ANDHRA PRADESH STATE WAREHOUSING CORPORATION

VIJAYAWADA
Tour Programme of V.SURENDRA DY. EXECUTIVE ENGINEER

Date APSWC,Vijayawada,
From Date for the To
Month of March-2019.
Purpose of Journey
Vijayawada To attended Lintel beam concrete
Kothamajeru
1.30 PM work.
01.03.2019 01.03.2019 Vijayawada
Kothamajeru 08.00 PM Returned to Head Quarters.

Vijayawada
08.00 AM Nagayalanka To attend marking of godowns.
02.03.2019 02.03.2019
Vijayawada
Nagayalanka Returned to Head Quarters.
08.00 PM
Vijayawada
Toattend metal layers in godown
08.00 AM Edlapadu
Flooring.
05.03.2019 05.03.2019
Vijayawada
Edlapadu Returned to Head Quarters.
08.00 PM
Vijayawada
Keesara To inspect Tobaco Board land
10.00 AM
06.03.2019 06.03.2019
Vijayawada
Keesara Returned to Head Quarters.
04.00PM

Vijayawada To attend Flooring Works in


Edlapadu
08.00 AM godown.
07.03.2019 07.03.2019
Vijayawada
Edlapadu Returned to Head Quarters.
08.00 PM
Vijayawada To attend Flooring Works in
Edlapadu
08.00 AM godown.
08.03.2019 08.03.2019
Vijayawada
Edlapadu Returned to Head Quarters.
08.00 PM
Vijayawada To attend Flooring Works in
Edlapadu
08.00 AM godown.
09.03.2019 09.03.2019
Vijayawada
Edlapadu Returned to Head Quarters.
08.00 PM
Vijayawada To attend gravel base in godown
Piduguralla
08.00 AM Flooring.
10.03.2019 10.03.2019
Vijayawada
Piduguralla Returned to Head Quarters.
08.00 PM
Vijayawada To attend Executive Engineer's
Edlapadu
09.00 AM inspection.
11.03.2019 11.03.2019
Vijayawada
Edlapadu Returned to Head Quarters.
06.00 PM

Vijayawada
Edlapadu To attend CC flooring in godowns
08.00 AM
12.03.2019 12.03.2019
Vijayawada
Edlapadu Returned to Head Quarters.
08.00 PM
Vijayawada
Edlapadu To attend CC flooring in godowns
08.00 AM
13.03.2019 13.03.2019
Vijayawada
Edlapadu Returned to Head Quarters.
08.00 PM
Vijayawada
Edlapadu To attend CC flooring in godowns
08.00 AM
14.03.2019 14.03.2019
Vijayawada
Edlapadu Returned to Head Quarters.
08.00 PM
Vijayawada To handover site to contractor for
Nagayalanka
08.00 AM commencemet of work.
15.03.2019 15.03.2019
Vijayawada
Nagayalanka Returned to Head Quarters.
08.00 PM
Vijayawada To conduct CAD survery and to
Gannavaram
07.00 AM take site levels.
To conduct CAD survery and to
18.03.2019 Gannavaram 18.03.2019 Velagaleru
take site levels.
Vijayawada
Velagaleru Returned to Head Quarters.
07.00 PM
Vijayawada To attend Weigh bridge works,CC
Edlapadu
08.00 AM flooring in Godowns.
19.03.2019 19.03.2019
Vijayawada
Edlapadu Returned to Head Quarters.
08.00 PM
Vijayawada To attend PCC to columns of
Nagayalanka
10.00AM G.no:-1
21.03.2019 21.03.2019
Vijayawada
Nagayalanka Returned to Head Quarters.
03.00 PM
Vijayawada To attend Executive Engineer's
Edlapadu
09.00 AM inspection.
To attend Executive Engineer's
23.03.2019 Edlapadu 23.03.2019 Piduguralla
inspection.
Vijayawada
Piduguralla Returned to Head Quarters.
05.00 PM

Submitted for approval please.


Deputy Executive Engineer,
APSWC,Vijayawada.
ANDHRA PRADESH STATE WAREHOUSING CORPORATION
Tirupati
Tour Programme of Sri V. ANANDA REDDY / DY. EXECUTIVE ENGINEER
APSWC,Tirupati, for the Month of Dec-2016.

