_____ DESIGN SUBMITTAL

CONSTRUCTION COST ESTIMATE

PROJECT NAME
FOR THE DEPARTMENT OF EARLY EDUCATION DEVELOPMENT
LOCATION

PREPARED FOR:

Organization/Firm Name
Address
City, State, Zip

Date

PREPARED BY:

Organization/Firm Name
Address
City, State, Zip
NAME OF PROJECT
PAGE 5
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

NOTES REGARDING THE PREPARATION OF THIS ESTIMATE

DRAWINGS AND DOCUMENTS

Level of Documents:
Date:
Provided By:

RATES

Pricing is based on current material, equipment and freight costs.

Labor Rates: A.S. Title 36

BIDDING ASSUMPTIONS

Contract:
Bidding Situation:
Bid Date:
Start of Construction:
Months to Complete: __ months completion.

EXCLUDED COSTS

1. A/E design fees


2. Administrative and management costs
3. Furniture, furnishings and equipment (except those specifically included)
4. Other

GROSS FLOOR AREA


NAME OF PROJECT
PAGE 6
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

0 GFA
NAME OF PROJECT
PAGE 7
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
NAME OF PROJECT
PAGE 8
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

COST SUMMARY
Rate $/SF
TOTAL Floor Area

01 - EXISTING CONDITIONS $0 #DIV/0!


02 - SUBSTRUCTURE 0 #DIV/0!
03 - SUPERSTRUCTURE 0 #DIV/0!
04 - EXTERIOR CLOSURE 0 #DIV/0!
05 - ROOF SYSTEMS 0 #DIV/0!
06 - INTERIORS 0 #DIV/0!
07 - CONVEYING EQUIPMENT 0 #DIV/0!
08 - MECHANICAL 0 #DIV/0!
09 - ELECTRICAL 0 #DIV/0!
10 - EQUIPMENT AND FURNISHINGS 0 #DIV/0!
11 - SPECIAL CONDITION 0 #DIV/0!
SUBTOTAL: $0

12 - GENERAL CONDITIONS AND PROFIT 0


SUBTOTAL: $0

13 - SITE AND INFRASTRUCTURE 0

SUBTOTAL: $0

14 - CONTINGENCIES 0

TOTAL ESTIMATED CONSTRUCTION COST: $0


COST PER SQUARE FOOT: #DIV/0! /SF
GROSS FLOOR AREA: $ 0 SF
NAME OF PROJECT
PAGE 9
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
NAME OF PROJECT
PAGE 10
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

Total TOTAL
ELEMENTO Material Mano de obra Mat/MO COST

01 - EXISTING CONDITIONS $0
011 - Selective Site Demolition 0 0 0
012 - Structure Demolition 0 0 0
013 - Selective Building Demolition 0 0 0
014 - Site Electrical Demolition 0 0 0
015 - Site Remediation 0 0 0
016 - Hazardous Material Removal 0 0 0

02 - SUBSTRUCTURE 0
021 - Standard Foundations 0 0 0
022 - Slab on Grade 0 0 0
023 - Basements 0 0 0
024 - Special Foundations 0 0 0

03 - SUPERSTRUCTURE 0
031 - Floor Structure 0 0 0
032 - Roof Structure 0 0 0
033 - Stair Construction 0 0 0

04 - EXTERIOR CLOSURE 0
041 - Exterior Walls and Soffits 0 0 0
042 - Exterior Curtain Walls 0 0 0
043 - Exterior Openings 0 0 0

05 - ROOF SYSTEMS 0
051 - Roofing 0 0 0
052 - Skylights 0 0 0
NAME OF PROJECT
PAGE 11
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

Total TOTAL
ELEMENTO Material Mano de obra Mat/MO COST

06 - INTERIORS 0
061 - Partitions/Soffits 0 0 0
062 - Special Partitions 0 0 0
063 - Interior Openings 0 0 0
064 - Interior Finishes 0 0 0
065 - Specialties 0 0 0

07 - CONVEYING EQUIPMENT 0
071 - Passenger Conveyors 0 0 0
072 - Material Handling Systems 0 0 0

