 Pasir pasang m³
278 Pasir sirtu lokal m³
279 Pasir sirtu woro m³
280 Pasir tras m³
281 Pasir urug m³
282 Paving 6 cm (kotak) m²
283 Paving 6 cm (segi enam) m²
284 Paving 8 cm m²
285 Paving 6 cm K.175 (abu-abu) m²
286 Paving 6 cm K.175 (warna) m²
287 Paving 8 cm K.175 (abu-abu) m²

1 2 3
288 Paving 8 cm K.175 (warna) m²
289 Paving 6 cm K. 225 m²
290 Paving 8 cm K. 225 m²
291 Paving 6 cm K.250 (abu-abu) m²
292 Paving 6 cm K.250 (warna) m²
293 Paving 8 cm K.250 (abu-abu) m²
294 Paving 8 cm K.250 (warna) m²
295 Paving 8 cm K.300 (abu-abu) m²
296 Paving 8 cm K.300 (warna) m²
297 Paving Difabel bh
298 Paving Grass Block m²
299 Pintu KM/WC sedang bh
300 Pintu PVC biasa bh
301 Pintu aluminium ram m2
302 Pipa Air Besi Ø 1/2 " / 6 m btg
303 Pipa Air Besi Ø 3/4 " / 6 m btg
304 Pipa Air Besi Ø 1 " / 6 m btg
305 Pipa Air Besi Ø 1,25 " / 6 m btg
306 Pipa Air Besi Ø 1,5 " / 6 m btg
307 Pipa Air Besi Ø 2 " / 6 m btg
308 Pipa Air Besi Ø 2,5 " / 6 m btg
309 Pipa Air GI Med. A Ø 1/2 " / 6 m btg
310 Pipa Air GI Med. A Ø 3/4 " / 6 m btg
311 Pipa Air GI Med. A Ø 1 " / 6 m btg
312 Pipa Air GI Med. A Ø 1,25 " / 6 m btg
313 Pipa Air GI Med. A Ø 1,5 " / 6 m btg
314 Pipa Air GI Med. A Ø 2 " / 6 m btg
315 Pipa Air GI Med. A Ø 2,5 " / 6 m btg
316 Pipa galvanis Ø 1,5" / 6 m. t= 2,5 mm btg
317 Pipa galvanis Ø 2 " / 6 m. t= 2,5 mm btg
318 Pipa galvanis Ø 3 " / 6 m. t= 2,5 mm btg
319 Pipa PVC Ø 1/2" / 4 m AW btg
320 Pipa PVC Ø 3/4" / 4 m AW btg
321 Pipa PVC Ø 1" / 4 m AW btg
322 Pipa PVC Ø 1,5" / 4 m AW btg
323 Pipa PVC Ø 2" / 4 m AW btg
324 Pipa PVC Ø 2,5" / 4 m AW btg
325 Pipa PVC Ø 3" / 4 m AW btg
326 Pipa PVC Ø 4" / 4 m AW btg
327 Pipa PVC Ø 6" / 4 m AW btg
328 Pipa PVC Ø 8" / 4 m AW btg
329 Pipa PVC S. 12.50 Ø 1 1/2" - 6 m btg
330 Pipa PVC S. 12.50 Ø 2" - 6 m btg
331 Pipa PVC S. 16 Ø 2" - 6 m btg
332 Pipa PVC S. 16 Ø 4" - 6 m btg
333 Plamir kg
334 Plint granit 10 x 20 cm m2
335 Plint granit 10 x 30 cm bh
336 Plint granit 10 x 40 cm bh
337 Plint granit 10 x 60 cm bh
338 Plint keramik 8 x 20 cm bh
339 Plint keramik 10 x 20 cm bh
340 Plint keramik 10 x 40 cm bh
341 Plint keramik 10 x 40 cm bh
342 Plint keramik 10 x 60 cm bh
343 Plint teraso bh
344 Plint ubin PC warna 15 x 20 cm bh
345 Politur ltr
346 Politur jadi ltr

1 2 3
347 Pompa Air (listrik) 450 watt ex. Dab bh
348 Pompa Submersible 2 pk, Q = 2 lt, H = 70 m unit
349 Pompa Submersible 3 pk, Q = 2 lt, H = 70 m unit
350 Profil aluminium m
351 Ram m
352 Ramset bh
353 Residu/ter ltr
354 Rolling door aluminium m2
355 Roster batu alam bh
356 Roster beton bh
357 Roster kayu jati bh
358 Roster tanah/genting bh
359 Roster keramik uk. 30x30 bh
360 Saklar ganda bh
361 Saklar tunggal bh
362 Sealant tube
363 Seal tape bh
364 Seling pengaman unit
365 Seng Glmbg.BJLS-0,3 ( 0,9 m x 1,8 m) lbr
366 Seng Glmbg.BJLS-0,3 ( 0,9 m x 2,1 m ) lbr
367 Seng Plat BJLS-0,3 ( 0.9 m x 1,8 m ) lbr
368 Seng Talang Bjls 0.3 lebar 0,60 m´
369 Seng Talang Bjls 0.3 lebar 0,90 m´
370 Shower bh
371 Slot biasa ( kuda terbang ) bh
372 Slot kunci pipih biasa bh
373 Slot Kunci Pipih sedang bh
374 Slot Kunci Pipih super bh
375 Stabilizer 5000 Watt bh
376 Stop kontak bh
377 Stop kran kuningan 3/4" bh
378 Stop kran KUNINGAN tipe handle Ø 1.5" bh
379 Stop kran KUNINGAN tipe handle Ø 2" bh
380 Strorox-100 kg
381 Tanah bentonit kg
382 Tanah cadas m³
383 Tanah liat m³
384 Tanah urug pilihan m³
385 Tandon air 1000 lt (fiber) bh
386 Tandon air 1000 lt (stainless) bh
387 Teakwood 4 mm ( 1,20 x 240 ) lbr
388 Teakwood 3 mm ( 1,20 x 2,40 ) lbr
389 Tegel abu-abu 20 x 20 cm m²
390 Tegel abu-abu 30 x 30 cm m²
391 Tegel wafel abu-abu m²
392 Tegel wafel warna m²
393 Tepung gypsum kg
394 Tiang listrik beton C11.350 daN E bh
395 Tiang listrik beton C11.350 daN E BC bh
396 Tiang listrik beton C11.200 daN E bh
397 Tiang listrik beton C9.200 daN E bh
398 Travo 50 KVA bh
399 Triplex 2.7 mm (1.2 x 2.4 ) Kruing lbr
400 Triplex 2.7 mm (1.2 x 2.4 ) Sengon lbr
401 Triplex 4 mm (1.2 x 2.4 ) Kruing lbr
402 Triplex 4 mm (1.2 x 2.4 ) Sengon lbr
403 Urinoir bh
404 Vernis ltr
405 Wallpaper lebar 50 cm m'

1 2 3
406 Wastafel komplit unit
407 Wasbak (bak cuci) stainless unit
408 Woodplank ( 4 M ) LBR

B. BAHAN BOX CULVERT TYPE BINA MARGA


BEBAN Gandar 21 Ton
1 BC 400x400x1000 unit
2 BC 500x500x1000 unit
3 BC 600x600x1000 unit
4 BC 800x800x1000 unit
5 BC 1000x1000x1000 unit
6 BC 1200x1200x1000 unit
7 BC 1400x1400x1000 unit
8 BC 1500x1500x1000 unit
9 BC 1600x1600x1000 unit
10 BC 1800x1800x1000 unit
11 BC 2000x2000x1000 unit

C. BAHAN PINTU PENGAIRAN

1 Plat daun pintu t: 8 mm m²


2 Drat ulir Ø 1 ½" m'
3 Drat ulir Ø 2" m'
4 Siku L 70.70.3 ljr
5 Anting baja bh
6 Anting baja bh
7 Stang pintu bh
8 Stang pemutar bh
9 Baut anting bh
10 Baut anting Ø ¾" bh
11 Baut penguat anting bh
12 Peluncur stanlis (2,20 x 0,04 x 5 mm ) bh
13 Siku L ( 9 x 9 x 7 mm ) m'
14 Baja kerangka pintu ( 12 x 5 x 6 mm) ljr
15 Baja C 12 ( 12,8 , 5,2 , 5 mm) ljr
16 Plat block frame 120 x 240 lbr
17 Siku pengait landasan ( 70 x 70 x 6 mm) bh
18 Besi angkur Ø12 bh
19 Baut bingkai Ø12 bh
20 Mur baut Ø 12 bh
21 Mur kuningan Ø 3 " bh
22 Mur kuningan Ø 2" bh
23 Baut pengait landasan Ø 16 bh
24 Pengait box bh
25 Baja Cu ( 70 x 200 x 70 ) ljr
26 Plat blok 120 x 240 lbr
27 Baut pesagen bh
28 Dudukan kuningan bh
29 Dudukan kuningan bh
30 Gigi kuningan bh
31 Gigi stang bh
32 Dudukan stang pemutar bh
33 As pemutar m'
34 Blok penyangga as bh
35 Mur kuningan Ø 3 " bh
36 Mur kuningan Ø 2" bh
37 Gigi nanas bh
38 Tutup pengaman gigi bh
39 Druk laker bh

1 2 3
40 Plat box 15 x 20 cm bh
41 Greese pelumas ls
42 Gembok kunci pengaman bh
43 Plat daun pintu t: 10 mm m²
44 Stang pintu engkel bh
45 Stang pintu doubel bh
46 Gir piringan ø 35 bh
47 Gir piringan ø 40 bh
48 Gir piringan ø 50 bh
49 Drat ulir 1 1/2" m'
50 Drat ulir 2" m'
51 Drat ulir 3" m'
52 Wortel mur ø 1 1/2" bh
53 Wortel mur ø 2" bh
54 Wortel mur ø 3" bh
55 Wortel mur ø 4" bh
56 Gigi nanas kecil bh
57 Gigi nanas besar bh
58 As pemutar gigi ø 2" m
59 Drat ulir ø 4" m
60 Plat penutup gir bh
61 Dudukan as pemutar gigi bh
62 Kerangka pintu siku 60 x 60 x 6 unit
63 Kerangka pintu siku 80 x 80 x 8 unit
64 Kerangka pintu siku 90 x 90 x 9 unit
65 Kerangka pintu siku 70 x 70 x 10 unit
66 Kerangka atas canal U 10 x 10 unit
67 Kerangka bawah duobel siku unit

Daftar Harga Pintu Sorong Baja


1 B = 0,50 ; H1 = 0,50 ; H2 = 3,00 bh
2 B = 0,60 ; H1 = 0,60 ; H2 = 3,50 bh
3 B = 0,70 ; H1 = 0,70 ; H2 = 4,00 bh
4 B = 0,80 ; H1 = 0,80 ; H2 = 4,50 bh
5 B = 0,90 ; H1 = 0,90 ; H2 = 5,00 bh

Daftar Haraga Pintu Tarik


1 B = 0,30 ; H1 = 0,30 ; H2 = 1,25 bh
2 B = 0,35 ; H1 = 0,35 ; H2 = 1,30 bh
3 B = 0,40 ; H1 = 0,40 ; H2 = 1,35 bh

Daftar Harga Pintu Drat Dobel Daun Besi


1 B = 1,50 ; H1 = 1,50 ; H2 = 3,50 bh
2 B = 1,75 ; H1 = 1,50 ; H2 = 4,00 bh
3 B = 2,00 ; H1 = 2,00 ; H2 = 5,00 bh
4 B = 2,00 ; H1 = 1,50 ; H2 = 6,00 bh

Daftar Harga Pintu Daun Kayu Drat Dobel


1 B = 1,00 ; H1 = 1,00 ; H2 = 3,00 bh
2 B = 1,50 ; H1 = 1,50 ; H2 = 3,50 bh
3 B = 2,00 ; H1 = 1,50 ; H2 = 4,00 bh
4 B = 2,00 ; H1 = 2,00 ; H2 = 5,00 bh

D. HARGA SEWA ALAT BERAT BINA MARGA


Kapasitas Alat
1 ASPHALT MIXING PLANT 60 T/Jam
2 ASPHALT FINISHER 10 Ton
3 ASPHALT SPRAYER 850 Liter
4 BULLDOZER 100-150 HP -

1 2 3
5 COMPRESSOR 4000-6500 L\M 5000 CPM/(L/m)
6 CONCRETE MIXER 0.3-0.6 M3 500 Liter
7 CRANE 10-15 TON 15 Ton
8 DUMP TRUCK 3.5 TON 3,5 Ton
9 DUMP TRUCK 10 TON 10 Ton
10 EXCAVATOR 80-140 HP 0,9 M3
11 FLAT BED TRUCK 3-4 M3 10 ton
12 GENERATOR SET 135 KVA
13 MOTOR GRADER >100 HP 10,800
14 TRACK LOADER 75-100 HP 0,8 M3
15 WHEEL LOADER 1.0-1.6 M3 1,5 M3
16 THREE WHEEL ROLLER 6-8 T 8,0 Ton
17 TANDEM ROLLER 6-8 T. 8,1 Ton
18 TIRE ROLLER 8-10 T. 9 Ton
19 VIBRATORY ROLLER 5-8 T. 7,1 Ton
20 CONCRETE VIBRATOR 25-
21 STONE CRUSHER T/Jam
22 WATER PUMP 70-100 mm -
23 WATER TANKER 3000-4500 L. 4000 Liter
24 PEDESTRIAN ROLLER 835 Ton
25 TAMPER 121 Ton
26 JACK HAMMER 1,330
27 FULVI MIXER 2,005
28 CONCRETE PUMP 8 M3
29 TRAILER 20 TON 20 Ton
30 PILE DRIVER + HAMMER 2,5 Ton
31 CRANE ON TRACK 35 TON 35 Ton
32 WELDING SET 250 Amp
33 BORE PILE MACHINE 2000 Meter
34 ASPHALT LIQUID MIXER 1000 Liter
35 TRONTON 15 Ton
36 ROCK DRILL BREAKER -
37 COLD MILLING 1000 m
38 COLD RECYCLER 2,2 M
39 HOT RECYCLER 3M
40 AGGREGAT (CHIP) SPREADER 3,5M
41 ASPHALT DISTRIBUTOR 4000 Liter
42 SLIP FORM PAVER 2,5 M
43 CONCRETE PAN MIXER 600 Liter
44 CONCRETE BREAKER 20 m3/jam
45 ASPHALT TANKER 4000 liter
46 CEMENT TANKER 4000 liter
47 CONCRETE MIXER (350) 350 liter
48 VIBRATING RAMMER 80 KG
49 TRUK MIXER (AGITATOR) 5 M3
50 BORE PILE MACHINE 60 CM
51 CRANE ON TRACK 75-100 TON 75 Ton
52 BLENDING EQUIPMENT 30 Ton
53 ASPHALT LIQUID MIXER 20000 Liter
54 Chain Saw
55 Dongkrak
56 Water Tanker Kap 15000-18000
57 Vibrator Compactor
58 Cement Spreader Truck
59 Smooth Drum Vibratory Roller
60 Padfoot Roller
AN HARGA SATUAN UPAH DAN BAHAN TAHUN 2018
NAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN KARANGANYAR

EBAKKRAMAT, COLOMADU, GONDANGREJO


ATESIH, KARANGPANDAN, MOJOGEDANG, KERJO, NGARGOYOSO

HARGA DASAR
USULAN HARGA SK BUPATI 2018
WILAYAH 1 WILAYAH 2 WILAYAH 3

4 5 6 7

126,000.00 100,000.00 100,000.00 100,000.00


82,000.00 65,000.00 65,000.00 65,000.00
76,000.00 60,000.00 60,000.00 60,000.00
89,000.00 70,500.00 70,500.00 70,500.00
82,000.00 65,000.00 65,000.00 65,000.00
177,000.00 140,000.00 140,000.00 140,000.00
221,000.00 175,000.00 175,000.00 175,000.00
101,000.00 80,000.00 80,000.00 80,000.00
101,000.00 80,000.00 80,000.00 80,000.00
101,000.00 80,000.00 80,000.00 80,000.00
101,000.00 80,000.00 80,000.00 80,000.00
101,000.00 80,000.00 80,000.00 80,000.00
221,000.00 175,000.00 175,000.00 175,000.00
95,000.00 75,000.00 75,000.00 75,000.00
95,000.00 75,000.00 75,000.00 75,000.00
95,000.00 75,000.00 75,000.00 75,000.00
89,000.00 70,500.00 70,500.00 70,500.00
101,000.00 80,000.00 80,000.00 80,000.00
82,000.00 65,000.00 65,000.00 65,000.00
95,000.00 75,000.00 75,000.00 75,000.00
189,000.00 150,000.00 150,000.00 150,000.00
82,000.00 65,000.00 65,000.00 65,000.00
82,000.00 65,000.00 65,000.00 65,000.00
76,000.00 60,000.00 60,000.00 60,000.00
76,000.00 60,000.00 60,000.00 60,000.00
89,000.00 70,500.00 70,500.00 70,500.00
89,000.00 70,500.00 70,500.00 70,500.00
89,000.00 70,500.00 70,500.00 70,500.00
89,000.00 70,500.00 70,500.00 70,500.00
89,000.00 70,500.00 70,500.00 70,500.00
95,000.00 75,000.00 75,000.00 75,000.00
89,000.00 70,500.00 70,500.00 70,500.00
89,000.00 70,500.00 70,500.00 70,500.00
101,000.00 80,000.00 80,000.00 80,000.00
95,000.00 75,000.00 75,000.00 75,000.00

HARGA DASAR
USULAN HARGA SK BUPATI 2018
WILAYAH 1 WILAYAH 2 WILAYAH 3

4 5 6 7

220,500.00 175,000.00 175,000.00 175,000.00


100.00 79.00 79.00 79.00
15,800.00 12,500.00 12,500.00 12,500.00
10,100.00 8,000.00 8,000.00 8,000.00
6,300.00 5,000.00 5,000.00 5,000.00
36,000.00 28,500.00 28,500.00 28,500.00
132,300.00 105,000.00 105,000.00 105,000.00
126,000.00 100,000.00 100,000.00 100,000.00
13,000.00 10,300.00 10,300.00 10,300.00
14,200.00 11,200.00 11,200.00 11,200.00
61,800.00 49,000.00 49,000.00 49,000.00
119,700.00 95,000.00 95,000.00 95,000.00
340,200.00 270,000.00 270,000.00 270,000.00
315,000.00 250,000.00 250,000.00 250,000.00
113,400.00 90,000.00 90,000.00 90,000.00
201,600.00 160,000.00 160,000.00 160,000.00
126,000.00 100,000.00 100,000.00 100,000.00
37,800.00 30,000.00 30,000.00 30,000.00
75,600.00 60,000.00 60,000.00 60,000.00
567,000.00 450,000.00 450,000.00 450,000.00
504,000.00 400,000.00 400,000.00 400,000.00
882,000.00 700,000.00 700,000.00 700,000.00
2,205,000.00 1,750,000.00 1,750,000.00 1,750,000.00
88,200.00 70,000.00 70,000.00 70,000.00
17,100.00 13,500.00 13,500.00 13,500.00
12,600.00 10,000.00 10,000.00 10,000.00
22,100.00 17,500.00 17,500.00 17,500.00
3,800.00 3,000.00 3,000.00 3,000.00
220,500.00 175,000.00 175,000.00 175,000.00
945,000.00 750,000.00 750,000.00 750,000.00
13,900.00 11,000.00 11,000.00 11,000.00
900.00 700.00 700.00 700.00
#VALUE! #VALUE! #VALUE! #VALUE!
315,000.00 250,000.00 250,000.00 250,000.00
113,400.00 90,000.00 90,000.00 90,000.00
315,000.00 250,000.00 240,000.00 230,000.00
100,800.00 80,000.00 80,000.00 80,000.00
157,500.00 125,000.00 125,000.00 125,000.00
126,000.00 100,000.00 100,000.00 100,000.00
327,600.00 220,000.00 240,000.00 260,000.00
327,600.00 220,000.00 240,000.00 260,000.00
327,600.00 220,000.00 240,000.00 260,000.00
327,600.00 220,000.00 240,000.00 260,000.00
321,300.00 255,000.00 245,000.00 235,000.00
321,300.00 255,000.00 245,000.00 235,000.00
318,800.00 253,000.00 243,000.00 233,000.00
317,600.00 252,000.00 242,000.00 232,000.00
315,000.00 250,000.00 240,000.00 230,000.00
37,800.00 30,000.00 30,000.00 30,000.00
13,900.00 9,000.00 9,000.00 9,000.00
5,700.00 4,500.00 4,500.00 4,500.00

4 5 6 7
9,500.00 7,500.00 7,500.00 7,500.00
10,100.00 8,000.00 8,000.00 8,000.00
15,200.00 12,000.00 12,000.00 12,000.00
22,100.00 17,500.00 17,500.00 17,500.00
22,100.00 17,500.00 17,500.00 17,500.00
300,100.00 238,100.00 238,100.00 238,100.00
416,000.00 330,100.00 330,100.00 330,100.00
446,700.00 354,500.00 354,500.00 354,500.00
480,700.00 381,500.00 381,500.00 381,500.00
624,000.00 495,200.00 495,200.00 495,200.00
787,700.00 625,100.00 625,100.00 625,100.00
830,300.00 658,900.00 658,900.00 658,900.00
876,300.00 695,400.00 695,400.00 695,400.00
1,365,600.00 1,083,800.00 1,083,800.00 1,083,800.00
2,125,900.00 1,687,200.00 1,687,200.00 1,687,200.00
35,300.00 28,000.00 28,000.00 28,000.00
44,800.00 35,500.00 35,500.00 35,500.00
44,800.00 35,500.00 35,500.00 35,500.00
63,700.00 50,500.00 50,500.00 50,500.00
66,800.00 53,000.00 53,000.00 53,000.00
92,000.00 73,000.00 73,000.00 73,000.00
104,600.00 83,000.00 83,000.00 83,000.00
110,900.00 88,000.00 88,000.00 88,000.00
161,300.00 128,000.00 128,000.00 128,000.00
69,300.00 55,000.00 55,000.00 55,000.00
69,300.00 55,000.00 55,000.00 55,000.00
69,300.00 55,000.00 55,000.00 55,000.00
31,500.00 25,000.00 25,000.00 25,000.00
157,500.00 125,000.00 125,000.00 125,000.00
1,575,000.00 1,250,000.00 1,250,000.00 1,250,000.00
1,701,000.00 1,350,000.00 1,350,000.00 1,350,000.00
2,898,000.00 2,300,000.00 2,300,000.00 2,300,000.00
1,260,000.00 1,000,000.00 1,000,000.00 1,000,000.00
126,000.00 100,000.00 100,000.00 100,000.00
189,000.00 150,000.00 150,000.00 150,000.00
25,200.00 20,000.00 20,000.00 20,000.00
37,800.00 30,000.00 30,000.00 30,000.00
12,600.00 10,000.00 10,000.00 10,000.00
15,200.00 12,000.00 12,000.00 12,000.00
18,900.00 15,000.00 15,000.00 15,000.00
12,600.00 10,000.00 10,000.00 10,000.00
18,900.00 15,000.00 15,000.00 15,000.00
25,200.00 20,000.00 20,000.00 20,000.00
17,700.00 14,000.00 14,000.00 14,000.00
756,000.00 600,000.00 600,000.00 600,000.00
1,260,000.00 1,000,000.00 1,000,000.00 1,000,000.00
9,500.00 7,500.00 7,500.00 7,500.00
81,900.00 65,000.00 65,000.00 65,000.00
88,200.00 70,000.00 70,000.00 70,000.00
1,512,000.00 1,200,000.00 1,200,000.00 1,200,000.00
1,260,000.00 1,000,000.00 1,000,000.00 1,000,000.00
1,008,000.00 800,000.00 800,000.00 800,000.00
819,000.00 650,000.00 650,000.00 650,000.00
6,300.00 5,000.00 5,000.00 5,000.00
8,900.00 7,000.00 7,000.00 7,000.00
2,400.00 1,900.00 1,900.00 1,900.00
8,900.00 7,000.00 7,000.00 7,000.00
3,600.00 2,800.00 2,800.00 2,800.00
5,100.00 4,000.00 4,000.00 4,000.00

4 5 6 7
10,100.00 8,000.00 8,000.00 8,000.00
5,100.00 4,000.00 4,000.00 4,000.00
10,100.00 8,000.00 8,000.00 8,000.00
6,600.00 5,200.00 5,200.00 5,200.00
15,200.00 12,000.00 12,000.00 12,000.00
9,500.00 7,500.00 7,500.00 7,500.00
12,600.00 10,000.00 10,000.00 10,000.00
15,200.00 12,000.00 12,000.00 12,000.00
20,200.00 16,000.00 16,000.00 16,000.00
25,200.00 20,000.00 20,000.00 20,000.00
37,800.00 30,000.00 30,000.00 30,000.00
330,100.00 261,900.00 261,900.00 261,900.00
308,200.00 244,600.00 244,600.00 244,600.00
368,700.00 292,600.00 292,600.00 292,600.00
149,000.00 118,200.00 118,200.00 118,200.00
450,500.00 357,500.00 357,500.00 357,500.00
277,200.00 220,000.00 220,000.00 220,000.00
693,000.00 550,000.00 550,000.00 550,000.00
554,400.00 440,000.00 440,000.00 440,000.00
1,108,800.00 880,000.00 880,000.00 880,000.00
504,000.00 400,000.00 400,000.00 400,000.00
56,700.00 45,000.00 45,000.00 45,000.00
7,600.00 6,000.00 6,000.00 6,000.00
10,100.00 8,000.00 8,000.00 8,000.00
12,600.00 10,000.00 10,000.00 10,000.00
252,000.00 200,000.00 200,000.00 200,000.00
252,000.00 200,000.00 200,000.00 200,000.00
100,800.00 80,000.00 80,000.00 80,000.00
75,600.00 60,000.00 60,000.00 60,000.00
94,500.00 75,000.00 75,000.00 75,000.00
5,700.00 4,500.00 4,500.00 4,500.00
10,800.00 8,500.00 8,500.00 8,500.00
17,100.00 13,500.00 13,500.00 13,500.00
12,600.00 10,000.00 10,000.00 10,000.00
22,100.00 17,500.00 17,500.00 17,500.00
11,400.00 9,000.00 9,000.00 9,000.00
23,400.00 18,500.00 18,500.00 18,500.00
50,400.00 40,000.00 40,000.00 40,000.00
15,800.00 12,500.00 12,500.00 12,500.00
151,200.00 120,000.00 120,000.00 120,000.00
6,300.00 5,000.00 5,000.00 5,000.00
7,600.00 6,000.00 6,000.00 6,000.00
2,142,000.00 1,700,000.00 1,700,000.00 1,700,000.00
315,000.00 250,000.00 250,000.00 250,000.00
1,008,000.00 800,000.00 800,000.00 800,000.00
100,800.00 80,000.00 80,000.00 80,000.00
132,300.00 105,000.00 105,000.00 105,000.00
239,400.00 190,000.00 190,000.00 190,000.00
302,400.00 240,000.00 240,000.00 240,000.00
126,000.00 100,000.00 100,000.00 100,000.00
1,008,000.00 800,000.00 800,000.00 800,000.00
100,800.00 80,000.00 80,000.00 80,000.00
113,400.00 90,000.00 90,000.00 90,000.00
10,080,000.00 8,000,000.00 8,000,000.00 8,000,000.00
37,800.00 30,000.00 30,000.00 30,000.00
63,000.00 50,000.00 50,000.00 50,000.00
107,100.00 85,000.00 85,000.00 85,000.00
27,800.00 22,000.00 22,000.00 22,000.00
13,900.00 11,000.00 11,000.00 11,000.00

4 5 6 7
567,000.00 450,000.00 450,000.00 450,000.00
20,800.00 16,500.00 16,500.00 16,500.00
31,500.00 25,000.00 25,000.00 25,000.00
283,500.00 225,000.00 225,000.00 225,000.00
1,400.00 1,100.00 1,100.00 1,100.00
1,890,000.00 1,500,000.00 1,500,000.00 1,500,000.00
15,200.00 12,000.00 12,000.00 12,000.00
5,100.00 4,000.00 4,000.00 4,000.00
14,490,000.00 11,500,000.00 11,500,000.00 11,500,000.00
15,750,000.00 12,500,000.00 12,500,000.00 12,500,000.00
30,000,100.00 23,809,600.00 23,809,600.00 23,809,600.00
403,200.00 320,000.00 320,000.00 320,000.00
27,720,000.00 22,000,000.00 22,000,000.00 22,000,000.00
27,720,000.00 22,000,000.00 22,000,000.00 22,000,000.00
20,160,000.00 16,000,000.00 16,000,000.00 16,000,000.00
18,900,000.00 15,000,000.00 15,000,000.00 15,000,000.00
11,970,000.00 9,500,000.00 9,500,000.00 9,500,000.00
13,230,000.00 10,500,000.00 10,500,000.00 10,500,000.00
8,820,000.00 7,000,000.00 7,000,000.00 7,000,000.00
9,450,000.00 7,500,000.00 7,500,000.00 7,500,000.00
9,500.00 7,500.00 7,500.00 7,500.00
8,190,000.00 6,500,000.00 6,500,000.00 6,500,000.00
6,300,000.00 5,000,000.00 5,000,000.00 5,000,000.00
8,820,000.00 7,000,000.00 7,000,000.00 7,000,000.00
1,890,000.00 1,500,000.00 1,500,000.00 1,500,000.00
2,205,000.00 1,750,000.00 1,750,000.00 1,750,000.00
2,520,000.00 2,000,000.00 2,000,000.00 2,000,000.00
157,500.00 125,000.00 125,000.00 125,000.00
63,000.00 50,000.00 50,000.00 50,000.00
69,300.00 55,000.00 55,000.00 55,000.00
56,700.00 45,000.00 45,000.00 45,000.00
65,600.00 52,000.00 52,000.00 52,000.00
75,600.00 60,000.00 60,000.00 60,000.00
110,300.00 87,500.00 87,500.00 87,500.00
69,300.00 55,000.00 55,000.00 55,000.00
81,900.00 65,000.00 65,000.00 65,000.00
95,100.00 75,400.00 75,400.00 75,400.00
75,600.00 60,000.00 60,000.00 60,000.00
365,400.00 290,000.00 290,000.00 290,000.00
15,200.00 12,000.00 12,000.00 12,000.00
31,500.00 25,000.00 25,000.00 25,000.00
78,200.00 62,000.00 62,000.00 62,000.00
20,800.00 16,500.00 16,500.00 16,500.00
34,700.00 27,500.00 27,500.00 27,500.00
69,300.00 55,000.00 55,000.00 55,000.00
25,200.00 20,000.00 20,000.00 20,000.00
32,200.00 25,500.00 25,500.00 25,500.00
78,800.00 62,500.00 62,500.00 62,500.00
22,100.00 17,500.00 17,500.00 17,500.00
37,800.00 30,000.00 30,000.00 30,000.00
56,700.00 45,000.00 45,000.00 45,000.00
50,400.00 40,000.00 40,000.00 40,000.00
119,700.00 95,000.00 95,000.00 95,000.00
88,200.00 70,000.00 70,000.00 70,000.00
176,400.00 140,000.00 140,000.00 140,000.00
126,000.00 100,000.00 100,000.00 100,000.00
100,800.00 80,000.00 80,000.00 80,000.00
81,900.00 65,000.00 65,000.00 65,000.00
17,100.00 13,500.00 13,500.00 13,500.00

