Professional Documents
Culture Documents
Irs M39 PDF
Irs M39 PDF
MC/STR/W/03 –Rev-1
Government of India
Ministry of Railways
For
Wire and Flux for Submerged Arc Welding as per IRS- M: 39 -
2001(With Amendment No. 1&2)
21.03.2011
2
1.0 SCOPE
This schedule covers the technical requirements for manufacture of Wire and Flux
for Submerged Arc Welding (SAW) as per IRS–M–39-01.
1.1 The welding consumables for submerged arc welding have been grouped as below
on the basis of infrastructure facilities, manufacturing process, quality control and
application at users end.
1.3 The firm should have the experience of at least three (3) years of manufacturing and
supplying/ exporting the applied welding consumables to the industries
manufacturing earth moving equipments, marine industries and thermal power
plants ( Enclose documentary evidences)
1.4 The firm should have annual turn over of minimum one (1) crore
1.5 The details of Manufacturing & testing facilities shall be submitted in format of
Annexure to STR as per Annex-I
1.6 The details about applied items and its test results as per Annex-III , IV&V
2.2.1 Wire drawing and Copper coating facilities consisting of Decoiler, Wire drawing
set, Pickling bath, Washing bath , Coppering bath, Rinsing bath, Finish drawing
and Coiling arrangement
2.3.1 GENERAL
2.3.1.1 The firm should have duly calibrated micrometer with least count 0.01mm. for
measurement of diameter of wire.
2.3.1.2 The firm should have arrangement for measurement of copper coating thickness
of wire by colorimeter/wet analysis method.
2.3.1.3 The firm should have SAW (Submerged Arc Welding) machine of capacity
minimum 500 Ampere and nozzle of various sizes for carrying out performance
test of wire.
2.3.2 MECHANICAL TESTING OF WIRE
2.3.2.1 The firm should have one duly calibrated universal testing machine of capacity
5 MT min. for carrying out UTS of finished wire.
2.3.3 CHEMICAL TESTING
2.3.3.1 The firm should have chemical testing laboratory consisting of Carbon-Sulphur
determination apparatus, Chemical balance, Hot plate, Muffle furnace (800ºC),
Electric oven, Barometer, Hygrometer, Platinum crucible, Glass-wares and
Chemicals.
3.0 REQUIREMENTS FOR SUBMERGED ARC WELDING
FLUX(F1,F2,F3,F4,&F5)
3.1 GENERAL
3.1.1 The firm manufacturing agglomerated flux should have well illuminated and
ventilated covered shed with sufficient height and space for various
manufacturing activities consisting of weighing of flux ingredients, Dry mixing,
Wet mixing, Agglomerating, Sieving of final product, Weighing of final flux
product and Packing.
The firm manufacturing fused flux should have well illuminated and ventilated
covered shed with sufficient height and space for various manufacturing activities
4
3.1.2 The firm should have separate identified area for storage of raw material, finished
product and scrap.
3.1.3 The firm should have separate welding room for performance test and test weld
preparations.
3.1.4 The firm should have separate laboratory for physical and chemical testing of raw
material and weld metal.
3.1.5 The firm should have mechanical testing laboratory for carrying out mechanical
test of weld metal.
3.1.6 Machining facilities at same location for preparation of test pieces from weld
assembly
ii) Shaping Machine – for shaping of test pieces, edge preparations on plates & back
gouging of welds.
iii) V-notch cutter with gauge for cutting of V notch on impact test pieces.
3.2.1.1 Sieve (B.S. Mesh size 10 or equivalent) for coarse screening of raw material.
3.2.1.2 Dry mixer, capacity 100 Kg. minimum, (generally electrically operated).
3.2.1.3 Wet mixer, capacity 100 Kg. minimum, (generally electrically operated).
3.2.1.6 Sieving set of B.S. mesh size 10, 40, 100 mesh or equivalent for sieving of
finished product.
3.2.1.7 Packing arrangement as per clause 5.6.2 or alternatively as per Clause 5.6.3 of
Amendment 2 of 2005 to IRS- M- 39 –01.
5
3.2.2.2 Dry mixer, capacity 100 Kg. minimum, (generally electrically operated).
3.2.2.3 Oil fired/Gas fired/Electric melting furnace, 15000C min. of adequate capacity,
for melting of charged dry mix.
3.2.2.5 Crushing Arrangement, Gyratory/Jaw crusher to crush the lumps to the required
grain size.
3.2.2.6 Drying oven, 2000C, of suitable capacity for drying of crushed flux.
3.2.2.7 Sieving set of B.S. mesh size 10, 40, 100 mesh or equivalent for sieving of
finished product.