08 - MECHANICAL 0
081 - Plumbing 0 0 0
082 - HVAC 0 0 0
083 - Integrated Automation 0 0 0
084 - Fire Suppression 0 0 0
085 - Special Mechanical Systems 0 0 0

09 - ELECTRICAL 0
091 - Service and Distribution 0 0 0
092 - Lighting and Power 0 0 0
093 - Communications 0 0 0
094 - Safety and Security 0 0 0
095 - Other Electrical Systems 0 0 0

10 - EQUIPMENT AND FURNISHINGS 0


101 - Fixed and Movable Equipment 0 0 0
102 - Furnishings 0 0 0
NAME OF PROJECT
PAGE 12
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

Total TOTAL
ELEMENTO Material Mano de obra Mat/MO COST

11 - SPECIAL CONDITION 0
111 - Special Construction 0 0 0
SUBTOTAL: $0 $0 $0

12 - GENERAL CONDITIONS AND PROFIT 0


121 - Mobilization and Demobilization 0
122 - Site Staff 0
123 - Temporary Construction 0
124 - Equipment and Tools 0
125 - Miscellaneous 0
126 - Labor Employment Costs 0
127 - Mark-Ups 0
SUBTOTAL: $0
13 - SITE AND INFRASTRUCTURE 0
131 - Site Preparation and Earthwork 0 0 0
132 - Site Improvements 0 0 0
133 - Site Structures 0 0 0
134 - Civil/Mechanical Utilities 0 0 0
135 - Site Electrical 0 0 0
136 - Off-Site Work 0 0 0
SUBTOTAL: $0
14 - CONTINGENCIES 0
141 - Estimate Contingency 0
142 - Escalation Contingency 0
TOTAL CONSTRUCTION COST: $0
NAME OF PROJECT
PAGE 13
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

Total TOTAL
ELEMENTO Material Mano de obra Mat/MO COST

Cost Per Square Foot:


Gross Floor Area:
NAME OF PROJECT
PAGE 14
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

Rate $/m2
Floor Area

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
NAME OF PROJECT
PAGE 15
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

Rate $/m2
Floor Area

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
NAME OF PROJECT
PAGE 16
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

Rate $/m2
Floor Area

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
NAME OF PROJECT
PAGE 17
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

Rate $/m2
Floor Area

$ 0.00 /m2
1 m2
NAME OF PROJECT
PAGE 18
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

01 - EXISTING CONDITIONS MATERIAL LABOR


RATE TOTAL RATE TOTAL
011 - Selective Site Demolition QUANTITY UNIT $ $ $ $

0 0
0 0
0 0.00 0 0.00 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 19
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

01 - EXISTING CONDITIONS MATERIAL LABOR


RATE TOTAL RATE TOTAL
011 - Selective Site Demolition QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 20
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 21
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 22
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

01 - EXISTING CONDITIONS MATERIAL LABOR


RATE TOTAL RATE TOTAL
012 - Structure Demolition QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 23
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

01 - EXISTING CONDITIONS MATERIAL LABOR


RATE TOTAL RATE TOTAL
012 - Structure Demolition QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 24
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 25
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 26
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

01 - EXISTING CONDITIONS MATERIAL LABOR


RATE TOTAL RATE TOTAL
013 - Selective Building Demolition QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 27
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

01 - EXISTING CONDITIONS MATERIAL LABOR


RATE TOTAL RATE TOTAL
013 - Selective Building Demolition QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 28
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 29
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 30
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

01 - EXISTING CONDITIONS MATERIAL LABOR


RATE TOTAL RATE TOTAL
014 - Site Electrical Demolition QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 31
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

01 - EXISTING CONDITIONS MATERIAL LABOR


RATE TOTAL RATE TOTAL
014 - Site Electrical Demolition QUANTITY UNIT $ $ $ $

0 0
0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 32
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 33
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0

$0
NAME OF PROJECT
PAGE 34
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

01 - EXISTING CONDITIONS MATERIAL LABOR


RATE TOTAL RATE TOTAL
015 - Site Remediation QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 35
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