4 5 6 7
44,100.00 35,000.00 35,000.00 35,000.00
47,300.00 37,500.00 37,500.00 37,500.00
63,000.00 50,000.00 50,000.00 50,000.00
15,800.00 12,500.00 12,500.00 12,500.00
69,300.00 55,000.00 55,000.00 55,000.00
15,200.00 12,000.00 12,000.00 12,000.00
69,300.00 55,000.00 55,000.00 55,000.00
15,200.00 12,000.00 12,000.00 12,000.00
97,100.00 77,000.00 77,000.00 77,000.00
117,900.00 93,500.00 93,500.00 93,500.00
138,600.00 110,000.00 110,000.00 110,000.00
277,200.00 220,000.00 220,000.00 220,000.00
346,500.00 275,000.00 275,000.00 275,000.00
3,465,000.00 2,750,000.00 2,750,000.00 2,750,000.00
1,732,500.00 1,375,000.00 1,375,000.00 1,375,000.00
157,500.00 125,000.00 125,000.00 125,000.00
68,100.00 54,000.00 54,000.00 54,000.00
22,100.00 17,500.00 17,500.00 17,500.00
31,500.00 25,000.00 25,000.00 25,000.00
31,500.00 25,000.00 25,000.00 25,000.00
8,600.00 6,800.00 6,800.00 6,800.00
11,600.00 9,200.00 9,200.00 9,200.00
25,200.00 20,000.00 20,000.00 20,000.00
11,600.00 9,200.00 9,200.00 9,200.00
9,400.00 7,400.00 7,400.00 7,400.00
13,900.00 11,000.00 11,000.00 11,000.00
81,900.00 65,000.00 65,000.00 65,000.00
126,000.00 100,000.00 100,000.00 100,000.00
138,600.00 110,000.00 110,000.00 110,000.00
170,100.00 135,000.00 135,000.00 135,000.00
207,900.00 165,000.00 165,000.00 165,000.00
242,600.00 192,500.00 192,500.00 192,500.00
25,200.00 20,000.00 20,000.00 20,000.00
25,200.00 20,000.00 20,000.00 20,000.00
800.00 600.00 600.00 600.00
18,900.00 15,000.00 15,000.00 15,000.00
28,400.00 22,500.00 22,500.00 22,500.00
200.00 100.00 100.00 100.00
6,300.00 5,000.00 5,000.00 5,000.00
1,100.00 800.00 800.00 800.00
25,200.00 20,000.00 20,000.00 20,000.00
18,900.00 15,000.00 15,000.00 15,000.00
252,000.00 200,000.00 200,000.00 200,000.00
1,600.00 1,000.00 1,000.00 1,000.00
2,900.00 2,300.00 2,300.00 2,300.00
15,500.00 12,300.00 12,300.00 12,300.00
5,670,000.00 4,500,000.00 4,500,000.00 4,500,000.00
352,800.00 240,000.00 245,000.00 250,000.00
315,000.00 240,000.00 245,000.00 250,000.00
189,000.00 150,000.00 150,000.00 150,000.00
277,200.00 210,000.00 215,000.00 220,000.00
157,500.00 125,000.00 125,000.00 125,000.00
176,400.00 140,000.00 140,000.00 140,000.00
88,200.00 70,000.00 70,000.00 70,000.00
88,200.00 70,000.00 70,000.00 70,000.00
100,800.00 80,000.00 80,000.00 80,000.00
88,200.00 70,000.00 70,000.00 70,000.00
94,500.00 75,000.00 75,000.00 75,000.00
107,100.00 85,000.00 85,000.00 85,000.00

4 5 6 7
113,400.00 90,000.00 90,000.00 90,000.00
94,500.00 75,000.00 75,000.00 75,000.00
126,000.00 100,000.00 100,000.00 100,000.00
96,800.00 76,800.00 76,800.00 76,800.00
107,100.00 85,000.00 85,000.00 85,000.00
138,600.00 110,000.00 110,000.00 110,000.00
144,900.00 115,000.00 115,000.00 115,000.00
157,500.00 125,000.00 125,000.00 125,000.00
163,800.00 130,000.00 130,000.00 130,000.00
56,700.00 45,000.00 45,000.00 45,000.00
138,600.00 110,000.00 110,000.00 110,000.00
693,000.00 550,000.00 550,000.00 550,000.00
283,500.00 225,000.00 225,000.00 225,000.00
441,000.00 350,000.00 350,000.00 350,000.00
63,000.00 50,000.00 50,000.00 50,000.00
81,900.00 65,000.00 65,000.00 65,000.00
88,200.00 70,000.00 70,000.00 70,000.00
113,400.00 90,000.00 90,000.00 90,000.00
157,500.00 125,000.00 125,000.00 125,000.00
189,000.00 150,000.00 150,000.00 150,000.00
340,200.00 270,000.00 270,000.00 270,000.00
163,800.00 130,000.00 130,000.00 130,000.00
189,000.00 150,000.00 150,000.00 150,000.00
283,500.00 225,000.00 225,000.00 225,000.00
359,100.00 285,000.00 285,000.00 285,000.00
567,000.00 450,000.00 450,000.00 450,000.00
693,000.00 550,000.00 550,000.00 550,000.00
819,000.00 650,000.00 650,000.00 650,000.00
567,000.00 450,000.00 450,000.00 450,000.00
693,000.00 550,000.00 550,000.00 550,000.00
882,000.00 700,000.00 700,000.00 700,000.00
27,800.00 22,000.00 22,000.00 22,000.00
34,100.00 27,000.00 27,000.00 27,000.00
40,400.00 32,000.00 32,000.00 32,000.00
84,500.00 67,000.00 67,000.00 67,000.00
147,500.00 117,000.00 117,000.00 117,000.00
172,700.00 137,000.00 137,000.00 137,000.00
197,900.00 157,000.00 157,000.00 157,000.00
355,400.00 282,000.00 282,000.00 282,000.00
563,300.00 447,000.00 447,000.00 447,000.00
872,000.00 692,000.00 692,000.00 692,000.00
160,100.00 127,000.00 127,000.00 127,000.00
179,000.00 142,000.00 142,000.00 142,000.00
147,500.00 117,000.00 117,000.00 117,000.00
443,600.00 352,000.00 352,000.00 352,000.00
22,100.00 17,500.00 17,500.00 17,500.00
15,800.00 12,500.00 12,500.00 12,500.00
25,200.00 20,000.00 20,000.00 20,000.00
31,500.00 25,000.00 25,000.00 25,000.00
37,800.00 30,000.00 30,000.00 30,000.00
3,800.00 3,000.00 3,000.00 3,000.00
5,700.00 4,500.00 4,500.00 4,500.00
6,300.00 5,000.00 5,000.00 5,000.00
7,000.00 5,500.00 5,500.00 5,500.00
8,200.00 6,500.00 6,500.00 6,500.00
7,600.00 6,000.00 6,000.00 6,000.00
4,800.00 3,800.00 3,800.00 3,800.00
88,200.00 70,000.00 70,000.00 70,000.00
100,800.00 80,000.00 80,000.00 80,000.00

4 5 6 7
693,000.00 550,000.00 550,000.00 550,000.00
22,176,000.00 17,600,000.00 17,600,000.00 17,600,000.00
34,020,000.00 27,000,000.00 27,000,000.00 27,000,000.00
8,900.00 7,000.00 7,000.00 7,000.00
138,600.00 110,000.00 110,000.00 110,000.00
1,800.00 1,400.00 1,400.00 1,400.00
5,100.00 4,000.00 4,000.00 4,000.00
535,500.00 425,000.00 425,000.00 425,000.00
44,800.00 35,500.00 35,500.00 35,500.00
17,100.00 13,500.00 13,500.00 13,500.00
47,900.00 38,000.00 38,000.00 38,000.00
10,800.00 8,500.00 8,500.00 8,500.00
45,400.00 36,000.00 36,000.00 36,000.00
25,200.00 20,000.00 20,000.00 20,000.00
19,600.00 15,500.00 15,500.00 15,500.00
78,200.00 62,000.00 62,000.00 62,000.00
6,300.00 5,000.00 5,000.00 5,000.00
1,386,000.00 1,100,000.00 1,100,000.00 1,100,000.00
94,500.00 75,000.00 75,000.00 75,000.00
100,800.00 80,000.00 80,000.00 80,000.00
82,600.00 65,500.00 65,500.00 65,500.00
37,800.00 30,000.00 30,000.00 30,000.00
63,000.00 50,000.00 50,000.00 50,000.00
315,000.00 250,000.00 250,000.00 250,000.00
88,200.00 70,000.00 70,000.00 70,000.00
144,900.00 115,000.00 115,000.00 115,000.00
252,000.00 200,000.00 200,000.00 200,000.00
258,300.00 205,000.00 205,000.00 205,000.00
4,410,000.00 3,500,000.00 3,500,000.00 3,500,000.00
19,600.00 15,500.00 15,500.00 15,500.00
94,500.00 75,000.00 75,000.00 75,000.00
252,000.00 200,000.00 200,000.00 200,000.00
441,000.00 350,000.00 350,000.00 350,000.00
56,700.00 45,000.00 45,000.00 45,000.00
7,000.00 5,500.00 5,500.00 5,500.00
50,400.00 40,000.00 40,000.00 40,000.00
44,100.00 35,000.00 35,000.00 35,000.00
53,600.00 42,500.00 42,500.00 42,500.00
1,890,000.00 1,500,000.00 1,500,000.00 1,500,000.00
4,725,000.00 3,750,000.00 3,750,000.00 3,750,000.00
138,600.00 110,000.00 110,000.00 110,000.00
151,200.00 120,000.00 120,000.00 120,000.00
27,800.00 22,000.00 22,000.00 22,000.00
36,100.00 28,600.00 28,600.00 28,600.00
33,300.00 26,400.00 26,400.00 26,400.00
40,200.00 31,900.00 31,900.00 31,900.00
4,500.00 3,500.00 3,500.00 3,500.00
- - - -
- - - -
- - - -
- - - -
- - - -
75,600.00 60,000.00 60,000.00 60,000.00
69,300.00 55,000.00 55,000.00 55,000.00
88,200.00 70,000.00 70,000.00 70,000.00
81,900.00 65,000.00 65,000.00 65,000.00
2,205,000.00 1,750,000.00 1,750,000.00 1,750,000.00
189,000.00 150,000.00 150,000.00 150,000.00
63,000.00 50,000.00 50,000.00 50,000.00

4 5 6 7
756,000.00 600,000.00 600,000.00 600,000.00
504,000.00 400,000.00 400,000.00 400,000.00
126,000.00 100,000.00 100,000.00 100,000.00
- - -
- - -
- - -
1,077,300.00 855,000.00 855,000.00 855,000.00
1,386,000.00 1,100,000.00 1,100,000.00 1,100,000.00
1,764,000.00 1,400,000.00 1,400,000.00 1,400,000.00
3,150,000.00 2,500,000.00 2,500,000.00 2,500,000.00
4,158,000.00 3,300,000.00 3,300,000.00 3,300,000.00
6,300,000.00 5,000,000.00 5,000,000.00 5,000,000.00
7,560,000.00 6,000,000.00 6,000,000.00 6,000,000.00
10,710,000.00 8,500,000.00 8,500,000.00 8,500,000.00
11,340,000.00 9,000,000.00 9,000,000.00 9,000,000.00
12,600,000.00 10,000,000.00 10,000,000.00 10,000,000.00
15,120,000.00 12,000,000.00 12,000,000.00 12,000,000.00
- - -
- - -
- - -
2,205,000.00 1,750,000.00 1,750,000.00 1,750,000.00
1,890,000.00 1,500,000.00 1,500,000.00 1,500,000.00
2,520,000.00 2,000,000.00 2,000,000.00 2,000,000.00
441,000.00 350,000.00 350,000.00 350,000.00
315,000.00 250,000.00 250,000.00 250,000.00
126,000.00 100,000.00 100,000.00 100,000.00
1,260,000.00 1,000,000.00 1,000,000.00 1,000,000.00
945,000.00 750,000.00 750,000.00 750,000.00
8,900.00 7,000.00 7,000.00 7,000.00
252,000.00 200,000.00 200,000.00 200,000.00
126,000.00 100,000.00 100,000.00 100,000.00
1,260,000.00 1,000,000.00 1,000,000.00 1,000,000.00
189,000.00 150,000.00 150,000.00 150,000.00
693,000.00 550,000.00 550,000.00 550,000.00
756,000.00 600,000.00 600,000.00 600,000.00
1,449,000.00 1,150,000.00 1,150,000.00 1,150,000.00
441,000.00 350,000.00 350,000.00 350,000.00
122,300.00 97,000.00 97,000.00 97,000.00
3,800.00 3,000.00 3,000.00 3,000.00
3,800.00 3,000.00 3,000.00 3,000.00
315,000.00 250,000.00 250,000.00 250,000.00
252,000.00 200,000.00 200,000.00 200,000.00
6,300.00 5,000.00 5,000.00 5,000.00
6,300.00 5,000.00 5,000.00 5,000.00
1,827,000.00 1,450,000.00 1,450,000.00 1,450,000.00
1,701,000.00 1,350,000.00 1,350,000.00 1,350,000.00
6,300.00 5,000.00 5,000.00 5,000.00
2,520,000.00 2,000,000.00 2,000,000.00 2,000,000.00
630,000.00 500,000.00 500,000.00 500,000.00
1,701,000.00 1,350,000.00 1,350,000.00 1,350,000.00
693,000.00 550,000.00 550,000.00 550,000.00
945,000.00 750,000.00 750,000.00 750,000.00
262,100.00 208,000.00 208,000.00 208,000.00
945,000.00 750,000.00 750,000.00 750,000.00
315,000.00 250,000.00 250,000.00 250,000.00
252,000.00 200,000.00 200,000.00 200,000.00
945,000.00 750,000.00 750,000.00 750,000.00
630,000.00 500,000.00 500,000.00 500,000.00
315,000.00 250,000.00 250,000.00 250,000.00

4 5 6 7
590,700.00 468,800.00 468,800.00 468,800.00
126,000.00 100,000.00 100,000.00 100,000.00
94,500.00 75,000.00 75,000.00 75,000.00
2,709,000.00 2,150,000.00 2,150,000.00 2,150,000.00
945,000.00 750,000.00 750,000.00 750,000.00
1,260,000.00 1,000,000.00 1,000,000.00 1,000,000.00
1,890,000.00 1,500,000.00 1,500,000.00 1,500,000.00
2,520,000.00 2,000,000.00 2,000,000.00 2,000,000.00
3,150,000.00 2,500,000.00 2,500,000.00 2,500,000.00
1,890,000.00 1,500,000.00 1,500,000.00 1,500,000.00
2,520,000.00 2,000,000.00 2,000,000.00 2,000,000.00
3,150,000.00 2,500,000.00 2,500,000.00 2,500,000.00
1,260,000.00 1,000,000.00 1,000,000.00 1,000,000.00
1,890,000.00 1,500,000.00 1,500,000.00 1,500,000.00
3,150,000.00 2,500,000.00 2,500,000.00 2,500,000.00
4,410,000.00 3,500,000.00 3,500,000.00 3,500,000.00
1,260,000.00 1,000,000.00 1,000,000.00 1,000,000.00
2,520,000.00 2,000,000.00 2,000,000.00 2,000,000.00
1,890,000.00 1,500,000.00 1,500,000.00 1,500,000.00
5,670,000.00 4,500,000.00 4,500,000.00 4,500,000.00
1,260,000.00 1,000,000.00 1,000,000.00 1,000,000.00
630,000.00 500,000.00 500,000.00 500,000.00
441,000.00 350,000.00 350,000.00 350,000.00
1,197,000.00 950,000.00 950,000.00 950,000.00
1,323,000.00 1,050,000.00 1,050,000.00 1,050,000.00
693,000.00 550,000.00 550,000.00 550,000.00
1,260,000.00 1,000,000.00 1,000,000.00 1,000,000.00
630,000.00 500,000.00 500,000.00 500,000.00
- - -
- - -
8,190,000.00 6,500,000.00 6,500,000.00 6,500,000.00
8,820,000.00 7,000,000.00 7,000,000.00 7,000,000.00
10,710,000.00 8,500,000.00 8,500,000.00 8,500,000.00
11,340,000.00 9,000,000.00 9,000,000.00 9,000,000.00
13,230,000.00 10,500,000.00 10,500,000.00 10,500,000.00
- - -
- - -
1,575,000.00 1,250,000.00 1,250,000.00 1,250,000.00
1,890,000.00 1,500,000.00 1,500,000.00 1,500,000.00
2,205,000.00 1,750,000.00 1,750,000.00 1,750,000.00
- - -
- - -
63,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00
69,300,000.00 55,000,000.00 55,000,000.00 55,000,000.00
88,200,000.00 70,000,000.00 70,000,000.00 70,000,000.00
94,500,000.00 75,000,000.00 75,000,000.00 75,000,000.00
- - -
- - -
75,600,000.00 60,000,000.00 60,000,000.00 60,000,000.00
81,900,000.00 65,000,000.00 65,000,000.00 65,000,000.00
88,200,000.00 70,000,000.00 70,000,000.00 70,000,000.00
100,800,000.00 80,000,000.00 80,000,000.00 80,000,000.00
- - -
- - -
- - -
9,286,200.00 7,370,000.00 7,370,000.00 7,370,000.00
454,900.00 361,000.00 361,000.00 361,000.00
162,600.00 129,000.00 129,000.00 129,000.00
759,800.00 603,000.00 603,000.00 603,000.00

4 5 6 7
259,600.00 206,000.00 206,000.00 206,000.00
74,400.00 59,000.00 59,000.00 59,000.00
574,600.00 456,000.00 456,000.00 456,000.00
394,400.00 313,000.00 313,000.00 313,000.00
732,100.00 581,000.00 581,000.00 581,000.00
602,300.00 478,000.00 478,000.00 478,000.00
654,000.00 519,000.00 519,000.00 519,000.00
704,400.00 559,000.00 559,000.00 559,000.00
672,900.00 534,000.00 534,000.00 534,000.00
318,800.00 253,000.00 253,000.00 253,000.00
496,500.00 394,000.00 394,000.00 394,000.00
257,100.00 204,000.00 204,000.00 204,000.00
424,700.00 337,000.00 337,000.00 337,000.00
471,300.00 374,000.00 374,000.00 374,000.00
389,400.00 309,000.00 309,000.00 309,000.00
50,400.00 40,000.00 40,000.00 40,000.00
1,161,800.00 922,000.00 922,000.00 922,000.00
55,500.00 44,000.00 44,000.00 44,000.00
209,200.00 166,000.00 166,000.00 166,000.00
124,800.00 99,000.00 99,000.00 99,000.00
50,400.00 40,000.00 40,000.00 40,000.00
64,300.00 51,000.00 51,000.00 51,000.00
1,352,000.00 1,073,000.00 1,073,000.00 1,073,000.00
434,700.00 345,000.00 345,000.00 345,000.00
655,200.00 520,000.00 520,000.00 520,000.00
150,000.00 119,000.00 119,000.00 119,000.00
648,900.00 515,000.00 515,000.00 515,000.00
158,800.00 126,000.00 126,000.00 126,000.00
2,227,700.00 1,768,000.00 1,768,000.00 1,768,000.00
114,700.00 91,000.00 91,000.00 91,000.00
749,700.00 595,000.00 595,000.00 595,000.00
272,200.00 216,000.00 216,000.00 216,000.00
1,755,200.00 1,393,000.00 1,393,000.00 1,393,000.00
3,735,900.00 2,965,000.00 2,965,000.00 2,965,000.00
2,217,600.00 1,760,000.00 1,760,000.00 1,760,000.00
672,900.00 534,000.00 534,000.00 534,000.00
448,600.00 356,000.00 356,000.00 356,000.00
376,800.00 299,000.00 299,000.00 299,000.00
573,300.00 455,000.00 455,000.00 455,000.00
1,106,300.00 878,000.00 878,000.00 878,000.00
675,400.00 536,000.00 536,000.00 536,000.00
618,700.00 491,000.00 491,000.00 491,000.00
53,000.00 42,000.00 42,000.00 42,000.00
53,000.00 42,000.00 42,000.00 42,000.00
465,000.00 369,000.00 369,000.00 369,000.00
2,759,400.00 2,190,000.00 2,190,000.00 2,190,000.00
926,100.00 735,000.00 735,000.00 735,000.00
236,900.00 188,000.00 188,000.00 188,000.00
221,800.00 176,000.00 176,000.00 176,000.00
58,000.00 46,000.00 46,000.00 46,000.00
74,400.00 59,000.00 59,000.00 59,000.00
861,900.00 684,000.00 684,000.00 684,000.00
447,300.00 355,000.00 355,000.00 355,000.00
515,400.00 409,000.00 409,000.00 409,000.00
534,300.00 424,000.00 424,000.00 424,000.00
1,064,700.00 845,000.00 845,000.00 845,000.00

Kepala Dinas Pekerjaan Umum


dan Penataan Ruang
Kabupaten Karanganyar
EDHY SRIYATNO, S.T.,M.T.
NIP. 19600323 198703 1 007
KETERANGAN

8
KETERANGAN

8
8
8
8
8
8
8
8
8
8
HARGA SATUAN UPAH DAN BAHAN TAHUN ANGGARAN 2017
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN KARANGANYAR

1. WILAYAH I : KARANGANYAR, TASIKMADU, JATEN, KEBAKKRAMAT, COLOMADU, GONDANGREJO


2. WILAYAH II : JUMANTONO, JUMAPOLO, JATIPURO, MATESIH, KARANGPANDAN, MOJOGEDANG, KERJO, NGARGOYOSO
3. WILAYAH III : JENAWI, TAWANGMANGU, JATIYOSO

I. HARGA UPAH

HARGA DASAR DPUPR 2017


NO. URAIAN TENAGA SATUAN
WILAYAH 1 WILAYAH 2

1 Ass. Driller OH 90,000.00 90,000.00


2 Buruh semi terlatih OH 52,500.00 52,500.00
3 Buruh tak terlatih/Pekerja OH 50,000.00 50,000.00
4 Buruh terlatih OH 70,000.00 70,000.00
5 Crew Drilling OH 65,000.00 65,000.00
6 Driller OH 125,000.00 125,000.00
7 Geologis OH 172,500.00 172,500.00
8 Kepala tukang batu OH 72,500.00 72,500.00
9 Kepala tukang besi OH 72,500.00 72,500.00
10 Kepala tukang cat OH 72,500.00 72,500.00
11 Kepala tukang gali OH 72,500.00 72,500.00
12 Kepala tukang kayu OH 72,500.00 72,500.00
13 Koordinator logging OH 165,000.00 165,000.00
14 Mandor OH 70,000.00 70,000.00
15 Mekanik terlatih OH 67,500.00 67,500.00
16 Masinis/operator OH 67,500.00 67,500.00
17 Mekanik welder OH 62,500.00 62,500.00
18 Operator pompa OH 70,000.00 70,000.00
19 Operator semi terlatih/stoker OH 50,000.00 50,000.00
20 Operator terlatih OH 62,500.00 62,500.00
21 Pembantu geologis OH 135,000.00 135,000.00
22 Pembantu masinis/operator OH 60,000.00 60,000.00
23 Pembantu mekanik OH 62,500.00 62,500.00
24 Pembantu sopir OH 46,000.00 46,000.00
25 Penjaga malam OH 46,000.00 46,000.00
26 Sopir OH 55,000.00 55,000.00
27 Tukang batu OH 65,000.00 65,000.00
28 Tukang besi OH 65,000.00 65,000.00
29 Tukang cat OH 65,000.00 65,000.00
30 Tukang gali OH 60,000.00 60,000.00
31 Tukang kayu OH 70,000.00 70,000.00
32 Tukang las OH 65,000.00 65,000.00
33 Tukang listrik OH 65,000.00 65,000.00
34 Tukang masak aspal OH 72,500.00 72,500.00
35 Tukang pipa/pompa OH 70,000.00 70,000.00
II. HARGA BAHAN

HARGA DASAR/SURVEY DPU 2017


NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

A. BAHAN BANGUNAN
1 Abu batu m³ 165,000.00 170,000.00
2 Air ltr 5.00 5.00
3 Aluminium foil m2 12,500.00 12,500.00
4 Aluminium strip m' 7,000.00 7,000.00
5 Amplas besi/kayu lbr 3,500.00 3,500.00
6 Asbes bubungan gelombang m' 28,500.00 28,500.00
7 Asbes gelombang besar ( 100 x 200 ) lbr 100,000.00 100,000.00
8 Asbes gelombang kecil ( 100 x 120 ) lbr 95,000.00 95,000.00
9 Aspal curah kg 9,500.00 9,500.00
10 Aspal pen. 60/70 (kemasan drum) kg 10,500.00 10,500.00
11 Atap galvalum tebal 0,3 m² 42,800.00 42,800.00
12 Atap galvalum & laminasi m² 85,300.00 85,300.00
13 Atap galvalum rangka baja ringan m² 270,000.00 270,000.00
14 Atap galvalum rangka hollow m² 250,000.00 250,000.00
15 Atap kerpus onduline 0,5 m 80,000.00 80,000.00
16 Atap onduline lbr 150,000.00 150,000.00
17 Atap multiroof pasir lbr 95,000.00 95,000.00
18 Atap multiroof bubungan m' 30,000.00 30,000.00
19 Atap polycarbonat m² 53,300.00 53,300.00
20 Atap polycarbonat rangka besi tempa m² 400,000.00 400,000.00
21 Atap polycarbonat rangka hollow m² 385,000.00 385,000.00
22 Atap polycarbonat rangka stainleess m² 550,000.00 550,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

23 Automatic Water Level unit 1,575,000.00 1,575,000.00


24 Avour stainless bh 60,000.00 60,000.00
25 Baja konstruksi kg 11,000.00 11,000.00
26 Bambu apus 4 m' ljr 10,000.00 10,000.00
27 Bambu ori 4 m' ljr 17,500.00 17,500.00
28 Bataco bj 3,000.00 3,000.00
29 Batu andesit m² 175,000.00 175,000.00
30 Batu apung/kambang kg 11,000.00 11,000.00
31 Batu bata merah bj 650.00 650.00
32 Batu berongga ekspos bh 70,000.00 70,000.00
33 Batu blondos m³ 125,000.00 125,000.00
34 Batu candi m² 90,000.00 90,000.00
35 Batu kali m³ 245,000.00 230,000.00
36 Batu lempeng m² 65,000.00 65,000.00
37 Batu palimanan m² 115,000.00 115,000.00
38 Batu paras m² 100,000.00 100,000.00
39 Batu pecah ½/1 cm / Mesin m³ 210,000.00 235,000.00
40 Batu pecah 1/2 cm / Mesin m³ 207,500.00 232,500.00
41 Batu pecah 2/3 cm (split) / Mesin m³ 205,000.00 230,000.00
42 Batu pecah 3/5 cm / Mesin m³ 202,500.00 227,500.00
43 Batu pecah 2/3 cm m³ 252,500.00 227,500.00
44 Batu pecah 3/5 cm m³ 252,000.00 227,000.00
45 Batu pecah 5/7 cm m³ 251,000.00 226,000.00
46 Batu pecah 10/15 cm m³ 250,000.00 225,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

47 Batu pecah 15/20 cm m³ 247,500.00 222,500.00


48 Baut baja kg 20,250.00 20,250.00
49 Besi beton kg 9,000.00 9,000.00
50 Besi Hollow 1,8/3,8 cm t:0,3 m' 4,500.00 4,500.00
51 Besi Hollow 3,8/3,8 cm t:0,3 m' 7,500.00 7,500.00
52 Besi Hollow galvanis 1,8/3,8 cm t:0,3 m' 6,000.00 6,000.00
53 Besi Hollow galvanis 3,8/3,8 cm t:0,3 m' 10,000.00 10,000.00
54 Besi profil siku kg 17,500.00 17,500.00
55 Besi teralis strip plat kg 15,500.00 15,500.00
56 Besi Wire Mesh M 5 (4,5 mm) uk. 2,1 x 5,4 lbr 192,861.00 192,861.00
57 Besi Wire Mesh M 6 (5,2 mm) uk. 2,1 x 5,4 lbr 267,381.00 267,381.00
58 Besi Wire Mesh M 6 (5,5 mm) uk. 2,1 x 5,4 lbr 287,145.00 287,145.00
59 Besi Wire Mesh M 6 (5,6 mm) uk. 2,1 x 5,4 lbr 309,015.00 309,015.00
60 Besi Wire Mesh M 7 (6,5 mm) uk. 2,1 x 5,4 lbr 401,112.00 401,112.00
61 Besi Wire Mesh M 8 (7,2 mm) uk. 2,1 x 5,4 lbr 506,331.00 506,331.00
62 Besi Wire Mesh M 8 (7,5 mm) uk. 2,1 x 5,4 lbr 533,709.00 533,709.00
63 Besi Wire Mesh M 8 (7,6 mm) uk. 2,1 x 5,4 lbr 563,274.00 563,274.00
64 Besi Wire Mesh M 10 (9,5 mm) uk. 2,1 x 5,4 lbr 877,878.00 877,878.00
65 Besi Wire Mesh M 12 (11,5 mm) uk. 2,1 x 5,4 lbr 1,366,632.00 1,366,632.00
66 Buis beton ½ Ø 20 cm m' 20,000.00 22,500.00
67 Buis beton ½ Ø 30 cm m' 27,500.00 30,000.00
68 Buis beton Ø 20 cm m' 27,500.00 30,000.00
69 Buis beton Ø 30 cm m' 42,500.00 45,000.00
70 Buis beton Ø 40 cm m' 45,000.00 47,500.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

71 Buis beton Ø 50 cm m' 65,000.00 67,500.00


72 Buis beton Ø 60 cm m' 75,000.00 77,500.00
73 Buis beton Ø 80 cm ½ m´ bj 80,000.00 82,500.00
74 Buis beton Ø 100 cm ½ m´ bj 120,000.00 122,500.00
75 Cat besi kg 50,000.00 50,000.00
76 Cat kayu (luar) kg 50,000.00 50,000.00
77 Cat kayu (dalam) kg 50,000.00 50,000.00
78 Cat tembok ( dalam ) kg 22,500.00 22,500.00
79 Cat tembok ( luar ) kg 125,000.00 125,000.00
80 Check valve Ø 1.5" bh 1,250,000.00 1,250,000.00
81 Closet duduk ex. INA/American Standard bh 1,350,000.00 1,350,000.00
82 Closet duduk ex. Toto bh 1,825,000.00 1,825,000.00
83 Closet duduk monoblock bh 1,000,000.00 1,000,000.00
84 Closet jongkok keramik bh 100,000.00 100,000.00
85 Closet jongkok ex. INA/American Standard bh 150,000.00 150,000.00
86 Dempul jadi/Wood Filler kg 16,000.00 16,000.00
87 Down light 4" bh 30,000.00 30,000.00
88 Engsel jendela biasa bh 6,000.00 6,000.00
89 Engsel jendela sedang bh 7,500.00 7,500.00
90 Engsel jendela super bh 12,500.00 12,500.00
91 Engsel pintu biasa bh 6,500.00 6,500.00
92 Engsel pintu sedang bh 10,250.00 10,250.00
93 Engsel pintu super bh 13,250.00 13,250.00
94 Eternit asbes ( 1,00 x 1,00 ) 3 mm lbr 10,000.00 10,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

95 Fiberglass (bak air) 0,50 m3 bh 300,000.00 300,000.00


96 Fiberglass (bak air) 1,00 m3 bh 800,000.00 800,000.00
97 Fitting porselin bh 7,500.00 7,500.00
98 Flang steel Ø 2" bh 60,000.00 60,000.00
99 Floor drain bh 60,000.00 60,000.00
100 Folding Gate tebal 1,20 mm m² 1,000,000.00 1,000,000.00
101 Folding Gate tebal 0,08 mm m² 750,000.00 750,000.00
102 Folding Gate tebal 0,06 mm m² 650,000.00 650,000.00
103 Folding Gate tebal 0,04 mm m² 550,000.00 550,000.00
104 Genting beton standard bh 4,000.00 4,000.00
105 Genting kerpus beton bh 6,000.00 6,000.00
106 Genteng ex. Mojolaban/Mantili bh 1,650.00 1,700.00
107 Genteng kerpus ex. Mojolaban bh 5,900.00 5,950.00
108 Genteng magas Kebumen bh 2,650.00 2,700.00
109 Genteng morando Kebumen bh 3,900.00 3,950.00
110 Genteng kerpus Kebumen bh 7,900.00 7,950.00
111 Genteng morando Jatiwangi bh 3,900.00 3,950.00
112 Genteng kerpus Jatiwangi bh 7,900.00 7,950.00
113 Genteng glasur Jatiwangi bh 4,650.00 4,700.00
114 Genteng kerpus glasur Jatiwangi bh 9,400.00 9,450.00
115 Genteng glasur Kebumen bh 6,400.00 6,450.00
116 Genteng kerpus glasur Kebumen bh 8,900.00 8,950.00
117 Genteng keramik bh 9,900.00 9,950.00
118 Genteng kerpus keramik bh 14,900.00 14,950.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

