Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 11

Krishna Buildestate Pvt. Ltd.

Sec.-150
CUSHMAN & EAKEFIELD
Excavation work
Date 10/09/2019

Method Statement
For
Excavation Work

Prepared By Reviewed By Approved By

ARUN KUMAR RAVINDRA


CHAUHAN
QC Engg. (KBE) SR. GM (KBE)

1|Page
Krishna Buildestate Pvt. Ltd.
Sec.-150
CUSHMAN & EAKEFIELD
Excavation work
Date 10/09/2019

2|Page
Krishna Buildestate Pvt. Ltd.
Sec.-150
CUSHMAN & EAKEFIELD
Excavation work
Date 10/09/2019

EXCAVATION:-
Excavation is the process of creating space by removing earth (soil or rock) to

place a utility or structure. Several methods are available to achieve

excavation. In all methods, excavation safety plays a crucial role. Some

popular methods of excavation are:

3|Page
Krishna Buildestate Pvt. Ltd.
Sec.-150
CUSHMAN & EAKEFIELD
Excavation work
Date 10/09/2019

 Open excavations.

 Thrust boring

 Horizontal Directional Drilling

 Micro tunnelling for Pipe Jacking

 Pile foundations and diaphragm walls

 Raise boring

 Tunnelling

OPEN EXCAVATION:-
Open excavation is a surface excavation suitable up to 6.0 meter deep. Trench

excavation is also an open excavation, but the depth exceeds the width of

excavation. Open excavation is mainly used for foundations, placing pipes and

cables for utility services, test pits, borrow pits and road formations.

Open excavation is one of the most hazardous construction operations.

Among excavation related dangers, cave-ins pose the greatest risk. Many

constructions fatal accidents occurred during excavation. Therefore it’s vital to

prepare a safe work method statement for carrying any excavation activity.

PURPOSE:-
Any open excavation deeper than 1.5 meter requires side protection by

sloping, benching or shoring. This method statement describes the excavation

safety requirements and safe work procedure for all open excavations. It

4|Page
Krishna Buildestate Pvt. Ltd.
Sec.-150
CUSHMAN & EAKEFIELD
Excavation work
Date 10/09/2019

summarizes suggested method of executing works safely within any

constraints. This method statement offers advice and guidance to the

personnel involved in this activity to:

a) Carry works in a manner that’s safe at all times;

b) Know the hazards involved in the activity;

c) Ensure controls to steer clear of hazard exposure are in place.

Use any other resources and methods not referred to in this method

statement to suit the project requirement. Always execute the work safely

complying with the required standard.

The sequence of activities is a repetitive process and many hazards are

common to distinct sites. Include with detail, any crucial information specific

to the project. Always follow the approved checklists prior to the start of the

activity.

WHAT THIS METHOD STATEMENT


COVERS:-
The scope of this document covers:

 Safe work method and procedure for carrying open excavation works

 Materials, equipment, and tools needed to carry out the excavation activity

5|Page
Krishna Buildestate Pvt. Ltd.
Sec.-150
CUSHMAN & EAKEFIELD
Excavation work
Date 10/09/2019

 Applicable standards throughout the execution of the project

STANDARDS FOR EXCAVATION SAFETY:-


 OSHA 2226-10R 2015: Trenching and Excavation Safety

 IS 3764: Indian Standard for Excavation work – Code of safety

 IS/ISO 20474-1: Indian Standard for Earth moving machinery – Safety

 IS 10386 (Part 8): Indian Standard for construction operation, operation, and

maintenance of river valley projects (Part 8: Open excavation) – Safety code

 IS 3696 (Part 2): Indian Standard for

scaffolds and ladders – Code of safety

 IS 4081: Indian Standard for blasting

Safety and related drilling operation – Code


Safety Footwea Safety
Helmet r Glasses of safety

PERSONAL PROTECT
IVE EQUIPMENT AND
SAFETY GEAR:-
Below are the suggested PPE for

excavation:

Safety
ladder

Safety Safety
Vest barrier

Refer standard operating procedure of

PPE for further PPE details

6|Page
Safety Safety
Cone Flags
Krishna Buildestate Pvt. Ltd.
Sec.-150
CUSHMAN & EAKEFIELD
Excavation work
Date 10/09/2019