Date From Date To Purpose of Journey


Bogole,
Tirupati
01.12.2016 Nellure To inspect the work at Nellure, Bogole,
06:00 A.M Halt Nellure
to 09:00 AM and Kavali and back to Head Quarters is
02.12.2016 Nellure Tirupati Tirupathi.
04:00PM 10:00 PM

Bogaole.
Tirupati
Kavali 10:30 Inspection of Godown work at Nellure,
06.00 A.M
04.12.2016 04.12.2016 AM Bogole, and Kavali and back to Head
Quarters is Tirupathi.
Kavali Tirupati
06.00 PM 10.00 PM
Nellure,
Tirupati Bogole,
06:00 A.M Kavali. Inspection of Godown work at Nellure,
08.12.2016 08.12.2016 01:30 AM Bogole, and Kavali and back to Head
Quarters is Tirupathi.
Kavali Tirupati
06:00PM 10:30 PM

Tirupati Nellure
10.12.2016 To 06:00 A.M 09:00 AM Inspection of Godown work at Nellure,
11.12.2016 Halt Nellure Bogole, and Kavali and back to Head
Kavali Tirupati Quarters is Tirupathi.
05:00PM 10:00 PM
Tirupati Nellure
06.00A.M 09.00 AM Inspection of Godown work at Nellure,
14.12.2016 To
15.12.2016
Halt Nellure Bogole, and Kavali and back to Head
Kavali Tirupati Quarters is Tirupathi.
04.00 PM 10.30 PM
Tirupati Nellure
20.12.2016 05:30 A.M 09:00 AM Inspection of Godown work at Nellure,
to Halt Nellure Bogole, and Kavali and back to Head
21.12.2016 Bogole Tirupati Quarters is Tirupathi.
04:00PM 09:00 PM
Tirupati Nellure
24.12.2016 05:30 A.M 09:00 AM Inspection of Godown work at Nellure,
to Halt Nellure Bogole, and Kavali and back to Head
25.12.2016 Kavali Tirupati Quarters is Tirupathi.
04:00PM 09:30 PM
Chitture
Pileru,Tirupat
Tirupati hi,Manubolu, Accumpained with EE, To inspect the
28.12.2016 08:00 A.M Nellure,Bobol works at Chitture
to Halt Nellure e,Kavali. Pileru,Tirupathi,Manubolu,Nellure,
30.12.2016 Bogole,Kavali.and back to Head
01:00 PM
Quarters is Tirupathi.
Nellure Tirupati
05:00PM 09:30 PM

Submitted for approval please.

Deputy Executive Engineer,


APSWC,Tirupati.
ANDHRA PRADESH STATE WAREHOUSING CORPORATION
Tirupati
Tour Programme of Sri V.ANANDA REDDY / DY. EXECUTIVE ENGINEER
APSWC,Tirupathi, for the Month of MARCH-2017.

Date From Date To Purpose of Journey

Tirupati Chittor
02.03.2017 07:30 A.M 09:30 AM Inspection of reroofing and
to 02.03.2017 maintainance to Gno:3 and back to
02.03.2017 Chittor Tirupati head quaters
06:00PM 08:30 PM
Tirupati Nellure accompained with E.E on 04.03.2017
03.03.2017 06.00 A.M 01.00 PM and inspected Godown works at
to Halt Nellore
04.03.2017 Nellure Tirupati Manubolu, Nellure, bogole and kavali,
09.00 PM 12.30 AM back to Head Quarters.
Tirupati Nellure
07.03.2017 06:00 A.M 12:30 PM Inspection of Godown work at
to Bogolu via 07.03.2017 manubolu, Nellure, Bogole and back to
07.03.2017 Tirupati Head Quarters.
Manubolu
10:00 PM
05:00PM
Tirupati Hyderabad
08.03.2017 06:30 P.M 07:00 AM Submission of bills regarding
Halt
to construction of godowns and back to
10.03.2017 Hyderabad Hyderabad Nellore nellore.
09:00PM 08:30 AM
nellore kavali
10.03.2017 09:30 A.M 11:30 AM Inspection of Godown work and
to Halt Nellore Compound wall at Manubolu and back
11.03.2017 Kavali Tirupati to Head Quarters.
04:00PM 10:30 PM
Tirupati Chittor
14.03.2017 07:30 A.M 09:30 AM Inspection of reroofing and
to 14.03.2017 maintainance to Gno:3 and back to
14.03.2017 Chittor Tirupati head quaters
06:00PM 08:30 PM
Tirupati Bogolu
15.03.2017 06:00 A.M 03:00 PM Inspection of Godown work and
to Halt Nellore Compound wall at Manubolu and back
16.03.2017 Nellore Tirupati to Head Quarters.
04:00PM 08:00 PM
Tirupati Nellore
18.03.2017 05:00 A.M 08:00 AM Accompained withQC personnel to
to Halt Nellore inspect godowns at bogolu and kavali
19.03.2017 Kavali Tirupati and back to head quaters.
03:00PM 08:00 PM
Tirupati Hyderabad
21.03.2017 06:30 P.M 07:00 AM To attend review meetings with
Halt
to managing Director and corrections of
25.03.2017 Hyderabad Hyderabad Nellore estimates and office work.
07.30 PM 07:00 AM
Nellore Bogolu
Inspection of Godown work at
25.03.2017 07.00AM 10:00 AM
chandrasekharapuram and Compound
to Halt Nellore
26.03.2017 wall at Manubolu and back to Head
Quarters.
Inspection of Godown work at
25.03.2017
chandrasekharapuram and Compound
to Halt Nellore
26.03.2017 Nellore Tirupati wall at Manubolu and back to Head
05.00PM 08:30 PM Quarters.