119 Genteng keramik setara M-Class bh 9,400.00 9,450.00


120 Genteng kerpus keramik setara M-Class bh 14,900.00 14,950.00
121 Glass Block 20x20 bh 20,000.00 20,000.00
122 Glass Block 30x30 bh 30,000.00 30,000.00
123 Granit tile 40 x 40 cm Warna tua m2 238,100.00 238,100.00
124 Granit tile 40 x 40 cm Warna muda m2 222,300.00 222,300.00
125 Granit tile 60 x 60 cm Warna tua m2 200,000.00 200,000.00
126 Granit tile 60 x 60 cm Warna muda m2 107,500.00 107,500.00
127 Granit tile 80 x 80 cm Warna tua m2 325,000.00 325,000.00
128 Granit tile 80 x 80 cm Warna muda m2 200,000.00 200,000.00
129 Granit tile 100 x 100 cm Warna tua m2 500,000.00 500,000.00
130 Granit tile 100 x 100 cm Warna muda m2 400,000.00 400,000.00
131 Granit/ubin 100 x 100 (batu granit) m2 800,000.00 800,000.00
132 Gravel Pack Ø 0,5 - 1,5 cm m³ 250,000.00 250,000.00
133 Grease (paselin) kg 45,000.00 45,000.00
134 Grendel biasa bh 4,500.00 4,500.00
135 Grendel sedang bh 6,500.00 6,500.00
136 Grendel super bh 8,500.00 8,500.00
137 Grosok 2/3 cm m³ 175,000.00 175,000.00
138 Grosok jagung m³ 175,000.00 175,000.00
139 GRC (120 x 240 cm) t: 5 mm lbr 80,000.00 80,000.00
140 Gypsum board (120 x 240 cm) t: 6.5 mm lbr 60,000.00 60,000.00
141 Gypsum board (120 x 240 cm) t: 9 mm lbr 75,000.00 75,000.00
142 Hak angin biasa bh 4,500.00 4,500.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

143 Hak angin sedang bh 8,500.00 8,500.00


144 Hak angin super bh 13,500.00 13,500.00
145 Handle Jendela bh 10,000.00 10,000.00
146 Harplex 3 mm (1,00 x 1,00) lbr 16,500.00 16,500.00
147 HB. 20 bh 7,000.00 7,000.00
148 HB. 10x20x60 bh 8,700.00 8,700.00
149 Hospital plint fiber bh 18,500.00 18,500.00
150 Hospital plint keramik bh 40,000.00 40,000.00
151 Ijuk kg 12,500.00 12,500.00
152 Jet sower bh 90,000.00 90,000.00
153 Kabel listrik 1.50 mm m' 4,500.00 4,500.00
154 Kabel listrik 2.50 mm m' 5,500.00 5,500.00
155 Kabel power unit 1,650,000.00 1,650,000.00
156 Kaca aluminium profil m' 250,000.00 250,000.00
157 Kaca aluminium patri m' 800,000.00 800,000.00
158 Kaca bening 3 mm m2 70,000.00 70,000.00
159 Kaca bening 5 mm m2 75,000.00 75,000.00
160 Kaca bening 6 cm m2 80,000.00 80,000.00
161 Kaca bening 8 mm m2 90,000.00 90,000.00
162 Kaca es 5 mm m2 85,000.00 85,000.00
163 Kaca framelist 8 mm unit 500,000.00 500,000.00
164 Kaca naco/daun bening m2 80,000.00 80,000.00
165 Kaca rayband 5 mm m2 80,000.00 80,000.00
166 Kaca tempered 12 mm + komplit unit 6,500,000.00 6,500,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

167 Kanstein beton (0,15x0,4x0,6) bh 29,000.00 29,000.00


168 Karpet biasa m2 50,000.00 50,000.00
169 Karpet tebal m2 85,000.00 85,000.00
170 Kawat bendrat kg 15,000.00 15,000.00
171 Kawat bronjong kg 10,000.00 10,000.00
172 Kawat duri (30 m') roll 300,000.00 300,000.00
173 Kawat D 4 mm kg 16,500.00 16,500.00
174 Kawat las listrik (lastok) kg 22,000.00 22,000.00
175 Kawur/kapur Pasang m³ 225,000.00 225,000.00
176 Kayu bakar kg 1,100.00 1,100.00
177 Kayu begesting m³ 1,300,000.00 1,300,000.00
178 Kayu begesteng steiger/dolken 4 M' bh 9,000.00 9,000.00
179 Kayu dudukan fitting bh 4,000.00 4,000.00
180 Kayu bangkiray Balok m³ 11,000,000.00 11,000,000.00
181 Kayu bangkiray Papan m³ 12,500,000.00 12,500,000.00
182 Kayu jati untuk Konstrusi Jembatan m³ 23,809,000.00 23,809,000.00
183 Kayu jati untuk perquet m² 317,500.00 317,500.00
184 Kayu jati hutan untuk Kusen m³ 17,857,200.00 17,857,200.00
185 Kayu jati hutan untuk Rangka Atap m³ 15,873,100.00 15,873,100.00
186 Kayu jati lokal untuk Kusen m³ 11,508,000.00 11,508,000.00
187 Kayu jati lokal untuk Rangka Atap m³ 13,889,000.00 13,889,000.00
188 Kayu kamper Balok m³ 9,500,000.00 9,500,000.00
189 Kayu kamper Papan m³ 10,500,000.00 10,500,000.00
190 Kayu kruing Balok m³ 6,000,000.00 6,000,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

191 Kayu kruing Papan m³ 6,500,000.00 6,500,000.00


192 Kayu list profil m' 7,500.00 7,500.00
193 Kayu meranti 5/7 m³ 5,250,000.00 5,250,000.00
194 Kayu meranti reng 2/3 m³ 3,200,000.00 3,200,000.00
195 Kayu meranti papan 30 cm m³ 5,750,000.00 5,750,000.00
196 Kayu perancah/sengon m³ 1,250,000.00 1,250,000.00
197 Kayu sengon kaso 5/7 m³ 1,750,000.00 1,750,000.00
198 Kayu sengon papan m³ 2,000,000.00 2,000,000.00
199 Kayu sirap jati hutan pak 125,000.00 125,000.00
200 Keramik 20 x 20 m2 50,000.00 50,000.00
201 Keramik 20 x 25 dinding m2 44,500.00 44,500.00
202 Keramik 30 x 30 polos m2 42,500.00 42,500.00
203 Keramik 30 x 30 warna motif m2 50,000.00 50,000.00
204 Keramik 30 x 30 eksterior texture m2 60,000.00 60,000.00
205 Keramik 30 x 60 dinding m2 87,500.00 87,500.00
206 Keramik 40 x 40 polos m2 55,000.00 55,000.00
207 Keramik 40 x 40 warna motif m2 63,800.00 63,800.00
208 Keramik 40 x 40 eksterior texture m2 75,400.00 75,400.00
209 Keramik 40 x 40 (Platinum) m2 58,900.00 58,900.00
210 Keramik kayu m2 289,900.00 289,900.00
211 Keramik 10 x 40 cm stepnose bh 7,000.00 7,000.00
212 Kerikil sungai di Quary m³ 22,500.00 22,500.00
213 Knie galvanis Ø 2" - 90º dan 45º bh 30,000.00 30,000.00
214 Kran air d 1" biasa bh 16,500.00 16,500.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

215 Kran air d 1" sedang bh 27,500.00 27,500.00


216 Kran air d 1" super bh 55,000.00 55,000.00
217 Kran air d 3/4" biasa bh 20,000.00 20,000.00
218 Kran air d 3/4" sedang bh 25,500.00 25,500.00
219 Kran air d 3/4" super bh 62,500.00 62,500.00
220 Kran air d 1/2" biasa bh 17,500.00 17,500.00
221 Kran air d 1/2" sedang bh 30,000.00 30,000.00
222 Kran air d 1/2" super bh 45,000.00 45,000.00
223 Kran tipe handle Ø 3/4" bh 40,000.00 40,000.00
224 Kusen aluminium coklat 4" m' 95,000.00 95,000.00
225 Kusen aluminium coklat 3" m' 70,000.00 70,000.00
226 Kusen aluminium motif kayu 4" m' 140,000.00 140,000.00
227 Kusen aluminium putih 4" m' 100,000.00 100,000.00
228 Kusen aluminium silver 4" m' 80,000.00 80,000.00
229 Kusen aluminium silver 3" m' 65,000.00 65,000.00
230 Kuwas bh 13,500.00 13,500.00
231 Lampu SL 18 watt bh 35,000.00 35,000.00
232 Lampu SL 20 watt bh 37,500.00 37,500.00
233 Lampu TL 20 watt komplit bh 50,000.00 50,000.00
234 Lem kayu kg 12,500.00 12,500.00
235 Lem kuning (ex. Aica Aibon) kg 55,000.00 55,000.00
236 Lem kuning putih (ex. Fox) kg 12,000.00 12,000.00
237 Lem wallpaper kg 55,000.00 55,000.00
238 List gypsum profil m 12,000.00 12,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

239 Marmer Tulung Agung 30 x 30 cm m2 70,000.00 70,000.00


240 Marmer Tulung Agung 40 x 40 cm m2 85,000.00 85,000.00
241 Marmer Tulung Agung 60 x 60 cm m2 100,000.00 100,000.00
242 Marmer Tulung Agung 80 x 80 cm m² 200,000.00 200,000.00
243 Marmer Tulung Agung 100 x 100 cm m² 250,000.00 250,000.00
244 Marmer ex. import m² 2,500,000.00 2,500,000.00
245 Marmer ex. import Italy m² 1,250,000.00 1,250,000.00
246 MCB 32 amper bh 40,000.00 40,000.00
247 MCB bh 54,000.00 54,000.00
248 MCB Box bh 17,500.00 17,500.00
249 Meni besi kg 25,000.00 25,000.00
250 Meni kayu kg 25,000.00 25,000.00
251 Minyak begesting ltr 6,750.00 6,750.00
252 Minyak bensin non subsidi ltr 9,200.00 9,200.00
253 Minyak pelumas ltr 20,000.00 20,000.00
254 Minyak pertamax ltr 9,200.00 9,200.00
255 Minyak premium ltr 7,400.00 7,400.00
256 Minyak solar non subsidi ltr 12,500.00 12,500.00
257 Multiplex 4 mm lbr 61,000.00 61,000.00
258 Multiplex 6 mm lbr 90,000.00 90,000.00
259 Multiplex 8 mm lbr 110,000.00 110,000.00
260 Multiplex 9 mm lbr 125,000.00 125,000.00
261 Multiplek 12 mm lbr 150,000.00 150,000.00
262 Pagar BRC (ting. 0,9 m x pj. 2,4 m x d. 6 mm ) lbr 175,000.00 175,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

263 Pagar kawat duri (30 m') roll 450,000.00 450,000.00


264 Paku eternit kg 22,000.00 22,000.00
265 Paku pacing kg 22,000.00 22,000.00
266 Paku pacing bj 600.00 600.00
267 Paku reng kg 11,000.00 11,000.00
268 Paku sekrup kg 22,500.00 22,500.00
269 Paku sekrup bj 125.00 125.00
270 Paku sekrup fisher/dynebolt/ramset bj 5,000.00 5,000.00
271 Paku sekrup onduline bj 800.00 800.00
272 Paku triplek 2 cm kg 21,750.00 21,750.00
273 Paku usuk kg 13,500.00 13,500.00
274 Pasang rangka atap baja ringan m2 200,000.00 200,000.00
275 Portland Cement (PC) 40 Kg kg 1,050.00 1,050.00
276 PC putih (40 Kg) kg 2,000.00 2,100.00
277 PC warna (40 Kg) kg 11,000.00 11,100.00
278 Panel control lengkap unit 4,500,000.00 4,500,000.00
279 Pasir beton woro m³ 235,000.00 255,000.00
280 Pasir pasang m³ 200,000.00 225,000.00
281 Pasir sirtu lokal m³ 150,000.00 150,000.00
282 Pasir sirtu woro m³ 170,000.00 195,000.00
283 Pasir tras m³ 125,000.00 100,000.00
284 Pasir urug m³ 140,000.00 140,000.00
285 Paving 6 cm (kotak) m² 68,250.00 68,500.00
286 Paving 6 cm (segi enam) m² 68,250.00 68,500.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

287 Paving 8 cm m² 76,500.00 76,750.00


288 Paving 6 cm K.175 (abu-abu) m² 68,500.00 68,750.00
289 Paving 6 cm K.175 (warna) m² 73,500.00 73,750.00
290 Paving 8 cm K.175 (abu-abu) m² 81,500.00 81,750.00
291 Paving 8 cm K.175 (warna) m² 86,500.00 86,750.00
292 Paving 6 cm K. 225 m² 71,000.00 71,250.00
293 Paving 8 cm K. 225 m² 88,500.00 88,750.00
294 Paving 6 cm K.250 (abu-abu) m² 76,250.00 76,500.00
295 Paving 6 cm K.250 (warna) m² 81,500.00 81,750.00
296 Paving 8 cm K.250 (abu-abu) m² 96,500.00 96,750.00
297 Paving 8 cm K.250 (warna) m² 99,500.00 99,750.00
298 Paving 8 cm K.300 (abu-abu) m² 109,500.00 109,750.00
299 Paving 8 cm K.300 (warna) m² 114,500.00 114,750.00
300 Paving Difabel bh 44,600.00 44,600.00
301 Paving Grass Block m² 106,200.00 106,200.00
302 Pintu KM/WC PVC sedang bh 550,000.00 550,000.00
303 Pintu PVC biasa bh 225,000.00 225,000.00
304 Pintu aluminium ram m' 110,000.00 110,000.00
305 Pipa Air Besi Ø 1/2 " / 6 m btg 45,000.00 45,000.00
306 Pipa Air Besi Ø 3/4 " / 6 m btg 60,000.00 60,000.00
307 Pipa Air Besi Ø 1 " / 6 m btg 65,000.00 65,000.00
308 Pipa Air Besi Ø 1,25 " / 6 m btg 85,000.00 85,000.00
309 Pipa Air Besi Ø 1,5 " / 6 m btg 120,000.00 120,000.00
310 Pipa Air Besi Ø 2 " / 6 m btg 145,000.00 145,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

311 Pipa Air Besi Ø 2,5 " / 6 m btg 260,000.00 260,000.00


312 Pipa Air GI Med. A Ø 1/2 " / 6 m btg 115,000.00 115,000.00
313 Pipa Air GI Med. A Ø 3/4 " / 6 m btg 135,000.00 135,000.00
314 Pipa Air GI Med. A Ø 1 " / 6 m btg 210,000.00 210,000.00
315 Pipa Air GI Med. A Ø 1,25 " / 6 m btg 270,000.00 270,000.00
316 Pipa Air GI Med. A Ø 1,5 " / 6 m btg 445,000.00 445,000.00
317 Pipa Air GI Med. A Ø 2 " / 6 m btg 535,000.00 535,000.00
318 Pipa Air GI Med. A Ø 2,5 " / 6 m btg 630,000.00 630,000.00
319 Pipa galvanis Ø 1,5" / 6 m. t= 2,5 mm btg 445,000.00 445,000.00
320 Pipa galvanis Ø 2 " / 6 m. t= 2,5 mm btg 535,000.00 535,000.00
321 Pipa galvanis Ø 3 " / 6 m. t= 2,5 mm btg 670,000.00 670,000.00
322 Pipa PVC Ø 1/2" / 4 m AW btg 20,000.00 20,000.00
323 Pipa PVC Ø 3/4" / 4 m AW btg 25,000.00 25,000.00
324 Pipa PVC Ø 1" / 4 m AW btg 30,000.00 30,000.00
325 Pipa PVC Ø 1,5" / 4 m AW btg 65,000.00 65,000.00
326 Pipa PVC Ø 2" / 4 m AW btg 115,000.00 115,000.00
327 Pipa PVC Ø 2,5" / 4 m AW btg 135,000.00 135,000.00
328 Pipa PVC Ø 3" / 4 m AW btg 155,000.00 155,000.00
329 Pipa PVC Ø 4" / 4 m AW btg 280,000.00 280,000.00
330 Pipa PVC Ø 6" / 4 m AW btg 445,000.00 445,000.00
331 Pipa PVC Ø 8" / 4 m AW btg 690,000.00 690,000.00
332 Pipa PVC S. 12.50 Ø 1 1/2" - 6 m btg 125,000.00 125,000.00
333 Pipa PVC S. 12.50 Ø 2" - 6 m btg 140,000.00 140,000.00
334 Pipa PVC S. 16 Ø 2" - 6 m btg 115,000.00 115,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

335 Pipa PVC S. 16 Ø 4" - 6 m btg 350,000.00 350,000.00


336 Plamir kg 17,500.00 17,500.00
337 Plint granit 10 x 20 cm m2 12,500.00 12,500.00
338 Plint granit 10 x 30 cm bh 20,000.00 20,000.00
339 Plint granit 10 x 40 cm bh 25,000.00 25,000.00
340 Plint granit 10 x 60 cm bh 30,000.00 30,000.00
341 Plint keramik 8 x 20 cm bh 3,000.00 3,000.00
342 Plint keramik 10 x 20 cm bh 4,500.00 4,500.00
343 Plint keramik 10 x 40 cm bh 5,000.00 5,000.00
344 Plint keramik 10 x 40 cm bh 5,500.00 5,500.00
345 Plint keramik 10 x 60 cm bh 6,500.00 6,500.00
346 Plint teraso bh 6,000.00 6,000.00
347 Plint ubin PC warna 15 x 20 cm bh 3,750.00 3,750.00
348 Politur ltr 70,000.00 70,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

349 Politur jadi ltr 80,000.00 80,000.00


350 Pompa Air (listrik) 450 watt ex. Dab bh 550,000.00 550,000.00
351 Pompa Submersible 2 pk, Q = 2 lt, H = 70 m unit 15,000,000.00 15,000,000.00
352 Pompa Submersible 3 pk, Q = 2 lt, H = 70 m unit 25,000,000.00 25,000,000.00
353 Porselin 10 x 10 dos 27,000.00 27,000.00
354 Porselin 11 x 11 dos 27,000.00 27,000.00
355 Profil aluminium m 7,000.00 7,000.00
356 Ram m 110,000.00 110,000.00
357 Ramset bh 1,400.00 1,400.00
358 Residu/ter ltr 4,000.00 4,000.00
359 Rolling door aluminium m2 425,000.00 425,000.00
360 Roster batu alam bh 35,500.00 35,500.00
361 Roster beton bh 13,500.00 13,500.00
362 Roster kayu jati bh 38,000.00 38,000.00
363 Roster tanah/genting bh 8,500.00 8,500.00
364 Roster keramik uk. 30x30 bh 36,000.00 36,000.00
365 Saklar ganda bh 20,000.00 20,000.00
366 Saklar tunggal bh 15,500.00 15,500.00
367 Sealant tube 62,000.00 62,000.00
368 Seal tape bh 5,000.00 5,000.00
369 Seling pengaman unit 1,100,000.00 1,100,000.00
370 Semen merah m³ 275,000.00 275,000.00
371 Seng Glmbg.BJLS-0,3 ( 0,9 m x 1,8 m) lbr 75,000.00 75,000.00
372 Seng Glmbg.BJLS-0,3 ( 0,9 m x 2,1 m ) lbr 80,000.00 80,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

373 Seng Plat BJLS-0,3 ( 0.9 m x 1,8 m ) lbr 65,500.00 65,500.00


374 Seng Talang Bjls 0.3 lebar 0,60 m´ 30,000.00 30,000.00
375 Seng Talang Bjls 0.3 lebar 0,90 m´ 50,000.00 50,000.00
376 Shower bh 500,000.00 500,000.00
377 Slot biasa ( kuda terbang ) bh 70,000.00 70,000.00
378 Slot kunci pipih biasa bh 115,000.00 115,000.00
379 Slot Kunci Pipih sedang bh 200,000.00 200,000.00
380 Slot Kunci Pipih super bh 205,000.00 205,000.00
381 Stabilizer 5000 Watt bh 3,150,000.00 3,150,000.00
382 Stop kontak bh 15,500.00 15,500.00
383 Stop kran kuningan 3/4" bh 27,500.00 27,500.00
384 Stop kran tipe handle Ø 1.5" bh 75,000.00 75,000.00
385 Stop kran tipe handle Ø 2" bh 125,000.00 125,000.00
386 Strorox-100 kg 45,000.00 45,000.00
387 Tanah bentonit kg 5,500.00 5,500.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

388 Tanah cadas m³ 40,000.00 37,500.00


389 Tanah liat m³ 35,000.00 32,500.00
390 Tanah urug pilihan m³ 42,500.00 40,000.00
391 Tandon air 1000 lt (fiber) bh 1,500,000.00 1,500,000.00
392 Tandon air 1000 lt (stainless) bh 3,750,000.00 3,750,000.00
393 Teakwood 4 mm ( 1,20 x 240 ) lbr 110,000.00 110,000.00
394 Teakwood 3 mm ( 1,20 x 2,40 ) lbr 120,000.00 120,000.00
395 Tegel abu-abu 20 x 20 cm m² 20,000.00 20,000.00
396 Tegel abu-abu 30 x 30 cm m² 26,000.00 26,000.00
397 Tegel wafel abu-abu m² 24,000.00 24,000.00
398 Tegel wafel warna m² 29,000.00 29,000.00
399 Tepung gypsum kg 3,500.00 3,500.00
400 Tiang listrik beton C11.350 daN E bh 5,500,000.00 5,500,000.00
401 Tiang listrik beton C11.350 daN E BC bh 5,600,000.00 5,600,000.00
402 Tiang listrik beton C11.200 daN E bh 4,800,000.00 4,800,000.00
403 Tiang listrik beton C9.200 daN E bh 3,900,000.00 3,900,000.00
404 Travo 50 KVA bh 31,000,000.00 31,000,000.00
405 Triplex 2.7 mm (1.2 x 2.4 ) Kruing lbr 55,000.00 55,000.00
406 Triplex 2.7 mm (1.2 x 2.4 ) Sengon lbr 50,000.00 50,000.00
407 Triplex 4 mm (1.2 x 2.4 ) Kruing lbr 67,500.00 67,500.00
408 Triplex 4 mm (1.2 x 2.4 ) Sengon lbr 60,000.00 60,000.00
409 Urinoir bh 1,750,000.00 1,750,000.00
410 Vernis ltr 150,000.00 150,000.00
411 Wallpaper lebar 50 cm m' 35,000.00 35,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

412 Wastafel komplit unit 600,000.00 600,000.00


413 Wasbak (bak cuci) stainless unit 400,000.00 400,000.00
414 Woodplank ( 4 M ) m' 65,000.00 65,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

B. BAHAN BOX CULVERT TYPE BINA MARGA


BEBAN Gandar 21 Ton
1 BC 400x400x1000 unit 725,000.00 725,000.00
2 BC 500x500x1000 unit 950,000.00 950,000.00
3 BC 600x600x1000 unit 1,200,000.00 1,200,000.00
4 BC 800x800x1000 unit 2,260,000.00 2,260,000.00
5 BC 1000x1000x1000 unit 2,810,000.00 2,810,000.00
6 BC 1200x1200x1000 unit 4,900,000.00 4,900,000.00
7 BC 1400x1400x1000 unit 3,700,000.00 3,700,000.00
8 BC 1500x1500x1000 unit 5,830,000.00 5,830,000.00
9 BC 1600x1600x1000 unit 6,450,000.00 6,450,000.00
10 BC 1800x1800x1000 unit 7,250,000.00 7,250,000.00
11 BC 2000x2000x1000 unit 8,060,000.00 8,060,000.00

C. BAHAN PINTU PENGAIRAN


1 Plat daun pintu t: 8 mm m² 1,750,000.00 1,750,000.00
2 Drat ulir Ø 1 ½" m' 1,500,000.00 1,500,000.00
3 Drat ulir Ø 2" m' 2,000,000.00 2,000,000.00
4 Siku L 70.70.3 ljr 350,000.00 350,000.00
5 Anting baja bh 250,000.00 250,000.00
6 Anting baja bh 100,000.00 100,000.00
7 Stang pintu bh 1,000,000.00 1,000,000.00
8 Stang pemutar bh 750,000.00 750,000.00
9 Baut anting bh 7,000.00 7,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

10 Baut anting Ø ¾" bh 200,000.00 200,000.00


11 Baut penguat anting bh 100,000.00 100,000.00
12 Peluncur stanlis (2,20 x 0,04 x 5 mm ) bh 1,000,000.00 1,000,000.00
13 Siku L ( 9 x 9 x 7 mm ) m' 150,000.00 150,000.00
14 Baja kerangka pintu ( 12 x 5 x 6 mm) ljr 550,000.00 550,000.00
15 Baja C 12 ( 12,8 , 5,2 , 5 mm) ljr 600,000.00 600,000.00
16 Plat block frame 120 x 240 lbr 1,150,000.00 1,150,000.00
17 Siku pengait landasan ( 70 x 70 x 6 mm) bh 350,000.00 350,000.00
18 Besi angkur Ø12 bh 97,000.00 97,000.00
19 Baut bingkai Ø12 bh 3,000.00 3,000.00
20 Mur baut Ø 12 bh 3,000.00 3,000.00
21 Mur kuningan Ø 3 " bh 250,000.00 250,000.00
22 Mur kuningan Ø 2" bh 200,000.00 200,000.00
23 Baut pengait landasan Ø 16 bh 5,000.00 5,000.00
24 Pengait box bh 5,000.00 5,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

25 Baja Cu ( 70 x 200 x 70 ) ljr 1,450,000.00 1,450,000.00


26 Plat blok 120 x 240 lbr 1,350,000.00 1,350,000.00
27 Baut pesagen bh 5,000.00 5,000.00
28 Dudukan kuningan bh 2,000,000.00 2,000,000.00
29 Dudukan kuningan bh 500,000.00 500,000.00
30 Gigi kuningan bh 1,350,000.00 1,350,000.00
31 Gigi stang bh 550,000.00 550,000.00
32 Dudukan stang pemutar bh 750,000.00 750,000.00
33 As pemutar m' 208,000.00 208,000.00
34 Blok penyangga as bh 750,000.00 750,000.00
35 Mur kuningan Ø 3 " bh 250,000.00 250,000.00
36 Mur kuningan Ø 2" bh 200,000.00 200,000.00
37 Gigi nanas bh 750,000.00 750,000.00
38 Tutup pengaman gigi bh 500,000.00 500,000.00
39 Druk laker bh 250,000.00 250,000.00
40 Plat box 15 x 20 cm bh 468,750.00 468,750.00
41 Greese pelumas ls 100,000.00 100,000.00
42 Gembok kunci pengaman bh 75,000.00 75,000.00
43 Plat daun pintu t: 10 mm m² 2,150,000.00 2,150,000.00
44 Stang pintu engkel bh 750,000.00 750,000.00
45 Stang pintu doubel bh 1,000,000.00 1,000,000.00
46 Gir piringan ø 35 bh 1,500,000.00 1,500,000.00
47 Gir piringan ø 40 bh 2,000,000.00 2,000,000.00
48 Gir piringan ø 50 bh 2,500,000.00 2,500,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

49 Drat ulir 1 1/2" m' 1,500,000.00 1,500,000.00


50 Drat ulir 2" m' 2,000,000.00 2,000,000.00
51 Drat ulir 3" m' 2,500,000.00 2,500,000.00
52 Wortel mur ø 1 1/2" bh 1,000,000.00 1,000,000.00
53 Wortel mur ø 2" bh 1,500,000.00 1,500,000.00
54 Wortel mur ø 3" bh 2,500,000.00 2,500,000.00
55 Wortel mur ø 4" bh 3,500,000.00 3,500,000.00
56 Gigi nanas kecil bh 1,000,000.00 1,000,000.00
57 Gigi nanas besar bh 2,000,000.00 2,000,000.00
58 As pemutar gigi ø 2" m 1,500,000.00 1,500,000.00
59 Drat ulir ø 4" m 4,500,000.00 4,500,000.00
60 Plat penutup gir bh 1,000,000.00 1,000,000.00
61 Dudukan as pemutar gigi bh 500,000.00 500,000.00
62 Kerangka pintu siku 60 x 60 x 6 unit 350,000.00 350,000.00
63 Kerangka pintu siku 80 x 80 x 8 unit 950,000.00 950,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

64 Kerangka pintu siku 90 x 90 x 9 unit 1,050,000.00 1,050,000.00


65 Kerangka pintu siku 70 x 70 x 10 unit 550,000.00 550,000.00
66 Kerangka atas canal U 10 x 10 unit 1,000,000.00 1,000,000.00
67 Kerangka bawah duobel siku unit 500,000.00 500,000.00

Daftar Harga Pintu Sorong Baja unit


1 B = 0,50 ; H1 = 0,50 ; H2 = 3,00 bh 6,500,000.00 6,500,000.00
2 B = 0,60 ; H1 = 0,60 ; H2 = 3,50 bh 7,000,000.00 7,000,000.00
3 B = 0,70 ; H1 = 0,70 ; H2 = 4,00 bh 8,500,000.00 8,500,000.00
4 B = 0,80 ; H1 = 0,80 ; H2 = 4,50 bh 9,000,000.00 9,000,000.00
5 B = 0,90 ; H1 = 0,90 ; H2 = 5,00 bh 10,500,000.00 10,500,000.00

Daftar Haraga Pintu Tarik


1 B = 0,30 ; H1 = 0,30 ; H2 = 1,25 bh 1,250,000.00 1,250,000.00
2 B = 0,35 ; H1 = 0,35 ; H2 = 1,30 bh 1,500,000.00 1,500,000.00
3 B = 0,40 ; H1 = 0,40 ; H2 = 1,35 bh 1,750,000.00 1,750,000.00

Daftar Harga Pintu Drat Dobel Daun Besi


1 B = 1,50 ; H1 = 1,50 ; H2 = 3,50 bh 50,000,000.00 50,000,000.00
2 B = 1,75 ; H1 = 1,50 ; H2 = 4,00 bh 55,000,000.00 55,000,000.00
3 B = 2,00 ; H1 = 2,00 ; H2 = 5,00 bh 70,000,000.00 70,000,000.00
4 B = 2,00 ; H1 = 1,50 ; H2 = 6,00 bh 75,000,000.00 75,000,000.00

Daftar Harga Pintu Daun Kayu Drat Dobel


HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

1 B = 1,00 ; H1 = 1,00 ; H2 = 3,00 bh 60,000,000.00 60,000,000.00


2 B = 1,50 ; H1 = 1,50 ; H2 = 3,50 bh 65,000,000.00 65,000,000.00
3 B = 2,00 ; H1 = 1,50 ; H2 = 4,00 bh 70,000,000.00 70,000,000.00
4 B = 2,00 ; H1 = 2,00 ; H2 = 5,00 bh 80,000,000.00 80,000,000.00

D. HARGA PERALATAN ALAT BERAT BINA MARGA


Kapasitas Alat
1 Asphalt Mixing Plant T/Jam 1,540,080,000.00 1,540,080,000.00
2 Asphalt Finisher Ton 324,000,000.00 324,000,000.00
3 Asphalt Sprayer Liter 324,000,000.00 324,000,000.00
4 Bulldozer 100-150 Hp - 756,000,000.00 756,000,000.00
5 Compressor 4000-6500 L\M CPM/(L/m) 146,880,000.00 146,880,000.00
6 Concrete Mixer 0.3-0.6 M3 Liter 59,400,000.00 59,400,000.00
7 Crane 10-15 Ton Ton 369,360,000.00 369,360,000.00
8 Dump Truck 3-4 M3 Ton 184,680,000.00 184,680,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

9 Dump Truck Ton 369,360,000.00 369,360,000.00


10 Excavator 80-140 Hp M3 492,480,000.00 492,480,000.00
11 Flat Bed Truck 3-4 M3 ton 142,560,000.00 142,560,000.00
12 Generator Set KVA 379,080,000.00 379,080,000.00
13 Motor Grader >100 Hp - 677,160,000.00 677,160,000.00
14 Track Loader 75-100 Hp M3 226,800,000.00 226,800,000.00
15 Wheel Loader 1.0-1.6 M3 M3 511,920,000.00 511,920,000.00
16 Three Wheel Roller 6-8 T Ton 181,440,000.00 181,440,000.00
17 Tandem Roller 6-8 T. Ton 427,680,000.00 427,680,000.00
18 Tire Roller 8-10 T. Ton 398,520,000.00 398,520,000.00
19 Vibratory Roller 5-8 T. Ton 324,000,000.00 324,000,000.00
20 Concrete Vibrator - 4,320,000.00 4,320,000.00
21 Stone Crusher T/Jam 1,477,440,000.00 1,477,440,000.00
22 Water Pump 70-100 Mm - 21,600,000.00 21,600,000.00
23 Water Tanker 3000-4500 L. Liter 145,800,000.00 145,800,000.00
24 Pedestrian Roller Ton 158,760,000.00 158,760,000.00
25 Tamper Ton 8,100,000.00 8,100,000.00
26 Jack Hammer - 108,000,000.00 108,000,000.00
27 Fulvi Mixer - 48,600,000.00 48,600,000.00
28 Concrete Pump M3 324,000,000.00 324,000,000.00
29 Trailer 20 Ton Ton 298,080,000.00 298,080,000.00
30 Pile Driver + Hammer Ton 139,320,000.00 139,320,000.00
31 Crane On Track 35 Ton Ton 751,680,000.00 751,680,000.00
32 Welding Set Amp 29,160,000.00 29,160,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

33 Bore Pile Machine Meter 5,391,360,000.00 5,391,360,000.00


34 Asphalt Liquid Mixer Liter 189,000,000.00 189,000,000.00
35 Trailler 15 Ton Ton 324,000,000.00 324,000,000.00
36 Rock Drill Breaker - 492,480,000.00 492,480,000.00
37 Cold Milling m 2,721,600,000.00 2,721,600,000.00
38 Cold Recycler M 2,721,600,000.00 2,721,600,000.00
39 Hot Recycler M 2,721,600,000.00 2,721,600,000.00
40 Aggregat (chip) Spreader M 234,360,000.00 234,360,000.00
41 Asphalt Distribution Liter 129,600,000.00 129,600,000.00
42 Split Form Paver M 10,800,000.00 10,800,000.00
43 Concrete Pan Mixer Liter 46,008,000.00 46,008,000.00
44 Concrete Breaker m3/jam 492,480,000.00 492,480,000.00
45 Asphalt Tanker liter 46,980,000.00 46,980,000.00
46 Cement Tanker liter 46,980,000.00 46,980,000.00
47 Concrete Mixer (350) liter 35,640,000.00 35,640,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

48 Vibrating Rammer KG 14,040,000.00 14,040,000.00


49 Truk Mixer M3 438,480,000.00 438,480,000.00
50 Bore Pile Machine Dia 60 CM 5,391,360,000.00 5,391,360,000.00
51 Crane On Track 75 - 100Ton Ton 839,160,000.00 839,160,000.00
52 Blending Equipment Ton 55,080,000.00 55,080,000.00
53 Asphalt Liquid Mixer (kap 20000) Liter 189,000,000.00 189,000,000.00
54 Chain Saw 12,960,000.00 12,960,000.00
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

Menyetujui:

1 Sekretaris DPUPR Kab. Karanganyar

TITIK UMARNI, S.H., M.H. 1. .................................................


