Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PROYEK PEMBANGUNAN FASILITAS PERKERETAAPIAN UNTUK MANGGARAI S/D

JATI NEGARA"PEKERJAAN JALAN REL"

FIELD DENSITY

Tanggal (Date) :06-4-2017


Lokasi (Location) :BOGOR LINE 1
Elevasi (Elevation) :LAYER 5
Kedalaman Lubang Tes (Depth of hole) 10 cm 10 CM
Station
KALIBRASI PASIR (SAND CALIBRATION)
Y Berat Jenis Pasir (Specivic gravity of sand) gr/cm3 1.347
w Berat Pasir didalam Corong (Weight of sand on cone) gr 1576
VOLUME LUBANG (VOLUME OF HOLE)
1 Berat Pasir + Botol (sebelum) (Weight sand + bottle (before)) gr 7730
2 Berat Pasir + Botol (setelah) (Weight sand + bottle (after)) gr 3422
3 Berat Pasir dalam lubang (Weight of sand on hole) gr 4308
4 Berat Pasir dalam corong (Weight of sand on cone) gr 1576
5 Berat Pasir didalam lubang (Weight of sand on hole) gr 2732
6 Volume lubang (5:Y) (Volume of hole (5:Y)) cm3 2028.2
BERAT JENIS BASAH (WET SPECIFIC GRAVITY)
7 Berat Contoh Basah (Weight of wet sample) gr 3987
8 Berat Jenis Basah (7/6) (Wet specific gravity) gr 1.965
KADAR AIR (WATER CONTENT)
9 Kadar air (Speedy) (Moisture content) % 34.11
10 Kadar air Optimum (Lab) (Optimum Moisture Content) % 27.9
KOREKSI KEPADATAN (DENSITY CORRECTION)
11 Kepadatan kering Max (Lab) (Maximum dry density) gr/cm3 1.501
12 Berat Contoh tertahan 3/4 (Weight of sample) %
13 Berat contoh 3/4 (Weight of sample 3/4) %
14 Berat Jenis kering koreksi (Dry Specific gravity Correction) gr/cm3
15 Berat Jenis kering contoh(8/(9+100))x100 (Dry Specific gravity) gr/cm3 1.465
16 % Kepadatan (15/11x100) (% Density) % 97.65

Keterangan :
(Description)

Jakarta, …………………..

Diketahui oleh Diperiksa Oleh Disiapkan oleh


(Knowing By) (Checked by) (Prepared by)

( ……………………….…… ) ( ……………………….…… ) ( ……………………….…… )

DDT-QC

You might also like