UPGRADATION OF STRETCH OF SH 317 FROM KALAMB- RALEGAON-

WADKI (CH. 0+000 TO CH. 50+632 JOINING NH 7) TO TWO LANE WITH


PAVED SHOULDER IN THE STATE OF MAHARASHTRA ON EPC MODE

EPC CONTRACTOR: DILIP BUILDCON LIMITED


PLOT NO : 5, INSIDE GOVIND NARYAN
SINGH GATE ,CHUNA BHATTI, KOLAR ROAD
BHOPAL - 462016 (M.P.)

CLIENT: MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION LTD.

AUTHORITY TPF ENGINEER PVT. LTD. IN ASSOCIATION WITH


ENGINEER : INFINITE CIVIL SOLUTION PVT. LTD.

PROOF CIVILBABA INFRA CONSULTANT PVT. LTD.


CONSULTANT : #1B, TOWER-5, CENTRAL PARK-2, SOHNA ROAD,
GURGAON-122018

HYDRAULIC CALCULATIONS FOR MNB AT PROP. CH. 00+759

DESIGN NOTE: 17032-MB-PS-DC-0013-01-R0


PAGES: 1 + 9 = 10

DATE REV DESCRIPTION DESIGNED CHECKED APPROVED

2-Sep-17 R0 FOR REVIEW MC SK SK

DESIGN DIRECTOR: SAHANAWAZ KHAN


17032-MB-PS-DC-0013-01-R0

HYDRAULIC CALCULATIONS FOR MNB AT PROP. CH. 00+759


CONTENTS

SR NO SUBJECT
1 Data
1.1 Bridge Data
1.2 River Data
2 Discharge Calculations Summary & Obstruction Calculations
2.1 Summary
2.2 Obstruction Calculations
2.3 Afflux Calculations
3 Scour Depth Calculations
4 Summary Of Hydraulic Features
5 George Data
6 Discharge Calculations

1
17032-MB-PS-DC-0013-01-R0

HYDRAULIC CALCULATIONS FOR MNB AT PROP. CH. 00+759


1 DATA:
1.1 BRIDGE DATA:
1 Distance of Abutment A1 = -9.250 m (frm Centre) (-ve)
2 Distance of Abutment A2 = 9.250 m (frm Centre) (+ve)
3 No of Pier = 3.000 nos
4 Spacing = 4.625 m
5 Width of Pier = 0.000 m
1.2 RIVER DATA:
1 Catchment Area = 2.70 km2
2 Observed HFL = 274.009 m
4 UpStream = RL 272.572 m @ dist. 130 m
5 DownStream = RL 271.191 m @ dist. 142 m
3 Bed Surface = (3) Winding, some pools and shoals, clean
4 Bed Condition = Fair
5 Bed Slope, S = 0.0051 = 1 in 197
6 The rugosity Co-efficient, n = 0.045
7 Silt Factor, Ksf = 1.50
8 Increase in Discharge = 30 %
2 DISCHARGE CALCULATIONS SUMMARY & OBSTRUCTION CALCULATIONS:
2.1 SUMMARY
SR Methods Discharge HFL Area Velocity
No m3/s m m2 m/s
1 Observed HFL 28.86 274.009 20.951 1.378
2 Dicken's Formula 29.49 273.944 19.550 1.508
3 Rational Formula 31.85 274.076 23.088 1.379
For Design,
Rational Formula 31.85 274.076 23.088 1.380
Vertical Clearance = 0.90 m

2.2 OBSTRUCTION CALCULATIONS:


SR Element CH. RL of Bed Avg Obst. Discharge
No Width Area
1 Abutment A1 -9.250 274.497 0.000 0.000 0.000
2 PIER 1 -4.625 274.215 0.000 0.000 0.000
12 Abutment A2 9.250 272.792 0.000 0.000 0.000
13 Other obstruction (A1 Side) 0.000 0.000
14 Other obstruction (A2 Side) 8.654 7.419
Total 8.654 7.420
Obstructed Discharge = 23.30 %

2.3 AFFLUX CALCULATIONS:


As per Molesworth Formula, Afflux is given by,
 V2  A  2 

h    0.01524     1
 17 . 88  
a 

Afflux, h = (1.38^2/17.88+0.01524)x((23.088/(23.088-8.654))^2-1) = 0.190 m
AHFL = 274.266 m
Obstructed Velocity = VxQ/q = 1.38 x 31.846 / ( 31.846 - 7.42 )
= 1.799 m/s