01 - EXISTING CONDITIONS MATERIAL LABOR


RATE TOTAL RATE TOTAL
015 - Site Remediation QUANTITY UNIT $ $ $ $

0 0

TOTAL ESTIMATED COST: $0 $0


NAME OF PROJECT
PAGE 36
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 37
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0

$0
NAME OF PROJECT
PAGE 38
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

01 - EXISTING CONDITIONS MATERIAL LABOR


RATE TOTAL RATE TOTAL
016 - Hazardous Material Removal QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 39
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

01 - EXISTING CONDITIONS MATERIAL LABOR


RATE TOTAL RATE TOTAL
016 - Hazardous Material Removal QUANTITY UNIT $ $ $ $

0 0

TOTAL ESTIMATED COST: $0 $0


NAME OF PROJECT
PAGE 40
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 41
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0

$0
NAME OF PROJECT
PAGE 42
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

02 - SUBSTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
021 - Standard Foundations QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 43
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

02 - SUBSTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
021 - Standard Foundations QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 44
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 45
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 46
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

02 - SUBSTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
022 - Slab on Grade QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 47
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

02 - SUBSTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
022 - Slab on Grade QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 48
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 49
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 50
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

02 - SUBSTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
023 - Basements QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 51
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

02 - SUBSTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
023 - Basements QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 52
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 53
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 54
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

02 - SUBSTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
024 - Special Foundations QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 55
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

02 - SUBSTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
024 - Special Foundations QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 56
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 57
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 58
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

03 - SUPERSTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
031 - Floor Structure QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 59
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

03 - SUPERSTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
031 - Floor Structure QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 60
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 61
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 62
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

03 - SUPERSTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
032 - Roof Structure QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 63
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

03 - SUPERSTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
032 - Roof Structure QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 64
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 65
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 66
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

03 - SUPERSTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
033 - Stair Construction QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 67
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

03 - SUPERSTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
033 - Stair Construction QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 68
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 69
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 70
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

04 - EXTERIOR CLOSURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
041 - Exterior Walls and Soffits QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 71
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

04 - EXTERIOR CLOSURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
041 - Exterior Walls and Soffits QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 72
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 73
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 74
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

04 - EXTERIOR CLOSURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
042 - Exterior Curtain Walls QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 75
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

04 - EXTERIOR CLOSURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
042 - Exterior Curtain Walls QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 76
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 77
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 78
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

04 - EXTERIOR CLOSURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
043 - Exterior Openings QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 79
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

04 - EXTERIOR CLOSURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
043 - Exterior Openings QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 80
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 81
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 82
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

05 - ROOF SYSTEMS MATERIAL LABOR


RATE TOTAL RATE TOTAL
051 - Roofing QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 83
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

05 - ROOF SYSTEMS MATERIAL LABOR


RATE TOTAL RATE TOTAL
051 - Roofing QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 84
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 85
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 86
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

05 - ROOF SYSTEMS MATERIAL LABOR


RATE TOTAL RATE TOTAL
052 - Skylights QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 87
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

05 - ROOF SYSTEMS MATERIAL LABOR


RATE TOTAL RATE TOTAL
052 - Skylights QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 88
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 89
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 90
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

06 - INTERIORS MATERIAL LABOR


RATE TOTAL RATE TOTAL
061 - Partitions/Soffits QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 91
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

06 - INTERIORS MATERIAL LABOR


RATE TOTAL RATE TOTAL
061 - Partitions/Soffits QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 92
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 93
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 94
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

06 - INTERIORS MATERIAL LABOR


RATE TOTAL RATE TOTAL
062 - Special Partitions QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 95
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

06 - INTERIORS MATERIAL LABOR


RATE TOTAL RATE TOTAL
062 - Special Partitions QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 96
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 97
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 98
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

06 - INTERIORS MATERIAL LABOR


RATE TOTAL RATE TOTAL
063 - Interior Openings QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 99
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

