Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

.

Application for the post of suitable position for Mechanical QA/QC INSPECTOR

Name Tarikmahmad Musamiyan Ghasura


Date of birth: 24/01/1983
Address: Bismilla society Patan Road AT Juna Deesa Tal ;Deesa.Dist-Banaskatha.

Pin- 385540,
State Gujarat,
Country: INDIA

Passport Details- k7597198 Issued at India (Ahmadabad)


Issued Date - 18/03/2013 & valid until 17/03/2023

INDIA: Mobil: 0091 99986424648, 8488099786

E-Mail address: tarik_ghasura@yahoo.co.in, tmg786@gmail.com

EDUCATIONAL QUALIFICATION
Diploma in Mechanical Engineer, Passed in 2004 Nov from Gujarat Technical
examination board, Gujarat, India.

PROFESSIONAL QUALIFICATION -
NDT Level II in RT, UT, MT, PT
Computer skills and software used. -- Conceptual Knowledge of computer. SAP ERP 6.0 QM Module, Baan, IMCS,
and e-ALPS
Languages: Fluency: English, Hindi, and Gujarati:

EMPLOYMENT HISTORY

PRESENT EMPLOYER: • Presently employed with M/S TUV-Nord (India ) Pvt Ltd, as a Field QC
Inspector, at L&T Hydrocarbon Engineering LTD Surat Hazira (DEC 2014 to till date)

 PREVIOUS EMPLOYER:
1) Worked as a QA/QC INSPECTION. Engineer in L&T Hydrocarbon Engineering LTD Surat Hazira for
(1year 9 month 2013 March to Nov 2014)
2) Worked as a QA/QC INSPECTION. Engineer in L&T Modular Fabrication Yard L.L.C, Sohar, Oman for
(1 year March 2012 to Feb 2013)
3) Worked as a QC INSPECTION. Engineer in L&T T Modular Fabrication Yard LTD Surat Hazira for
(5 year Jan 2007 to Feb 2012)
4) Worked as a QC INSPECTION. Engineer in Tube Products Incorporate Baroda for
(2 year Jan 2005 to Jan 2007 )

EXPERIENCE SUMMARY- 10 yrs of total Experience

 M/s TUV-NORD (INDIA) PVT LTD (DEC 2014 to till date)


Project- Reliance Jamnagar 3 Program
- Central Spooling Cell Jamnagar
WITNESSED

1) Raw Material identified, checked & verified with IMIR & challan
2) Welding related activities during fabrication of piping spools
3) Fit up inspection of piping spool Components
4) Dye Penetrant test of branch welds, Fillet welds & Stiffener joints
5) Dye Penetrant test of Temporary attachment locations
6 )Weld Visual ,Final Dimension Inspection & PMI (Base metal & weld metal ) of piping spools
7 )Painting related activities
8) Adhesion test 10 % & Prime coat 10 % inspection for painted piping spools
9) Pneumatic Test of Reinforcement Pad witnessed as per drawing/specification requirements as
applicable
10) Marking verification, Surface preparation ,blasted surface quality & painting DFT
11) Ensure proper packing with RFID Tag, weld end protection & flange protection visually checked at
100 % for Shipping clearance of piping spools
Documents/records reviewed:
1 ) Inward Material Inspection reports
2) NDE & other procedures
3 ) WPS, PQR, Welder Qualification and Welding Consumable records
4) In process inspection and NDT records
5) Pneumatic Test reports
6) Radiography test reports , PMI reports & Dye Penetrant test reports
7) Painting report & Line History Sheet
8) Final Documentation & final dossier

L&T Hydrocarbon Engineering LTD Surat Hazira & L&T Modular Fabrication Yard
L.L.C, Sohar, Oman ( Jan 2007 to Nov 2014 )

Project - HRP-II (JACKET AND TOP-SIDE) - Client -ONGC


- NASR & UMM LULU PHASE-1 DEVELOPMENT PROJECT- Client - ADMA-OPCO
-MHSRP-II, MNW NF BRIDGE, NQRC, MHNRD-II, MHN MNP PP&LQ - Client -ONGC