2
17032-MB-PS-DC-0013-01-R0

HYDRAULIC CALCULATIONS FOR MNB AT PROP. CH. 00+759


2.4 LINEAR WATERWAY CALCULATIONS FOR GOVERNING CASE:
Design Discharge = 31.85 m3/s
Velocity of Flow = 1.800 m/s
Depth of Flow = 1.730 m
Linear Waterway req. = (Discharge / (Velocity x Depth of Flow) )
= (31.85/(1.8x1.73)) = 10.228 m
3 SCOUR DEPTH CALCULATIONS:
As per Clause 703.2, IRC:78-2000
>> Normal Scour Depth,
Q = Discharge in m3/s = 31.85 m3/s
Actual Water Way = 18.50 m
Effective Water Way, We = 18.50 m
>> % Incr. in Design Discharge = 30 % = 41.4 m3/s
2 1/3
>> dsm = 1.34 (Db /Ksf)
Db = Design discharge for foundation per metre width of eff. waterway
Db = Q/We
We = 18.500 m
Q = 41 m (as computed above)
Db = 2.240 m
Ksf = 1.500 m
>> dsm = 1.34 x (2.24^2 / 1.5)^(1/3) = 2.004 m
As per IRC:SP:13-2004, Cl 21.1.2
Length of apron on U/S side req. = 1.5 x dsm = 3.006 m
Length of apron on D/S side req. = 2.0 x dsm = 4.008 m

4 SUMMARY OF HYDRAULIC FEATURES:


1 Design Discharge = 31.85 m3/s
2 Design HFL = 274.076 m
3 Afflux = 0.190 m
4 AHFL = 274.266 m
5 Linear Water Way Required = 10.228 m
6 Eff. Water Way Provided = 18.500 m
7 Obstructed Area = 23.300 %
8 Obstructed Velocity = 1.799 m/s
9 Bed slope = 0.0051
5 GORGE DATA:
CH. (X) RL (Y)
36 -72 276.628
35 -70 276.619
34 -68 276.579
33 -66 276.539
32 -64 276.499
31 -62 276.459
30 -60 276.419
29 -58 276.38
28 -56 276.339
27 -54 276.297
26 -52 276.255
25 -50 276.175
24 -48 276.089
23 -46 276.002
3
17032-MB-PS-DC-0013-01-R0

HYDRAULIC CALCULATIONS FOR MNB AT PROP. CH. 00+759


22 -44 275.911
21 -42 275.791
20 -40 275.457
19 -38 275.344
18 -36 275.325
17 -34 275.306
16 -32 275.287
15 -30 275.268
14 -28 275.25
13 -26 275.231
12 -24 275.249
11 -22 274.986
10 -20 274.736
9 -18 274.669
8 -16 274.695
7 -14 274.584
6 -12 274.469 277
5 -10 274.485 276.5
4 -8 274.517 276
3 -6 274.339 275.5
2 -4 274.159 275
1 -2 273.702 274.5
0 0 273.109 274
1 2 272.786 273.5
2 4 272.543 273
3 6 272.536 272.5
4 8 272.663 272
5 10 272.869 -100 -50 0 50 100
6 12 273.022
7 14 273.039
8 16 273.340
9 18 273.941
10 20 274.079
11 22 274.025
12 24 273.986
13 26 273.958
14 28 274.049
15 30 274.055
16 32 274.104
17 34 274.155
18 36 274.206
19 38 274.257
20 40 274.31
21 42 274.362
22 44 274.416
23 46 274.47
24 48 274.525
25 50 274.58
26 52 274.637
27 54 274.702
28 56 274.913

4
17032-MB-PS-DC-0013-01-R0

HYDRAULIC CALCULATIONS FOR MNB AT PROP. CH. 00+759


29 58 275.159
30 60 275.251
31 62 275.254
32 64 275.251
33 66 275.245
34 68 275.122

6 DISCHARGE CALCULATIONS:
6.1 OBSERVED HFL:
6.1.1 DISCHARGE:
HFL = 274.009 m
2 1
Q = AV = A  R 3
 S 2

A P R Q
m2 m m m3/s
C1 0.00 0.00 0.00 0.00
C2 13.59 12.77 1.06 22.42
C3 7.37 18.00 0.41 6.43
TOTAL 20.95 28.9

6.1.2 CALCULATIONS:
C-1 Chainage GL HFL HT AVG Dist. C/S area Ht. Diff. Wetted
HT Perimeter
(m) (m) (m) (m) (m) (m) (m2) (m) (m)
-3.344 274.009 274.009 0.000
0.0000 0.0000