06 - INTERIORS MATERIAL LABOR


RATE TOTAL RATE TOTAL
063 - Interior Openings QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 100
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 101
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 102
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

06 - INTERIORS MATERIAL LABOR


RATE TOTAL RATE TOTAL
064 - Interior Finishes QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 103
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

06 - INTERIORS MATERIAL LABOR


RATE TOTAL RATE TOTAL
064 - Interior Finishes QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 104
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 105
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 106
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

06 - INTERIORS MATERIAL LABOR


RATE TOTAL RATE TOTAL
065 - Specialties QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 107
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

06 - INTERIORS MATERIAL LABOR


RATE TOTAL RATE TOTAL
065 - Specialties QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 108
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 109
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 110
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

07 - CONVEYING EQUIPMENT MATERIAL LABOR


RATE TOTAL RATE TOTAL
071 - Passenger Conveyors QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 111
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

07 - CONVEYING EQUIPMENT MATERIAL LABOR


RATE TOTAL RATE TOTAL
071 - Passenger Conveyors QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 112
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 113
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 114
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

07 - CONVEYORS MATERIAL LABOR


RATE TOTAL RATE TOTAL
072 - Material Handling Systems QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 115
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

07 - CONVEYORS MATERIAL LABOR


RATE TOTAL RATE TOTAL
072 - Material Handling Systems QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 116
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 117
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 118
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

08 - MECHANICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
081 - Plumbing QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 119
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

08 - MECHANICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
081 - Plumbing QUANTITY UNIT $ $ $ $

0 0

TOTAL ESTIMATED COST: $0 $0


NAME OF PROJECT
PAGE 120
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 121
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0

$0
NAME OF PROJECT
PAGE 122
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

08 - MECHANICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
082 - HVAC QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 123
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

08 - MECHANICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
082 - HVAC QUANTITY UNIT $ $ $ $

0 0

TOTAL ESTIMATED COST: $0 $0


NAME OF PROJECT
PAGE 124
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 125
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0

$0
NAME OF PROJECT
PAGE 126
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

08 - MECHANICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
083 - Integrated Automation QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 127
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

08 - MECHANICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
083 - Integrated Automation QUANTITY UNIT $ $ $ $

0 0

TOTAL ESTIMATED COST: $0 $0


NAME OF PROJECT
PAGE 128
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 129
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0

$0
NAME OF PROJECT
PAGE 130
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

08 - MECHANICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
084 - Fire Suppression QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 131
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

08 - MECHANICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
084 - Fire Suppression QUANTITY UNIT $ $ $ $

0 0

TOTAL ESTIMATED COST: $0 $0


NAME OF PROJECT
PAGE 132
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 133
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0

$0
NAME OF PROJECT
PAGE 134
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

08 - MECHANICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
085 - Special Mechanical Systems QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 135
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

08 - MECHANICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
085 - Special Mechanical Systems QUANTITY UNIT $ $ $ $

0 0

TOTAL ESTIMATED COST: $0 $0


NAME OF PROJECT
PAGE 136
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 137
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0

$0
NAME OF PROJECT
PAGE 138
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

09 - ELECTRICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
091 - Service and Distribution QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 139
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

09 - ELECTRICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
091 - Service and Distribution QUANTITY UNIT $ $ $ $

0 0

TOTAL ESTIMATED COST: $0 $0


NAME OF PROJECT
PAGE 140
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 141
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0

$0
NAME OF PROJECT
PAGE 142
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

09 - ELECTRICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
092 - Lighting and Power QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 143
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

09 - ELECTRICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
092 - Lighting and Power QUANTITY UNIT $ $ $ $

0 0

TOTAL ESTIMATED COST: $0 $0


NAME OF PROJECT
PAGE 144
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 145
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0

$0
NAME OF PROJECT
PAGE 146
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

09 - ELECTRICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
093 - Communications QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 147
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

09 - ELECTRICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
093 - Communications QUANTITY UNIT $ $ $ $