NIP. 19660923 198607 2 001

2 Bidang Sumber Daya Air

JOKO PURNOMO, S.T. 2. .................................................


NIP. 19590622 198010 1 003

3 Kepala Bidang Bina Marga

DARMANTO, S.T., M.M. 3. .................................................


NIP. 19631108 198909 1 001

4 Kepala Bidang Tata Ruang dan Bina Konstruksi

SUPANI, S.T., M.Si. 4. .................................................


NIP. 19680626 199703 2 008

5 Kepala Bidang Cipta Karya


HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

ASIHNO PURWADI, S.T. 5. .................................................


NIP. 19720828 199803 1 016

Karanganyar, 10 Januari 2

KEPALA DINAS PEKERJAAN UMUM DAN P


KABUPATEN KARANGANY

EDHY SRIYATNO, S.T., M.


NIP. 19600323 198703 1 0
HARGA DASAR/SURVEY DPU 2017
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

Keterangan :
Harga Perencanaan2017 tersebut sudah termasuk pajak 10%, keuntungan penyedia/profit dan overhead 13% dan eskalasi harga 3% dari harga survey.
GGARAN 2017
N RUANG

ARGOYOSO

R 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

90,000.00 114,000.00
52,500.00 67,000.00
50,000.00 63,000.00
70,000.00 82,000.00
65,000.00 82,000.00
125,000.00 158,000.00
172,500.00 218,000.00
72,500.00 92,000.00
72,500.00 92,000.00
72,500.00 92,000.00
72,500.00 92,000.00
72,500.00 92,000.00
165,000.00 208,000.00
70,000.00 89,000.00
67,500.00 86,000.00
67,500.00 86,000.00
62,500.00 79,000.00
70,000.00 89,000.00
50,000.00 63,000.00
62,500.00 79,000.00
135,000.00 171,000.00
60,000.00 76,000.00
62,500.00 -
46,000.00 58,000.00
46,000.00 58,000.00
55,000.00 70,000.00
65,000.00 82,000.00
65,000.00 82,000.00
65,000.00 82,000.00
60,000.00 77,000.00
70,000.00 89,000.00
65,000.00 82,000.00
65,000.00 82,000.00
72,500.00 92,000.00
70,000.00 89,000.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

175,000.00 220,500.00
5.00 10.00
12,500.00 15,800.00
7,000.00 8,900.00
3,500.00 4,500.00
28,500.00 36,000.00
100,000.00 126,000.00
95,000.00 119,700.00
9,500.00 13,000.00
10,500.00 14,200.00
42,800.00 54,000.00
85,300.00 107,500.00
270,000.00 340,200.00
250,000.00 315,000.00
80,000.00 100,800.00
150,000.00 189,000.00
95,000.00 119,700.00
30,000.00 37,800.00
53,300.00 67,200.00
400,000.00 504,000.00
385,000.00 485,100.00
550,000.00 693,000.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

1,575,000.00 1,984,500.00
60,000.00 75,600.00
11,000.00 17,100.00
10,000.00 12,600.00
17,500.00 22,100.00
3,000.00 3,800.00
175,000.00 220,500.00
11,000.00 13,900.00
650.00 900.00
70,000.00 -
125,000.00 157,500.00
90,000.00 113,400.00
215,000.00 308,700.00
65,000.00 81,900.00
115,000.00 144,900.00
100,000.00 126,000.00
260,000.00 327,600.00
257,500.00 324,500.00
255,000.00 321,300.00
252,500.00 318,200.00
202,500.00 318,200.00
202,000.00 317,600.00
201,000.00 316,300.00
200,000.00 315,000.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

197,500.00 311,900.00
20,250.00 31,500.00
9,000.00 13,900.00
4,500.00 5,700.00
7,500.00 9,500.00
6,000.00 7,600.00
10,000.00 12,600.00
17,500.00 22,100.00
15,500.00 19,600.00
192,861.00 300,100.00
267,381.00 416,000.00
287,145.00 446,700.00
309,015.00 480,700.00
401,112.00 624,000.00
506,331.00 787,700.00
533,709.00 830,300.00
563,274.00 876,300.00
877,878.00 1,365,600.00
1,366,632.00 2,125,900.00
25,000.00 31,500.00
32,500.00 41,000.00
32,500.00 41,000.00
47,500.00 59,900.00
50,000.00 63,000.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

70,000.00 88,200.00
80,000.00 100,800.00
85,000.00 107,100.00
125,000.00 157,500.00
50,000.00 63,000.00
50,000.00 63,000.00
50,000.00 63,000.00
22,500.00 28,400.00
125,000.00 157,500.00
1,250,000.00 1,575,000.00
1,350,000.00 1,701,000.00
1,825,000.00 2,300,000.00
1,000,000.00 1,260,000.00
100,000.00 126,000.00
150,000.00 189,000.00
16,000.00 20,200.00
30,000.00 37,800.00
6,000.00 7,600.00
7,500.00 9,500.00
12,500.00 15,800.00
6,500.00 8,200.00
10,250.00 13,000.00
13,250.00 16,700.00
10,000.00 12,600.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

300,000.00 378,000.00
800,000.00 1,008,000.00
7,500.00 9,500.00
60,000.00 75,600.00
60,000.00 75,600.00
1,000,000.00 1,260,000.00
750,000.00 945,000.00
650,000.00 819,000.00
550,000.00 693,000.00
4,000.00 5,100.00
6,000.00 7,600.00
1,750.00 2,300.00
6,000.00 7,600.00
2,750.00 3,500.00
4,000.00 5,100.00
8,000.00 10,100.00
4,000.00 5,000.00
8,000.00 10,100.00
4,750.00 6,000.00
9,500.00 12,000.00
6,500.00 8,200.00
9,000.00 11,400.00
10,000.00 12,600.00
15,000.00 18,900.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

9,500.00 12,000.00
15,000.00 18,900.00
20,000.00 25,200.00
30,000.00 37,800.00
238,100.00 300,000.00
222,300.00 280,000.00
200,000.00 335,200.00
107,500.00 135,500.00
325,000.00 409,500.00
200,000.00 252,000.00
500,000.00 630,000.00
400,000.00 504,000.00
800,000.00 1,008,000.00
250,000.00 315,000.00
45,000.00 56,700.00
4,500.00 5,700.00
6,500.00 8,200.00
8,500.00 10,800.00
175,000.00 220,500.00
175,000.00 220,500.00
80,000.00 100,800.00
60,000.00 75,600.00
75,000.00 94,500.00
4,500.00 5,700.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

8,500.00 10,800.00
13,500.00 17,100.00
10,000.00 12,600.00
16,500.00 20,800.00
7,000.00 8,900.00
8,700.00 -
18,500.00 23,400.00
40,000.00 50,400.00
12,500.00 15,800.00
90,000.00 113,400.00
4,500.00 5,700.00
5,500.00 7,000.00
1,650,000.00 2,079,000.00
250,000.00 315,000.00
800,000.00 1,008,000.00
70,000.00 88,200.00
75,000.00 94,500.00
80,000.00 100,800.00
90,000.00 113,400.00
85,000.00 107,100.00
500,000.00 630,000.00
80,000.00 100,800.00
80,000.00 100,800.00
6,500,000.00 8,190,000.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

29,000.00 36,600.00
50,000.00 63,000.00
85,000.00 107,100.00
15,000.00 27,800.00
10,000.00 13,900.00
300,000.00 567,000.00
16,500.00 20,800.00
22,000.00 27,800.00
225,000.00 283,500.00
1,100.00 1,400.00
1,300,000.00 1,638,000.00
9,000.00 11,400.00
4,000.00 5,100.00
11,000,000.00 13,860,000.00
12,500,000.00 15,750,000.00
23,809,000.00 30,000,000.00
317,500.00 400,000.00
17,857,200.00 22,500,000.00
15,873,100.00 20,000,000.00
11,508,000.00 14,500,000.00
13,889,000.00 17,500,000.00
9,500,000.00 11,970,000.00
10,500,000.00 13,230,000.00
6,000,000.00 7,560,000.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

6,500,000.00 8,190,000.00
7,500.00 9,500.00
5,250,000.00 6,615,000.00
3,200,000.00 4,032,000.00
5,750,000.00 7,245,000.00
1,250,000.00 1,575,000.00
1,750,000.00 2,205,000.00
2,000,000.00 2,520,000.00
125,000.00 157,500.00
50,000.00 63,000.00
44,500.00 56,100.00
42,500.00 53,600.00
50,000.00 63,000.00
60,000.00 75,600.00
87,500.00 110,300.00
55,000.00 69,300.00
63,800.00 80,400.00
75,400.00 95,100.00
58,900.00 74,300.00
289,900.00 365,300.00
7,000.00 8,900.00
22,500.00 28,400.00
30,000.00 37,800.00
16,500.00 20,800.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

27,500.00 34,700.00
55,000.00 69,300.00
20,000.00 25,200.00
25,500.00 32,200.00
62,500.00 78,800.00
17,500.00 22,100.00
30,000.00 37,800.00
45,000.00 56,700.00
40,000.00 50,400.00
95,000.00 119,700.00
70,000.00 88,200.00
140,000.00 176,400.00
100,000.00 126,000.00
80,000.00 100,800.00
65,000.00 81,900.00
13,500.00 17,100.00
35,000.00 44,100.00
37,500.00 47,300.00
50,000.00 63,000.00
12,500.00 15,800.00
55,000.00 69,300.00
12,000.00 15,200.00
55,000.00 69,300.00
12,000.00 15,200.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

70,000.00 88,200.00
85,000.00 107,100.00
100,000.00 126,000.00
200,000.00 252,000.00
250,000.00 315,000.00
2,500,000.00 3,150,000.00
1,250,000.00 1,575,000.00
40,000.00 50,400.00
54,000.00 68,100.00
17,500.00 22,100.00
25,000.00 31,500.00
25,000.00 31,500.00
6,750.00 8,600.00
9,200.00 11,600.00
20,000.00 25,200.00
9,200.00 11,600.00
7,400.00 9,400.00
12,500.00 15,800.00
61,000.00 76,900.00
90,000.00 113,400.00
110,000.00 138,600.00
125,000.00 157,500.00
150,000.00 189,000.00
175,000.00 220,500.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

450,000.00 567,000.00
22,000.00 27,800.00
22,000.00 27,800.00
600.00 800.00
11,000.00 17,100.00
22,500.00 28,400.00
125.00 200.00
5,000.00 6,300.00
800.00 1,100.00
21,750.00 27,500.00
13,500.00 17,100.00
200,000.00 252,000.00
1,100.00 1,700.00
2,200.00 2,900.00
11,200.00 15,500.00
4,500,000.00 5,670,000.00
280,000.00 352,800.00
250,000.00 315,000.00
150,000.00 189,000.00
220,000.00 277,200.00
75,000.00 157,500.00
140,000.00 176,400.00
68,750.00 86,700.00
68,750.00 86,700.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

77,000.00 97,100.00
69,000.00 87,000.00
74,000.00 93,300.00
82,000.00 103,400.00
87,000.00 109,700.00
71,500.00 90,100.00
89,000.00 112,200.00
76,750.00 96,800.00
82,000.00 103,400.00
97,000.00 122,300.00
100,000.00 126,000.00
110,000.00 138,600.00
115,000.00 144,900.00
44,600.00 56,200.00
106,200.00 133,900.00
550,000.00 693,000.00
225,000.00 283,500.00
110,000.00 138,600.00
45,000.00 56,700.00
60,000.00 75,600.00
65,000.00 81,900.00
85,000.00 107,100.00
120,000.00 151,200.00
145,000.00 182,700.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

260,000.00 327,600.00
115,000.00 144,900.00
135,000.00 170,100.00
210,000.00 264,600.00
270,000.00 340,200.00
445,000.00 560,700.00
535,000.00 674,100.00
630,000.00 793,800.00
445,000.00 560,700.00
535,000.00 674,100.00
670,000.00 844,200.00
20,000.00 25,200.00
25,000.00 31,500.00
30,000.00 37,800.00
65,000.00 81,900.00
115,000.00 144,900.00
135,000.00 170,100.00
155,000.00 195,300.00
280,000.00 352,800.00
445,000.00 560,700.00
690,000.00 869,400.00
125,000.00 157,500.00
140,000.00 176,400.00
115,000.00 144,900.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

350,000.00 441,000.00
17,500.00 22,100.00
12,500.00 15,800.00
20,000.00 25,200.00
25,000.00 31,500.00
30,000.00 37,800.00
3,000.00 3,800.00
4,500.00 5,700.00
5,000.00 6,300.00
5,500.00 7,000.00
6,500.00 8,200.00
6,000.00 7,600.00
3,750.00 4,800.00
70,000.00 88,200.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

80,000.00 100,800.00
550,000.00 693,000.00
15,000,000.00 18,900,000.00
25,000,000.00 31,500,000.00
27,000.00 34,100.00
27,000.00 34,100.00
7,000.00 8,900.00
110,000.00 138,600.00
1,400.00 1,800.00
4,000.00 5,100.00
425,000.00 535,500.00
35,500.00 44,800.00
13,500.00 17,100.00
38,000.00 47,900.00
8,500.00 10,800.00
36,000.00 45,400.00
20,000.00 25,200.00
15,500.00 19,600.00
62,000.00 78,200.00
5,000.00 6,300.00
1,100,000.00 1,386,000.00
275,000.00 346,500.00
75,000.00 94,500.00
80,000.00 100,800.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

65,500.00 82,600.00
30,000.00 37,800.00
50,000.00 63,000.00
500,000.00 630,000.00
70,000.00 88,200.00
115,000.00 144,900.00
200,000.00 252,000.00
205,000.00 258,300.00
3,150,000.00 3,969,000.00
15,500.00 19,600.00
27,500.00 34,700.00
75,000.00 94,500.00
125,000.00 157,500.00
45,000.00 56,700.00
5,500.00 7,000.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

35,000.00 50,400.00
30,000.00 44,100.00
37,500.00 53,600.00
1,500,000.00 1,890,000.00
3,750,000.00 4,725,000.00
110,000.00 138,600.00
120,000.00 151,200.00
20,000.00 25,200.00
26,000.00 32,800.00
24,000.00 30,300.00
29,000.00 36,600.00
3,500.00 4,500.00
5,500,000.00 6,930,000.00
5,600,000.00 7,056,000.00
4,800,000.00 6,048,000.00
3,900,000.00 4,914,000.00
31,000,000.00 39,060,000.00
55,000.00 69,300.00
50,000.00 63,000.00
67,500.00 85,100.00
60,000.00 75,600.00
1,750,000.00 2,205,000.00
150,000.00 189,000.00
35,000.00 44,100.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

600,000.00 756,000.00
400,000.00 504,000.00
65,000.00 81,900.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

725,000.00 913,500.00
950,000.00 1,197,000.00
1,200,000.00 1,512,000.00
2,260,000.00 2,847,600.00
2,810,000.00 3,540,600.00
4,900,000.00 6,174,000.00
3,700,000.00 4,662,000.00
5,830,000.00 7,345,800.00
6,450,000.00 8,127,000.00
7,250,000.00 9,135,000.00
8,060,000.00 10,155,600.00

1,750,000.00 2,205,000.00
1,500,000.00 1,890,000.00
2,000,000.00 2,520,000.00
350,000.00 441,000.00
250,000.00 315,000.00
100,000.00 126,000.00
1,000,000.00 1,260,000.00
750,000.00 945,000.00
7,000.00 8,900.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

200,000.00 252,000.00
100,000.00 126,000.00
1,000,000.00 1,260,000.00
150,000.00 189,000.00
550,000.00 693,000.00
600,000.00 756,000.00
1,150,000.00 1,449,000.00
350,000.00 441,000.00
97,000.00 122,300.00
3,000.00 3,800.00
3,000.00 3,800.00
250,000.00 315,000.00
200,000.00 252,000.00
5,000.00 6,300.00
5,000.00 6,300.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

1,450,000.00 1,827,000.00
1,350,000.00 1,701,000.00
5,000.00 6,300.00
2,000,000.00 2,520,000.00
500,000.00 630,000.00
1,350,000.00 1,701,000.00
550,000.00 693,000.00
750,000.00 945,000.00
208,000.00 262,100.00
750,000.00 945,000.00
250,000.00 315,000.00
200,000.00 252,000.00
750,000.00 945,000.00
500,000.00 630,000.00 (25,000.00)
250,000.00 315,000.00 (12,500.00)
468,750.00 590,700.00 (23,400.00)
100,000.00 126,000.00 (5,000.00)
75,000.00 94,500.00 (3,750.00)
2,150,000.00 2,709,000.00 (107,500.00)
750,000.00 945,000.00 (37,500.00)
1,000,000.00 1,260,000.00 (50,000.00)
1,500,000.00 1,890,000.00 (75,000.00)
2,000,000.00 2,520,000.00 (100,000.00)
2,500,000.00 3,150,000.00 (125,000.00)
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

1,500,000.00 1,890,000.00 (75,000.00)


2,000,000.00 2,520,000.00 (100,000.00)
2,500,000.00 3,150,000.00 (125,000.00)
1,000,000.00 1,260,000.00 (50,000.00)
1,500,000.00 1,890,000.00 (75,000.00)
2,500,000.00 3,150,000.00 (125,000.00)
3,500,000.00 4,410,000.00 (175,000.00)
1,000,000.00 1,260,000.00 (50,000.00)
2,000,000.00 2,520,000.00 (100,000.00)
1,500,000.00 1,890,000.00 (75,000.00)
4,500,000.00 5,670,000.00 (225,000.00)
1,000,000.00 1,260,000.00 (50,000.00)
500,000.00 630,000.00 (25,000.00)
350,000.00 441,000.00 (17,500.00)
950,000.00 1,197,000.00 (47,500.00)
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

1,050,000.00 1,323,000.00 (52,500.00)


550,000.00 693,000.00 (27,500.00)
1,000,000.00 1,260,000.00 (50,000.00)
500,000.00 630,000.00 (25,000.00)

6,500,000.00 8,190,000.00
7,000,000.00 8,820,000.00
8,500,000.00 10,710,000.00
9,000,000.00 11,340,000.00
10,500,000.00 13,230,000.00

1,250,000.00 1,575,000.00
1,500,000.00 1,890,000.00
1,750,000.00 2,205,000.00

50,000,000.00 63,000,000.00
55,000,000.00 69,300,000.00
70,000,000.00 88,200,000.00
75,000,000.00 94,500,000.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

60,000,000.00 75,600,000.00
65,000,000.00 81,900,000.00
70,000,000.00 88,200,000.00
80,000,000.00 100,800,000.00

Harga Beli
1,540,080,000.00 1,940,600,000.00
324,000,000.00 408,300,000.00
324,000,000.00 408,300,000.00
756,000,000.00 952,600,000.00
146,880,000.00 185,100,000.00
59,400,000.00 74,900,000.00
369,360,000.00 465,400,000.00
184,680,000.00 232,700,000.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

369,360,000.00 465,400,000.00
492,480,000.00 620,600,000.00
142,560,000.00 179,700,000.00
379,080,000.00 477,700,000.00
677,160,000.00 853,300,000.00
226,800,000.00 285,800,000.00
511,920,000.00 645,100,000.00
181,440,000.00 228,700,000.00
427,680,000.00 538,900,000.00
398,520,000.00 502,200,000.00
324,000,000.00 408,300,000.00
4,320,000.00 5,500,000.00
1,477,440,000.00 1,861,600,000.00
21,600,000.00 27,300,000.00
145,800,000.00 183,800,000.00
158,760,000.00 200,100,000.00
8,100,000.00 10,300,000.00
108,000,000.00 136,100,000.00
48,600,000.00 61,300,000.00
324,000,000.00 408,300,000.00
298,080,000.00 375,600,000.00
139,320,000.00 175,600,000.00
751,680,000.00 947,200,000.00
29,160,000.00 36,800,000.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

5,391,360,000.00 6,793,200,000.00
189,000,000.00 238,200,000.00
324,000,000.00 408,300,000.00
492,480,000.00 620,600,000.00
2,721,600,000.00 3,429,300,000.00
2,721,600,000.00 3,429,300,000.00
2,721,600,000.00 3,429,300,000.00
234,360,000.00 295,300,000.00
129,600,000.00 163,300,000.00
10,800,000.00 13,700,000.00
46,008,000.00 58,000,000.00
492,480,000.00 620,600,000.00
46,980,000.00 59,200,000.00
46,980,000.00 59,200,000.00
35,640,000.00 45,000,000.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

14,040,000.00 17,700,000.00
438,480,000.00 552,500,000.00
5,391,360,000.00 6,793,200,000.00
839,160,000.00 1,057,400,000.00
55,080,000.00 69,500,000.00
189,000,000.00 238,200,000.00
12,960,000.00 16,400,000.00
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

Karanganyar, 10 Januari 2017

AS PEKERJAAN UMUM DAN PENATAAN RUANG


KABUPATEN KARANGANYAR

EDHY SRIYATNO, S.T., M.T.


NIP. 19600323 198703 1 007
DPU 2017
HARGA SK BUPATI 2017 KET
Rp
WILAYAH 3

ari harga survey.


HARGA SATUAN UPAH DAN BAHAN TAHUN 2016
DINAS PEKERJAAN UMUM
KABUPATEN KARANGANYAR

1. WILAYAH I : KARANGANYAR, TASIKMADU, JATEN, KEBAKKRAMAT, COLOMADU, GONDANGR


2. WILAYAH II : JUMANTONO, JUMAPOLO, JATIPURO, MATESIH, KARANGPANDAN, MOJOGEDAN
NGARGOYOSO
3. WILAYAH III : JENAWI, TAWANGMANGU, JATIYOSO

I. HARGA UPAH

HARGA DASAR DPU 2015


NO. URAIAN TENAGA SATUAN
WILAYAH 1 WILAYAH 2

1 Ass. Driller OH 90,000.00 90,000.00


2 Buruh semi terlatih OH 52,500.00 52,500.00
3 Buruh tak terlatih/Pekerja OH 50,000.00 50,000.00
4 Buruh terlatih OH 65,000.00 65,000.00
5 Crew Drilling OH 65,000.00 65,000.00
6 Driller OH 125,000.00 125,000.00
7 Geologis OH 172,500.00 172,500.00
8 Kepala tukang batu OH 72,500.00 72,500.00
9 Kepala tukang besi OH 72,500.00 72,500.00
10 Kepala tukang cat OH 72,500.00 72,500.00
11 Kepala tukang gali OH 72,500.00 72,500.00
12 Kepala tukang kayu OH 72,500.00 72,500.00
13 Koordinator logging OH 165,000.00 165,000.00
14 Mandor OH 70,000.00 70,000.00
15 Mekanik terlatih OH 67,500.00 67,500.00
16 Masinis/operator OH 67,500.00 67,500.00
17 Mekanik welder OH 62,500.00 62,500.00
18 Operator pompa OH 70,000.00 70,000.00
19 Operator semi terlatih/stoker OH 50,000.00 50,000.00
20 Operator terlatih OH 62,500.00 62,500.00
21 Pembantu geologis OH 135,000.00 135,000.00
22 Pembantu masinis/operator OH 60,000.00 60,000.00
23 Pembantu mekanik OH 62,500.00 62,500.00
24 Pembantu sopir OH 46,000.00 46,000.00
25 Penjaga malam OH 46,000.00 46,000.00
26 Sopir OH 55,000.00 55,000.00
27 Tukang batu OH 65,000.00 65,000.00
28 Tukang besi OH 65,000.00 65,000.00
29 Tukang cat OH 65,000.00 65,000.00
30 Tukang gali OH 61,000.00 61,000.00
31 Tukang kayu OH 70,000.00 70,000.00
32 Tukang las OH 65,000.00 65,000.00
33 Tukang listrik OH 65,000.00 65,000.00
34 Tukang masak aspal OH 72,500.00 72,500.00
35 Tukang pipa/pompa OH 70,000.00 70,000.00
II. HARGA BAHAN

HARGA DASAR DPU 2015


NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

A. BAHAN BANGUNAN
1 Abu batu m³ 165,000.00 170,000.00
2 Air ltr 5.00 5.00
3 Aluminium foil m2 12,500.00 12,500.00
4 Aluminium strip m' 7,000.00 7,000.00
5 Amplas besi/kayu lbr 3,500.00 3,500.00
6 Asbes bubungan gelombang m' 28,500.00 28,500.00
7 Asbes gelombang besar ( 100 x 200 ) lbr 100,000.00 100,000.00
8 Asbes gelombang kecil ( 100 x 120 ) lbr 95,000.00 95,000.00
9 Aspal curah kg 10,250.00 10,250.00
10 Aspal pen. 60/70 (kemasan drum) kg 11,250.00 11,250.00
11 Atap galvalum tebal 0,3 m² 42,800.00 42,800.00
12 Atap galvalum & laminasi m² 85,300.00 85,300.00
13 Atap galvalum rangka baja ringan m² 270,000.00 270,000.00
14 Atap galvalum rangka hollow m² 250,000.00 250,000.00
15 Atap kerpus onduline 0,5 m 80,000.00 80,000.00
16 Atap onduline lbr 150,000.00 150,000.00
17 Atap multiroof pasir lbr 95,000.00 95,000.00
18 Atap multiroof bubungan m' 30,000.00 30,000.00
19 Atap polycarbonat m² 53,300.00 53,300.00
20 Atap polycarbonat rangka besi tempa m² 400,000.00 400,000.00
21 Atap polycarbonat rangka hollow m² 385,000.00 385,000.00
22 Atap polycarbonat rangka stainleess m² 550,000.00 550,000.00
23 Automatic Water Level unit 1,575,000.00 1,575,000.00
24 Avour stainless bh 60,000.00 60,000.00
25 Baja konstruksi kg 13,500.00 13,500.00
26 Bambu apus 4 m' ljr 10,000.00 10,000.00
27 Bambu ori 4 m' ljr 17,500.00 17,500.00
28 Bataco bj 3,000.00 3,000.00
29 Batu andesit m² 175,000.00 175,000.00
30 Batu apung/kambang kg 11,000.00 11,000.00
31 Batu bata merah bj 655.00 655.00
32 Batu berongga ekspos bh - -
33 Batu blondos m³ 125,000.00 125,000.00
34 Batu candi m² 90,000.00 90,000.00
35 Batu kali m³ 245,000.00 230,000.00
36 Batu lempeng m² 65,000.00 65,000.00
37 Batu palimanan m² 115,000.00 115,000.00
38 Batu paras m² 100,000.00 100,000.00
39 Batu pecah ½/1 cm / Mesin m³ 210,000.00 235,000.00
40 Batu pecah 1/2 cm / Mesin m³ 207,500.00 232,500.00
41 Batu pecah 2/3 cm (split) / Mesin m³ 205,000.00 230,000.00
42 Batu pecah 3/5 cm / Mesin m³ 202,500.00 227,500.00
43 Batu pecah 2/3 cm m³ 252,500.00 227,500.00
44 Batu pecah 3/5 cm m³ 252,000.00 227,000.00
45 Batu pecah 5/7 cm m³ 251,000.00 226,000.00
46 Batu pecah 10/15 cm m³ 250,000.00 225,000.00
HARGA DASAR DPU 2015
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

47 Batu pecah 15/20 cm m³ 247,500.00 222,500.00


48 Baut baja kg 25,000.00 25,000.00
49 Besi beton kg 11,000.00 11,000.00
50 Besi Hollow 1,8/3,8 cm t:0,3 m' 4,500.00 4,500.00
51 Besi Hollow 3,8/3,8 cm t:0,3 m' 7,500.00 7,500.00
52 Besi Hollow galvanis 1,8/3,8 cm t:0,3 m' 6,000.00 6,000.00
53 Besi Hollow galvanis 3,8/3,8 cm t:0,3 m' 10,000.00 10,000.00
54 Besi profil siku kg 17,500.00 17,500.00
55 Besi teralis strip plat kg 15,500.00 15,500.00
56 Besi Wire Mesh M 5 (4,5 mm) uk. 2,1 x 5,4 lbr 238,100.00 238,100.00
57 Besi Wire Mesh M 6 (5,2 mm) uk. 2,1 x 5,4 lbr 330,100.00 330,100.00
58 Besi Wire Mesh M 6 (5,5 mm) uk. 2,1 x 5,4 lbr 354,500.00 354,500.00
59 Besi Wire Mesh M 6 (5,6 mm) uk. 2,1 x 5,4 lbr 381,500.00 381,500.00
60 Besi Wire Mesh M 7 (6,5 mm) uk. 2,1 x 5,4 lbr 495,200.00 495,200.00
61 Besi Wire Mesh M 8 (7,2 mm) uk. 2,1 x 5,4 lbr 625,100.00 625,100.00
62 Besi Wire Mesh M 8 (7,5 mm) uk. 2,1 x 5,4 lbr 658,900.00 658,900.00
63 Besi Wire Mesh M 8 (7,6 mm) uk. 2,1 x 5,4 lbr 695,400.00 695,400.00
64 Besi Wire Mesh M 10 (9,5 mm) uk. 2,1 x 5,4 lbr 1,083,800.00 1,083,800.00
65 Besi Wire Mesh M 12 (11,5 mm) uk. 2,1 x 5,4 lbr 1,687,200.00 1,687,200.00
66 Buis beton ½ Ø 20 cm m' 20,000.00 22,500.00
67 Buis beton ½ Ø 30 cm m' 27,500.00 30,000.00
68 Buis beton Ø 20 cm m' 27,500.00 30,000.00
69 Buis beton Ø 30 cm m' 42,500.00 45,000.00
70 Buis beton Ø 40 cm m' 45,000.00 47,500.00
71 Buis beton Ø 50 cm m' 65,000.00 67,500.00
72 Buis beton Ø 60 cm m' 75,000.00 77,500.00
73 Buis beton Ø 80 cm ½ m´ bj 80,000.00 82,500.00
74 Buis beton Ø 100 cm ½ m´ bj 120,000.00 122,500.00
75 Cat besi kg 50,000.00 50,000.00
76 Cat kayu (luar) kg 50,000.00 50,000.00
77 Cat kayu (dalam) kg 50,000.00 50,000.00
78 Cat tembok ( dalam ) kg 22,500.00 22,500.00
79 Cat tembok ( luar ) kg 125,000.00 125,000.00
80 Check valve Ø 1.5" bh 1,250,000.00 1,250,000.00
81 Closet duduk ex. INA/American Standard bh 1,350,000.00 1,350,000.00
82 Closet duduk ex. Toto bh 1,750,000.00 1,750,000.00
83 Closet duduk monoblock bh 1,000,000.00 1,000,000.00
84 Closet jongkok keramik bh 100,000.00 100,000.00
85 Closet jongkok ex. INA/American Standard bh 150,000.00 150,000.00
86 Dempul jadi/Wood Filler kg 16,000.00 16,000.00
87 Down light 4" bh 30,000.00 30,000.00
88 Engsel jendela biasa bh 6,000.00 6,000.00
89 Engsel jendela sedang bh 7,500.00 7,500.00
90 Engsel jendela super bh 12,500.00 12,500.00
91 Engsel pintu biasa bh 6,500.00 6,500.00
92 Engsel pintu sedang bh 10,250.00 10,250.00
93 Engsel pintu super bh 13,250.00 13,250.00
94 Eternit asbes ( 1,00 x 1,00 ) 3 mm lbr 10,000.00 10,000.00
HARGA DASAR DPU 2015
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

