SL - No Item Name Unit (Metre) Rate/mt. Total Amount
SL - No Item Name Unit (Metre) Rate/mt. Total Amount
SL - No Item Name Unit (Metre) Rate/mt. Total Amount
Total Amount
1 Lowering, Laying and Jointing true to line and lavel
RCC Hume pipes (NP-2 class) with specials including
collars and perfect linking of joints with jack to
correct position including cost of pipes & collars,
jointing materials i.e. C:M 1:3 proportion and tar
dipped hemp,including filling the execavated
trenches with approved quality saturated sand on
sides, bottom and top surface of pipe with all leads
and lifts, including giving hydraulic test to the
required pressure equal to 2.10 times the working
pressure (contractor will make his own
arrangements for procuring water for testing) 365.00 537.24 196092.60
Rupees= 196092.60