0 0

TOTAL ESTIMATED COST: $0 $0


NAME OF PROJECT
PAGE 148
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 149
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0

$0
NAME OF PROJECT
PAGE 150
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

09 - ELECTRICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
094 - Safety and Security QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 151
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

09 - ELECTRICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
094 - Safety and Security QUANTITY UNIT $ $ $ $

0 0

TOTAL ESTIMATED COST: $0 $0


NAME OF PROJECT
PAGE 152
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 153
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0

$0
NAME OF PROJECT
PAGE 154
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

09 - ELECTRICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
095 - Other Electrical Systems QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 155
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

09 - ELECTRICAL MATERIAL LABOR


RATE TOTAL RATE TOTAL
095 - Other Electrical Systems QUANTITY UNIT $ $ $ $

0 0

TOTAL ESTIMATED COST: $0 $0


NAME OF PROJECT
PAGE 156
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 157
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0

$0
NAME OF PROJECT
PAGE 158
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

10 - EQUIPMENT AND FURNISHINGS MATERIAL LABOR


RATE TOTAL RATE TOTAL
101 - Fixed and Movable Equipment QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 159
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

10 - EQUIPMENT AND FURNISHINGS MATERIAL LABOR


RATE TOTAL RATE TOTAL
101 - Fixed and Movable Equipment QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 160
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 161
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 162
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

10 - EQUIPMENT AND FURNISHINGS MATERIAL LABOR


RATE TOTAL RATE TOTAL
102 - Furnishings QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 163
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

10 - EQUIPMENT AND FURNISHINGS MATERIAL LABOR


RATE TOTAL RATE TOTAL
102 - Furnishings QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 164
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 165
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 166
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

11 - SPECIAL CONDITION MATERIAL LABOR


RATE TOTAL RATE TOTAL
111 - Special Construction QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 167
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

11 - SPECIAL CONDITION MATERIAL LABOR


RATE TOTAL RATE TOTAL
111 - Special Construction QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 168
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 169
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 170
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

12 - GENERAL CONDITIONS AND PROFIT MATERIAL LABOR


RATE TOTAL RATE TOTAL
121 - Mobilization and Demobilization QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 171
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

12 - GENERAL CONDITIONS AND PROFIT MATERIAL LABOR


RATE TOTAL RATE TOTAL
121 - Mobilization and Demobilization QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 172
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 173
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 174
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

12 - GENERAL CONDITIONS AND PROFIT MATERIAL LABOR


RATE TOTAL RATE TOTAL
122 - Site Staff QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 175
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

12 - GENERAL CONDITIONS AND PROFIT MATERIAL LABOR


RATE TOTAL RATE TOTAL
122 - Site Staff QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 176
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 177
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 178
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

12 - GENERAL CONDITIONS AND PROFIT MATERIAL LABOR


RATE TOTAL RATE TOTAL
123 - Temporary Construction QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 179
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

12 - GENERAL CONDITIONS AND PROFIT MATERIAL LABOR


RATE TOTAL RATE TOTAL
123 - Temporary Construction QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 180
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 181
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 182
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

12 - GENERAL CONDITIONS AND PROFIT MATERIAL LABOR


RATE TOTAL RATE TOTAL
124 - Equipment and Tools QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 183
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

12 - GENERAL CONDITIONS AND PROFIT MATERIAL LABOR


RATE TOTAL RATE TOTAL
124 - Equipment and Tools QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 184
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 185
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 186
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

12 - GENERAL CONDITIONS AND PROFIT MATERIAL LABOR


RATE TOTAL RATE TOTAL
125 - Miscellaneous QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 187
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

12 - GENERAL CONDITIONS AND PROFIT MATERIAL LABOR


RATE TOTAL RATE TOTAL
125 - Miscellaneous QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 188
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 189
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 190
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

12 - GENERAL CONDITIONS AND PROFIT MATERIAL LABOR


RATE TOTAL RATE TOTAL
126 - Labor Employment Costs QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 191
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