95 Fiberglass (bak air) 0,50 m3 bh 300,000.00 300,000.00


96 Fiberglass (bak air) 1,00 m3 bh 800,000.00 800,000.00
97 Fitting porselin bh 7,500.00 7,500.00
98 Flang steel Ø 2" bh 60,000.00 60,000.00
99 Floor drain bh 60,000.00 60,000.00
100 Folding Gate tebal 1,20 mm m² 1,000,000.00 1,000,000.00
101 Folding Gate tebal 0,08 mm m² 750,000.00 750,000.00
102 Folding Gate tebal 0,06 mm m² 650,000.00 650,000.00
103 Folding Gate tebal 0,04 mm m² 550,000.00 550,000.00
104 Genting beton standard bh 3,900.00 3,900.00
105 Genting kerpus beton bh 6,000.00 6,000.00
106 Genteng ex. Mojolaban/Mantili bh 1,650.00 1,700.00
107 Genteng kerpus ex. Mojolaban bh 5,900.00 5,950.00
108 Genteng magas Kebumen bh 2,650.00 2,700.00
109 Genteng morando Kebumen bh 3,900.00 3,950.00
110 Genteng kerpus Kebumen bh 7,900.00 7,950.00
111 Genteng morando Jatiwangi bh 3,400.00 3,450.00
112 Genteng kerpus Jatiwangi bh 7,900.00 7,950.00
113 Genteng glasur Jatiwangi bh 4,650.00 4,700.00
114 Genteng kerpus glasur Jatiwangi bh 9,400.00 9,450.00
115 Genteng glasur Kebumen bh 6,400.00 6,450.00
116 Genteng kerpus glasur Kebumen bh 8,900.00 8,950.00
117 Genteng keramik bh 9,900.00 9,950.00
118 Genteng kerpus keramik bh 14,900.00 14,950.00
119 Genteng keramik setara M-Class bh 9,400.00 9,450.00
120 Genteng kerpus keramik setara M-Class bh 14,900.00 14,950.00
121 Glass Block 20x20 bh 20,000.00 20,000.00
122 Glass Block 30x30 bh 30,000.00 30,000.00
123 Granit tile 40 x 40 cm Warna tua m2 90,000.00 90,000.00
124 Granit tile 40 x 40 cm Warna muda m2 85,000.00 85,000.00
125 Granit tile 60 x 60 cm Warna tua m2 200,000.00 200,000.00
126 Granit tile 60 x 60 cm Warna muda m2 107,500.00 107,500.00
127 Granit tile 80 x 80 cm Warna tua m2 325,000.00 325,000.00
128 Granit tile 80 x 80 cm Warna muda m2 200,000.00 200,000.00
129 Granit tile 100 x 100 cm Warna tua m2 500,000.00 500,000.00
130 Granit tile 100 x 100 cm Warna muda m2 400,000.00 400,000.00
131 Granit/ubin 100 x 100 (batu granit) m2 800,000.00 800,000.00
132 Gravel Pack Ø 0,5 - 1,5 cm m³ 250,000.00 250,000.00
133 Grease (paselin) kg 45,000.00 45,000.00
134 Grendel biasa bh 4,500.00 4,500.00
135 Grendel sedang bh 6,500.00 6,500.00
136 Grendel super bh 8,500.00 8,500.00
137 Grosok 2/3 m³ 175,000.00 175,000.00
138 Grosok jagung m³ 175,000.00 175,000.00
139 GRC (120 x 240 cm) t: 5 mm lbr 80,000.00 80,000.00
140 Gypsum board (120 x 240 cm) t: 6.5 mm lbr 60,000.00 60,000.00
141 Gypsum board (120 x 240 cm) t: 9 mm lbr 75,000.00 75,000.00
142 Hak angin biasa bh 4,500.00 4,500.00
HARGA DASAR DPU 2015
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

143 Hak angin sedang bh 8,500.00 8,500.00


144 Hak angin super bh 13,500.00 13,500.00
145 Handle Jendela bh 10,000.00 10,000.00
146 Harplex 3 mm (1,00 x 1,00) lbr 16,500.00 16,500.00
147 HB. 20 bh 7,000.00 7,000.00
148 Hospital plint fiber bh 18,500.00 18,500.00
149 Hospital plint keramik bh 40,000.00 40,000.00
150 Ijuk kg 12,500.00 12,500.00
151 Jet sower bh 90,000.00 90,000.00
152 Kabel listrik 1.50 mm m' 4,500.00 4,500.00
153 Kabel listrik 2.50 mm m' 5,500.00 5,500.00
154 Kabel power unit 1,650,000.00 1,650,000.00
155 Kaca aluminium profil m' 250,000.00 250,000.00
156 Kaca aluminium patri m' 800,000.00 800,000.00
157 Kaca bening 3 mm m2 70,000.00 70,000.00
158 Kaca bening 5 mm m2 75,000.00 75,000.00
159 Kaca bening 6 cm m2 17,500.00 17,500.00
160 Kaca bening 8 mm m2 90,000.00 90,000.00
161 Kaca es 5 mm m2 85,000.00 85,000.00
162 Kaca framelist 8 mm unit 500,000.00 500,000.00
163 Kaca naco/daun bening m2 80,000.00 80,000.00
164 Kaca rayband 5 mm m2 80,000.00 80,000.00
165 Kaca tempered 12 mm + komplit unit 6,500,000.00 6,500,000.00
166 Kanstein beton (0,15x0,4x0,6) bh 29,000.00 29,000.00
167 Karpet biasa m2 50,000.00 50,000.00
168 Karpet tebal m2 85,000.00 85,000.00
169 Kawat bendrat kg 22,000.00 22,000.00
170 Kawat bronjong kg 11,000.00 11,000.00
171 Kawat duri (30 m') roll 450,000.00 450,000.00
172 Kawat D 4 mm kg 16,500.00 16,500.00
173 Kawat las listrik (lastok) kg 22,000.00 22,000.00
174 Kawur/kapur Pasang m³ 225,000.00 225,000.00
175 Kayu bakar kg 1,100.00 1,100.00
176 Kayu begesting m³ 1,300,000.00 1,300,000.00
177 Kayu begesteng steiger/dolken 4 M' bh 9,000.00 9,000.00
178 Kayu dudukan fitting bh 4,000.00 4,000.00
179 Kayu bangkiray Balok m³ 11,000,000.00 11,000,000.00
180 Kayu bangkiray Papan m³ 12,500,000.00 12,500,000.00
181 Kayu jati untuk Konstrusi Jembatan m³ 21,250,000.00 21,250,000.00
182 Kayu jati untuk perquet m² 250,000.00 250,000.00
183 Kayu jati hutan untuk Kusen m³ 14,750,000.00 14,750,000.00
184 Kayu jati hutan untuk Rangka Atap m³ 12,750,000.00 12,750,000.00
185 Kayu jati lokal untuk Kusen m³ 10,500,000.00 10,500,000.00
186 Kayu jati lokal untuk Rangka Atap m³ 12,000,000.00 12,000,000.00
187 Kayu kamper Balok m³ 9,500,000.00 9,500,000.00
188 Kayu kamper Papan m³ 10,500,000.00 10,500,000.00
189 Kayu kruing Balok m³ 6,000,000.00 6,000,000.00
190 Kayu kruing Papan m³ 6,500,000.00 6,500,000.00
HARGA DASAR DPU 2015
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

191 Kayu list profil m' 7,500.00 7,500.00


192 Kayu meranti 5/7 m³ 5,250,000.00 5,250,000.00
193 Kayu meranti reng 2/3 m³ 3,200,000.00 3,200,000.00
194 Kayu meranti papan 30 cm m³ 5,750,000.00 5,750,000.00
195 Kayu perancah/sengon m³ 1,250,000.00 1,250,000.00
196 Kayu sengon kaso 5/7 m³ 1,750,000.00 1,750,000.00
197 Kayu sengon papan m³ 2,000,000.00 2,000,000.00
198 Kayu sirap jati hutan pak 125,000.00 125,000.00
199 Keramik 20 x 20 m2 50,000.00 50,000.00
200 Keramik 20 x 25 dinding m2 44,500.00 44,500.00
201 Keramik 30 x 30 polos m2 42,500.00 42,500.00
202 Keramik 30 x 30 warna motif m2 50,000.00 50,000.00
203 Keramik 30 x 30 eksterior texture m2 60,000.00 60,000.00
204 Keramik 30 x 60 dinding m2 87,500.00 87,500.00
205 Keramik 40 x 40 polos m2 55,000.00 55,000.00
206 Keramik 40 x 40 warna motif m2 63,800.00 63,800.00
207 Keramik 40 x 40 eksterior texture m2 75,400.00 75,400.00
208 Keramik 40 x 40 (Platinum) m2 58,900.00 58,900.00
209 Keramik kayu m2 289,900.00 289,900.00
210 Keramik 10 x 40 cm stepnose bh 7,000.00 7,000.00
211 Kerikil sungai di Quary m³ 22,500.00 22,500.00
212 Knie galvanis Ø 2" - 90º dan 45º bh 30,000.00 30,000.00
213 Kran air d 1" biasa bh 16,500.00 16,500.00
214 Kran air d 1" sedang bh 27,500.00 27,500.00
215 Kran air d 1" super bh 55,000.00 55,000.00
216 Kran air d 3/4" biasa bh 20,000.00 20,000.00
217 Kran air d 3/4" sedang bh 25,500.00 25,500.00
218 Kran air d 3/4" super bh 62,500.00 62,500.00
219 Kran air d 1/2" biasa bh 17,500.00 17,500.00
220 Kran air d 1/2" sedang bh 30,000.00 30,000.00
221 Kran air d 1/2" super bh 45,000.00 45,000.00
222 Kran tipe handle Ø 3/4" bh 40,000.00 40,000.00
223 Kusen aluminium coklat 4" m' 95,000.00 95,000.00
224 Kusen aluminium coklat 3" m' 70,000.00 70,000.00
225 Kusen aluminium motif kayu 4" m' 140,000.00 140,000.00
226 Kusen aluminium putih 4" m' 100,000.00 100,000.00
227 Kusen aluminium silver 4" m' 80,000.00 80,000.00
228 Kusen aluminium silver 3" m' 65,000.00 65,000.00
229 Kuwas bh 13,500.00 13,500.00
230 Lampu SL 18 watt bh 35,000.00 35,000.00
231 Lampu SL 20 watt bh 37,500.00 37,500.00
232 Lampu TL 20 watt komplit bh 50,000.00 50,000.00
233 Lem kayu kg 12,500.00 12,500.00
234 Lem kuning (ex. Aica Aibon) kg 55,000.00 55,000.00
235 Lem kuning putih (ex. Fox) kg 12,000.00 12,000.00
236 Lem wallpaper kg 55,000.00 55,000.00
237 List gypsum profil m 12,000.00 12,000.00
238 Marmer Tulung Agung 30 x 30 cm m2 70,000.00 70,000.00
HARGA DASAR DPU 2015
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

239 Marmer Tulung Agung 40 x 40 cm m2 85,000.00 85,000.00


240 Marmer Tulung Agung 60 x 60 cm m2 100,000.00 100,000.00
241 Marmer Tulung Agung 80 x 80 cm m² 200,000.00 200,000.00
242 Marmer Tulung Agung 100 x 100 cm m² 250,000.00 250,000.00
243 Marmer ex. import m² 2,500,000.00 2,500,000.00
244 Marmer ex. import Italy m² 1,250,000.00 1,250,000.00
245 MCB 32 amper bh 40,000.00 40,000.00
246 MCB bh - -
247 MCB Box bh 17,500.00 17,500.00
248 Meni besi kg 25,000.00 25,000.00
249 Meni kayu kg 25,000.00 25,000.00
250 Minyak begesting ltr 6,750.00 6,750.00
251 Minyak bensin non subsidi ltr 9,200.00 9,200.00
252 Minyak pelumas ltr 20,000.00 20,000.00
253 Minyak pertamax ltr 9,200.00 9,200.00
254 Minyak premium ltr 7,400.00 7,400.00
255 Minyak solar non subsidi ltr 12,500.00 12,500.00
256 Multiplex 4 mm lbr 61,000.00 61,000.00
257 Multiplex 6 mm lbr 90,000.00 90,000.00
258 Multiplex 8 mm lbr 110,000.00 110,000.00
259 Multiplex 9 mm lbr 125,000.00 125,000.00
260 Multiplek 12 mm lbr 150,000.00 150,000.00
261 Pagar BRC (ting. 0,9 m x pj. 2,4 m x d. 6 mm ) lbr 175,000.00 175,000.00
262 Pagar kawat duri (30 m') roll 450,000.00 450,000.00
263 Paku eternit kg 22,000.00 22,000.00
264 Paku pacing kg 22,000.00 22,000.00
265 Paku pacing bj 600.00 600.00
266 Paku reng kg 13,500.00 13,500.00
267 Paku sekrup kg 22,500.00 22,500.00
268 Paku sekrup bj 125.00 125.00
269 Paku sekrup fisher/dynebolt/ramset bj 5,000.00 5,000.00
270 Paku sekrup onduline bj 800.00 800.00
271 Paku triplek 2 cm kg 21,750.00 21,750.00
272 Paku usuk kg 13,500.00 13,500.00
273 Pasang rangka atap baja ringan m2 200,000.00 200,000.00
274 Portland Cement (PC) 40 Kg kg 1,325.00 1,325.00
275 PC putih (40 Kg) kg 2,250.00 2,250.00
276 PC warna (40 Kg) kg 12,250.00 12,250.00
277 Panel control lengkap unit 4,500,000.00 4,500,000.00
278 Pasir beton woro m³ 230,000.00 255,000.00
279 Pasir pasang m³ 200,000.00 225,000.00
280 Pasir sirtu lokal m³ 150,000.00 150,000.00
281 Pasir sirtu woro m³ 170,000.00 195,000.00
282 Pasir tras m³ 125,000.00 100,000.00
283 Pasir urug m³ 140,000.00 140,000.00
284 Paving 6 cm (kotak) m² 68,250.00 68,500.00
285 Paving 6 cm (segi enam) m² 68,250.00 68,500.00
286 Paving 8 cm m² 76,500.00 76,750.00
HARGA DASAR DPU 2015
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

287 Paving 6 cm K.175 (abu-abu) m² 68,500.00 68,750.00


288 Paving 6 cm K.175 (warna) m² 73,500.00 73,750.00
289 Paving 8 cm K.175 (abu-abu) m² 81,500.00 81,750.00
290 Paving 8 cm K.175 (warna) m² 86,500.00 86,750.00
291 Paving 6 cm K. 225 m² 71,000.00 71,250.00
292 Paving 8 cm K. 225 m² 88,500.00 88,750.00
293 Paving 6 cm K.250 (abu-abu) m² 76,250.00 76,500.00
294 Paving 6 cm K.250 (warna) m² 81,500.00 81,750.00
295 Paving 8 cm K.250 (abu-abu) m² 96,500.00 96,750.00
296 Paving 8 cm K.250 (warna) m² 99,500.00 99,750.00
297 Paving 8 cm K.300 (abu-abu) m² 109,500.00 109,750.00
298 Paving 8 cm K.300 (warna) m² 114,500.00 114,750.00
299 Paving Difabel bh 44,600.00 44,600.00
300 Paving Grass Block m² 106,200.00 106,200.00
301 Pintu KM/WC PVC sedang bh 550,000.00 550,000.00
302 Pintu PVC biasa bh 225,000.00 225,000.00
303 Pintu aluminium ram m' - -
304 Pipa Air Besi Ø 1/2 " / 6 m btg 45,000.00 45,000.00
305 Pipa Air Besi Ø 3/4 " / 6 m btg 60,000.00 60,000.00
306 Pipa Air Besi Ø 1 " / 6 m btg 65,000.00 65,000.00
307 Pipa Air Besi Ø 1,25 " / 6 m btg 85,000.00 85,000.00
308 Pipa Air Besi Ø 1,5 " / 6 m btg 120,000.00 120,000.00
309 Pipa Air Besi Ø 2 " / 6 m btg 145,000.00 145,000.00
310 Pipa Air Besi Ø 2,5 " / 6 m btg 260,000.00 260,000.00
311 Pipa Air GI Med. A Ø 1/2 " / 6 m btg 115,000.00 115,000.00
312 Pipa Air GI Med. A Ø 3/4 " / 6 m btg 135,000.00 135,000.00
313 Pipa Air GI Med. A Ø 1 " / 6 m btg 210,000.00 210,000.00
314 Pipa Air GI Med. A Ø 1,25 " / 6 m btg 270,000.00 270,000.00
315 Pipa Air GI Med. A Ø 1,5 " / 6 m btg 445,000.00 445,000.00
316 Pipa Air GI Med. A Ø 2 " / 6 m btg 535,000.00 535,000.00
317 Pipa Air GI Med. A Ø 2,5 " / 6 m btg 630,000.00 630,000.00
318 Pipa galvanis Ø 1,5" / 6 m. t= 2,5 mm btg 445,000.00 445,000.00
319 Pipa galvanis Ø 2 " / 6 m. t= 2,5 mm btg 535,000.00 535,000.00
320 Pipa galvanis Ø 3 " / 6 m. t= 2,5 mm btg 670,000.00 670,000.00
321 Pipa PVC Ø 1/2" / 4 m AW btg 20,000.00 20,000.00
322 Pipa PVC Ø 3/4" / 4 m AW btg 25,000.00 25,000.00
323 Pipa PVC Ø 1" / 4 m AW btg 30,000.00 30,000.00
324 Pipa PVC Ø 1,5" / 4 m AW btg 65,000.00 65,000.00
325 Pipa PVC Ø 2" / 4 m AW btg 115,000.00 115,000.00
326 Pipa PVC Ø 2,5" / 4 m AW btg 135,000.00 135,000.00
327 Pipa PVC Ø 3" / 4 m AW btg 155,000.00 155,000.00
328 Pipa PVC Ø 4" / 4 m AW btg 280,000.00 280,000.00
329 Pipa PVC Ø 6" / 4 m AW btg 445,000.00 445,000.00
330 Pipa PVC Ø 8" / 4 m AW btg 690,000.00 690,000.00
331 Pipa PVC S. 12.50 Ø 1 1/2" - 6 m btg 125,000.00 125,000.00
332 Pipa PVC S. 12.50 Ø 2" - 6 m btg 140,000.00 140,000.00
333 Pipa PVC S. 16 Ø 2" - 6 m btg 115,000.00 115,000.00
334 Pipa PVC S. 16 Ø 4" - 6 m btg 350,000.00 350,000.00
HARGA DASAR DPU 2015
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

335 Plamir kg 17,500.00 17,500.00


336 Plint granit 10 x 20 cm m2 12,500.00 12,500.00
337 Plint granit 10 x 30 cm bh 20,000.00 20,000.00
338 Plint granit 10 x 40 cm bh 25,000.00 25,000.00
339 Plint granit 10 x 60 cm bh 30,000.00 30,000.00
340 Plint keramik 8 x 20 cm bh 3,000.00 3,000.00
341 Plint keramik 10 x 20 cm bh 4,500.00 4,500.00
342 Plint keramik 10 x 40 cm bh 5,000.00 5,000.00
343 Plint keramik 10 x 40 cm bh 5,500.00 5,500.00
344 Plint keramik 10 x 60 cm bh 6,500.00 6,500.00
345 Plint teraso bh 6,000.00 6,000.00
346 Plint ubin PC warna 15 x 20 cm bh 3,750.00 3,750.00
347 Politur ltr 70,000.00 70,000.00
348 Politur jadi ltr 80,000.00 80,000.00
349 Pompa Air (listrik) 450 watt ex. Dab bh 550,000.00 550,000.00
350 Pompa Submersible 2 pk, Q = 2 lt, H = 70 m unit 15,000,000.00 15,000,000.00
351 Pompa Submersible 3 pk, Q = 2 lt, H = 70 m unit 25,000,000.00 25,000,000.00
352 Porselin 10 x 10 dos 27,000.00 27,000.00
353 Porselin 11 x 11 dos 27,000.00 27,000.00
354 Profil aluminium m 7,000.00 7,000.00
355 Ram m 110,000.00 110,000.00
356 Ramset bh 1,400.00 1,400.00
357 Residu/ter ltr 4,000.00 4,000.00
358 Rolling door aluminium m2 425,000.00 425,000.00
359 Roster batu alam bh 35,500.00 35,500.00
360 Roster beton bh 13,500.00 13,500.00
361 Roster kayu jati bh 38,000.00 38,000.00
362 Roster tanah/genting bh 8,500.00 8,500.00
363 Roster keramik uk. 30x30 bh 36,000.00 36,000.00
364 Saklar ganda bh 20,000.00 20,000.00
365 Saklar tunggal bh 15,500.00 15,500.00
366 Sealant tube 62,000.00 62,000.00
367 Seal tape bh 5,000.00 5,000.00
368 Seling pengaman unit 1,100,000.00 1,100,000.00
369 Semen merah m³ 275,000.00 275,000.00
370 Seng Glmbg.BJLS-0,3 ( 0,9 m x 1,8 m) lbr 75,000.00 75,000.00
371 Seng Glmbg.BJLS-0,3 ( 0,9 m x 2,1 m ) lbr 80,000.00 80,000.00
372 Seng Plat BJLS-0,3 ( 0.9 m x 1,8 m ) lbr 65,500.00 65,500.00
373 Seng Talang Bjls 0.3 lebar 0,60 m´ 30,000.00 30,000.00
374 Seng Talang Bjls 0.3 lebar 0,90 m´ 50,000.00 50,000.00
375 Shower bh 500,000.00 500,000.00
376 Slot biasa ( kuda terbang ) bh 70,000.00 70,000.00
377 Slot kunci pipih biasa bh 115,000.00 115,000.00
378 Slot Kunci Pipih sedang bh 200,000.00 200,000.00
379 Slot Kunci Pipih super bh 205,000.00 205,000.00
380 Stabilizer 5000 Watt bh 3,150,000.00 3,150,000.00
381 Stop kontak bh 15,500.00 15,500.00
382 Stop kran kuningan 3/4" bh 27,500.00 27,500.00
HARGA DASAR DPU 2015
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

383 Stop kran tipe handle Ø 1.5" bh 75,000.00 75,000.00


384 Stop kran tipe handle Ø 2" bh 125,000.00 125,000.00
385 Strorox-100 kg 45,000.00 45,000.00
386 Tanah bentonit kg 5,500.00 5,500.00
387 Tanah cadas m³ 40,000.00 37,500.00
388 Tanah liat m³ 35,000.00 32,500.00
389 Tanah urug pilihan m³ 42,500.00 40,000.00
390 Tandon air 1000 lt (fiber) bh 1,500,000.00 1,500,000.00
391 Tandon air 1000 lt (stainless) bh 3,750,000.00 3,750,000.00
392 Teakwood 4 mm ( 1,20 x 240 ) lbr 110,000.00 110,000.00
393 Teakwood 3 mm ( 1,20 x 2,40 ) lbr 120,000.00 120,000.00
394 Tegel abu-abu 20 x 20 cm m² 20,000.00 20,000.00
395 Tegel abu-abu 30 x 30 cm m² 26,000.00 26,000.00
396 Tegel wafel abu-abu m² 24,000.00 24,000.00
397 Tegel wafel warna m² 29,000.00 29,000.00
398 Tepung gypsum kg 3,500.00 3,500.00
399 Tiang listrik beton C11.350 daN E bh 5,500,000.00 5,500,000.00
400 Tiang listrik beton C11.350 daN E BC bh 5,600,000.00 5,600,000.00
401 Tiang listrik beton C11.200 daN E bh 4,800,000.00 4,800,000.00
402 Tiang listrik beton C9.200 daN E bh 3,900,000.00 3,900,000.00
403 Travo 50 KVA bh 31,000,000.00 31,000,000.00
404 Triplex 2.7 mm (1.2 x 2.4 ) Kruing lbr 55,000.00 55,000.00
405 Triplex 2.7 mm (1.2 x 2.4 ) Sengon lbr 50,000.00 50,000.00
406 Triplex 4 mm (1.2 x 2.4 ) Kruing lbr 67,500.00 67,500.00
407 Triplex 4 mm (1.2 x 2.4 ) Sengon lbr 60,000.00 60,000.00
408 Urinoir bh 1,750,000.00 1,750,000.00
409 Vernis ltr 150,000.00 150,000.00
410 Wallpaper lebar 50 cm m' 35,000.00 35,000.00
411 Wastafel komplit unit 600,000.00 600,000.00
412 Wasbak (bak cuci) stainless unit 400,000.00 400,000.00
413 Woodplank ( 4 M ) m' 65,000.00 65,000.00

B. BAHAN BOX CULVERT TYPE BINA MARGA


BEBAN Gandar 21 Ton
1 BC 400x400x1000 unit 725,000.00 725,000.00
2 BC 500x500x1000 unit 950,000.00 950,000.00
3 BC 600x600x1000 unit 1,200,000.00 1,200,000.00
4 BC 800x800x1000 unit 2,260,000.00 2,260,000.00
5 BC 1000x1000x1000 unit 2,810,000.00 2,810,000.00
6 BC 1200x1200x1000 unit 4,900,000.00 4,900,000.00
7 BC 1400x1400x1000 unit 3,700,000.00 3,700,000.00
8 BC 1500x1500x1000 unit 5,830,000.00 5,830,000.00
9 BC 1600x1600x1000 unit 6,450,000.00 6,450,000.00
10 BC 1800x1800x1000 unit 7,250,000.00 7,250,000.00
11 BC 2000x2000x1000 unit 8,060,000.00 8,060,000.00

C. BAHAN PINTU PENGAIRAN


1 Plat daun pintu t: 8 mm m² 1,750,000.00 1,750,000.00
HARGA DASAR DPU 2015
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

2 Drat ulir Ø 1 ½" m' 1,500,000.00 1,500,000.00


3 Drat ulir Ø 2" m' 2,000,000.00 2,000,000.00
4 Siku L 70.70.3 ljr 350,000.00 350,000.00
5 Anting baja bh 250,000.00 250,000.00
6 Anting baja bh 100,000.00 100,000.00
7 Stang pintu bh 1,000,000.00 1,000,000.00
8 Stang pemutar bh 750,000.00 750,000.00
9 Baut anting bh 7,000.00 7,000.00
10 Baut anting Ø ¾" bh 200,000.00 200,000.00
11 Baut penguat anting bh 100,000.00 100,000.00
12 Peluncur stanlis (2,20 x 0,04 x 5 mm ) bh 1,000,000.00 1,000,000.00
13 Siku L ( 9 x 9 x 7 mm ) m' 150,000.00 150,000.00
14 Baja kerangka pintu ( 12 x 5 x 6 mm) ljr 550,000.00 550,000.00
15 Baja C 12 ( 12,8 , 5,2 , 5 mm) ljr 600,000.00 600,000.00
16 Plat block frame 120 x 240 lbr 1,150,000.00 1,150,000.00
17 Siku pengait landasan ( 70 x 70 x 6 mm) bh 350,000.00 350,000.00
18 Besi angkur Ø12 bh 97,000.00 97,000.00
19 Baut bingkai Ø12 bh 3,000.00 3,000.00
20 Mur baut Ø 12 bh 3,000.00 3,000.00
21 Mur kuningan Ø 3 " bh 250,000.00 250,000.00
22 Mur kuningan Ø 2" bh 200,000.00 200,000.00
23 Baut pengait landasan Ø 16 bh 5,000.00 5,000.00
24 Pengait box bh 5,000.00 5,000.00
25 Baja Cu ( 70 x 200 x 70 ) ljr 1,450,000.00 1,450,000.00
26 Plat blok 120 x 240 lbr 1,350,000.00 1,350,000.00
27 Baut pesagen bh 5,000.00 5,000.00
28 Dudukan kuningan bh 2,000,000.00 2,000,000.00
29 Dudukan kuningan bh 500,000.00 500,000.00
30 Gigi kuningan bh 1,350,000.00 1,350,000.00
31 Gigi stang bh 550,000.00 550,000.00
32 Dudukan stang pemutar bh 750,000.00 750,000.00
33 As pemutar m' 208,000.00 208,000.00
34 Blok penyangga as bh 750,000.00 750,000.00
35 Mur kuningan Ø 3 " bh 250,000.00 250,000.00
36 Mur kuningan Ø 2" bh 200,000.00 200,000.00
37 Gigi nanas bh 750,000.00 750,000.00
38 Tutup pengaman gigi bh 500,000.00 500,000.00
39 Druk laker bh 250,000.00 250,000.00
40 Plat box 15 x 20 cm bh 468,750.00 468,750.00
41 Greese pelumas ls 100,000.00 100,000.00
42 Gembok kunci pengaman bh 75,000.00 75,000.00
43 Plat daun pintu t: 10 mm m² 2,150,000.00 2,150,000.00
44 Stang pintu engkel bh 750,000.00 750,000.00
45 Stang pintu doubel bh 1,000,000.00 1,000,000.00
46 Gir piringan ø 35 bh 1,500,000.00 1,500,000.00
47 Gir piringan ø 40 bh 2,000,000.00 2,000,000.00
48 Gir piringan ø 50 bh 2,500,000.00 2,500,000.00
49 Drat ulir 1 1/2" m' 1,500,000.00 1,500,000.00
HARGA DASAR DPU 2015
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

50 Drat ulir 2" m' 2,000,000.00 2,000,000.00


51 Drat ulir 3" m' 2,500,000.00 2,500,000.00
52 Wortel mur ø 1 1/2" bh 1,000,000.00 1,000,000.00
53 Wortel mur ø 2" bh 1,500,000.00 1,500,000.00
54 Wortel mur ø 3" bh 2,500,000.00 2,500,000.00
55 Wortel mur ø 4" bh 3,500,000.00 3,500,000.00
56 Gigi nanas kecil bh 1,000,000.00 1,000,000.00
57 Gigi nanas besar bh 2,000,000.00 2,000,000.00
58 As pemutar gigi ø 2" m 1,500,000.00 1,500,000.00
59 Drat ulir ø 4" m 4,500,000.00 4,500,000.00
60 Plat penutup gir bh 1,000,000.00 1,000,000.00
61 Dudukan as pemutar gigi bh 500,000.00 500,000.00
62 Kerangka pintu siku 60 x 60 x 6 unit 350,000.00 350,000.00
63 Kerangka pintu siku 80 x 80 x 8 unit 950,000.00 950,000.00
64 Kerangka pintu siku 90 x 90 x 9 unit 1,050,000.00 1,050,000.00
65 Kerangka pintu siku 70 x 70 x 10 unit 550,000.00 550,000.00
66 Kerangka atas canal U 10 x 10 unit 1,000,000.00 1,000,000.00
67 Kerangka bawah duobel siku unit 500,000.00 500,000.00

Daftar Harga Pintu Sorong Baja unit


1 B = 0,50 ; H1 = 0,50 ; H2 = 3,00 bh 6,500,000.00 6,500,000.00
2 B = 0,60 ; H1 = 0,60 ; H2 = 3,50 bh 7,000,000.00 7,000,000.00
3 B = 0,70 ; H1 = 0,70 ; H2 = 4,00 bh 8,500,000.00 8,500,000.00
4 B = 0,80 ; H1 = 0,80 ; H2 = 4,50 bh 9,000,000.00 9,000,000.00
5 B = 0,90 ; H1 = 0,90 ; H2 = 5,00 bh 10,500,000.00 10,500,000.00

Daftar Haraga Pintu Tarik


1 B = 0,30 ; H1 = 0,30 ; H2 = 1,25 bh 1,250,000.00 1,250,000.00
2 B = 0,35 ; H1 = 0,35 ; H2 = 1,30 bh 1,500,000.00 1,500,000.00
3 B = 0,40 ; H1 = 0,40 ; H2 = 1,35 bh 1,750,000.00 1,750,000.00
HARGA DASAR DPU 2015
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

Daftar Harga Pintu Drat Dobel Daun Besi


1 B = 1,50 ; H1 = 1,50 ; H2 = 3,50 bh 50,000,000.00 50,000,000.00
2 B = 1,75 ; H1 = 1,50 ; H2 = 4,00 bh 55,000,000.00 55,000,000.00
3 B = 2,00 ; H1 = 2,00 ; H2 = 5,00 bh 70,000,000.00 70,000,000.00
4 B = 2,00 ; H1 = 1,50 ; H2 = 6,00 bh 75,000,000.00 75,000,000.00

Daftar Harga Pintu Daun Kayu Drat Dobel


1 B = 1,00 ; H1 = 1,00 ; H2 = 3,00 bh 60,000,000.00 60,000,000.00
2 B = 1,50 ; H1 = 1,50 ; H2 = 3,50 bh 65,000,000.00 65,000,000.00
3 B = 2,00 ; H1 = 1,50 ; H2 = 4,00 bh 70,000,000.00 70,000,000.00
4 B = 2,00 ; H1 = 2,00 ; H2 = 5,00 bh 80,000,000.00 80,000,000.00

1 Sekretaris DPU Kab. Karanganyar


TITIK UMARNI, SH., MH. 1. .................................................
NIP. 19660923 198607 2 001

2 Kepala Bidang Perencanaan dan Bina Teknik


ASIHNO PURWADI, ST. 2. ................................................
NIP. 19720828 199803 1 016

3 Kepala Bidang Cipta Karya


PURWONO, ST., MT. 3. .................................................
NIP. 19600909 198811 1 002

4 Kepala Bidang Bina Marga


DARMANTO, ST., MM. 4. ................................................
NIP. 19631108 198909 1 001

5 Bidang Pengairan dan ESDM


JOKO PURWONO, ST. 5. .................................................
NIP. 19590622 198010 1 003

Karanganyar, 21 Desember 20

KEPALA DINAS PEKERJAAN UMU


KABUPATEN KARANGANYAR
HARGA DASAR DPU 2015
NO. URAIAN BAHAN SATUAN
WILAYAH 1 WILAYAH 2

EDHY SRIYATNO, ST., MT.


