PT.

WIJAYA KARYA BETON


PPB SUMUT Form : WB-PCP-PS-03-F02 Rev: 00

1.Produksi
RENCANA PRODUKSI 2018 2.TM
3.LAT
Periode : Minggu ke 38
VOLUME Sept Okt Nov Des
Jlr Cet JADWAL
RA RI STOCK SISA PROD 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
NO SPPrB/NPP/Pesanan/Proyek Tipe Produk Ra Ri 20.Sep 27.Sep 04.Okt 11.Okt 18.Okt 25.Okt 01.Nov 08.Nov 15.Nov 22.Nov 25.Nov 29.Nov 06.Des 13.Des 20.Des KET
SPPrB Mg Mg +/- 26.Sep 03.Okt 10.Okt 17.Okt 24.Okt 31.Okt 07.Nov 14.Nov 21.Nov 24.Nov 28.Nov 05.Des 12.Des 19.Des 26.Des
20.Sep 20.Sep 20.Sep 37 37 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 5.0 6.0 6.0 6.0 6.0 6.0 5.0
274/PI/SPPRB/IX/WP-I/18 (M) 80.A1.BM.12.9.B 642 642 2 12 28 36 36 36 60 60 50 60 60 60 60 60 24
Pembangunan Perumahan,PT 80.A1.M.12.9.B 642 124 124 518 2 12 24 24 24 24 48 48 40 48 48 48 48 48 34
Proyek Perkantoran Inalum di Kuala Tanjung,Sumut (PO.23)
Cetakan 4 4 5 5 5 9 9 9 9 9 9 9 9 6
batang perhari 8 9 10 10 10 18 18 18 18 18 18 18 18 12
Diski, 20 Sep 2018
Mengetahui, Dibuat oleh

Suheryanto Abdul Wakhid Hasan


MPPB M.PEP
NB :
01. Tambahan 1 set dari CLT per tanggal 09 Oktober 2018
02. Tambahan 4 set asesoris cetakan per tanggal 1 Nopember 2018