PROCEDURE FOR EXCAVATION:-


 Get relevant data of subsurface soil and water table location

 Design excavation sides and protective system based on the size of excavation

and type of soil. Three popular methods to protect excavation sides are:

1. Sloping the walls

Sloping the walls for excavation safety

2) Bench Excavation

7|Page
Krishna Buildestate Pvt. Ltd.
Sec.-150
CUSHMAN & EAKEFIELD
Excavation work
Date 10/09/2019

Benching for excavation safety

3) Supported excavation by shoring up the walls with wood or metal supports

Supported excavation

 Finalize excavation and soil removal method namely mechanically or manual

 Locate underground utilities like electric cables, Optical fiber cables (OFC),

Pipeline etc. with cable detector and pipe detector.

 Assess for a chance of chemical hazard or low oxygen levels

 Intimate or take permission as needed from the underground utility operator

 Get work permit for excavation work

 Barricade the excavation area to keep vehicles, equipment, and personnel

away from the excavation

 Make proper lighting arrangements

 Inspect the arrangements with a competent person before the start of

excavation work

8|Page
Krishna Buildestate Pvt. Ltd.
Sec.-150
CUSHMAN & EAKEFIELD
Excavation work
Date 10/09/2019

 Carry manual excavation until exposure of underground utilities. Allow

mechanical excavation only after exposure of underground utilities

 Make safe access and egress arrangements for personnel and equipment at

least from two sides

 Excavation should be kept free from water. Water in an excavation can weaken

the surfaces of the excavation. Dewater whenever water accumulates. If

required, put essential shoring to protect persons working.

 Carry the balance excavation with excavators

PRECAUTIONS FOR SAFE EXCAVATION:-


 Within 2.0 meters of excavation edge, permit only excavation equipment.

Don’t allow any other equipment near excavation edge since the weight of the

machines can fall trench walls.

 Cranes should maintain a safe distance equal to the depth of excavation from

the edge of the excavation

 Deposit excavated soil along with other materials at least 0.61 meters from the

edge. Place soft barricades for pedestrians at least 1.0 meter from the edge.

Scaffold posts, loose materials along with any loads shall be at a distance of 1.5

times excavation depth away from the edge. Provide hard barricades for vehicles

at least 2.0 meter from the edge.

 Only authorized persons should enter the excavation

 Keep flagman with a red flag in busy and risky locations to guide vehicular

traffic

9|Page
Krishna Buildestate Pvt. Ltd.
Sec.-150
CUSHMAN & EAKEFIELD
Excavation work
Date 10/09/2019

 Keep signalman to guide equipment operation safely

 Use blinking warning lights where the pedestrian or vehicular traffic is

expected.

 Provide additional bracing and shoring in the vicinity of the source of vibration

such as Pile driving rigs to prevent slides, slips or cave-in where excavations.

 Provide one ladder per 15 meters of length. Extend the ladder for one meter

above the top of the cut

 Prohibit persons in the path of an excavator turning bucket

 Prohibit lone workers without a supervisor

 Wherever presence of insects, leeches, and snakes is possible, make

arrangements for repellents, fumigation and first aid as needed.

 Carry earth work inspection daily

COMMON EXCAVATION SAFETY HAZARDS:-


 Quicksand condition

 Side walls become highly unstable following rainfall due to water content

 Vibrations from nearby machinery, railroad, blasting, and other sources

 The surcharge imposed by nearby buildings

EXCAVATION SAFETY CHECKLIST:-


 Approved excavation drawing available

10 | P a g e
Krishna Buildestate Pvt. Ltd.
Sec.-150
CUSHMAN & EAKEFIELD
Excavation work
Date 10/09/2019

 Presence of underground utilities located and marked

 Barricades, safety signs, and lighting are in place

 Excavation slope protection system finalized like sloping, shoring or benching

 Entry and exit means for personnel and equipment

 Dewatering arrangements made wherever water is expected.

 Flagmen are positioned to guide vehicular traffic

 Emergency rescue equipment is in place

 Excavation permit available

Please follow the standard practice of daily checklist, weekly

inspection and monthly audit for safe excavation.