NIP. 19600323 198703 1 007
GONDANGREJO
MOJOGEDANG, KERJO,

R DPU 2015

WILAYAH 3

90,000.00
52,500.00
50,000.00
65,000.00
65,000.00
125,000.00
172,500.00
72,500.00
72,500.00
72,500.00
72,500.00
72,500.00
165,000.00
70,000.00
67,500.00
67,500.00
62,500.00
70,000.00
50,000.00
62,500.00
135,000.00
60,000.00
62,500.00
46,000.00
46,000.00
55,000.00
65,000.00
65,000.00
65,000.00
61,000.00
70,000.00
65,000.00
65,000.00
72,500.00
70,000.00
R DPU 2015

WILAYAH 3

175,000.00
5.00
12,500.00
7,000.00
3,500.00
28,500.00
100,000.00
95,000.00
10,250.00
11,250.00
42,800.00
85,300.00
270,000.00
250,000.00
80,000.00
150,000.00
95,000.00
30,000.00
53,300.00
400,000.00
385,000.00
550,000.00
1,575,000.00
60,000.00
13,500.00
10,000.00
17,500.00
3,000.00
175,000.00
11,000.00
655.00
-
125,000.00
90,000.00
215,000.00
65,000.00
115,000.00
100,000.00
260,000.00
257,500.00
255,000.00
252,500.00
202,500.00
202,000.00
201,000.00
200,000.00
R DPU 2015

WILAYAH 3

197,500.00
25,000.00
11,000.00
4,500.00
7,500.00
6,000.00
10,000.00
17,500.00
15,500.00
238,100.00
330,100.00
354,500.00
381,500.00
495,200.00
625,100.00
658,900.00
695,400.00
1,083,800.00
1,687,200.00
25,000.00
32,500.00
32,500.00
47,500.00
50,000.00
70,000.00
80,000.00
85,000.00
125,000.00
50,000.00
50,000.00
50,000.00
22,500.00
125,000.00
1,250,000.00
1,350,000.00
1,750,000.00
1,000,000.00
100,000.00
150,000.00
16,000.00
30,000.00
6,000.00
7,500.00
12,500.00
6,500.00
10,250.00
13,250.00
10,000.00
R DPU 2015

WILAYAH 3

300,000.00
800,000.00
7,500.00
60,000.00
60,000.00
1,000,000.00
750,000.00
650,000.00
550,000.00
3,900.00
6,000.00
1,750.00
6,000.00
2,750.00
4,000.00
8,000.00
3,500.00
8,000.00
4,750.00
9,500.00
6,500.00
9,000.00
10,000.00
15,000.00
9,500.00
15,000.00
20,000.00
30,000.00
90,000.00
85,000.00
200,000.00
107,500.00
325,000.00
200,000.00
500,000.00
400,000.00
800,000.00
250,000.00
45,000.00
4,500.00
6,500.00
8,500.00
175,000.00
175,000.00
80,000.00
60,000.00
75,000.00
4,500.00
R DPU 2015

WILAYAH 3

8,500.00
13,500.00
10,000.00
16,500.00
7,000.00
18,500.00
40,000.00
12,500.00
90,000.00
4,500.00
5,500.00
1,650,000.00
250,000.00
800,000.00
70,000.00
75,000.00
17,500.00
90,000.00
85,000.00
500,000.00
80,000.00
80,000.00
6,500,000.00
29,000.00
50,000.00
85,000.00
22,000.00
11,000.00
450,000.00
16,500.00
22,000.00
225,000.00
1,100.00
1,300,000.00
9,000.00
4,000.00
11,000,000.00
12,500,000.00
21,250,000.00
250,000.00
14,750,000.00
12,750,000.00
10,500,000.00
12,000,000.00
9,500,000.00
10,500,000.00
6,000,000.00
6,500,000.00
R DPU 2015

WILAYAH 3

7,500.00
5,250,000.00
3,200,000.00
5,750,000.00
1,250,000.00
1,750,000.00
2,000,000.00
125,000.00
50,000.00
44,500.00
42,500.00
50,000.00
60,000.00
87,500.00
55,000.00
63,800.00
75,400.00
58,900.00
289,900.00
7,000.00
22,500.00
30,000.00
16,500.00
27,500.00
55,000.00
20,000.00
25,500.00
62,500.00
17,500.00
30,000.00
45,000.00
40,000.00
95,000.00
70,000.00
140,000.00
100,000.00
80,000.00
65,000.00
13,500.00
35,000.00
37,500.00
50,000.00
12,500.00
55,000.00
12,000.00
55,000.00
12,000.00
70,000.00
R DPU 2015

WILAYAH 3

85,000.00
100,000.00
200,000.00
250,000.00
2,500,000.00
1,250,000.00
40,000.00
-
17,500.00
25,000.00
25,000.00
6,750.00
9,200.00
20,000.00
9,200.00
7,400.00
12,500.00
61,000.00
90,000.00
110,000.00
125,000.00
150,000.00
175,000.00
450,000.00
22,000.00
22,000.00
600.00
13,500.00
22,500.00
125.00
5,000.00
800.00
21,750.00
13,500.00
200,000.00
1,325.00
2,250.00
12,250.00
4,500,000.00
280,000.00
250,000.00
150,000.00
220,000.00
75,000.00
140,000.00
68,750.00
68,750.00
77,000.00
R DPU 2015

WILAYAH 3

69,000.00
74,000.00
82,000.00
87,000.00
71,500.00
89,000.00
76,750.00
82,000.00
97,000.00
100,000.00
110,000.00
115,000.00
44,600.00
106,200.00
550,000.00
225,000.00
-
45,000.00
60,000.00
65,000.00
85,000.00
120,000.00
145,000.00
260,000.00
115,000.00
135,000.00
210,000.00
270,000.00
445,000.00
535,000.00
630,000.00
445,000.00
535,000.00
670,000.00
20,000.00
25,000.00
30,000.00
65,000.00
115,000.00
135,000.00
155,000.00
280,000.00
445,000.00
690,000.00
125,000.00
140,000.00
115,000.00
350,000.00
R DPU 2015

WILAYAH 3

17,500.00
12,500.00
20,000.00
25,000.00
30,000.00
3,000.00
4,500.00
5,000.00
5,500.00
6,500.00
6,000.00
3,750.00
70,000.00
80,000.00
550,000.00
15,000,000.00
25,000,000.00
27,000.00
27,000.00
7,000.00
110,000.00
1,400.00
4,000.00
425,000.00
35,500.00
13,500.00
38,000.00
8,500.00
36,000.00
20,000.00
15,500.00
62,000.00
5,000.00
1,100,000.00
275,000.00
75,000.00
80,000.00
65,500.00
30,000.00
50,000.00
500,000.00
70,000.00
115,000.00
200,000.00
205,000.00
3,150,000.00
15,500.00
27,500.00
R DPU 2015

WILAYAH 3

75,000.00
125,000.00
45,000.00
5,500.00
35,000.00
30,000.00
37,500.00
1,500,000.00
3,750,000.00
110,000.00
120,000.00
20,000.00
26,000.00
24,000.00
29,000.00
3,500.00
5,500,000.00
5,600,000.00
4,800,000.00
3,900,000.00
31,000,000.00
55,000.00
50,000.00
67,500.00
60,000.00
1,750,000.00
150,000.00
35,000.00
600,000.00
400,000.00
65,000.00

725,000.00
950,000.00
1,200,000.00
2,260,000.00
2,810,000.00
4,900,000.00
3,700,000.00
5,830,000.00
6,450,000.00
7,250,000.00
8,060,000.00

1,750,000.00
R DPU 2015

WILAYAH 3

1,500,000.00
2,000,000.00
350,000.00
250,000.00
100,000.00
1,000,000.00
750,000.00
7,000.00
200,000.00
100,000.00
1,000,000.00
150,000.00
550,000.00
600,000.00
1,150,000.00
350,000.00
97,000.00
3,000.00
3,000.00
250,000.00
200,000.00
5,000.00
5,000.00
1,450,000.00
1,350,000.00
5,000.00
2,000,000.00
500,000.00
1,350,000.00
550,000.00
750,000.00
208,000.00
750,000.00
250,000.00
200,000.00
750,000.00
500,000.00
250,000.00
468,750.00
100,000.00
75,000.00
2,150,000.00
750,000.00
1,000,000.00
1,500,000.00
2,000,000.00
2,500,000.00
1,500,000.00
R DPU 2015

WILAYAH 3

2,000,000.00
2,500,000.00
1,000,000.00
1,500,000.00
2,500,000.00
3,500,000.00
1,000,000.00
2,000,000.00
1,500,000.00
4,500,000.00
1,000,000.00
500,000.00
350,000.00
950,000.00
1,050,000.00
550,000.00
1,000,000.00
500,000.00

6,500,000.00
7,000,000.00
8,500,000.00
9,000,000.00
10,500,000.00

1,250,000.00
1,500,000.00
1,750,000.00
R DPU 2015

WILAYAH 3

50,000,000.00
55,000,000.00
70,000,000.00
75,000,000.00

60,000,000.00
65,000,000.00
70,000,000.00
80,000,000.00

.............................

.............................

Desember 2015

KERJAAN UMUM
RANGANYAR
R DPU 2015

WILAYAH 3

NO, ST., MT.


198703 1 007
HARGA BUPATI SK HARGA DPU 2016 KETERANGAN
2016

1.26 1.23
113,400.00 110,700.00
66,150.00 64,500.00
63,000.00 61,500.00
81,900.00 79,900.00
81,900.00 79,900.00
157,500.00 153,700.00
217,350.00 212,100.00
91,350.00 89,100.00
91,350.00 89,100.00
91,350.00 89,100.00
91,350.00 89,100.00
91,350.00 89,100.00
207,900.00 202,900.00
88,200.00 86,100.00
85,050.00 83,000.00
85,050.00 83,000.00
78,750.00 76,800.00
88,200.00 86,100.00
63,000.00 61,500.00
78,750.00 76,800.00
170,100.00 166,000.00
75,600.00 73,800.00
78,750.00 76,800.00
56,700.00 56,500.00 Lebih tinggi dari pekerja
56,700.00 56,500.00 Lebih tinggi dari pekerja
69,300.00 67,600.00
81,900.00 79,900.00
81,900.00 79,900.00
81,900.00 79,900.00
76,860.00 75,000.00
88,200.00 86,100.00
81,900.00 79,900.00
81,900.00 79,900.00
91,350.00 89,100.00
88,200.00 86,100.00
-
HARGA BUPATI SK HARGA DPU 2016 KETERANGAN
2016

220,500.00 215,200.00
5.00 5.00
15,750.00 15,300.00
8,820.00 8,600.00
4,410.00 4,300.00
35,910.00 35,000.00
126,000.00 123,000.00
119,700.00 116,800.00
12,814.20 12,600.00 Tidak menggunakan jarak harga per wilayah karena analis
14,805.00 13,800.00 Tidak menggunakan jarak harga per wilayah karena analis
78,750.00 52,600.00
- 104,900.00
340,200.00 332,100.00
315,000.00 307,500.00
100,800.00 98,400.00
189,000.00 184,500.00
119,700.00 116,800.00
37,800.00 36,900.00
- 65,500.00
504,000.00 492,000.00
485,100.00 473,500.00
693,000.00 676,500.00
1,984,500.00 1,937,200.00
75,600.00 73,800.00
17,010.00 16,600.00
15,000.00 14,600.00 11,904.76 14,642.86
15,750.00 15,300.00 12,500.00 15,375.00
3,780.00 3,600.00
220,500.00 215,200.00
13,860.00 13,500.00
819.00 800.00

157,500.00 153,700.00
113,400.00 110,700.00
315,000.00 301,300.00
81,900.00 79,900.00
144,900.00 141,400.00
126,000.00 123,000.00
327,600.00 319,800.00
324,450.00 316,700.00
321,300.00 313,600.00
318,150.00 310,500.00
318,150.00 310,500.00
315,000.00 309,900.00
311,850.00 308,700.00
308,700.00 307,500.00
HARGA BUPATI SK HARGA DPU 2016 KETERANGAN
2016

305,550.00 304,400.00
32,750.00 30,700.00 http://www.hargabangunan.xyz/harga-besi-beton-terbaru/
14,500.00 13,500.00 Besi Beton Besi 6mmBesi 6mm full Rp. 18.000,-Rp. 28.000
5,670.00 5,500.00 18,000.00 4,500.00
9,450.00 9,200.00 22,000.00 5,500.00
7,560.00 7,300.00 20,000.00 5,000.00
12,600.00 12,300.00 27,000.00 6,750.00
22,925.00 21,500.00
20,400.00 19,000.00
- 292,800.00
- 406,000.00
- 436,000.00
- 469,200.00
- 609,000.00
- 768,800.00
- 810,400.00
- 855,300.00
- 1,333,000.00
- 2,075,200.00
32,750.00 30,700.00
42,575.00 39,900.00
42,575.00 39,900.00
62,225.00 58,400.00
65,500.00 61,500.00
91,700.00 86,100.00
104,800.00 98,400.00
111,350.00 104,500.00
163,750.00 153,700.00
63,000.00 61,500.00
63,000.00 61,500.00

28,350.00 27,600.00
157,500.00 153,700.00
1,637,500.00 1,537,500.00
1,768,500.00 1,660,500.00
2,292,500.00 2,152,500.00
1,310,000.00 1,230,000.00
125,000.00 122,000.00 99,206.35 122,023.81
196,500.00 184,500.00
20,160.00 19,600.00
37,800.00 36,900.00
7,560.00 7,300.00
9,450.00 9,200.00
15,750.00 15,300.00
8,272.00 8,000.00 6,565.08 8,075.05
12,985.00 12,600.00 10,305.56 12,675.83
16,736.00 16,300.00 13,282.54 16,337.52
13,100.00 12,300.00
HARGA BUPATI SK HARGA DPU 2016 KETERANGAN
2016

378,000.00 369,000.00
1,008,000.00 984,000.00
9,450.00 9,200.00
75,600.00 73,800.00
75,600.00 73,800.00
1,310,000.00 1,230,000.00
982,500.00 922,500.00
851,500.00 799,500.00
720,500.00 676,500.00
4,900.00 4,700.00 3,888.89 4,783.33
- 7,300.00
2,300.00 2,100.00
7,900.00 7,300.00
3,700.00 3,300.00
5,000.00 4,900.00
9,825.00 9,800.00
4,300.00 4,300.00
9,825.00 9,800.00
5,900.00 5,800.00 Pakai glasur jangan keramik
11,790.00 11,600.00
8,200.00 7,900.00
11,800.00 11,000.00
13,100.00 12,300.00
19,650.00 18,400.00
12,500.00 11,600.00
19,650.00 18,400.00
25,200.00 24,600.00
37,800.00 36,900.00
113,400.00 113,100.00 Keramik tipe granit 200,000.00 Keramik tipe granit
107,100.00 107,000.00 Jangan digunakan
327,600.00 327,100.00 Sekelas Platinum
132,300.00 132,200.00
409,500.00 399,700.00
252,000.00 246,000.00
630,000.00 615,000.00
504,000.00 492,000.00
1,008,000.00 984,000.00
315,000.00 307,500.00
56,700.00 55,300.00
5,670.00 5,500.00
8,190.00 7,900.00
10,710.00 10,400.00
220,500.00 215,200.00 175,000.00 215,250.00
229,250.00 215,200.00
104,800.00 98,400.00
78,600.00 73,800.00
98,250.00 92,200.00
5,670.00 5,500.00
HARGA BUPATI SK HARGA DPU 2016 KETERANGAN
2016

10,710.00 10,400.00
17,010.00 16,600.00
12,600.00 12,300.00
22,100.00 21,500.00 17,539.68 21,573.81
8,820.00 8,600.00
23,310.00 22,700.00
50,400.00 49,200.00
15,750.00 15,300.00
113,400.00 110,700.00
5,670.00 5,500.00
6,930.00 6,700.00
2,079,000.00 2,029,500.00
315,000.00 307,500.00
1,008,000.00 984,000.00
88,200.00 86,100.00
94,500.00 92,200.00
22,100.00 21,500.00 17,539.68 21,573.81
113,400.00 110,700.00
107,100.00 104,500.00
630,000.00 615,000.00
12,600.00 98,400.00
100,800.00 98,400.00
8,190,000.00 7,995,000.00
36,036.00 35,600.00
63,000.00 61,500.00
107,100.00 104,500.00
27,720.00 27,000.00
26,460.00 13,500.00
- 553,500.00
20,790.00 20,200.00
27,720.00 27,000.00
283,500.00 276,700.00
1,500.00 1,300.00
1,703,000.00 1,599,000.00
11,800.00 11,000.00
5,300.00 4,900.00
14,410,000.00 13,530,000.00
16,375,000.00 15,375,000.00
26,200,000.00 26,137,500.00
327,500.00 307,500.00
18,340,000.00 18,142,500.00
15,720,000.00 15,682,500.00
13,100,000.00 12,915,000.00
15,065,000.00 14,760,000.00
11,790,000.00 11,685,000.00
13,100,000.00 12,915,000.00
7,860,000.00 7,380,000.00
8,515,000.00 7,995,000.00
HARGA BUPATI SK HARGA DPU 2016 KETERANGAN
2016

9,825.00 9,200.00
6,877,500.00 6,457,500.00
4,192,000.00 3,936,000.00
7,532,500.00 7,072,500.00
1,575,000.00 1,537,500.00
2,205,000.00 2,152,500.00
2,520,000.00 2,460,000.00
157,500.00 153,700.00
63,000.00 61,500.00
56,070.00 54,700.00
59,850.00 52,200.00
66,780.00 61,500.00
75,600.00 73,800.00
110,250.00 107,600.00
81,900.00 67,600.00
94,500.00 78,400.00
94,500.00 92,700.00
100,800.00 72,400.00
- 356,500.00
1.00 8,600.00
28,350.00 27,600.00
37,800.00 36,900.00
20,790.00 20,200.00
34,650.00 33,800.00
69,300.00 67,600.00
25,200.00 24,600.00
32,130.00 31,300.00
78,750.00 76,800.00
22,050.00 21,500.00
37,800.00 36,900.00
56,700.00 55,300.00
50,400.00 49,200.00
119,700.00 116,800.00
88,200.00 86,100.00
176,400.00 172,200.00
126,000.00 123,000.00
100,800.00 98,400.00
81,900.00 79,900.00
17,010.00 16,600.00
44,100.00 43,000.00
47,250.00 46,100.00
63,000.00 61,500.00
15,750.00 15,300.00
69,300.00 67,600.00
15,120.00 14,700.00
69,300.00 67,600.00
15,120.00 14,700.00
88,200.00 86,100.00
HARGA BUPATI SK HARGA DPU 2016 KETERANGAN
2016

107,100.00 104,500.00
126,000.00 123,000.00
252,000.00 246,000.00
315,000.00 307,500.00
3,150,000.00 3,075,000.00
1,575,000.00 1,537,500.00
50,400.00 49,200.00
- 66,400.00
22,925.00 21,500.00
31,500.00 30,700.00
31,500.00 30,700.00
8,505.00 8,300.00
11,592.00 11,300.00
UP 24,600.00
UP 11,300.00
UP 9,100.00
UP 15,300.00
76,860.00 75,000.00
113,400.00 110,700.00
138,600.00 135,300.00
157,500.00 153,700.00
189,000.00 184,500.00
220,500.00 215,200.00
567,000.00 553,500.00
27,720.00 27,000.00
27,720.00 27,000.00
756.00 700.00
17,010.00 16,600.00
28,350.00 27,600.00
157.50 100.00
6,300.00 6,100.00
1,008.00 900.00
27,405.00 26,700.00
17,010.00 16,600.00
264,600.00 246,000.00
1,900.00 1,600.00
3,150.00 2,700.00
15,120.00 15,000.00
5,670,000.00 5,535,000.00
352,800.00 344,400.00
315,000.00 307,500.00
189,000.00 184,500.00
277,200.00 270,600.00
157,500.00 153,700.00
176,400.00 172,200.00
85,050.00 84,500.00
85,050.00 84,500.00
- 94,700.00
HARGA BUPATI SK HARGA DPU 2016 KETERANGAN
2016

85,050.00 84,800.00
91,350.00 91,000.00
100,800.00 100,800.00
107,100.00 107,000.00
88,200.00 87,900.00
110,250.00 109,400.00
94,500.00 94,400.00
100,800.00 100,800.00
119,700.00 119,300.00
126,000.00 123,000.00
138,600.00 135,300.00
144,900.00 141,400.00
- 54,800.00
- 130,600.00
- 676,500.00
283,500.00 276,700.00
- -
56,700.00 55,300.00
75,600.00 73,800.00
81,900.00 79,900.00
107,100.00 104,500.00
151,200.00 147,600.00
182,700.00 178,300.00
327,600.00 319,800.00
144,900.00 141,400.00
170,100.00 166,000.00
264,600.00 258,300.00
340,200.00 332,100.00
560,700.00 547,300.00
674,100.00 658,000.00
793,800.00 774,900.00
560,700.00 547,300.00
674,100.00 658,000.00
844,200.00 824,100.00
25,200.00 24,600.00
31,500.00 30,700.00
37,800.00 36,900.00
81,900.00 79,900.00
144,900.00 141,400.00
- 166,000.00
195,300.00 190,600.00
352,800.00 344,400.00
560,700.00 547,300.00
869,400.00 848,700.00
157,500.00 153,700.00
176,400.00 172,200.00
144,900.00 141,400.00
441,000.00 430,500.00
HARGA BUPATI SK HARGA DPU 2016 KETERANGAN
2016

22,050.00 21,500.00
15,750.00 15,300.00
25,200.00 24,600.00
31,500.00 30,700.00
37,800.00 36,900.00
3,780.00 3,600.00
5,670.00 5,500.00
- 6,100.00
6,930.00 6,700.00
8,190.00 7,900.00
7,560.00 7,300.00
4,725.00 4,600.00
88,200.00 86,100.00
100,800.00 98,400.00
693,000.00 676,500.00
18,900,000.00 18,450,000.00
31,500,000.00 30,750,000.00
34,020.00 33,200.00
34,020.00 33,200.00
8,820.00 8,600.00
138,600.00 135,300.00
1,764.00 1,700.00
5,040.00 4,900.00
535,500.00 522,700.00
44,730.00 43,600.00
17,010.00 16,600.00
47,880.00 46,700.00
10,710.00 10,400.00
- 44,200.00
25,200.00 24,600.00
19,530.00 19,000.00
78,120.00 76,200.00
6,300.00 6,100.00
1,386,000.00 1,353,000.00
346,500.00 338,200.00
94,500.00 92,200.00
100,800.00 98,400.00
82,530.00 80,500.00
37,800.00 36,900.00
63,000.00 61,500.00
630,000.00 615,000.00
88,200.00 86,100.00
144,900.00 141,400.00
252,000.00 246,000.00
258,300.00 252,100.00
3,969,000.00 3,874,500.00
19,530.00 19,000.00
34,650.00 33,800.00
HARGA BUPATI SK HARGA DPU 2016 KETERANGAN
2016

94,500.00 92,200.00
157,500.00 153,700.00
56,700.00 55,300.00
6,930.00 6,700.00
50,400.00 49,200.00
44,100.00 43,000.00
53,550.00 52,200.00
1,890,000.00 1,845,000.00
- 3,500,000.00
138,600.00 135,300.00
151,200.00 147,600.00
25,200.00 24,600.00
32,760.00 31,900.00
30,240.00 29,500.00
36,540.00 35,600.00
4,410.00 4,300.00
6,930,000.00 6,765,000.00
7,056,000.00 6,888,000.00
6,048,000.00 5,904,000.00
4,914,000.00 4,797,000.00
39,060,000.00 38,130,000.00
69,300.00 67,600.00
63,000.00 61,500.00
85,050.00 83,000.00
75,600.00 73,800.00
2,205,000.00 2,152,500.00
189,000.00 184,500.00
44,100.00 43,000.00
756,000.00 738,000.00
504,000.00 492,000.00
81,900.00 79,900.00

949,800.00 891,700.00
1,244,500.00 1,168,500.00
1,572,000.00 1,476,000.00
2,960,600.00 2,779,800.00
3,682,000.00 3,456,300.00
6,419,000.00 6,027,000.00
4,847,000.00 4,551,000.00
7,637,300.00 7,170,900.00
8,449,500.00 7,933,500.00
9,497,500.00 8,917,500.00
10,558,600.00 9,913,800.00

2,292,500.00 2,152,500.00
HARGA BUPATI SK HARGA DPU 2016 KETERANGAN
2016

1,965,000.00 1,845,000.00
2,620,000.00 2,460,000.00
458,500.00 430,500.00
327,500.00 307,500.00
131,000.00 123,000.00
1,310,000.00 1,230,000.00
982,500.00 922,500.00
9,200.00 8,600.00
262,000.00 246,000.00
131,000.00 123,000.00
1,310,000.00 1,230,000.00
196,500.00 184,500.00
720,500.00 676,500.00
786,000.00 738,000.00
1,506,500.00 1,414,500.00
458,500.00 430,500.00
127,100.00 119,300.00
4,000.00 3,600.00
4,000.00 3,600.00
327,500.00 307,500.00
262,000.00 246,000.00
6,550.00 6,100.00
6,550.00 6,100.00
1,899,500.00 1,783,500.00
1,768,500.00 1,660,500.00
6,550.00 6,100.00
2,620,000.00 2,460,000.00
655,000.00 615,000.00
1,768,500.00 1,660,500.00
720,500.00 676,500.00
982,500.00 922,500.00
272,500.00 255,800.00
982,500.00 922,500.00
327,500.00 307,500.00
262,000.00 246,000.00
982,500.00 922,500.00
655,000.00 615,000.00
327,500.00 307,500.00
614,100.00 576,500.00
131,000.00 123,000.00
98,250.00 92,200.00
2,816,500.00 2,644,500.00
982,500.00 922,500.00
1,310,000.00 1,230,000.00
1,965,000.00 1,845,000.00
2,620,000.00 2,460,000.00
3,275,000.00 3,075,000.00
1,965,000.00 1,845,000.00
HARGA BUPATI SK HARGA DPU 2016 KETERANGAN
2016

2,620,000.00 2,460,000.00
3,275,000.00 3,075,000.00
1,310,000.00 1,230,000.00
1,965,000.00 1,845,000.00
3,275,000.00 3,075,000.00
4,585,000.00 4,305,000.00
1,310,000.00 1,230,000.00
2,620,000.00 2,460,000.00
1,965,000.00 1,845,000.00
5,895,000.00 5,535,000.00
1,310,000.00 1,230,000.00
655,000.00 615,000.00
458,500.00 430,500.00
1,244,500.00 1,168,500.00
1,375,500.00 1,291,500.00
720,500.00 676,500.00
1,310,000.00 1,230,000.00
655,000.00 615,000.00

8,515,000.00 7,995,000.00
9,170,000.00 8,610,000.00
11,135,000.00 10,455,000.00
11,790,000.00 11,070,000.00
13,755,000.00 12,915,000.00

1,637,500.00 1,537,500.00
1,965,000.00 1,845,000.00
2,292,500.00 2,152,500.00
HARGA BUPATI SK HARGA DPU 2016 KETERANGAN
2016

65,500,000.00 61,500,000.00
72,050,000.00 67,650,000.00
91,700,000.00 86,100,000.00
98,250,000.00 92,250,000.00

78,600,000.00 73,800,000.00
85,150,000.00 79,950,000.00
91,700,000.00 86,100,000.00
104,800,000.00 98,400,000.00

1 Sekretaris DPU Kab. Karanganyar


TITIK UMARNI, SH., MH. 1. ...........................................
NIP. 19660923 198607 2 001

2 Kepala Bidang Perencanaan dan Bina Teknik


ASIHNO PURWADI, ST.
NIP. 19720828 199803 1 016

3 Kepala Bidang Cipta Karya


PURWONO, ST., MT. 3. ...........................................
NIP. 19600909 198811 1 002

4 Kepala Bidang Bina Marga


DARMANTO, ST., MM.
NIP. 19631108 198909 1 001

5 Bidang Pengairan dan ESDM


JOKO PURWONO, ST. 5. ...........................................
NIP. 19590622 198010 1 003
er wilayah karena analis sudah
er wilayah karena analis sudah
ga-besi-beton-terbaru/
Rp. 18.000,-Rp. 28.000, Besi Beton Besi 8 mm Besi 8 mm SNI Rp. 34.000,-Rp. 46.500
Besi Beton Besi Beton 10 mm (batang)Besi Beton 10 mm SNI Rp. 56.000,-Rp. 69.000,
Besi Beton Besi 12 mm (batang)Besi 12 mm SNI Rp. 80.000,-Rp. 95.000
Besi Beton Besi 16 mm (batang)Besi 16 mm SNI Rp. 135.000,-Rp. 160.000,-
. .................................................

2. .................................................

. .................................................

4. .................................................

. .................................................