3.2.2.8 Packing arrangement as per clause 5.6.2 or alternatively as per Clause 5.6.3
of Amendment 2 of 2005 to IRS- M- 39 –01.
3.3 TESTING FACILITIES
3.3.1 GENERAL
3.3.1.1 The firm should have facilities for determination of grain size distribution of
flux, measurement of tap density and moisture content of flux.
3.3.1.2 The firm should have facilities for determination of Basicity Index of flux by
XRF method or by Chemical Analysis method.
3.3.1.3 The firm should have SAW machine of capacity 1000 Amp. for performance
test and welding of test weld samples.
3.3.1.4 Radiographic(X –Rays or Gama Rays) test facility( Applicable for firms
applying for radiographic Quality welding consumables)
3.3.1.5 Metallurgical Microscope
3.3.2.2 The firm should have duly calibrated Impact Testing Machine capacity
30 kgfm (Charpy ‘V’ notch type test piece) with testing facilities at room
temperature, 0ºC, -20ºC and -46ºC depending upon the requirement of the
product offered.
6
2. Firm's address
(ii) Works/Factory
(iii) PHONE/FAX
3. Applied FOR TYPE OF CONSUMABLES :
4 Quality Policy
Format of Sr.9
S. Item Sample Frequency Parameters for Specifica- Acceptance Test Traceability
No. Size Inspection tion Criteria/Value
19. In House Testing facilities available for calibration with the firm
4.3
i) All the technical personnel responsible for supervision and handling of products and
quality control activities should have Degree in Mechanical Engineering /
Metallurgical Engineering with a minimum of three (3) years experience and should
be working in the firm as regular employees
ii) Artisan staff like machinist, welder and fitter should have ITI qualification in
respective trade and time to time they should have been imparted training from
recognized institution in the respective trades( Enclose training documents)
4.4 The vendor shall have acquired ISO Certification ISO : 9001 : 2000 version in
respect of all the products applied for and the same shall be covered in the
certification.
4.5 There should exist a quality manual of the firm indicating the extent of control over
production and testing.
4.6 The firm should ensure that proper analysis is being done on monthly basis to study
the rejection at various internal stages and it is documented.
4.7 The firm should ensure that all the relevant specifications and IS standards are
available with them.
4.8 The firm should ensure that proper record of complaints received from users
(Railways) is being maintained and corrective action is taken.
4.9 Calibrated quality control measuring equipment/instrument like UTM, Impact testing
machine, Vernier callipers/Screw guage, Tong tester, Weight boxes etc. shall be
used.
4.10 Minimum Qty. specified for up-gradation from Pt-II to Pt-I status as per Annex -II
9
Annex-I
ANNEXURE TO STR
S.No. STR para Requirement of M&P/T&P as per STR Details of the M&P/T&P available with the firm
no.
Name of M&P/T&P Range / Name of M&P/T&P Model Make Machine Year Range/ Proof of
Capacity of no. of Capacity ownership
M&P/T&P Built
Annex-II
2 Group-VIIIB 5,000Kg
11
Annex-III
Head Office :
Works/Factory :
PHONE/FAX :
8. Special characteristics/
recommendation for the brand, if
any :
Note :
1. All the items are to be filled properly. Please write N.A. if not applicable.
Form will be rejected without any further reference.
Encl :
Sample IRS Grade Batch No. Date of Size (mm) Packaging as per Quality of wire & Wire spool
Code of Wire manufacture IRS : M-39-01 ( as per IRS M 39-01)
No./Brand
Wire Wire spool
Specified value as
per IRSM -39/01
Note : Please fill up all the boxes. Write N.A. if not applicable.
Signature of QC Incharge/Chemist
14
Annex-V 14
BTC STANDARD FORMAT FOR
Test Results For SAW Flux
Test No……………….. Dt : …………………
1. Sample Details :
Sample IRS Batch Date of Type of Packaging Grade, Brand & Weld Parameters*
Code Grade of No. manufacture Flux ( as per IRS : Size of Wire Used
Voltage Current Travel speed
No./Brand Flux M-39-01) in combination
Specified value as
per IRSM -39/01
3. Mechanical Properties:
a) Multirun All weld :
Properties Radiography/Ultrasonic UTS YS %age El. on %age Charpy impact value (Joule)
IIW Blue/RDSO procedure N/mm2 N/ mm2 5d G.L. R.A. Ind. Values Av. Temp oC
No. MC-4 (min.3 values)
As obtained