12 - GENERAL CONDITIONS AND PROFIT MATERIAL LABOR


RATE TOTAL RATE TOTAL
126 - Labor Employment Costs QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 192
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 193
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 194
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

12 - GENERAL CONDITIONS AND PROFIT MATERIAL LABOR


RATE TOTAL RATE TOTAL
127 - Mark-Ups QUANTITY UNIT $ $ $ $

0 0
Add percentages here 20.00%
0
0
0
0
0
0
0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 195
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

12 - GENERAL CONDITIONS AND PROFIT MATERIAL LABOR


RATE TOTAL RATE TOTAL
127 - Mark-Ups QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST:
NAME OF PROJECT
PAGE 196
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 197
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00
0.00 0
$0
NAME OF PROJECT
PAGE 198
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

13 - SITE AND INFRASTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
131 - Site Preparation and Earthwork QUANTITY UNIT $ $ $ $

0 0
0 0
0 0.00 0 0.00 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 199
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

13 - SITE AND INFRASTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
131 - Site Preparation and Earthwork QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: 0 $0 $0
NAME OF PROJECT
PAGE 200
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 201
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 202
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

13 - SITE AND INFRASTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
132 - Site Improvements QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 203
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

13 - SITE AND INFRASTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
132 - Site Improvements QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 204
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 205
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 206
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

13 - SITE AND INFRASTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
133 - Site Structures QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 207
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

13 - SITE AND INFRASTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
133 - Site Structures QUANTITY UNIT $ $ $ $

0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 208
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 209
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 210
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

13 - SITE AND INFRASTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
134 - Civil/Mechanical Utilities QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 211
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

13 - SITE AND INFRASTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
134 - Civil/Mechanical Utilities QUANTITY UNIT $ $ $ $

0 0
0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 212
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 213
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0

$0
NAME OF PROJECT
PAGE 214
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

13 - SITE AND INFRASTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
135 - Site Electrical QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 215
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

13 - SITE AND INFRASTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
135 - Site Electrical QUANTITY UNIT $ $ $ $

0 0

TOTAL ESTIMATED COST: $0 $0


NAME OF PROJECT
PAGE 216
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 217
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0

$0
NAME OF PROJECT
PAGE 218
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

13 - SITE AND INFRASTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
136 - Off-Site Work QUANTITY UNIT $ $ $ $

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

0 0
0 0
NAME OF PROJECT
PAGE 219
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

13 - SITE AND INFRASTRUCTURE MATERIAL LABOR


RATE TOTAL RATE TOTAL
136 - Off-Site Work QUANTITY UNIT $ $ $ $

0 0
0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 220
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0

0.00 0
0.00 0
NAME OF PROJECT
PAGE 221
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0

$0
NAME OF PROJECT
PAGE 222
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

14 - CONTINGENCIES MATERIAL LABOR


RATE TOTAL RATE TOTAL
141 - Estimate Contingency QUANTITY UNIT $ $ $ $

0 0
Estimate Contingency 10.00%
NAME OF PROJECT
PAGE 223
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

14 - CONTINGENCIES MATERIAL LABOR


RATE TOTAL RATE TOTAL
141 - Estimate Contingency QUANTITY UNIT $ $ $ $

0 0

TOTAL ESTIMATED COST: 0 0


NAME OF PROJECT
PAGE 224
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
$0
NAME OF PROJECT
PAGE 225
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0

$0
NAME OF PROJECT
PAGE 226
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

14 - CONTINGENCIES MATERIAL LABOR


RATE TOTAL RATE TOTAL
142 - Escalation Contingency QUANTITY UNIT $ $ $ $

0 0
Escalation Contingency 10.00%
NAME OF PROJECT
PAGE 227
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

14 - CONTINGENCIES MATERIAL LABOR


RATE TOTAL RATE TOTAL
142 - Escalation Contingency QUANTITY UNIT $ $ $ $

0 0

TOTAL ESTIMATED COST: 0 0


NAME OF PROJECT
PAGE 228
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0
$0
NAME OF PROJECT
PAGE 229
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019

TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $

0.00 0

$0

You might also like