Karanganyar, 21 Desember 2015

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN KARANGANYAR
EDHY SRIYATNO, ST., MT.
NIP. 19600323 198703 1 007
PERHITUNGAN BESI
Foot plat sap bawah tul tarik 1.25 16 4
4.2
Tulangan geser/kuda" 1.5 4 4
Foot plat sap atas/tul tekan 1.15 16 4

Tul. utama Kolom 7.6 8 4


Begel Kolom 1.38 50.7 4

Tul. Sloof (balok D) 5.32 2 0.887


Begel sloof 0.62 35.47 2

Ring (balok C) 5.32 2 4


Begel balok C 0.62 35.47 2
Balok dak (balok B) 5.32 6.00 2
5.32 2.00 2
Begel balok B 0.88 17.73 2
0.88 35.47 2
Ring (balok A) 5.32 2 3
5.32 2 2
Begel balok A 0.88 35.47 2

Plat dudukan stavol x 0.75 20 0.393


y 2.25 6 0.393

Plat lt bak x 16.67 2.6 0.887


y 41.66667 2.1 0.887
tul tekan x 16.67 2.77 0.887
tul tekan y 16.66667 2.6 0.887
16.66667 2.6 0.887
Plat dinding bak tegak 90 2 2
datar 20 9 2
Plat penutup bak x 25 1.5 0.393
y 16.66667 2 0.62
Plat kantilever x 19.66667 0.18 0.62
y 1.8 2.36 0.393
Plat kantilever x 20.83333 0.18 0.62
y 1.8 2.5 0.393

Beton pondasi foot plat k225


Kolom k 225
Beton sloof k225
Beton balok dan ring balk
Plat dudukan stavol dan tutup sumur k225
Plat tower k225

Plat tutup sumur x 1 10 0.393


y 0.8 8 0.393
0.887 = 70.96
0.887 = 3.73
0.887 = 21.29
0.887 = 65.28
161.26

1.578 = 383.77
0.393 = 109.91
493.68

4 = 37.75
0.393 = 17.28
55.03

0.887 = 37.75
0.393 = 17.28
1.578 = 100.74
0.887 = 18.88
0.393 = 12.27
0.393 = 24.53
0.887 = 28.31
0.62 = 13.19
0.393 = 24.53
277.48

2 = 11.79
2 = 10.61
22.40

2 = 76.87
2 = 155.23
= 40.95
= 38.44
= 38.44
0.393 = 141.48
0.393 = 141.48
= 14.74
= 20.67
4 = 8.78
4 = 6.68
4 = 9.30
4 = 7.07
700.12

161.26
493.68
55.03
277.48
22.40
700.12
Jumlah 1709.977

= 3.93
= 2.52
6.45
PERHITUNGAN VOLUME
PEKERJAAN : 0
LOKASI : 0

NO SKET GAMBAR URAIAN VOLUME JML. VOLUME

A Galian tanah


 galian tanah footplat
1.00 x 1.00 x 1.70 x 4 6.80



 6.80 #REF!

B Urugan tanah
  Tanah Urug
Urugan tanah footplat
1.35 + 1.25 x 0.65 x 1.00 x 4 3.38
2




    


1.35 + 1.25 x 0.65 x 0.35 x 4 1.18





 

Lantai Kerja [beton 1:2:3]


Urugan Pasir 2 4.56 #REF!






 Urugn tanah kembali

0.35 x 2.50 x 2.13 1.86
 

4 O 16
0.00
O 8 - 15
0.00


0.00
4 O 16

JUM LAH

13.44

NO SKET GAMBAR URAIAN VOLUME JML. VOLUME

C Pasangan bata merah 1.86


Pasangan batu bata merah pondasi tower
0.25 x 0.15 x 4.20 x 4 = 0.63 : 0.15 4.20
0.25 + 0.35 x 0.40 x 4.20 x 4 = 2.016 : 0.15 13.44
2
Pasangan bata merah dinding bawah tower
1.75 x 2.50 4.38
0.50 x 1.75 x 2 1.75
23.77 #REF!
D Urugan pasir
Urugan pasir dibawah footplat -3.86
0.10 x 1.00 x 1.00 x 4 0.40
                                  Urugan
 pasir dibawah lantai tower
0.06 x 3.70 x 3.20 0.71

1.11 #REF!
E Pekerjaan Beton Rabat


beton rabat lantai kerja 1;3;5


        
              
0.10 x 1.00 x 1.00 x 4 0.40


beton rabat lantai bawah tower


0.08 x 4.20 x 3.70 1.24

1.64 #REF!
F Beton betulang
POTONGAN PEM ASANGAN PI PA
PADA PENYEBRANGAN J ALAN footplat 0.15 x 1.00 x 1.00 x 4 0.60 0.60
skala 1 : 50 0.30 x 0.30 + 1.00 x 1.00 x 0.10 x 1.00 x 4 0.01 0.01
2 2 0.00
kolom footplat 0.30 x 0.30 x 1.25 x 4 0.45
JUM LAH

NO SKET GAMBAR URAIAN VOLUME JML. VOLUME

tiang tower
Kolom tower 0.40 x 0.40 x 1.90 x 4 1.22
0.30 x 0.30 x 4.10 x 4 1.48
balk D 0.12 x 0.20 x 2.50 x 2 0.12 3.97
0.12 x 0.20 x 2.00 x 2 0.10 0.00
balk C 0.12 x 0.20 x 2.50 x 2 0.12
0.12 x 0.20 x 2.00 x 2 0.10
balk B 0.20 x 0.25 x 2.50 x 2 0.25
0.20 x 0.25 x 2.00 x 2 0.20
balk A 0.20 x 0.25 x 2.50 x 2 0.25
0.20 x 0.25 x 2.00 x 2 0.20
beton cor bak tower
lantai tower 0.17 x 2.50 x 2.00 0.85
dinding tower 0.15 x 1.50 x 2.00 x 2 0.90
dinding tower 0.15 x 1.50 x 2.50 x 2 1.13
atap tower 0.08 x 2.50 x 1.40 0.28
0.08 x 1.90 x 0.60 0.09
Beton kanopi
0.08 x 0.30 x 2.00 x 2 0.10
0.08 x 0.30 x 2.50 x 2 0.12
0.08 x 0.18 x 0.48 x 4 0.03
0.08 x 0.18 x 0.30 x 4 0.02

tempat stavol


0.12 x 0.60 x 2.00 0.14
8.73 #REF!
 
G Besi terpasang #REF!


1,709.98
1,709.98

 

TAM PAK ATAS


JUM LAH
skala 1 : 50

NO SKET GAMBAR URAIAN VOLUME JML. VOLUME

H Begestengan
                footplat 0.30 x 1.25 x 4 x 4 6.00
   

6.00
0.4 x 1.90 x x 4 12.16
    

        

tiang 4
0.3 x 3.85 x 4 x 4 18.48 5.10
         

9.19
         

0.20 x 2.50 x 2 x 2 2.00


 
    
sloof
          

              

    

 
         

         

 
    

          

0.20 x 2.00 x 2 x 2 1.60
              
3.60
0.12 x 2.50 x 2 0.60
    

 
balok
0.20 x 2.50 x 4 2.00
 
0.12 x 2.00 x 2 0.48
         
           
           0.20 x 2.00 x 4 1.60
 


       
  0.20 x 2.50 x 4 2.00
0.25 x 2.50 x 8 5.00
 
 



           0.20 x 2.00 x 4 1.60


0.25 x 2.00 x 8 4.00
 
  
5.18
 
0.30 x 2.00 x 4 2.40
 
         
         
kanopi
POTONGAN A-A 0.30 x 2.50 x 4 3.00
skala 1 : 50
0.18 x 0.48 x 8 0.69
0.18 x 0.30 x 8 0.43
lantai 2.00 x 2.50 x 2 10.00
16.52
dinding 2.00 x 2.50 x 2 x 4 40.00
40.00
I Plesteran
tiang tower
  0.40 x 1.90 x 4 x 4 12.16
  0.07 x 0.50 x 4 x 8 1.12

0.30 x 3.85 x 4 x 4 18.48
balok
 
0.12 x 2.50 x 4 1.20
DENAH TOWER 0.20 x 2.50 x 4 2.00
skala 1 : 50
0.12 x 2.00 x 4 0.96
0.20 x 2.00 x 4 1.60
0.20 x 2.50 x 4 2.00

 0.05 x 2.50 x 4 0.50
0.25 x 2.50 x 6 3.75
JUM LAH
NO SKET GAMBAR URAIAN VOLUME JML. VOLUME

0.20 x 2.00 x 4 1.60



0.05 x 2.00 x 4 0.40



0.25 x 2.00 x 6 3.00


  
  

lantai

  
   0.30 x 4.20 x 2 2.52
0.30 x 3.70 x 2 2.22
 

       
4.20 x 3.70 15.54
  
  
     
plat tower dan dinding tower
   
     plat dasar 2.00 x 2.50 x 3 15.00
1.50 x 2.50 x 4 15.00
  
  
  
  
dinding

POT. D-D
1.50 x 2.00 x 4 12.00
PEM BESI AN BAK kanopi 0.30 x 2.50 x 2 x 2 3.00
skala 1 : 50
0.30 x 2.00 x 2 x 2 2.40
 
0.18 x 0.48 x 2 x 4 0.69
   0.18 x 0.30 x 2 x 4 0.43
tembok tempat stavol
  1.50 x 2.50 x 2 7.50
     
0.50 x 1.50 x 2 x 2 3.00 10.50
  
  
128.07
      


-


  -
PEM BESI AN BAK

JUM LAH

NO SKET GAMBAR URAIAN VOLUME JML. VOLUME

J Pengecatan
            
          tiang tower

 
            
         

0.45 x 1.90 x 4 x 4 13.68


  0.07 x 0.50 x 4 x 8 1.12 14.80
0.30 x 3.85 x 4 x 4 18.48
balok
0.12 x 2.50 x 4 1.20
  0.20 x 2.50 x 4 2.00
        0.12 x 2.00 x 4 0.96
             
0.20 x 2.00 x 4 1.60
          
  0.20 x 2.50 x 4 2.00
0.05 x 2.50 x 4 0.50
0.25 x 2.50 x 6 3.75
      
0.20 x 2.00 x 4 1.60 0.50


0.05 x 2.00 x 4 0.40



0.25 x 2.00 x 6 3.00
        
plat tower dan dinding tower
         
dinding 1.50 x 2.50 x 2 7.50
        1.50 x 2.00 x 2 6.00
kanopi 0.30 x 2.50 x 2 x 2 3.00
                          0.30 x 2.00 x 2 x 2 2.40
0.18 x 0.48 x 2 x 4 0.69
              
               0.18 x 0.30 x 2 x 4 0.43
plat 2.00 x 2.50 x 2 10.00
   
tembok tempat stavol
1.50 x 2.00 x 2 6.00
0.50 x 1.50 x 2 x 2 3.00
       
89.31
              
   

JUM LAH

NO SKET GAMBAR URAIAN VOLUME JML. VOLUME

WELL HEAD COVER


1
galian tanah pondasi well head cover
0.40 x 0.80 x 1.00 0.32
Pasangan bata merah well head cover
1.07 x 1.00 x 2 2.14 129.00
1.07 0.80 x 2 1.71
3.85
Urugan pasir pembalut pipa well head cover
0.57 x 0.80 x 1.00 0.46

beton rabat penggapit pipa well head cover 1;3;5


0.10 x 1.00 x 0.80 0.08
beton bertulang penutup well head cover
0.08 x 0.95 x 0.75 0.06
pembesian 6.45
plesteran well head cover
0.60 x 1.00 x 2 x 2 2.40
0.60 x 0.80 x 2 x 2 1.92
0.80 x 1.00 0.80
0.76 x 0.56 0.43
pengecatan 5.55
0.60 x 1.00 x 4 2.40
0.80 x 1.00 0.80
3.20

   K Tutup manhole


   1 unit 1.00
   
1.00
   L Tutup pengaman panel dari tralis besi


  
1.00 unit 1.00
  
1.00
BALOK C, D ( 12 x 20 ) M Plat hole 4"
skala 1 : 20 100.00 m' 100.00
100.00
N Elektrik logging
100 m' 100.00
100.00
O Reaming tanah sulit
100.00 m' 100.00
100.00
P Pemasangan pipa dan screen
  
100.00 m' 100.00
  
100.00



  
Q Gravel peck
  
   
80 m' 80.00
BALOK A ( 20 x 25 )
skala 1 : 20 80.00
        
  
   R Cement grouting
  
0.95 m3 0.95 0.95


      


  
              S Pengembangan sumur ( developing )
Lapangan
BALOK B ( 20 x 25 ) 8.00 jam 8.00
skala 1 : 20
8.00
   T Pumping test
24.00 jam 24.00


  

   24.00
Tumpuan

JUM LAH

NO SKET GAMBAR URAIAN VOLUME JML. VOLUME

U Pipa PVC 4" AW


100 m' 100.00
100.00
X Pipa GIPkl medium A 2"
24.00 m' 24.00
24.00
Y Pipa GIPkl medium A 1,5"
72 m' 72.00
72.00
Z Panel kontrol lengkap
1 Unit 1
1.00
II Pompa submersible
1 Unit 1
1.00
III Seling pengaman
1 Unit 1
1.00
IV Kabel power
1 Unit 1
1.00
V Automatic Water Level
1 Unit 1
1.00
VI well head cover
1 Unit 1 1.00
VII Stabiliser 5000 watt
1 Unit 1.00
1.00
VIII Asessoris perpipaan di reservoir
1 Unit 1.00
JUM LAH

NO SKET GAMBAR URAIAN VOLUME JML. VOLUME

XI Penyambungan daya PLN 3500 watt 1.00


1 Unit 1.00
1.00
X Memasang pipa s 12,5 diameter 1,5"/m
776 m' 750.00 diganti
750.00
XI Memasang crossing pipa PVC TIPE AW diameter 1,5"/m
24 m' 24.00
24.00 diganti

PERHITUNGAN AIRASI

BATU FILTER
0.1 x 1.18 x 1.03 x 3 0.36
0.1 x 1.18 x 2.36 0.28

IJUK 0.03 x 1.03 x 1.28 x 3 0.12

JUM LAH

NO SKET GAMBAR URAIAN VOLUME JML. VOLUME

PERHITUNGAN AIRASI
beton cor
kolom 0.2 x 0.2 x 2.65 x 2 0.21
0.2 x 0.2 x 2.87 x 2 0.23
             
              
              
0.15 x 0.15 x 2.77 x 2 0.12
0.15 x 0.15 x 2.87 0.06 0.63
                            
        

balok
        

           


     

   

      
  

             
       
        
        
 


             
              
              
                            
        

        

           


     

0.1 x 0.2 x 2.2 x 4 0.18



   

      

0.1 x 0.2 x 2.7 x 4 0.22


  

             

balok filter
       
        

0.1 x 0.28 x 1.03 x 6


        
 

 0.17
0.1 x 0.28 x 1.28 x 6 0.22
balok penampung
0.1 x 0.25 x 2.6 0.07
 


0.1 x 0.25 x 1.23 0.03



0.1 x 0.25 x 0.98 0.02
0.1 x 0.25 x 2

 
  
    
0.05
0.1 x 0.25 x 1.03 0.03
 



            
0.1 x 0.25 x 1.28 0.03
 

 0.1 x 0.15 x 1.23 0.02
0.1 x 0.15 x 1.03
 
  
0.02 1.04
plat penyaring


 
0.08 x 1.03 x 1.28 x 3 0.32
  
    plat lapis fiber
0.05 x 1.03 x 1.28 0.07 0.38
 
POTONGAN B - B
skala 1 : 100

jumlah cor total 2.06 343.2085


plesteran
kolom 0.20 x 2.65 x 4 x 2 4.24
0.20 x 2.87 x 4 x 2 4.59
0.15 x 2.77 x 4 x 2 3.32
0.15 x 2.87 x 4 1.72

JUM LAH

NO SKET GAMBAR URAIAN VOLUME JML. VOLUME

balok 0.10 x 2.2 x 2 x 4 1.76


0.20 x 2.2 x 2 x 4 3.52
0.10 x 2.7 x 2 x 4 2.16
0.20 x 2.7 x 2 x 4 4.32
balok filter
0.10 x 1.03 x 2 x 6 1.24
0.28 x 1.03 x 2 x 6 3.46
0.10 x 1.28 x 2 x 6 1.54
0.28 x 1.28 x 2 x 6 4.30
balok penampung
0.10 x 2.6 x 2 0.52
0.10 x 1.23 x 2 0.25
0.10 x 0.98 x 2 0.20
0.10 x 2 x 2 0.40
0.10 x 1.03 x 2 0.21
0.10 x 1.28 x 2 0.26
0.10 x 1.23 x 2 0.25
0.10 x 1.03 x 2 0.21
0.25 x 2.6 x 2 1.30
0.25 x 1.23 x 2 0.62
0.25 x 0.98 x 2 0.49
0.25 x 2 x 2 1.00
0.25 x 1.03 x 2 0.52
0.25 x 1.28 x 2 0.64
0.15 x 1.23 x 2 0.37
0.15 x 1.03 x 2 0.31
43.69
besi hollow 4.5 x 3.9 17.55
atap galvalu 4.7 x 3.9 18.33
pipa outlet 3m 3.00
pipa 5/8 6,30m 6.30
JUM LAH
urugan kembali

1.86
27.6
PERHITUNGAN VOLUME
0
0
NO. URAIAN PEKERJAAN
1 2
A PEKERJAAN PERSIAPAN
1 Pekerjaan persiapan dan mobilisasi
2 Pengukuran dan pemasangan bowplank
3 Uji laboratorium kualitas air

B PEKERJAAN RESERVOIR
1 Galian tanah sedalam 1 m'
Galian tanah foot plat
1.00 x 1.00 x 1.70 x 4
Galian tanah sedalam 1 m'

2 Urugan Tanah
Urugan tanah foot plat
1.25 + 1.35 x 0.35 x 1.00 x 2 x 4
2
Urugan Tanah

3 Urugan Pasir
Urugan pasir di bawah foot plat
0.10 x 1.00 x 1.00 x 4
Urugan pasir di bawah lantai tower
0.06 x 4.20 x 3.70
Urugan Pasir

4 Membuat lantai kerja beton mutu f'c = 7,4 Mpa slump (3-6) cm, w/c = 0,87
lantai kerja di bawah foot plat
0.10 x 1.00 x 1.00 x 4.00

lantai kerja di bawah tower


0.08 x 4.20 x 3.70

Membuat lantai kerja beton mutu f'c = 7

5 Membuat beton mutu f'c = 19,3 Mpa


foot plat
0.15 x 1.00 x 1.00 x 4
0.30 + 1.00 x 0.10 x 1.00 x 4
2
kolom foot plat
0.30 x 0.30 x 1.25 x 4
kolom tower
0.30 x 0.30 x 1.90 x 4
0.30 x 0.30 x 4.05 x 4
balok D
0.12 x 0.20 x 2.50 x 2
0.12 x 0.20 x 2.00 x 2
balok C
0.12 x 0.20 x 2.50 x 2
0.12 x 0.20 x 2.00 x 2
balok B
0.20 x 0.25 x 2.50 x 2
0.20 x 0.25 x 2.00 x 2
balok A
0.20 x 0.25 x 2.50 x 2
0.20 x 0.25 x 2.00 x 2
beton cor bak tower
lantai 0.17 x 2.50 x 2.00
dinding 0.15 x 1.50 x 2.50 x 2
0.15 x 1.50 x 2.00 x 2
atap 0.08 x 2.50 x 2.00
dikurangi 0.08 x 0.60 x 0.60
beton topi2
0.08 x 0.30 x 2.50 x 2 x 2
0.08 x 0.30 x 2.00 x 2 x 2
0.08 x 0.15 x 0.45 x 4 x 2
0.08 x 0.15 x 0.30 x 4 x 2
tempat stavolt
0.12 x 0.60 x 2.50

Membuat beton mutu f'c = 19,3 Mpa


6 Bekisting
foot plat
0.30 x 1.25 x 4 x 4

tiang 0.40 x 1.90 x 4 x 4


0.30 x 4.05 x 4 x 4

sloof 0.20 x 2.50 x 2 x 2


0.20 x 2.00 x 2 x 2

balok C 0.12 x 2.50 x 1 x 2


0.20 x 2.50 x 2 x 2
0.12 x 2.00 x 1 x 2
0.20 x 2.00 x 2 x 2
B 0.20 x 2.50 x 1 x 2
0.25 x 2.50 x 2 x 2
0.20 x 2.00 x 1 x 2
0.25 x 2.00 x 2 x 2
A 0.20 x 2.50 x 1 x 2
0.25 x 2.50 x 2 x 2
0.20 x 2.00 x 1 x 2
0.25 x 2.00 x 2 x 2

topi2 0.30 x 2.50 x 2 x 2


0.30 x 2.00 x 2 x 2
0.15 x 0.45 x 4 x 2
0.15 x 0.30 x 4 x 2

lantai 2.50 x 2.00 x 2

dinding 2.50 x 1.50 x 2 x 2


2.00 x 1.50 x 2 x 2

8 Pembesian
Footplate sap bawah tul tarik 1.25 x 16 x 4 x 0.887
4.2 x 0.887
Tulangan geser/kuda" 1.5 x 4 x 4 x 0.887
Foot plat sap atas/tul tekan 1.15 x 16 x 4 x 0.887

Tul. utama Kolom 7.6 x 8 x 4 x 1.56 ulir


Begel Kolom 1.22 x 50.7 x 4 x 0.393

Tul. Sloof (balok D) 4.62 x 2 x 4 x 0.887


Begel sloof 0.62 x 30.80 x 2 x 0.393
Ring (balok C) 4.62 x 2 x 4 x 0.887
Begel balok C 0.62 x 30.80 x 2 x 0.393
Balok dak (balok B) 4.62 x 2.00 x 5 x 1.56 ulir
4.62 x 2.00 x 2 x 0.887
Begel balok B 0.88 x 15.40 x 2 x 0.393
0.88 x 30.80 x 2 x 0.393
Ring (balok A) 4.62 x 2 x 4 x 0.887
4.62 x 2 x 2 x 0.62
Begel balok A 0.88 x 30.80 x 2 x 0.393

Plat dudukan stavol x 0.75 x 20 x 1 x 0.393


y 2.25 x 6 x 1 x 0.393

Plat lt bak x 17.67 x 2.6 x 2 x 0.617


y 21.833 x 2.1 x 2 x 0.617
tul tekan x 17.67 x 3 x 0.617
tul tekan y 21.833 x 2.5 x 0.617

Plat dinding bak tegak 90 x 2 x 0.393 x 2


datar 20 x 9 x 0.393 x 2
Plat penutup bak x 25 x 1.5 x 0.393
y 20 x 2 x 0.62
Plat kantilever x 19.667 x 0.18 x 4 x 0.62
y 1.8 x 2.36 x 4 x 0.393
Plat kantilever x 20.833 x 0.18 x 4 x 0.62
y 1.8 x 2.5 x 4 x 0.393

Pembesian
9 Pasangan bata merah
pasangan bata merah pondasi tower
0.35 + 0.25 x 0.40 x 4.20 x 2
2
0.35 + 0.25 x 0.40 x 3.70 x 2
2
Pasangan bata merah dinding bawah tower
1.70 x 2.00
0.50 x 1.70 x 2
Pasangan bata merah

10 Plesteran
tiang tower
0.40 x 1.90 x 4 x 4
0.07 x 0.50 x 4 x 8
0.30 x 3.85 x 4 x 4
balok
0.12 x 2.50 x 4
0.20 x 2.50 x 4
0.12 x 2.00 x 4
0.20 x 2.00 x 4
0.20 x 2.50 x 4
0.05 x 2.50 x 4
0.25 x 2.50 x 6
0.20 x 2.00 x 4
0.05 x 2.00 x 4
0.25 x 2.00 x 6
lantai
0.30 x 4.20 x 2
0.30 x 3.70 x 2
4.20 x 3.70
plat tower dan dinding tower
plat dasar 2.00 x 2.50 x 3
dinding 1.50 x 2.50 x 4
1.50 x 2.00 x 4

tembok tempat stavolt


1.70 x 2.50 x 2
0.50 x 1.70 x 2 x 2

Plesteran

11 Tutup manhole
12 Pengecatan
tiang tower
0.45 x 1.90 x 4 x 4
0.30 x 3.85 x 4 x 4
balok
0.12 x 2.50 x 4
0.20 x 2.50 x 4
0.12 x 2.00 x 4
0.20 x 2.00 x 4
0.20 x 2.50 x 4
0.05 x 2.50 x 4
0.25 x 2.50 x 6
0.20 x 2.00 x 4
0.05 x 2.00 x 4
0.25 x 2.00 x 6
plat tower dan dinding tower
dinding 1.50 x 2.50 x 2
1.50 x 2.00 x 2
kanopi 0.30 x 2.50 x 2 x 2
0.30 x 2.00 x 2 x 2
0.15 x 0.45 x 2 x 4
0.15 x 0.30 x 2 x 4
plat 2.00 x 2.50 x 2
tembok tempat stavolt
1.70 x 2.00 x 2
0.50 x 1.70 x 2 x 2

Pengecatan
13 Tutup Pengaman Panel dari Tralis Besi
14 Accessories Perpipaan di Reservoir
C PEKERJAAN SUMUR
I PEKERJAAN PENGEBORAN
1 Pemboran Pilot Hole Ø 4"
2 Pemboran reaming Ø 8"
3 Electric Well Logging
4 Pemasangan Pipa Casing dan Screen
5 Gravel Pack
6 Cement grouting
7 Penyempurnaan Sumur ( Developing )
8 Pemasangan Pompa Submersible & Pipa GI Med. 1,5"
9 Pumping Test
10 Pipa indikator

II PEKERJAAN WHELL HEAD COVER


1 galian tanah
0.40 x 0.80 x 1.00
2 urugan pasir pembalut pipa whc
0.56 x 0.80 x 1.00
3 pasangan bata merah whc
1.00 x 1.00 x 2
1.00 x 0.80 x 2

4 plesteran whc
0.60 x 1.00 x 2.00 x 2
0.60 x 0.80 x 2.00 x 2
0.80 x 1.00

5 beton rabat pengapit pipa whc


0.10 x 1.00 x 0.80
6 beton bertulang penutup whc
0.08 x 0.80 x 0.60
7 pembesian
Plat tutup sumur x 1 10 0.393
y 0.8 8 0.393

8 pengecatan
0.60 x 1.00 x 4.00
0.80 x 1.00

9 Perlengkapan Whell Head Cover


III PEKERJAAN ELECTRICAL
1 Panel control lengkap
2 Automatic water level
3 Stabilizer 5000 Wat
4 Penyambungan daya PLN 3500 Wat
5 Pemasangan tiang listrik komplit
D PEKERJAAN JARINGAN PIPA
I Pekerjaan Pipa Distribusi
1 Memasang pipa PVC S. 12.50 Ø 2"
2 Galian tanah
0.40 x 0.20 x 1480
3 Urugan kembali galian
118.40 - 0.002 x 1480
beton rabat
0.08 x 0.20 x 222
II Pekerjaan crossing pipa
1 Memasang pipa PVC S. 12.50 Ø 2"
2 Galian tanah
0.50 x 0.20 x 24
3 Urugan kembali galian
2.40 - 0.002 x 24
4 Urugan pasir
0.20 x 0.20 x 24
beton rabat
0.08 x 0.20 x 24
III Pekerjaan jaringan SR
1 Memasang SR
2 Galian tanah
0.40 x 0.20 x 4 x 68
3 Urugan kembali galian
21.76 - 0.00012 x 4 x 68
VOLUME JUMLAH SATUAN
3 4 5

1 ls
8 m'
1 ls

6.80
6.80 m3

3.64

3.64 m3

0.40

0.93
1.33 m3

0.40

1.24

beton mutu f'c = 7,4 Mpa slump (3 1.64 m3

0.60
0.26

0.45

0.68
1.46

0.12
0.10

0.12
0.10

0.25
0.20

0.25
0.20

0.85
1.13
0.90
0.40
-0.03

0.24
0.19
0.04
0.03

0.18

f'c = 19,3 Mpa 8.71 m3


6.00
6.00 m2
12.16
19.44
31.60 m2
3x pakai 10.53 m2
2.00
1.60
3.60 m2
0.60
2.00
0.48
1.60
1.00
2.50
0.80
2.00
1.00
2.50
0.80
2.00
17.28 m2
3x pakai 5.76 m2
2.40
0.54
0.36
0.00
10.00
13.30 m2
15.00
12.00
27.00 m2

70.96
3.73
21.29
65.28
161.26 kg

379.39
97.17
476.56 kg

32.78
15.01
47.79 kg
32.78
15.01
72.07
16.39
10.65
21.30
32.78
11.46
21.30
233.76 kg

5.90
5.31
11.20 kg

56.68
56.58
32.70
33.68

141.48
141.48
14.74
24.80
8.78
6.68
9.30
7.07
533.97 kg

1464.54 Kg
1.01

0.89

3.40
1.70
7.00 m2

12.16
1.12
18.48

1.20
2.00
0.96
1.60
2.00
0.50
3.75
1.60
0.40
3.00

2.52
2.22
15.54

15.00
15.00
12.00

8.50
3.40

122.95 m2

1.00 unit
13.68
18.48

1.20
2.00
0.96
1.60
2.00
0.50
3.75
1.60
0.40
3.00

7.50
6.00
3.00
2.40
0.54
0.36
10.00

6.80
3.40

89.17 m2
1.00 ls
1.00 ls

100.00 m'
100.00 m'
100.00 m'
100.00 m'
80.00 m'
0.95 m3
8.00 jam
1.00 unit
24.00 jam
80.00 m'

0.32 m3

0.45 m3

2.00
1.60
3.60 m2

2.40
1.92
0.80
5.12 m2

0.08 m3

0.04 m3

3.93
2.52
6.45 kg

2.40
0.80
3.20 m2
1.00 m'

1.00 unit
1.00 unit
1.00 bh
1.00 unit
1.00 unit
1480 m'

118 m3

112.93 m3

3.55 m3

24.00 m'

2.40 m3

2.35 m3

0.96 m3

0.38 m3

68.00 unit

21.76 m3

21.73 m3
RENCANA ANGGARAN BIAYA ( RAB

PROGRAM :
KEGIATAN :

VOLUME :
LOKASI :
KABUPATEN :
SUMBER DANA :
TAHUN ANGGARAN : 2019

No. Uraian Pekerjaan Volume Sat.

1 2 3

A PEKERJAAN PERSIAPAN
1 Pekerjaan persiapan dan mobilisasi 1.00 ls
2 Pengukuran dan pemasangan bouwplank 8.00 m'
3 Uji Laboratorium Kualitas Air 1.00 ls

B PEKERJAAN RESERVOIR
I PEKERJAAN TANAH
1 Menggali tanah biasa sedalam 1 m' 6.80 m3
2 Pengurugan kembali galian tanah 3.64 m3
3 Mengurug pasir urug 1.33 m3

II PEKERJAAN PASANGAN, BETON DAN LAIN-LAIN


1 Membuat lantai kerja beton mutu f'c = 7,4 Mpa slump (3-6) cm, w/c = 0,87 1.64 m3
2 Membuat beton mutu f'c = 19,3 Mpa (Mutu K 225) 8.71 m3
3 (K3) Memasang bekisting untuk pondasi 6.00 m2
4 (K3) Memasang bekisting untuk kolom 10.53 m2
5 (K3) Memasang bekisting untuk sloof 3.60 m2
6 (K3) Memasang bekisting untuk balok 5.76 m2
7 (K3) Memasang bekisting untuk lantai 13.30 m2
8 (K3) Memasang bekisting untuk dinding 27.00 m2
9 Pembesian 1 kg dengan besi polos atau besi ulir 1,464.54 kg
10 Membuat dinding bata merah tebal 1/2 bata , camp 1 PC : 4 PP 7.00 m2
11 Memasang plesteran 1 PC : 3 PP, tebal 15 mm 122.95 m2
12 Tutup Manhole 1.00 unit
13 Pengecatan tembok baru 89.17 m2
14 Tutup Pengaman Panel dari Tralis Besi 1.00 ls
15 Accessories Perpipaan di Reservoir 1.00 ls
16 Pembuatan Tulisan Timbul 1.00 ls

C PEKERJAAN SUMUR
I PEKERJAAN PENGEBORAN
1 Pemboran Pilot Hole Ø 4" 100.00 m'
2 Pemboran reaming Ø 8" 100.00 m'
( tanah sulit )
No. Uraian Pekerjaan Volume Sat.