C-2 Chainage GL HFL HT AVG Dist. C/S area Ht. Diff. Wetted
HT Perimeter
(m) (m) (m) (m) (m) (m) (m2) (m) (m)
-3.344 274.009 274.009 0.000 0.2 1.34 0.206 0.307 1.378
-2.000 273.702 274.009 0.307 0.6 2.00 1.207 0.593 2.086
0.000 273.109 274.009 0.900 0.6
2.000 272.786 274.009 1.223 1.1 2.00 2.123 0.323 2.026
4.000 272.543 274.009 1.466 1.3 2.00 2.689 0.243 2.015
6.000 272.536 274.009 1.473 1.5 2.00 2.939 0.007 2.000
8.000 272.663 274.009 1.346 1.4 2.00 2.819 0.127 2.004
9.250 272.792 274.009 1.217 1.3 1.25 1.602 0.129 1.257
13.59 12.7655

5
17032-MB-PS-DC-0013-01-R0

HYDRAULIC CALCULATIONS FOR MNB AT PROP. CH. 00+759


C-3 Chainage GL HFL HT AVG Dist. C/S area Ht. Diff. Wetted
HT Perimeter
(m) (m) (m) (m) (m) (m) (m2) (m) (m)
9.250 272.792 274.009 1.217
10.000 272.869 274.009 1.140 1.2 0.75 0.884 0.077 0.754
12.000 273.022 274.009 0.987 1.1 2.00 2.127 0.153 2.006
14.000 273.039 274.009 0.970 1.0 2.00 1.957 0.017 2.000
16.000 273.340 274.009 0.669 0.8 2.00 1.639 0.301 2.023
18.000 273.941 274.009 0.068 0.4 2.00 0.737 0.601 2.088
20.000 274.079 274.009 -0.070 0.0 2.00 -0.002 0.138 2.005
22.000 274.025 274.009 -0.016 0.0 2.00 -0.086 0.054 2.001
24.000 273.986 274.009 0.023 0.0 2.00 0.007 0.039 2.000
26.000 273.958 274.009 0.051 0.0 2.00 0.074 0.028 2.000
27.121 274.009 274.009 0.000 0.0 1.12 0.029 0.051 1.122
7.3656 17.9989

6.2 DICKENS FORMULA:


Q = CM3/4
Q = the peak run-off in m3/s
C = 11-14 where the annual rainfall in 60-120 cm
= 14-19 where the annual rainfall in more than 120cm
= 22 in Western ghats
= 14
M = The area of the catchment in sq.km = 2.700 km2
Q = 14 x 2.7^(3/4)
Q = 29.49 m3/s
6.2.1 DISCHARGE:
2 1
Q = AV = A  R 3  S 2
n
A = Cross Sectional area A
P = Wetted Perimeter
R = the hydraulic mean depth = A / P
P = wetted perimeter, in m
S = the energy slope which may be taken equal to the bed slope,
n = the rugosity co-efficient
A P R Q
m2 m m m3/s
C1 0.00 0.00 0.00 0.00
C2 12.78 12.47 1.02 20.55
C3 6.77 8.91 0.76 8.93
TOTAL 19.55 29.49 Diff = 0.0 m3/s

6.2.2 CALCULATIONS:
C-1 Chainage GL HFL HT AVG Dist. C/S area Ht. Diff. Wetted
HT Perimeter
(m) (m) (m) (m) (m) (m) (m2) (m) (m)
-3.059 273.944 273.944 0.000
0.000 0.000

6
17032-MB-PS-DC-0013-01-R0

HYDRAULIC CALCULATIONS FOR MNB AT PROP. CH. 00+759


C-2 Chainage GL HFL HT AVG Dist. C/S area Ht. Diff. Wetted
HT Perimeter
(m) (m) (m) (m) (m) (m) (m2) (m) (m)
-3.059 273.944 273.944 0.000 0.1 1.06 0.128 0.242 1.086
-2.000 273.702 273.944 0.242 0.5 2.00 1.077 0.593 2.086
0.000 273.109 273.944 0.835 0.5
2.000 272.786 273.944 1.158 1.0 2.00 1.993 0.323 2.026
4.000 272.543 273.944 1.401 1.3 2.00 2.559 0.243 2.015
6.000 272.536 273.944 1.408 1.4 2.00 2.809 0.007 2.000
8.000 272.663 273.944 1.281 1.3 2.00 2.689 0.127 2.004
9.250 272.792 273.944 1.152 1.2 1.25 1.521 0.129 1.257
12.775 12.474

C-3 Chainage GL HFL HT AVG Dist. C/S area Ht. Diff. Wetted
HT Perimeter
(m) (m) (m) (m) (m) (m) (m2) (m) (m)
9.250 272.792 273.944 1.152
10.000 272.869 273.944 1.075 1.1 0.75 0.835 0.077 0.754
12.000 273.022 273.944 0.922 1.0 2.00 1.997 0.153 2.006
14.000 273.039 273.944 0.905 0.9 2.00 1.827 0.017 2.000
16.000 273.340 273.944 0.604 0.8 2.00 1.509 0.301 2.023
18.000 273.941 273.944 0.003 0.3 2.00 0.607 0.601 2.088
18.043 273.944 273.944 0.000 0.0 0.04 0.000 0.003 0.043
6.775 8.914

