Professional Documents
Culture Documents
V B PDF
V B PDF
Arrears Outstanding for the Financial Year (`) Slab Calculation Connection Details
Description Previous Current Total (`) Unit Rate Amount (`) Tariff Category NDS
SOP Charges 0.00 12247.60 12247.60 394 6.350 2501.90 Flats in BS (DS) NA
F.S.A. 0.00 708.55 708.55 Total 2501.90 Supply Voltage(kV) 0.23KV
Surcharge 0.00 133.00 133.00 Applicable Tariff on Read Date: Sanctioned Load (kW) 3.00
E. Duty 0.00 191.50 191.50 MMC(`) 3337.00
M. Tax 0.00 257.37 257.37 Cons. Security (`) 3000.00
Fixed Charges 0.00 0.00 0.00 Meter Security (`) 600.00
Excess Credit 0.00 0.00 0.00 Meter Ownership/MDI Meter NM/
Total Arrear 0.00 13538.02 13538.02 Meter Make/Meter Type L & T /1-PH-MTR
Details of Charges for Current Cycle Details of Amount Payable Last Payment Details
Description Amount (`) Description Amount (`) Amount(`)
Fixed Charges 0.00 Current Cycle Charges 3686.51 Receipt No
Energy Charges 2501.90 Arrears/Outstanding Dues 13538.02 Receipt Date
MMC/FC for Reconnection 0.00 Sundry Charges/Allowances 0.00/0.00 Mode of Payment
Amount to cover MMC 835.10 Provisional Adjustment/BR Adj. -13405.00 Previous Consumption Pattern
Fuel Surcharge Adjustment 145.78 LPS Adjustment 0.00 Units Units
Bill month MDI Status
Reliability Charges 0.00 Other Non-Energy Charges 0.00 (KWH) (KVAH)
Excess Load Surcharge 0.00 Net Payable Amount
3820.00
Capacitor Surcharge 0.00 On Or Before Due Date(`) In case of bill is not paid within 7 days of due date the supply
Meter Service Charges 94.67 Surcharge(`) 117.00 shall be liable to be disconnected without any further notice.
Line Service Charges 0.00 Gross Amount Payable After Date from which bill other than "OK" Reason:
Due Date(`) 3937.00 is being issued:
Capacitor Service Charges 0.00
Solar Rebate / BS Rebate 0.00/0.00 Brief details of Sundry charges /allowances*
W. Rbt. / Govt. Subsidy 0.00/0.00 12224/2019/00358
Electricity Duty 39.40
Municipal Tax 69.66
Total Current Cycle
3686.51
Charges (`)
Page 1 of 1