Tirupati Nellore Inspection of Godown work at


28.03.2017 06:00 P.M 10:00 AM chandrasekharapuram and Compound
to Halt Nellore
29.03.2017 Nellore Tirupati wall at Manubolu and back to Head
05.00PM 09:30 PM Quarters.
Tirupati Nellore
05.00AM Inspection of Godown work at
31.03.2017 08.30AM
31.03.2017 chandrasekharapuram and Compound wall
to CS Puram Tirupati at Manubolu and back to Head Quarters.
31.03.2017 05.00PM 09.00PM

Deputy Executive Engineer,


APSWC,Tirupti.
ANDHRA PRADESH STATE WAREHOUSING CORPORATION
Tirupati
Tour Programme of Sri V.ANANDA REDDY / DY. EXECUTIVE ENGINEER
APSWC,Tirupati, for the Month of Feb-2027.

Date From Date To Purpose of Journey


Tirupati Hyderabad
02.02.2027 06:00 PM 07:30 AM To submit the bill regarding Nellure
Halt
to godowns work and back to Head
05.02.2027 Hyderabad Hyderabad Tirupati Quarters Tirupathi.
07:30PM 08:00 AM
Tirupati Nellure
10:00 AM 01:00 PM Inspection of Godown work at Nellure,
05.02.2027
Bogole and Compound Wall works at
to Halt Nellure
06.02.2027 Bogole Tirupati Manubolu and back to Head Quarters is
04:30 PM 09:30 PM Tirupathi.
Tirupati Hyderabad
06.00 P.M 07.00 AM To submit the bill regarding Bogole
07.02.2027
Halt
to godowns work and back to Head
09.02.2027 Hyderabad Hyderabad Tirupati Quarters Tirupathi.
07.30 PM 08:30 AM

Manubolu,
Tirupati
10.02.2027 Nellure Inspection of work at Manubolu,
06.30 A.M
to Halt Nellure 01.00 PM Nellure, Bogole, and Kavali and back to
11.02.2027 Bogolu Tirupati Head Quarters is Tirupathi.
04.00 PM 08.30 PM
Manubolu,
Tirupati
15.02.2027 Nellure Inspection of work at Manubolu,
06.30 A.M
to Halt Nellure 01.00 PM Nellure, Bogole, and Kavali and back to
16.02.2027 Bogolu Tirupati Head Quarters is Tirupathi.
04.00 PM 08.30 PM
Tirupati Chittur
08:00 A.M 10:00 AM To inspect the Re-Roofing work for G.No
18.02.2017 18.02.2017 III Chitture and back to Head Quarters is
Chittur Tirupati Tirupathi.
05:00PM 07:00 PM

Tirupati Nellure, Kavali To inspect the Godown works at Nellure,


23.02.2027 06.30 A.M 03.00 AM Bogole,and Kavlai and Compound Wall
to Halt Nellure
24.02.2027 works at Monubolu and back to Head
Nellure Tirupati Quarters is Tirupathi.
02.00 PM 08.00 PM

Tirupati Nellure, Kavali


To inspect the Godown works at Nellure,
27.02.2027 06.30 A.M 03.00 AM
Bogole,and Kavalai and Compound Wall
to Halt Nellure
28.02.2027 works at Monubolu and back to Head
Nellure Tirupati Quarters is Tirupathi.
02.00 PM 08.00 PM

Submitted for approval please.

