A4 Panathur Schedule

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 7

R E T A I L   S O U T H  -  PANATHUR

CONSTRUCTION OF NRO - PLOT SIZE 38 M X 25 M
D  E  T  A  I  L  E  D      B  A  R      C  H  A  R  T     -     7   W  E  E  K  S

1 2 3 4 5 6 7 8 9 10 ### ### 13 ### ### 16 ### ### 19 ### 21


Sl No. Description Start Date End date

10-Aug-19

12-Aug-19

13-Aug-19

14-Aug-19

15-Aug-19

16-Aug-19

17-Aug-19

18-Aug-19

19-Aug-19

20-Aug-19

21-Aug-19

22-Aug-19

23-Aug-19

24-Aug-19

25-Aug-19
11-Aug-19
5-Aug-19

6-Aug-19

7-Aug-19

8-Aug-19

9-Aug-19
Total Project 5-Aug 21-Sep                                          

1 Site preparation 5-Aug 5-Aug      


  
2 TANKS
Marking, Excavation & Dressing 5-Aug 5-Aug  
Excavationof 20KL tank 6-Aug 7-Aug    
PCC 7-Aug 7-Aug  
Beam for 20 KL 8-Aug 9-Aug    
e) Brick Masonry & Plastering 10-Aug 10-Aug
Installation of Tank 11-Aug 11-Aug  
Backfilling 12-Aug 13-Aug    
RCC Slab as curb 27-Aug 8-Nov

3 CANOPY
Excavation soil upto 1.50 m 10-Aug 12-Aug      
Foundation - PCC 1:4:8 mix 13-Aug 15-Aug      
RCC HYSD Steel Bars 14-Aug 15-Aug    
Foundation - RCC 1:11/2:3 16-Aug 20-Aug          
RCC Pedestal 21-Aug 25-Aug          
Backfilling 22-Aug 26-Aug        

4 Front Culvert
Exit and Entry Approach Alternatvely
Excavation 13-Aug 15-Aug      
PCC 16-Aug 16-Aug  
RR Masonry 17-Aug 19-Aug      
RCC Slab 20-Aug 20-Aug  
Open Drain wall 2 sides 21-Aug 21-Aug  
Backfilling 22-Aug 22-Aug  
Open drain
Excavation 27-Aug 28-Aug
PCC 28-Aug 28-Aug
RR Masonry 29-Aug 31-Aug

5 SALES BUILDING
Exe.soil upto 1.5M 10-Aug 10-Aug  
PCC for footing 10-Aug 11-Aug    
Steel binding for Footing 11-Aug 13-Aug      
RCC for sales bldg footing 14-Aug 16-Aug      
Column rcc upto plinth 17-Aug 18-Aug    
Back filling foundation 19-Aug 20-Aug    
Excavation, PCC & bar bending for Plint 20-Aug 21-Aug    
Shuttering for PB 21-Aug 21-Aug  
Placing of PB Reinforcement 22-Aug 22-Aug  
RCC for Plinth Beam 23-Aug 23-Aug  
RCC Column upto roof beam 24-Aug 26-Aug    
BW upto FFL 24-Aug 26-Aug    
Back filling basement 27-Aug 28-Aug
Sand filling & PCC for flooring 28-Aug 29-Aug
Masonry work including lintel 26-Aug 31-Aug
Bar bending & Shuttering for roof 1-Sep 3-Sep
RCC 1:1.5:3, for slab 4-Sep 4-Sep
Plastering Inside 8-Sep 10-Sep
Plastering Outside 10-Sep 12-Sep
Tiling 11-Sep 12-Sep
P & L IPS flooring 50 mm thick 11-Sep 12-Sep
Water ProofingSales bldg. roof top 6-Sep 7-Sep
S/F Plain/Frosted glass 12 mm thick 13-Sep 14-Sep
P & F Frame work for fixed glass 13-Sep 14-Sep
SANITARY 8-Sep 10-Sep
Construction of septic tank 2-Sep 9-Sep
Construction of soak pit 3-Sep 10-Sep
Painting 14-Sep 18-Sep
Electrical fitting fixing and finishing 9-Sep 21-Sep
Handingover 21-Sep 21-Sep
U T H  -  PANATHUR

O - PLOT SIZE 38 M X 25 M
C  H  A  R  T     -     7   W  E  E  K  S

### ### 24 ### ### 27 ### ### 30 ### 32 33 ### 35 ### ### 38 ### ### 41 ### ### 44 ### 46 ### 48
26-Aug-19

27-Aug-19

28-Aug-19

29-Aug-19

30-Aug-19

31-Aug-19

10-Sep-19

13-Sep-19

14-Sep-19

15-Sep-19

16-Sep-19

17-Sep-19

18-Sep-19

19-Sep-19

20-Sep-19

21-Sep-19
12-Sep-19
11-Sep-19
1-Sep-19

2-Sep-19

3-Sep-19

4-Sep-19

5-Sep-19

6-Sep-19

7-Sep-19

8-Sep-19

9-Sep-19
                                                     

 

   
 
     

 
 
   
   
           
     
 
     
     
   
   
   
   
   
     
               
               
         
                         

 

R E T A I L   S O U T H  -  PANATHUR
CONSTRUCTION OF NRO - PLOT SIZE 38 M X 25 M
D  E  T  A  I  L  E  D      B  A  R      C  H  A  R  T     -     7   W  E  E  K  S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
Sl No. Description Start Date End date
6 DRIVE WAY & ROAD WORK
230mm soling 21-Aug 26-Aug            
230mm thick compacted W.M.M using
stone agg.50-75mm
27-Aug 29-Aug      
Laying of Hume pipe for Rainwater 17-Aug 18-Aug    
Laying of Hume pipe for cables 17-Aug 18-Aug    
Laying of paver block 8-Sep 10-Sep
Approach work Bitumen/Paver 12-Sep 14-Sep
7 PUMPS Island
Excavation for rain water chamber 10-Aug 12-Aug      
PCC below 150 mm dia hume pipe 13-Aug 14-Aug    
150 dia Hume pipe laying from rain 15-Aug 16-Aug    

water chamber to oprn drain


Backfilling 17-Aug 18-Aug    
23-Aug 25-Aug      
4 35 36 37 38 39 40 41 42 43 44 45 46 47 48

     
     

     
Installation of Pump inlcuidng stand
Electrical cable laying for pump 23-Aug 25-Aug      
Commisioning of pumps 27-Aug 29-Aug    
Pump Island granite fixing 11-Sep 13-Sep
8 PIPE LINES
Excavation for Product line tranch 15-Aug 12-Aug
PCC for trench 13-Aug 14-Aug    
Masonry wall for trench 15-Aug 21-Aug              
Laying of product line 22-Aug 24-Aug      
Filling of trench with sand 25-Aug 25-Aug  
Pre cast slab on Trench 26-Aug 31-Aug            
9 KERB WALL
Excavation ordinary soil upto 1.5m 9-Sep 11-Sep Foundation - PCC 1:4:8 mix 12-Sep 12-Sep
Brick Masonry in foundation in C.M1:6 13-Sep 15-Sep
Cement Plastering 12mm Tk 16-Sep 18-Sep
      
  
      
      
Painting with White cement paint
(snowcem)-2 Coats
16-Sep 18-Sep
      
13-Aug 14-Aug    
15-Aug 21-Aug              
22-Aug 24-Aug      
25-Aug 25-Aug  
26-Aug 31-Aug            

9-Sep 11-Sep Foundation - PCC 1:4:8 mix 12-Sep 12-Sep