WPR September 1
WPR September 1
Page 1 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE PRO
VI)
ENGINEERING
ENGINEERS INDIA LTD (EIL)
CONSULTANT
CONSTRUCTION
INTERTEK INDIA PRIVATE LIMITED
SUPERVISION
Inde
S.No. Description
1 Project Details
iProject Brief
2 HSE Status
Page 2 of 101
3 Doc./Drg. Deliverables
4 Procurement Status
7 Construction Progress
9 Manpower status
10 Equipement Stauts
11 QC/QC Status
Signature
Date
Page 3 of 101
ELINE PROJECT- PHASE-II (Section-
ress Report
AL LTD.(CEIL)
MITED
Index
Page 4 of 101
5
distribution system 8
10
11
12
13
14
For CS For GIGL
Page 5 of 101
8-Sep-2019
Sep To 07 Sep
Page 6 of 101
For GIGL
Page 7 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE
PHASE-II (Section-VI)
PROJECT BRIEF
Page 8 of 101
Pipe Material API 5L Gr. X-70, PSL-2
Pipe Type LSAW/ HSAW
Design Pressure 98 BAR
Project Schdule
LOA Date
Name
Signature
Date
Page 9 of 101
PELINE PROJECT-
I)
port
Section-VI
EIL)
Station Details
SARSANA) CH.24.900KM
ADWA) CH.51.563KM
UNGAD) CH.80.590 KM
Page 10 of 101
:: 27-March-2019
:: 27-September-2020
:: 27-October-2020
:: NA
For GIGL
Page 11 of 101
PROJECT : MEHSANA-BATHINDA PIPELIN
(Section-VI)
HSE Status
DETAIL-1
Up to Previous Week
SL.No Description Cummulative
1 Safe Manhours
DETAIL-2
1 Near Mis 0
2 First Aid Case 0
2.1 Minor 0
2.2 Major 0
2.3 Environmental Case 0
3 Accident/Inccident 0
4 Fire 0
Page 12 of 101
5 Inspection/Audit/visit 0
6 Tool Box Talk/HSE Meeting 0
7 No. Awareness Programs 0
Manhours loss due to fire and
8 0
accidents
DETAIL-2
SL.No Description
1 Whether workmen compensation policy taken
2 Whether workmen compensation policy is valid
3 Compensation raised with insurance
4 Compensation cases resolved and paid to workmen
For EPC For CS
Name
Signature
Date
Page 13 of 101
PIPELINE PROJECT- PHASE-II
n-VI)
ess Report
tatus
AIL-1
AIL-2
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Page 14 of 101
0 0
0 0
0 0
0 0
0 0
AIL-2
Yes No Remark
For GIGL
Page 15 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE
PHASE-II (Section-VII)
CONSTRUCTION SUPERVISION
A286-GIGLS-105A00/MBPL-II/Section-VII/ WPR-1
Executive Summary
Major Highlights of the week
Sr. No Engineering
Sr. No Procurement
Sr. No Construction-Pipeline
Sr. No Construction-Station
Page 16 of 101
Page 17 of 101
IPELINE PROJECT-
II)
eport
Report Date 0
Progress Date 0
Status as of : 30-Dec-99
ry
week
Page 18 of 101
Page 19 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE PROJECT- PHASE-
1 Pipeline
2 Station Piping
3 Civil
4 Electrical
5 Instrumentation
Page 20 of 101
6 CP System
B.Document
Approved by
Sl.No Description Total Nos. of Procedure Submitted to CS/GIGL TPIA/CS/GIGL
1 General (Including HSE) 7 0
2 Project Management 5 0
3 QA/QC 16 0
4 Pipeline 37 0
5 Station Piping 8 0
6 Mechanical 1 0
Electrode Qualification Test 4 0
7 Record for Pipeline/ Piping
Name
Signature
Date
Page 21 of 101
HASE-II (Section-VI)
Approval Status
Approved in code 1 Balance
Under Review Total RECD Remarks
&2 Submission
Page 22 of 101
Commented by Balance to be Submitted Remarks
TPIA/CS/GIGL
0 7
0 5
0 16
0 37
0 8
0 1
0 4
0 4
0 12
0 27
0 15
0 15
0 16
0 30
For GIGL
Page 23 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE PROJEC
Procure
Ordered Quantity Check
SL No Items. UOM
Scope Qty Variance (If any)
MAINLINE
Page 24 of 101
3 Casing Pipes Mtrs. 0
Page 26 of 101
1 Pig Launcher/ Receiver with Jib Crane & Pig Signaller Nos
Page 27 of 101
1 Transformer
2 LV Switchboard
3 AC-UPS
4 DG Set
5 Air Conditioner
6 Capacitor bank
7 VCB
8 Cable Glands
9 Light Fixture and accessories
10 Solar street Lights
11 Poles
12 Cable Trays
13 Wires
14 Cables
15 Earthing Material
16 Electrical Bulk
17 Battery Charger
INSTRUMENTATION
1 Local Control Panel
Page 28 of 101
2 Gas Detection System with detectors
3 Pressure/ Temperature Gauges
4 Pressure/ Temperature Transmitter
5 Temperature Elements
Non-Intrusive type pig signaller
6 Ultrasonic Type
7 PSV
Name
Signature
Date
Page 29 of 101
NE PROJECT- PHASE-II (Section-VI)
ess Report
Report Date 8-Sep-2019
Procurement Status
Received
LOI / PO Qty
Vendor details LOI / PO number/Inv. No & date/Ref. Qantity At
(Latest Qty) Site
Ratnamani 1-Apr-2019
5-Jun-2019
NSSL-Italia Srl
Page 30 of 101
Advance Electronics
Systems 22-May-2019
Corrtech (In-house)
Corrtech (In-house)
8-Aug-2019
Sparco Multiplast
Lincoln
Page 31 of 101
4-Jun-2019
Aksh Optifiber
Page 32 of 101
Control Plus Oil & Gas Solutions Pvt. 23-May-2019
Ltd.