QA/QC
 Report to project QC Manager at site
 Implementation & monitoring of project Quality Plan requirements and assure compliance
 Periodic review of PQP for its adequacy and updating the same
 Generate new work procedures or record forms at site for any additional activities identified/as required
 Prepare update & maintain site Document Master List & verify with HO
 Implementation and monitoring ,revision if necessary .of all contract specific procedures .work
instructions
 Check that approval off all necessary documentation has been obtained and the inspection formats
properly filled signed off by concerned people
 Control Quality documents and maintain distribution list
 Co-ordination with company and sub –contractors
 Supervision of inspection carried out by Inspectors and NDE Technicians
 Check daily inspection reports for correctness & completeness
 Ensure that inspection /testing Equipments are with valid calibration
 Maintaining & updating all quality related records/documents at site
 Prepare test packs in consultation with concerned discipline engineers
 Responsible for internal audits and organize to conduct audits on sub –contractors activities & follow up
of corrective actions
 Overall control supervision & implementation of contract quality & technical problems resolution of
quality problems
 Ensure that WPS are Followed during the welding
 Welding Inspection after the welding
 Welder s Qualification tests
 Material Inspection & Traceability of cs materials /consumables
 Ensure Consumable handling /Storage procedures are Followed
 Review of material test certificates
 Prepare daily inspection reports
 Check AS-built marked ups for correctness
 Offer for NDT& review of Radiographs
 Feed back to welders regarding their performance
 Prepare Test Packs

Piping

 Reviewing vendor drawings & documents, checking piping layouts & inter discipline drawings/
documents.
 Preparing the weld mapping of isometric drawings and dimension and material check of
computed spools.
 Identifying the material (pipes, flanges, fittings, etc) As per the material take off list and
isometric drawings during the fabrication.
 Preparing the inspection request prior to accept the construction piping / welding work,
pressure testing g and releasing of fabricated pipe lines in order to prepare certification for the
completed items.
 Monitoring and inspecting the fit up, root run and all subsequent passes for pipe joints with
dimension and orientation during fabrication of spool in fabrication shops.
Welding

 Monitoring welder performance and conduct visual inspections of welds and repairs of welds in
accordance with company procedure and international codes of practice.
 Checking, inspecting and testing incoming welding and construction materials to ensure they
meet project specification requirements.
 Managing the construction process from all aspects to ensure performance meets job quality in
accordance with company procedure and international standard.
 Coordinating with clients to undertake Procedure Qualification Test (PQT) and inspect of
prepared test specimen and witness destructive test.
 Identifying Welding Procedure Specification (WPS) and PQR for job as per project specification
and verify Welders meet PQR requirements.
 Collating all relevant documentation for the job and apply for the data to the creation of a Test
Pack to undertake pre-hydro test inspection activity.
 Conducting fit up and dimension inspection as per Inspection and Test Plan (ITP) and provides
technical guidance for welding sequence and distortion control.
 Reviewing final Packages for Hydro-Tests, approving & releasing for Hydro-Test.
 Formulating Isometric Control Sheet as per piping index sheet (Hydrostatic Test Package).
 Reviewing Manifold Certificate, Pressure Gauges and Relief Valve during Hydro Test.
 Controlling non-conformance reports and undertaking remedial action.
 Coordinate ,supervise the WPS/PQR and Welders Qualification tests and Prepare necessary
 Welding Inspection before, during and after welding
 Monitoring the NDT offer as per Specifications and maintaining the register
 Punch list and Check list Clearing
 Ensure the preparation of the Quality Mechanical works dossier for final handover to the Client
 Must comply with the company/client safety standard
 Working with ASME Sections 2/5/9,ASME B31.3
 ONGC SPEC,EIL SPEC,ASME B16.5,B16.9,B16.28,B16.19

M/S Tube Products Incorporate Baroda ( Jan 2005 to Jan 2007 )

Plants - Oil/Gas &Petroleum /Largest fitting Manufactures


Scope of Work - Inspection of Welded & Seamless Pipes & Fitting

 Closely coordinate with production to schedule Inspection stages timely


 Carry out in coming Inspection of project material &give disposition
 Prepare daily inspection reports and quality action not

 Material Identification (Traceability) Checking of pipe, piping components grade, schedule, size,
rating as per the isometric drawing requirement shall be done
 Physical condition of the base material to be verified
 Report the findings and give dispositions, ie. Accepted, Rework or Reject
 Check that approval of all necessary documentation has been obtain
 Monitoring and controlling team work
 Implementation of quality system at the site as per QAP

 coordinating with Third party Inspection agencies like BVIS,CEIL


 Must comply with the company/client safety standards

References
1)javidmechmus@redifmail.com : SR. QA/QC engineer (L&T Hydrocarbon Engineering LTD Surat)
Tel no: 0091 9879113206
2) akhtar_husain@intenc.com: SR. QA/QC engineer ( L&T Hydrocarbon Engineering LTD Surat)
Tel no: 0091 9879113212

Tarik Ghasura
M-09998642464

You might also like