Professional Documents
Culture Documents
Bharatmala Package-IV
Bharatmala Package-IV
PKG-IV
SAHA
Project
Road
SAHA
Under this project, between Bheja(Madhubani) and Bakaur(Supaul), bridge over Kosi is
proposed which is under Seismic zone V.
During the high level technical committee meeting between NHAI & Consultant
on submitted inception, Feasibility and IIT reports, it was decided to submit details of
comparison on following four alternatives.
COMPARISON ALTERNATIVES
OF KOSI BRIDGE
SUMMARY OF ALL ALTERNATIVES
11200 m Extradose
long d Bridge of
3536 m long
Precast 2036 m
3535 m long bridge bridge with 10200 m long Precast
Description Segment (span 180
with 2035 m long 2036 m long Segmental Box Girder
of al Box m) and
Extradosed Bridge Extradosed Bridge of 60 m span with
alternative Girder rest 7664
(Span=125m) Bridge approach roads
Bridge of m bridge
(Span=180m)
50 m of 50 m
span span
Total Length
3535m 3536m 11200m 11136m 10200m
of Bridges
Guide Bund
11072 11072 0 0 0
Length
Total cost of
597 681 1416 1639 925.1
Bridges
Guide Bund
413 413 0 0 0
Cost (Crore)
High
Embankmen
t with slope
Protection 153 153 0 0 59.19
and
launching
Apron
Land
Acquisition 220 220 28.95 28.95 28.95
(Rs)
R&R Cost
to be R & R cost
Guide bund area
added for of affected
as per Hydraulic NA NA NA
villages in villages to
Model study
Guide be added.
bund area
module of 4x60m=240m
road protection
In the light of above the details project report was prepared with following silent features.
Latitude 26°05’16” N
Location of Bridge
Longitude 86°27’12” E
District Madhubani/Supaul
State Bihar
Overall Width 16 m
Carriageway Width 11 m
Design H.F.L 50 m
In the light of above silent feature of the project, it was also decided with NHAI meeting to
determine optimal bridge length without guide bund, maximum scour depth and protection
works for approach roads. The bank to bank width of the river was measured as 11.2 km
and a bridge length of 10.2 km with 400m of approach road on western bund side and 550m
on eastern bund side was considered for mathematical modeling and think about the pile
foundation over well foundation. Consultant and IIT Roorkee has submited its report as
follows.
In the final discussion after considering all parameters it was decided to submit cost
estimate, which was prepared by Consultant amounting Rs. 984.29 Cr.
This will be the longest road bridge 10.2km length in India. At present, the Dhola Sadia
bridge is the longest bridge over Brahamputra river in between Arunachal Pradesh and
Assam
After clearance by NHAI, tender was invited in which lowest bidder Gammon
Engineers & Contractors Pvt. Ltd quoted its rates 11.96% above estimated rate which
under approval by competent authorities.
GENERAL ARRANGEMENT
OF KOSI BRIDGE
TYPICAL CROSS SECTION
DIMENSION DETAILS OF
SEGMENT AT MID SPAN
DIMENSION DETAILS OF
ABUTMENT
DIMENSION DETAILS FIXED PIER AND
SEISMIC STOPPERS
TYPICAL CONSTRUCTION SCHEME
OF 4X60m MODULE