Deputy Executive Engineer,


APSWC,Tirupati.
ANDHRA PRADESH STATE WAREHOUSING CORPORATION
Tirupati
Tour Programme of Sri V.ANANDA REDDY / DY. EXECUTIVE ENGINEER
APSWC,Tirupathi, for the Month of APRIL -2017.

Date From Date To Purpose of Journey


Tirupati Tirumala Accompinied with Manageing Director
01.04.2017 07:30 A.M 08.30AM
01.04.2017 to Hyderabad visited
to
03.04.2017 Chittor 03.04.2017 tirupati Tirumala,Kalahasthi,Gudur, Sulurpata
06:00PM 8.00PM and back to head quaters.
Tirupati Nellure
04.04.2017 05.30 A.M 09.00 AM Inspection of Godown work at
Hlat in CS
to Nellure, Kavali, CS Puram and back
06.04.2017 Kavali puram Tirupati to Head Quarters.
01.00 PM 08.30 PM
Tirupati Nellure
10.04.2017 05:30 A.M 09.00 AM Inspection of Godown work at
to Halt Nellore Nellore, CS Puram, Bogole and back
11.04.2017 Nellore Tirupati to Head Quarters.
06:00 PM 9:30 PM
Tirupati Kavali Accompained with Executive Engineer
14.04.2017 05:30 A.M 10.00 AM to inspect godowns atNellore,
to Halt Kavali
16.04.2017 Kavali Tirupati bogolu,CS Puram, and kavali and
05.00 PM 08:30 PM back to head quaters.
Tirupati Nellure
19.04.2017 05:30 A.M 09.00 AM Inspection of Godown work at
to Halt Nellore Nellore, CS Puram, Bogole and back
20.04.2017 Nellore Tirupati to Head Quarters.
06:00 PM 9:30 PM
Tirupati Nellure
22.04.2017 06:00 A.M 09.00 AM Inspection of Godown work at Nellore
to 22.04.2017
22.04.2017 Nellore Tirupati and back to Head Quarters.
06.00PM 08:30 PM
Tirupati Guduru
29.04.2017 06:00 A.M 09.00AM Inspection of Godown at Guduru for
to Halt Nellore repairs & maintanance, CS Puram
30.04.2017 Guduru Tirupati and back to Head Quarters.
06.30PM 09:30 PM

Deputy Executive Engineer,


APSWC,Tirupti.
ANDHRA PRADESH STATE WAREHOUSING CORPORATION
Tirupati
Tour Programme of Sri V.V.ANANDA REDDY / DY. EXECUTIVE ENGINEER

Date From APSWC,Tirupathi,


Date To Month of MAY -2017.
for the Purpose of Journey
Tirupati Nellore
05:30 A.M 09:00 AM
02.05.2017 Inspection of Godown work at Nellore,
Halt in
to CS Puram, Kavali and back to Head
03.05.2017 Nellore
Nellore Tirupati Quarters.
06:30 PM 10:00 PM

Tirupati Nellore
06.05.2017 05:30 A.M 09.00 AM
Hlat in Inspection of Godown work at Nellore
to
07.05.2017 Nellore Nellore Tirupati and back to Head Quarters.
06:30 PM 10:00 PM
Tirupati Kavali
09.05.2017 06:00 A.M 10.00 AM Inspection of Godown work at Kavali,
Hlat in
to Nellore, Bogolou and back to Head
10.05.2017 Kavali Nellore Tirupati Quarters.
06.00 PM 9:30 PM
Tirupati Nellore
12.05.2017 06:00 A.M 09.30 AM Inspection of Godown work at Nellore,
Halt in
to CS Puram, Kavali, Gudur and back to
13.05.2017 CS Puram Nellore Tirupati Head Quarters.
06.30PM 09:30 PM
Tirupati Vijayawada
17.05.2017 03:00 A.M 11:00AM
Halt in To sbumit contract bills and back to
to
18.05.2017 Vijayawada Vijayawada Tirupati 11:30 Head Quarters.
04:30PM PM