1 2 3

3 Electric Well Logging 100.00 m'


4 Pemasangan Pipa Casing dan Screen 100.00 m'
5 Gravel Pack 80.00 m'
6 Err:509 0.95 ###
( cement grouting )
7 Penyempurnaan Sumur ( Developing ) 8.00 jam
8 Pemasangan Pompa Submersible & Pipa GI Med. 1,5" 1.00 unit
9 Pumping Test 24.00 jam
10 Pipa indikator 80.00 m'

II PEKERJAAN WHELL HEAD COVER


1 Menggali tanah biasa sedalam 1 m' 0.32 m3
2 Mengurug pasir urug 0.45 m3
3 Membuat dinding bata merah tebal 1/2 bata , camp 1 PC : 4 PP 3.60 m2
4 Memasang plesteran 1 PC : 3 PP, tebal 15 mm 5.12 m2
5 Membuat lantai kerja beton mutu f'c = 7,4 Mpa slump (3-6) cm, w/c = 0,87 0.08 m3
6 Err:509 0.04 ###
7 Pembesian 1 kg dengan besi polos atau besi ulir 6.45 kg
8 Pengecatan tembok baru 3.20 m2
9 Perlengkapan Whell Head Cover 1.00 unit

III PEKERJAAN ELEKTRICAL


1 Panel control lengkap 1.00 unit
2 Automatic Water Level 1.00 unit
3 Stabilizer 5000 Watt 1.00 bh
4 Penyambungan Daya PLN 3500 watt 1.00 unit
5 Pemasangan tiang listrik komplit 1.00 unit
No. Uraian Pekerjaan Volume Sat.

1 2 3

D PEKERJAAN JARINGAN PIPA


I PEKERJAAN PIPA DISTRIBUSI
1 Menggali tanah biasa sedalam 1 m' 118.40 m3
2 Pengurugan kembali galian tanah 112.78 m3
3 Memasang pipa PVC S. 12.50 Ø 2" 1,480.00 m'
4 Membuat beton mutu f'c = 7,4 Mpa (mutu K 100) 3.55 m3

II PEKERJAAN CROSSING PIPA


1 Menggali tanah biasa sedalam 1 m' 2.40 m3
2 Pengurugan kembali galian tanah 2.35 m3
3 Mengurug pasir urug 0.96 m3
4 Membuat beton mutu f'c = 7,4 Mpa (mutu K 100) 0.38 m3
5 Memasang pipa PVC S. 12.50 Ø 2" 24.00 m'

III PEKERJAAN JARINGAN SR


1 Menggali tanah biasa sedalam 1 m' 21.76 m3
2 Pengurugan kembali galian tanah 21.73 m3
3 Memasang Jaringan SR 68.00 unit

REKAPITULASI :
A PEKERJAAN PERSIAPAN :
B PEKERJAAN RESERVOIR :
C PEKERJAAN SUMUR :
D PEKERJAAN JARINGAN PIPA :

Terbilang : ( TIGA RATUS TUJUH PULUH SATU JUTA RUPIAH )


AN BIAYA ( RAB )

Analysa Harga Jumlah Harga


Satuan Harga Semua
Rp. Rp. Rp.
4 5 6 7

Dihitung 3,000,000.00 3,000,000.00


A.2.2.1.4. 57,571.24 460,569.92
Dihitung 500,000.00 500,000.00
JUMLAH A. 3,960,569.92

A.2.3.1.1. 57,375.75 390,155.10


A.2.3.1.9. 41,301.50 150,337.46
A.2.3.1.11. 215,502.30 287,135.26
JUMLAH I. 827,627.82

A.4.1.1.4. 833,652.78 1,369,858.25


A.4.1.1.7. 1,039,504.84 9,058,453.08
A.4.1.1.20. 146,832.20 880,993.20
A.4.1.1.22. 280,059.20 2,949,956.91
A.4.1.1.21. 156,030.40 561,709.44
A.4.1.1.23. 286,500.20 1,650,241.15
A.4.1.1.24 325,259.20 4,325,947.36
A.4.1.1.25. 308,105.80 8,318,856.60
A.4.1.1.17. 15,264.83 22,355,922.96
A.4.4.1.9. 125,271.80 876,401.51
A.4.4.2.3. 55,709.00 6,849,421.55
An. Dihitung 12 1,038,619.16 1,038,619.16
A.4.7.1.10. 20,989.41 1,871,625.69
An. Dihitung 11 1,780,737.62 1,780,737.62
An. Dihitung 10 4,670,826.98 4,670,826.98
ls 500,000.00 500,000.00
JUMLAH II. 69,059,571.46
JUMLAH B. 69,887,199.28

An. Dihitung 3 203,761.60 20,376,160.00


An. Dihitung 5 208,218.49 20,821,849.06
Analysa Harga Jumlah Harga
Satuan Harga Semua
Rp. Rp. Rp.
4 5 6 7

An. Dihitung 4 34,691.00 3,469,100.00


An. Dihitung 6 105,655.00 10,565,500.00
An. Dihitung 7 20,093.66 1,607,492.80
Err:509 Err:509 Err:509

An. Dihitung 9 585,114.00 4,680,912.00


An. Dihitung 18 33,785,870.00 33,785,870.00
An. Dihitung 8 109,610.00 2,630,640.00
Dihitung 9,425.00 754,000.00
JUMLAH I. Err:509

A.2.3.1.1. 57,375.75 18,360.24


A.2.3.1.11. 215,502.30 96,545.03
A.4.4.1.9. 125,271.80 450,978.48
A.4.4.2.3. 55,709.00 285,230.08
A.4.1.1.4. 833,652.78 66,692.22
Err:509 Err:509 Err:509
A.4.1.1.17. 15,264.83 98,384.88
A.4.7.1.10. 20,989.41 67,166.11
An. Dihitung 13 3,903,020.00 3,903,020.00
JUMLAH II. Err:509

Daftar Bahan 4,886,000.00 4,886,000.00


Daftar Bahan 1,900,000.00 1,900,000.00
Daftar Bahan 3,800,000.00 3,800,000.00
An. Dihitung 14 6,159,630.00 6,159,630.00
Daftar Bahan 7,000,000.00 7,000,000.00
JUMLAH III. 23,745,630.00
JUMLAH C. Err:509
Analysa Harga Jumlah Harga
Satuan Harga Semua
Rp. Rp. Rp.
4 5 6 7

A.2.3.1.1. 57,375.75 6,793,288.80


A.2.3.1.9. 41,301.50 4,657,797.31
An. Dihitung 17 52,974.06 78,401,608.80
A.4.1.1.1. 891,401.30 3,166,257.42
JUMLAH I. 93,018,952.33

A.2.3.1.1. 57,375.75 137,701.80


A.2.3.1.9. 41,301.50 97,178.30
A.2.3.1.11. 215,502.30 206,882.21
A.4.1.1.1. 891,401.30 342,298.10
An. Dihitung 17 52,974.06 1,271,377.44
JUMLAH II. 2,055,437.85

A.2.3.1.1. 57,375.75 1,248,496.32


A.2.3.1.9. 41,301.50 897,342.72
An. Dihitung 16 555,992.54 37,807,492.72
JUMLAH III. 39,953,331.76
JUMLAH D. 135,027,721.94

Rp. 3,960,569.92
Rp. 69,887,199.28
Rp. Err:509
Rp. 135,027,721.94
JUMLAH Rp. Err:509
PPN 10% Rp. Err:509
JUMLAH TOTAL Rp. Err:509
DIBULATKAN Rp. Err:509

Karanganyar, ………………………… 2019

KEPALA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


KABUPATEN KARANGANYAR

EDHY SRIYATNO, ST, MT


NIP. 19600323 198703 1 007
DAFTAR ANALISIS HARGA SATUAN PEKERJAAN
BIDANG CIPTA KARYA TAHUN 2019

PROGRAM :0
KEGIATAN :0
0
VOLUME :0
LOKASI :0
KABUPATEN :0
SUMBER DANA :0
TAHUN ANGGARAN : 2019
5 Membuat lantai kerja beton mutu f'c = 7,4 Mpa slump (3-6) cm, w/c = 0,87
m3

No Kebutuhan Satuan Indeks

A Bahan PC kg 230.000
Pasir Beton kg 893.000
Kerikil ( maks 30 mm ) kg 1027.000
Air ltr 200.000

B Tenaga Kerja Pekerja OH 1.200


Tukang Batu OH 0.200
Kepala Tukang OH 0.020
Mandor OH 0.060

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan

7 (K3) Memasang bekisting untuk pondasi


m2

No Kebutuhan Satuan Indeks

A Bahan Kayu kelas III m3 0.040


Paku 5 cm - 10 cm kg 0.300
Minyak Bekisting ltr 0.100

B Tenaga Kerja Pekerja OH 0.520


Tukang Kayu OH 0.260
Kepala Tukang OH 0.026
Mandor OH 0.026

C Peralatan
D Jumlah harga tenaga, bahan dan peralatan
E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan

8 (K3) Memasang bekisting untuk kolom


m2

No Kebutuhan Satuan Indeks

A Bahan Kayu kelas III m3 0.040


Paku 5 cm - 12 cm kg 0.400
Minyak Bekisting ltr 0.200
Balok kayu kelas II m3 0.015
Plywood tebal 9 mm lbr 0.350
Dolken kayu galam, btg 2.000
Ø (8 - 10) cm, panj 4 m

B Tenaga Kerja Pekerja OH 0.660


Tukang Kayu OH 0.330
Kepala Tukang OH 0.033
Mandor OH 0.033

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan
9 (K3) Memasang bekisting untuk sloof
m2

No Kebutuhan Satuan Indeks

A Bahan Kayu kelas III m3 0.045


Paku 5 cm - 10 cm kg 0.300
Minyak Bekisting ltr 0.100

B Tenaga Kerja Pekerja OH 0.520


Tukang Kayu OH 0.260
Kepala Tukang OH 0.026
Mandor OH 0.026

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan

10 (K3) Memasang bekisting untuk balok


m2

No Kebutuhan Satuan Indeks

A Bahan Kayu kelas III m3 0.040


Paku 5 cm - 12 cm kg 0.400
Minyak Bekisting ltr 0.200
Balok kayu kelas II m3 0.018
Plywood tebal 9 mm lbr 0.350
Dolken kayu galam, btg 2.000
Ø (8 - 10) cm, panj 4 m

B Tenaga Kerja Pekerja OH 0.660


Tukang Kayu OH 0.330
Kepala Tukang OH 0.033
Mandor OH 0.033

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan

11 (K3) Memasang bekisting untuk lantai


m2

No Kebutuhan Satuan Indeks

A Bahan Kayu kelas III m3 0.040


Paku 5 cm - 12 cm kg 0.400
Minyak Bekisting ltr 0.200
Balok kayu kelas II m3 0.015
Plywood tebal 9 mm lbr 0.350
Dolken kayu galam, btg 6.000
Ø (8 - 10) cm, panj 4 m
B Tenaga Kerja Pekerja OH 0.660
Tukang Kayu OH 0.330
Kepala Tukang OH 0.033
Mandor OH 0.033

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan
12 (K3) Memasang bekisting untuk dinding
m2

No Kebutuhan Satuan Indeks

A Bahan Kayu kelas III m3 0.030


Paku 5 cm - 10 cm kg 0.400
Minyak Bekisting ltr 0.200
Balok kayu kelas II m3 0.020
Plywood tebal 9 mm lbr 0.350
Dolken kayu galam, btg 3.000
Ø (8 - 10) cm, panj 4 m
Formite / penjaga jarak Buah 4.000
bekesting / spacer

B Tenaga Kerja Pekerja OH 0.660


Tukang Kayu OH 0.330
Kepala Tukang OH 0.033
Mandor OH 0.033

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan

14 Membuat dinding bata merah tebal 1/2 bata , camp 1 PC : 4 PP


m2

No Kebutuhan Satuan Indeks

A Bahan Batu Merah Buah 70.000


PC kg 11.500
Pasir Pasang m3 0.043

B Tenaga Kerja Pekerja OH 0.300


Tukang Batu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.015

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan

15 Memasang plesteran 1 PC : 3 PP, tebal 15 mm


m2

No Kebutuhan Satuan Indeks

A Bahan PC kg 7.776
Pasir Pasang m3 0.023

B Tenaga Kerja Pekerja OH 0.300


Tukang Batu OH 0.150
Kepala Tukang OH 0.015
Mandor OH 0.015

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan
16 Tutup Manhole
unit

No Kebutuhan Satuan Indeks

A Bahan Besi plat t = 3 mm kg 21.600


Bingkai L 30.30.3 kg 5.440
Engsel bh 2.000
Cat Meni m2 1.236

B Tenaga Kerja Pemasangan / OH 1.000


Pengelasan

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan

18 Tutup Pengaman Panel dari Tralis Besi


ls

No Kebutuhan Satuan Indeks

A Bahan Besi L 40.40.4 dan kg 48.400


besi Strip tb. 4 mm, 2 cm
Mur baut kg 1.600
Cat besi m2 4.646

B Tenaga Kerja Pemasangan / OH 1.000


Pengelasan

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan

19 Accessories Perpipaan di Reservoir


ls

No Kebutuhan Satuan Indeks

A Bahan Pipa penembus dinding GIP Ø 2" bh 4.000


Knie GIP Ø 2" bh 8.000
Stop kran kuningan Ø 2" bh 3.000
Shield tape / packing ls 1.000

B Tenaga Kerja Pekerja OH 0.043


Tukang Pipa OH 0.072
Kepala Tukang OH 0.007
Mandor OH 0.002

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan
20 Pemboran Pilot Hole Ø 4"
m'

No Kebutuhan Satuan Indeks

A Bahan Solar ltr 20.000


Olie mesin ltr 1.000
Olie hydrolic ltr 1.000
Grease ls 1.000
Bentonite kg 5.200

B Tenaga Kerja Geologis OH 1.000


Assisten Geologis OH 1.000
Driller OH 1.000
Ass. Driller OH 1.000
Crew driller OH 2.000
Tenaga lokal OH 2.000
Mekanik / Operator OH 1.000
Jaga malam OH 1.000

C Peralatan Depresiasi mesin / rig hr 1.000

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan
G Harga Satuan Pekerjaan ( HSP ) / m' F / 10
Pemboran Pilot Hole Ø 4"

21 Pemboran reaming Ø 8"


m'

No Kebutuhan Satuan Indeks

A Bahan Solar ltr 20.000


Olie mesin ltr 1.000
Olie hydrolic ltr 1.000
Grease ls 1.000
Bentonite kg 5.200

B Tenaga Kerja Geologis OH 1.000


Assisten Geologis OH 1.000
Driller OH 2.000
Ass. Driller OH 1.000
Crew driller OH 2.000
Tenaga lokal OH 2.000
Mekanik / Operator OH 1.000
Jaga malam OH 1.000

C Peralatan Depresiasi mesin / rig hr 1.000

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan
Harga Satuan Pekerjaan ( HSP ) / m'
G Pemboran reaming Ø 8" F / 15.0
( tanah padas )
Harga Satuan Pekerjaan ( HSP ) / m'
H Pemboran reaming Ø 8" F / 10.6
( tanah sulit )
22 Electric Well Logging
m'

No Kebutuhan Satuan Indeks

A Bahan Pengadaan kertas logging ls 1.000


pena dan tinta untuk
perangkat logging

B Tenaga Kerja Geologis OH 1.000


Ass. Geologis OH 1.000
Koordinator OH 1.000
Driller OH 1.000
Crew driller OH 1.000

C Peralatan Sewa + transportasi alat ls 1.000


Resistivity meter / loger

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan
G Harga Satuan Pekerjaan ( HSP ) / m' F / 100
Electric Well Logging
23 Pemasangan Pipa Casing dan Screen
m'

No Kebutuhan Satuan Indeks

A Bahan Solar ltr 0.450


Olie mesin ltr 0.010
Olie hydrolic ltr 1.000
Grease ls 1.000
Bentonite kg 5.200
Pipa PVC Ø 4" / 4 m AW m 100.000
Aksesoris pipa PVC 20% ls 0.200

B Tenaga Kerja Geologis OH 1.000


Assisten Geologis OH 1.000
Driller OH 1.000
Ass. Driller OH 1.000
Crew driller OH 1.000
Tenaga lokal OH 1.000
Mekanik / Operator OH 1.000
Jaga malam OH 1.000

C Peralatan Depresiasi mesin / rig hr 1.000

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan
G Harga Satuan Pekerjaan ( HSP ) /m' F / 100
Pemasangan Pipa Casing dan Screen

24 Gravel Pack
m'

No Kebutuhan Satuan Indeks

A Bahan Gravel m3 0.023

B Tenaga Kerja Pekerja OH 0.120

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan
26 Penyempurnaan Sumur ( Developing )
jam

No Kebutuhan Satuan Indeks

A Bahan Solar ltr 2.000


Olie mesin ltr 0.070

B Tenaga Kerja Geologis OH 1.000


Koordinator OH 1.000
Driller OH 0.100
Crew driller OH 0.100
Tenaga lokal OH 0.200

C Peralatan Depresiasi mesin hr 0.100


kompresor

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan
27 Pemasangan Pompa Submersible & Pipa GI Med. 1,5"
unit

No Kebutuhan Satuan Indeks

A Bahan
Pompa submersible Q 2 lt/dt H = 70 m bh 1.000
Pipa Air GI Med. A Ø 1,5 " / 6 m m 70.000
Aksesoris Pipa GI 20% ls 0.200
Seal tape bh 10.000
Seling pengaman ls 1.000
Kabel power ls 1.000

B Tenaga Kerja
Driller OH 1.000
Ass. Driller OH 1.000
Crew driller OH 1.000
Tenaga lokal OH 1.000
Mekanik / Operator OH 1.000
Jaga malam OH 1.000

C Peralatan Sewa alat pemasangan hr 1.000

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan

28 Pumping Test
jam

No Kebutuhan Satuan Indeks

A Bahan Solar ltr 1.500


Olie mesin ltr 0.050
Alat tulis ltr 1.000

B Tenaga Kerja Operator pompa OH 0.100


Crew driller OH 0.200
Tenaga lokal OH 0.200

C Peralatan Depresiasi mesin pompa hr 0.100

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan

29 Perlengkapan Whell Head Cover


unit

No Kebutuhan Satuan Indeks

A Bahan Flanged CI Ø 1.5" bh 1.000


Meter air bh 1.000
Check Valve Ø 1.5" bh 1.000
Stop kran Ø 1.5" bh 1.000
Double nepel bh 3.000
Knee Ø 1.5" bh 1.000
V sock Ø 1.5" x Ø 2" bh 1.000
Water mur Ø 1.5" bh 1.000
Seal tape bh 4.000

B Tenaga Kerja

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan

30 Penyambungan Daya PLN 3500 watt


unit

No Kebutuhan Satuan Indeks

A Pengadaan Paket AKLI ls 1.000


Material Material SR ls 1.000
Material pelengkap ls 1.000

B Administrasi BTL Jasa BTL / Administrasi ls 1.000

C Perijinan PLN dan Biaya Penyambungan ( BP ) ls 1.000


Administrasi Uang Jaminan Langganan ( UJL ) ls 1.000
Data Teknik Gambar ls 1.000
Materai ls 1.000

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan
32 Memasang pipa PVC S. 12.50 Ø 2"
m'

No Kebutuhan Satuan Indeks

A Bahan Pipa PVC S.12.5 Ø 2" m 1.200


Perlengkapan ( 15% analisa bh 0.150
pipa PVC )

B Tenaga kerja Pekerja OH 0.054


Tukang batu OH 0.090
Kep.Tukang OH 0.009
Mandor OH 0.003

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan

33 Memasang Jaringan SR
unit

No Kebutuhan Satuan Indeks

A Bahan Pipa PVC Ø 1/2" AW 8 m 1.100


Perlengkapan ( 15% analisa bh 0.150
pipa PVC )
Klem Sedel 1 bh 1.000
Meter air 1 bh 1.000
Plug kran 1 bh 1.000
Stop kran kuningan 1/2 " 1 bh 1.000
Kran air 1/2 " sedang 1 bh 1.000

B Tenaga kerja Pekerja OH 0.216


Tukang batu OH 0.360
Kep.Tukang OH 0.036
Mandor OH 0.011

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan
32 Memasang pipa PVC S. 12.5 Ø 2", distribusi
m'

No Kebutuhan Satuan Indeks

A Bahan Pipa PVC S.16 Ø 2" m 1.200


Perlengkapan ( 35% analisa bh 0.350
pipa PVC )

B Tenaga kerja Pekerja OH 0.054


Tukang batu OH 0.090
Kep.Tukang OH 0.009
Mandor OH 0.003

C Peralatan

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan

13 Pembuatan Kran Umum


unit

No Kebutuhan Satuan Indeks

A Pekerjaan Pipa Pipa PVC Ø 40 mm (1,5") m 12.000


Perlengkapan m3 0.350
Kran air 3/4" bh 3.000

B Pekerjaan Pas. Batu merah 1 : 4 m2 0.840


Pasangan Plesteran 1 : 3 m2 5.600
Rabat 1 : 3 : 5 m3 0.140
Galian tanah m3 0.420
Cat tembok m2 5.600

D Jumlah harga tenaga, bahan dan peralatan


E Overhead & profit 10% + 3%
F Jumlah harga per satuan pekerjaan
G Harga Satuan Pekerjaan ( HSP ) / unit F * 1
Pembuatan Kran Umum
TUAN PEKERJAAN
TAHUN 2019
A.4.1.1.4.

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
1,250.00 287,500.00
185.71 165,842.86
162.96 167,362.96
85.00 17,000.00
637,705.82
65,000.00 78,000.00
77,000.00 15,400.00
89,000.00 1,780.00
81,000.00 4,860.00
100,040.00

-
(A+B+C) 737,745.82
x D 95,906.96
(D+E) 833,652.78

A.4.1.1.20.

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
1,628,000.00 65,120.00
16,000.00 4,800.00
7,400.00 740.00
70,660.00
65,000.00 33,800.00
81,000.00 21,060.00
89,000.00 2,314.00
81,000.00 2,106.00
59,280.00

-
(A+B+C) 129,940.00
x D 16,892.20
(D+E) 146,832.20

A.4.1.1.22.

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
1,628,000.00 65,120.00
16,000.00 6,400.00
7,400.00 1,480.00
1,900,000.00 28,500.00
146,000.00 51,100.00
10,000.00 20,000.00

172,600.00
65,000.00 42,900.00
81,000.00 26,730.00
89,000.00 2,937.00
81,000.00 2,673.00
75,240.00

-
(A+B+C) 247,840.00
x D 32,219.20
(D+E) 280,059.20
A.4.1.1.21.

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
1,628,000.00 73,260.00
16,000.00 4,800.00
7,400.00 740.00
78,800.00
65,000.00 33,800.00
81,000.00 21,060.00
89,000.00 2,314.00
81,000.00 2,106.00
59,280.00

-
(A+B+C) 138,080.00
x D 17,950.40
(D+E) 156,030.40

A.4.1.1.23.

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
1,628,000.00 65,120.00
16,000.00 6,400.00
7,400.00 1,480.00
1,900,000.00 34,200.00
146,000.00 51,100.00
10,000.00 20,000.00

178,300.00
65,000.00 42,900.00
81,000.00 26,730.00
89,000.00 2,937.00
81,000.00 2,673.00
75,240.00

-
(A+B+C) 253,540.00
x D 32,960.20
(D+E) 286,500.20

A.4.1.1.24

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
1,628,000.00 65,120.00
16,000.00 6,400.00
7,400.00 1,480.00
1,900,000.00 28,500.00
146,000.00 51,100.00
10,000.00 60,000.00

212,600.00
65,000.00 42,900.00
81,000.00 26,730.00
89,000.00 2,937.00
81,000.00 2,673.00
75,240.00

-
(A+B+C) 287,840.00
x D 37,419.20
(D+E) 325,259.20
A.4.1.1.25.

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
1,628,000.00 48,840.00
16,000.00 6,400.00
7,400.00 1,480.00
1,900,000.00 38,000.00
146,000.00 51,100.00
10,000.00 30,000.00

5,400.00 21,600.00

197,420.00
65,000.00 42,900.00
81,000.00 26,730.00
89,000.00 2,937.00
81,000.00 2,673.00
75,240.00

-
(A+B+C) 272,660.00
x D 35,445.80
(D+E) 308,105.80

A.4.4.1.9.

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
800.00 56,000.00
1,250.00 14,375.00
260,000.00 11,180.00
81,555.00
65,000.00 19,500.00
77,000.00 7,700.00
89,000.00 890.00
81,000.00 1,215.00
29,305.00

-
(A+B+C) 110,860.00
x D 14,411.80
(D+E) 125,271.80

A.4.4.2.3.

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
1,250.00 9,720.00
260,000.00 5,980.00
15,700.00
65,000.00 19,500.00
77,000.00 11,550.00
89,000.00 1,335.00
81,000.00 1,215.00
33,600.00

-
(A+B+C) 49,300.00
x D 6,409.00
(D+E) 55,709.00
An. Dihitung 12

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
19,000.00 410,400.00
19,000.00 103,360.00
21,000.00 42,000.00
27,000.00 33,372.00

589,132.00
330,000.00 330,000.00

330,000.00
-

-
(A+B+C) 919,132.00
x D 119,487.16
(D+E) 1,038,619.16

An. Dihitung 11

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
19,000.00 919,600.00

32,600.00 52,160.00
59,000.00 274,114.00

1,245,874.00
330,000.00 330,000.00

330,000.00
-

-
(A+B+C) 1,575,874.00
x D 204,863.62
(D+E) 1,780,737.62

An. Dihitung 10

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
597,000.00 2,388,000.00
67,000.00 536,000.00
380,000.00 1,140,000.00
60,000.00 60,000.00

4,124,000.00
65,000.00 2,808.00
81,000.00 5,832.00
89,000.00 640.80
81,000.00 194.40

9,475.20
-

-
(A+B+C) 4,133,475.20
x D 537,351.78
(D+E) 4,670,826.98
An. Dihitung 3

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
12,000.00 240,000.00
40,000.00 40,000.00
40,000.00 40,000.00
48,000.00 48,000.00
6,000.00 31,200.00
399,200.00
186,000.00 186,000.00
162,000.00 162,000.00
150,000.00 150,000.00
105,000.00 105,000.00
70,000.00 140,000.00
65,000.00 130,000.00
81,000.00 81,000.00
65,000.00 65,000.00
1,019,000.00
385,000.00 385,000.00
385,000.00
(A+B+C) 1,803,200.00
x D 234,416.00
(D+E) 2,037,616.00
= HSP 203,761.60

An. Dihitung 5

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
12,000.00 240,000.00
40,000.00 40,000.00
40,000.00 40,000.00
48,000.00 48,000.00
6,000.00 31,200.00
399,200.00
186,000.00 186,000.00
162,000.00 162,000.00
150,000.00 300,000.00
105,000.00 105,000.00
70,000.00 140,000.00
65,000.00 130,000.00
81,000.00 81,000.00
65,000.00 65,000.00
1,169,000.00
385,000.00 385,000.00
385,000.00
(A+B+C) 1,953,200.00
x D 253,916.00
(D+E) 2,207,116.00

= HSP 147,141.07

= HSP 208,218.49
An. Dihitung 4

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
120,000.00 120,000.00
-
-
120,000.00
186,000.00 186,000.00
162,000.00 162,000.00
182,000.00 182,000.00
150,000.00 150,000.00
70,000.00 70,000.00
750,000.00
2,200,000.00 2,200,000.00

2,200,000.00
(A+B+C) 3,070,000.00
x D 399,100.00
(D+E) 3,469,100.00
= HSP 34,691.00
An. Dihitung 6

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
12,000.00 5,400.00
40,000.00 400.00
40,000.00 40,000.00
48,000.00 48,000.00
6,000.00 31,200.00
76,500.00 7,650,000.00
1,530,000.00 306,000.00
8,081,000.00
186,000.00 186,000.00
162,000.00 162,000.00
150,000.00 150,000.00
105,000.00 105,000.00
70,000.00 70,000.00
65,000.00 65,000.00
81,000.00 81,000.00
65,000.00 65,000.00
884,000.00
385,000.00 385,000.00
385,000.00
(A+B+C) 9,350,000.00
x D 1,215,500.00
(D+E) 10,565,500.00
= HSP 105,655.00

An. Dihitung 7

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
434,000.00 9,982.00

9,982.00
65,000.00 7,800.00

7,800.00
-
-
(A+B+C) 17,782.00
x D 2,311.66
(D+E) 20,093.66
An. Dihitung 9

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
12,000.00 24,000.00
40,000.00 2,800.00
26,800.00
186,000.00 186,000.00
182,000.00 182,000.00
150,000.00 15,000.00
70,000.00 7,000.00
65,000.00 13,000.00
403,000.00
880,000.00 88,000.00

88,000.00
(A+B+C) 517,800.00
x D 67,314.00
(D+E) 585,114.00
An. Dihitung 18

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )

19,111,000.00 19,111,000.00
81,333.33 5,693,333.33
5,693,333.33 1,138,666.67
5,000.00 50,000.00
1,194,000.00 1,194,000.00
1,846,000.00 1,846,000.00
29,033,000.00

150,000.00 150,000.00
105,000.00 105,000.00
70,000.00 70,000.00
65,000.00 65,000.00
81,000.00 81,000.00
65,000.00 65,000.00
536,000.00
330,000.00 330,000.00
330,000.00
(A+B+C) 29,899,000.00
x D 3,886,870.00
(D+E) 33,785,870.00

An. Dihitung 8

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
12,000.00 18,000.00
40,000.00 2,000.00
3,000.00 3,000.00
23,000.00
85,000.00 8,500.00
70,000.00 14,000.00
65,000.00 13,000.00
35,500.00
385,000.00 38,500.00

38,500.00
(A+B+C) 97,000.00
x D 12,610.00
(D+E) 109,610.00

An. Dihitung 13

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
55,000.00 55,000.00
1,650,000.00 1,650,000.00
1,357,000.00 1,357,000.00
217,000.00 217,000.00
20,000.00 60,000.00
20,000.00 20,000.00
25,000.00 25,000.00
50,000.00 50,000.00
5,000.00 20,000.00
3,454,000.00
-

-
-

-
(A+B+C) 3,454,000.00
x D 449,020.00
(D+E) 3,903,020.00

An. Dihitung 14

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
1,200,000.00 1,200,000.00
800,000.00 800,000.00
145,000.00 145,000.00

2,145,000.00
275,000.00 275,000.00

275,000.00
1,650,000.00 1,650,000.00
550,000.00 550,000.00
825,000.00 825,000.00
6,000.00 6,000.00

3,031,000.00
(A+B+C) 5,451,000.00
x D 708,630.00
(D+E) 6,159,630.00
An. Dihitung 17

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
25,666.67 30,800.00
30,800.00 4,620.00
-
35,420.00
65,000.00 3,510.00
77,000.00 6,930.00
89,000.00 801.00
81,000.00 218.70
11,459.70

(A+B+C) 46,879.70
x D 6,094.36
(D+E) 52,974.06

An. Dihitung 16

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
5,750.00 50,600.00
50,600.00 7,590.00
-
42,000.00 42,000.00
200,000.00 200,000.00
44,000.00 44,000.00
70,000.00 70,000.00
32,000.00 32,000.00
446,190.00
65,000.00 14,040.00
77,000.00 27,720.00
89,000.00 3,204.00
81,000.00 874.80
45,838.80

(A+B+C) 492,028.80
x D 63,963.74
(D+E) 555,992.54

Karanganyar, ………………………… 2019

KEPALA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


KABUPATEN KARANGANYAR

EDHY SRIYATNO, ST, MT


NIP. 19600323 198703 1 007
An. Dihitung 19

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
25,666.67 30,800.00
25,666.67 8,983.33
-
39,783.33
65,000.00 3,510.00
77,000.00 6,930.00
89,000.00 801.00
81,000.00 218.70
11,459.70

(A+B+C) 51,243.03
x D 6,661.59
(D+E) 57,904.62

An. Dihitung 15

Harga Satuan Jumlah Total Harga


Bahan / Upah ( Rp. ) ( Rp. )
( Rp. )
72,000.00 864,000.00
72,000.00 25,200.00
43,000.00 129,000.00
1,018,200.00
#REF! #REF!
#REF! #REF!
833,652.78 116,711.39
#REF! #REF!
#REF! #REF!
#REF!
-

-
(A+B+C) #REF!
x D #REF!
(D+E) #REF!
= HSP #REF!

You might also like