6.3 RATIONAL FORMULA:


1 Catchment Area A = 2.700 km2
= 270 Hec
2 Length of Longest Stream L = 2 km
3 Elevation Difference H = 9 m
4 Max Rainfall Intensity F = 10.24 cm (Ref: subzone 3(f))
5 Duration of storm T = 1 hr

One hour rainfall intensity


I0 = F x (T + 1) (Ref: Pg. 15-SP:13-2004)
2T
= 10.24 x (1 + 1)
2 x1
= 10.24 cm
Time of Concentration tc (Ref: Pg. 12-SP:13-2004)
tc = (0.87 x L3/H) 0.385
= (0.87 x 2^3/9)^0.385
= 0.9057768 Hr.
Critical Intensity of rainfall in cm per hour (Ref: Pg. 12-SP:13-2004)
IC = I0 x 2
tc+1
= 10.24 x 2 / (0.905776796607835 + 1)
= 10.746274 cm/hr
Coeff of runoff P = 0.4 (Ref: Table 4.1-SP:13-2004)
Fraction  = 0.980 (Ref: fig. 4.2-SP:13-2004)

7
17032-MB-PS-DC-0013-01-R0

HYDRAULIC CALCULATIONS FOR MNB AT PROP. CH. 00+759


Design Discharge Q (Ref: Pg.13-SP:13-2004)
Q = 0.028 x P x  x A x IC
= 0.028 x 0.4 x 0.98 x 270 x 10.746
= 31.85 Cumec

6.3.1 DISCHARGE:
Q = 31.85 m3/s
2 1
Q = AV =
A  R 3
 S 2

A P R Q
m2 m m m3/s
C1 0.00 0.00 0.00 0.00
C2 14.43 13.06 1.10 24.43
C3 8.65 21.72 0.40 7.42
TOTAL 23.09 31.85 Diff = 0.00 m3/s

6.3.2 CALCULATIONS:
C-1 Chainage GL HFL HT AVG Dist. C/S area Ht. Diff. Wetted
HT Perimeter
(m) (m) (m) (m) (m) (m) (m2) (m) (m)
-3.635 274.076 274.076 0.000
0.0000 0.0000

C-2 Chainage GL HFL HT AVG Dist. C/S area Ht. Diff. Wetted
HT Perimeter
(m) (m) (m) (m) (m) (m) (m2) (m) (m)
-3.635 274.076 274.076 0.000 0.2 1.64 0.306 0.374 1.677
-2.000 273.702 274.076 0.374 0.7 2.00 1.340 0.593 2.086
0.000 273.109 274.076 0.967 0.7
2.000 272.786 274.076 1.290 1.1 2.00 2.256 0.323 2.026
4.000 272.543 274.076 1.533 1.4 2.00 2.822 0.243 2.015
6.000 272.536 274.076 1.540 1.5 2.00 3.072 0.007 2.000
8.000 272.663 274.076 1.413 1.5 2.00 2.952 0.127 2.004
9.250 272.792 274.076 1.284 1.3 1.25 1.685 0.129 1.257
14.435 13.0648

8
17032-MB-PS-DC-0013-01-R0

HYDRAULIC CALCULATIONS FOR MNB AT PROP. CH. 00+759


C-3 Chainage GL HFL HT AVG Dist. C/S area Ht. Diff. Wetted
HT Perimeter
(m) (m) (m) (m) (m) (m) (m2) (m) (m)
9.250 272.792 274.076 1.284
10.000 272.869 274.076 1.207 1.2 0.75 0.934 0.077 0.754
12.000 273.022 274.076 1.054 1.1 2.00 2.260 0.153 2.006
14.000 273.039 274.076 1.037 1.0 2.00 2.090 0.017 2.000
16.000 273.340 274.076 0.736 0.9 2.00 1.772 0.301 2.023
18.000 273.941 274.076 0.135 0.4 2.00 0.870 0.601 2.088
20.000 274.079 274.076 -0.003 0.1 2.00 0.131 0.138 2.005
22.000 274.025 274.076 0.051 0.0 2.00 0.047 0.054 2.001
24.000 273.986 274.076 0.090 0.1 2.00 0.140 0.039 2.000
26.000 273.958 274.076 0.118 0.1 2.00 0.207 0.028 2.000
28.000 274.049 274.076 0.027 0.1 2.00 0.144 0.091 2.002
30.000 274.055 274.076 0.021 0.0 2.00 0.047 0.006 2.000
30.843 274.076 274.076 0.000 0.0 0.84 0.009 0.021 0.844
8.6539 21.7225

You might also like