PROJECT NAME
FOR THE DEPARTMENT OF EARLY EDUCATION DEVELOPMENT
LOCATION
PREPARED FOR:
Organization/Firm Name
Address
City, State, Zip
Date
PREPARED BY:
Organization/Firm Name
Address
City, State, Zip
NAME OF PROJECT
PAGE 5
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
Level of Documents:
Date:
Provided By:
RATES
BIDDING ASSUMPTIONS
Contract:
Bidding Situation:
Bid Date:
Start of Construction:
Months to Complete: __ months completion.
EXCLUDED COSTS
0 GFA
NAME OF PROJECT
PAGE 7
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
NAME OF PROJECT
PAGE 8
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
COST SUMMARY
Rate $/SF
TOTAL Floor Area
SUBTOTAL: $0
14 - CONTINGENCIES 0
Total TOTAL
ELEMENTO Material Mano de obra Mat/MO COST
01 - EXISTING CONDITIONS $0
011 - Selective Site Demolition 0 0 0
012 - Structure Demolition 0 0 0
013 - Selective Building Demolition 0 0 0
014 - Site Electrical Demolition 0 0 0
015 - Site Remediation 0 0 0
016 - Hazardous Material Removal 0 0 0
02 - SUBSTRUCTURE 0
021 - Standard Foundations 0 0 0
022 - Slab on Grade 0 0 0
023 - Basements 0 0 0
024 - Special Foundations 0 0 0
03 - SUPERSTRUCTURE 0
031 - Floor Structure 0 0 0
032 - Roof Structure 0 0 0
033 - Stair Construction 0 0 0
04 - EXTERIOR CLOSURE 0
041 - Exterior Walls and Soffits 0 0 0
042 - Exterior Curtain Walls 0 0 0
043 - Exterior Openings 0 0 0
05 - ROOF SYSTEMS 0
051 - Roofing 0 0 0
052 - Skylights 0 0 0
NAME OF PROJECT
PAGE 11
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
Total TOTAL
ELEMENTO Material Mano de obra Mat/MO COST
06 - INTERIORS 0
061 - Partitions/Soffits 0 0 0
062 - Special Partitions 0 0 0
063 - Interior Openings 0 0 0
064 - Interior Finishes 0 0 0
065 - Specialties 0 0 0
07 - CONVEYING EQUIPMENT 0
071 - Passenger Conveyors 0 0 0
072 - Material Handling Systems 0 0 0
08 - MECHANICAL 0
081 - Plumbing 0 0 0
082 - HVAC 0 0 0
083 - Integrated Automation 0 0 0
084 - Fire Suppression 0 0 0
085 - Special Mechanical Systems 0 0 0
09 - ELECTRICAL 0
091 - Service and Distribution 0 0 0
092 - Lighting and Power 0 0 0
093 - Communications 0 0 0
094 - Safety and Security 0 0 0
095 - Other Electrical Systems 0 0 0
Total TOTAL
ELEMENTO Material Mano de obra Mat/MO COST
11 - SPECIAL CONDITION 0
111 - Special Construction 0 0 0
SUBTOTAL: $0 $0 $0
Total TOTAL
ELEMENTO Material Mano de obra Mat/MO COST
Rate $/m2
Floor Area
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NAME OF PROJECT
PAGE 15
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
Rate $/m2
Floor Area
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NAME OF PROJECT
PAGE 16
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
Rate $/m2
Floor Area
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NAME OF PROJECT
PAGE 17
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
Rate $/m2
Floor Area
$ 0.00 /m2
1 m2
NAME OF PROJECT
PAGE 18
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0.00 0 0.00 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 19
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 20
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 21
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 22
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 23
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 24
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 25
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 26
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 27
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 28
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 29
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 30
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 31
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 32
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 33
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0
NAME OF PROJECT
PAGE 34
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 35
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 37
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0
NAME OF PROJECT
PAGE 38
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 39
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 41
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0
NAME OF PROJECT
PAGE 42
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 43
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 44
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 45
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 46
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 47
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 48
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 49
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 50
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 51
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 52
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 53
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 54
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 55
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 56
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 57
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 58
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 59
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 60
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 61
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 62
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 63
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 64
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 65
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 66
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 67
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 68
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 69
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 70
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 71
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 72
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 73
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 74
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 75
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 76
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 77
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 78
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 79
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 80
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 81
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 82
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 83
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 84
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 85
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 86
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 87
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 88
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 89
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 90
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 91
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 92
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 93
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 94
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 95
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 96
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 97
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 98
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 99
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 100
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 101
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 102
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 103
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 104
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 105
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 106
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 107
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 108
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 109
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 110
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 111
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 112
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 113
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 114
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 115
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 116
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 117
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 118
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 119
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 121
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0
NAME OF PROJECT
PAGE 122
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 123
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 125
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0
NAME OF PROJECT
PAGE 126
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 127
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 129
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0
NAME OF PROJECT
PAGE 130
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 131
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 133
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0
NAME OF PROJECT
PAGE 134
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 135
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 137
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0
NAME OF PROJECT
PAGE 138
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 139
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 141
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0
NAME OF PROJECT
PAGE 142
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 143
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 145
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0
NAME OF PROJECT
PAGE 146
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 147
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 149
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0
NAME OF PROJECT
PAGE 150
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 151
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 153
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0
NAME OF PROJECT
PAGE 154
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 155
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 157
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0
NAME OF PROJECT
PAGE 158
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 159
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 160
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 161
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 162
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 163
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 164
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 165
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 166
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 167
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 168
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 169
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 170
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 171
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 172
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 173
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 174
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 175
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 176
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 177
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 178
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 179
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 180
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 181
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 182
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 183
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 184
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 185
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 186
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 187
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 188
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 189
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 190
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 191
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 192
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 193
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 194
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
Add percentages here 20.00%
0
0
0
0
0
0
0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 195
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST:
NAME OF PROJECT
PAGE 196
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 197
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00
0.00 0
$0
NAME OF PROJECT
PAGE 198
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0.00 0 0.00 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 199
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: 0 $0 $0
NAME OF PROJECT
PAGE 200
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 201
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 202
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 203
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 204
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 205
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 206
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 207
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 208
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 209
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
$0
NAME OF PROJECT
PAGE 210
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 211
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 212
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 213
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0
NAME OF PROJECT
PAGE 214
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 215
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 217
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0
NAME OF PROJECT
PAGE 218
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
NAME OF PROJECT
PAGE 219
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
0
TOTAL ESTIMATED COST: $0 $0
NAME OF PROJECT
PAGE 220
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0
0.00 0
0.00 0
0.00 0
NAME OF PROJECT
PAGE 221
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0
NAME OF PROJECT
PAGE 222
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
Estimate Contingency 10.00%
NAME OF PROJECT
PAGE 223
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0
NAME OF PROJECT
PAGE 225
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0
NAME OF PROJECT
PAGE 226
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
Escalation Contingency 10.00%
NAME OF PROJECT
PAGE 227
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
0 0
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0
NAME OF PROJECT
PAGE 229
LOCATION OF PROJECT
LEVEL OF PROJECT
DATE: 09/10/2019
TOTAL TOTAL
UNIT RATE MATERIAL/LABOR
$ $
0.00 0
$0