5-Jun-2019
NSSL-Italia Srl
29-May-2019
Flowchem Industries
Page 33 of 101
Page 34 of 101
For GIGL
Page 35 of 101
Remarks
Page 36 of 101
Order Under finalization
Page 37 of 101
Submitted for GIGL
approval
Page 38 of 101
Revised doc. under DEC
review. Shared on 03.09.19
Page 39 of 101
Page 40 of 101
Page 41 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE P
Weekly Progress
Materials Delive
1 Line Pipes
Page 42 of 101
8
10
11
12
For EPC
Name
Signature
Date
Page 43 of 101
HINDA PIPELINE PROJECT- PHASE-II (Section-VI)
ONAL LTD.(CEIL)
IMITED
Materials Deliverable
Previous
UOM Scope This Week
Week
KM 110.229
Page 44 of 101
For CS For GIGL
Page 45 of 101
-Sep-2019
ep To 07 Sep
Cumm.
Page 46 of 101
IGL
Page 47 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE PROJECT- PHASE-
Construction
Page 49 of 101
TOTAL 0.00% 0.00% 0.00% 0.00% 0.00%
Name
Signature
Date
Page 50 of 101
CT- PHASE-II (Section-VI)
rt
bution system
Difference for the Remarks
week
0.00%
0.00%
0.00%
Page 51 of 101
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Page 52 of 101
0.00%
For GIGL
Page 53 of 101
PROJECT : MEHSANA-BAT
We
Co
A.Pipeline
Page 54 of 101
10 HDPE Laying Mtrs. 110229
Highlights:-
B.Station
Excavation(Cum)
Sl No. Station For the week
Scope
Plan Achived
1 020-SV-2001
2 020-SV-2002
3 020-SV-2003
Backfilling(Cum)
For the week
Scope
Plan
1 020-SV-2001
2 020-SV-2002
3 020-SV-2003
Water proffing(Sq Mtr)
For the week
Scope
Plan
1 020-SV-2001
2 020-SV-2002
Page 55 of 101
3 020-SV-2003
Highlights:-
For EPC
Name
Signature
Date
Page 56 of 101
EHSANA-BATHINDA PIPELINE PROJECT- PHASE-II (Section-VI)
Report Date
Progress Date
TD.(CEIL)
Page 57 of 101
Activity Description
PCC(Cum) RCC(Cum)
ek For the week For the week
Scope Scope
chived Plan Achived Plan
ng(Sq Mtr)
ek
Achived
Page 58 of 101
For CS
Page 59 of 101
)
8-Sep-2019
01 Sep To 07 Sep
Remarks
hived
10229 Completed
Page 60 of 101
CC(Cum)
week
Achived
ering(Sq Mtr)
For the week
Plan Achived
Page 61 of 101
For GIGL
Page 62 of 101
PROJECT : MEHSANA-BATHINDA P
Weekly P
Nex
A.Pipeline
2 Trenching Mtrs.
3 Stringing Mtrs.
5 Tie-In Nos.
8 Lowering Mtrs.
Page 63 of 101
10 Backfilling Mtrs.
B. Station Civil
Sl No. Station UOM
Site levelling, boundary wa
1 020-SV-2001 (SARSANA) up.
