Cheek Sheet

Civil

Wooden Door Frame Fixing


Pg 1 of 1
Project: Date:
Client:
Contractor:

Description/Activity: Location/Block/Tower
Location:
Reference Drawing no:

Comments of
Check points Comments of Contractor
Forum's Engineer

1)Type of door frame is correct as per relevant drawing ,opening location


and size?

2)The door frame is correct as per dimensions,


straightness,cracks, joints and/or any other visible defects?

3)Hold Fasts are correct as per specification and nos.?

4)Door Frame Opening sides are in Plumb?

5)Pockets in Brick Masonry are chipped off for correct positioning


of door frame alongwith Hold Fasts?
6)Check the final alignment and plumb of the door frame and also
NO gap between door frame and plastered wall surface
7)Check the concrete has been properly used for packing of
masonry pocket in Hold Fast locations?(Min. 7 days curing of
concrete is recommended)
8)Ensure Door Frame should not be disturbed for 24 hours after
fixing

Any other points to check:

1)

2)

3)

Signature of Contractor : Signature of


Forum's Engineer
Remarks on Acceptance of work by Forum's Engineer:

Checked By(QC Dept

Approved By(PM) Date and Time