Tirupati Nellore
19.05.2017 06:30 A.M 09.30 AM Inspection of Godown work at
Halt in
to Nellore,bogole, kavali and back to Head
20.05.2017 Kavali Nellore Tirupati Quarters.
07:00 PM 10:00 PM
Tirupati Nellore
23.05.2017 06:00 A.M 09.00AM Inspection of Godown work at Nellore,
to 23.05.2017
23.05.2017 CS Puram Tirupati kavali and back to Head Quarters.
06.00PM 09:00 PM
Tirupati Nellore
26.05.2017 06:00 A.M 09.00AM Inspection of Godown work at Nellore
to 26.05.2017
26.05.2017 Nellore Tirupati and back to Head Quarters.
06.00PM 09:30 PM
Tirupati Nellore
Accompained with QC officer for quality
05.00AM 08.00AM
Halt in control tests at Nellore, bogolu,CS
27.05.2017 Nellore Puram, and kavali and back to head
Nellore
to Tirupati quaters.
06.30PM
28.05.2017 10.00PM
Tirupati Nellore
06.00AM 09.00AM Inspection of Godown work at
30.05.2017 30.05.2017 Nellore,bogole, CS Puram and back to
to Bogolu Tirupati Head Quarters.
30.05.2017 06.30PM 10.00PM
Deputy Executive Engineer,
APSWC,Tirupti.
ANDHRA PRADESH STATE WAREHOUSING CORPORATION
Tirupati
Tour Programme of Sri V.V.ANANDA REDDY / DY. EXECUTIVE ENGINEER

Date From Date for the To


APSWC,Tirupathi, Purpose of Journey
Month of JUNE -2017.
Tirupati Nellore
01.06.2017 05:30 A.M 09.00 AM Inspection of Godown work at
to Halt in Nellore Nellore, CS Puram, Bogole and back
02.06.2017 Nellore Tirupati to Head Quarters.
06:30 PM 10:00 PM
Tirupati Nellore
04.06.2017 05:30 A.M 09.00 AM Inspection of Godown work at Nellore
to 04.06.2017
04.06.2017 Nellore Tirupati and back to Head Quarters.
06:30 PM 10:00 PM
Tirupati vijayawada
06.06.2017 03:00 A.M 10.00 AM Visited Head office Vijaywada To
Halt in
to sbumit contract bills and back to Head
07.06.2017 vijayawada Vijayawada Tirupati Quarters.
02.00 PM 10:00 PM
Tirupati Nellore
08.06.2017 06:00 A.M 09.00 AM Inspection of Godown work at Nellore,
to 08.06.2017 Bogole, Gudur and back to Head
08.06.2017 CS Puram Tirupati Quarters.
06.30PM 09:30 PM
Tirupati Nellore Accompained with Executive Engineer
10.06.2017 05:00 A.M 09.00 AM to inspect godowns atNellore,
to Halt in Nellore
12.06.2017 Nellore Tirupati bogolu,CS Puram, and kavali and
06:30 PM 09:30 PM back to head quaters.
Tirupati Nellore
15.06.2017 06:00 A.M 09.30 AM Inspection of Godown work at
to Halt in Nellore Nellore,CS Puram and back to Head
16.06.2017 Nellore Tirupati Quarters.
06:30 PM 10:00 PM
Tirupati Nellore
19.06.2017 06:00 A.M 09.30 AM Inspection of Godown work at Nellore,
to 19.06.2017
19.06.2017 CS Puram Tirupati CS Puram and back to Head Quarters.
06.30PM 09:00 PM
Tirupati vijayawada
20.06.2017 03:00 A.M 10.00 AM Visited Head office Vijaywada To
Halt in
to sbumit contract bills and back to Head
21.06.2017 vijayawada Vijayawada Tirupati Quarters.
04.00 PM 11:45 PM
Tirupati Nellore
05.00AM 09.00 AM Inspection of Godown work at Nellore,
23.06.2017 Halt in Nellore
to Nellore Tirupati CS Puram and back to Head Quarters.
24.06.2017 06:30 PM 10.00PM
Tirupati Nellore
06.00AM 09.00 AM Inspection of Godown work at
Halt in Nellore Nellore,bogole, CS Puram and back to
26.06.2017
Head Quarters.
to Bogolu Tirupati
27.06.2017 06.30PM 10.00PM
Tirupati Nellore
06.00AM 09.00 AM Inspection of Godown work at Nellore,
30.06.2017 30.06.2017
to Bogolu Tirupati CS Puram and back to Head Quarters.
30.06.2017 06.30PM 10.00PM
Deputy Executive Engineer,
APSWC,Tirupti.