2 020-SV-2002(LADWA)
3 020-SV-2003(KUNGAD)
4
5
C.Other Works
1
For EPC
Name
Signature
Date
Page 64 of 101
INDA PIPELINE PROJECT- PHASE-II (Section-VI)
Report Date
Progress Date
Page 65 of 101
Activities Remarks
dary wall point marking,soil filling,store room and water tank set
Page 66 of 101
8-Sep-2019
01 Sep To 07 Sep
Remarks
Page 67 of 101
Remarks
For GIGL
Page 68 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE
VI)
Weekly Progress R
Manpower Deploymen
SL No. EQUIPMENT DETAIL
1
RESIDENT CONSTRUCTION MANAGER /SECTION
INCHARGE (NOTE- 5)
2 LEAD PLANNING ENGINEER/MANAGER (NOTE- 5)
8 QUANTITY SURVEYOR
9 PLANNING ENGINEER
10 QA/QC ENGINEER
Page 69 of 101
11 LEAD WELDING/ NDT ENGINEER
13
FOREMAN / SUPERVISOR {For Front End Activities 4
nos}
14 DRAFTSMAN / SURVEYOR
15 DOCUMENT CONTROLLER
16 STORE KEEPER
17 WELDER
18 FITTER
19 GRINDER
20 MACHINE OPERATOR
23 RIGGER
24 DRIVERS
26 SAFETY SUPERVISOR
29
PAY WELDER CREW ( M/L WELDING, TIE-INS &
CROSSINGS)
30 X-RAY CREW
31
AUT CREW (M/C WITH 2 OPERATORS)- AS
APPLICABLE
Page 70 of 101
32 HYDROTESTING CREW
35 HDD CREW
37 CP CREW
38 GPS CREW
39
OTHER SKILLED / SEMISKILLED / UNSKILLED
WORKERS
For EPC
Name
Signature
Date
Page 71 of 101
HINDA PIPELINE PROJECT- PHASE-II (Section-
VI)
ONAL LTD.(CEIL)
IMITED
1 0
1
1 1
0
1
0 1
1
1 0
1 1
0
2
1 1
2
1 1
2 1
1
2
1 1
Page 72 of 101
2
1 1
36(10/10/8/4/4) 7
29
36
4 32
8
1 7
4
1 3
4
2 2
30
4 26
16
1 15
24
4 20
62
5 57
12
0 12
24
1 23
60
14 46
50 5
45
4
0 4
As Req.
1
As Req.
0
As Req.
0
28
0 28
2
0 2
2
0 2
Page 73 of 101
4
0 4
6
0 6
6
0 6
As Req.
0 0
2
0 2
2
0 2
2
0 2
140
11 129
Page 74 of 101
8-Sep-2019
Sep To 07 Sep
arks
Page 75 of 101
Page 76 of 101
GIGL
Page 77 of 101
PROJECT : MEHSANA-BATHINDA PIPELI
(Section-VI)
Weekly Progress Re
Equipment Deploymen
SL No. EQUIPMENT DETAIL
CATEGORY - 1
Page 78 of 101
AUTOMETIC WELDING SET for 18" (1+5 welding units per set Including
5 Pipe Facing M/c and Internal Clamp) See note xx
SEMI AUTO WELDING M/C / PAY WELDER EACH SET (FOR MAINLINE, TIE-
6 INS & CROSSINGS) AS APPLICABLE
9 GRADER
11 HYDRA (8 TO 14 T)
18 UT MACHINE (MANUAL)
24 DEWATERING PUMP
26 DOZING PUMP
27 PIPE LOCATOR
28 DEAD WT TESTER
29 MOBILE WORKSHOP
30 DUMPER/TRIPPER
Page 79 of 101
CONCRETE MIXER M/C with Digital Weigh Batching system / Self Loading
31 Concrete Mixer(Argo 2500 or eq)
32 GUNITING M/C
33 TOTAL STATION
For EPC
Name
Signature
Date
Page 80 of 101
BATHINDA PIPELINE PROJECT- PHASE-II
(Section-VI)
L LIMITED.
IMITED
8 8
0
4 3
1
2 2
0
2 2
0
2 2
0
12 12
0
0
10 10
0
4 4
0
2 0
0
2 2
0
Page 81 of 101
2 2
0
28 28
0
2 2
0
4 4
0
2 1
1
20 15
5
4 4
0
3 3
0
6 6
0
4 4
0
6 3
0
24 14
10
6 5
1
2 1
1
2 2
0
2 2
0
2 2
0
8 8
0
6 1
5
As Req. 0
0
6 4
2
2 2
0
2 2
0
2 2
0
2 2
0
4 4
0
Page 82 of 101
4 4
0
As Req. 0
0
2 1
1
4 4
0
As Req. 0
0
4 4
0
4 4
0
10 10
0
4/32 4/32
0
4 4
0
2 0
0
2 1
1
As Req. 0
0
2 2
0
28 28
0
For CS For GIGL
Page 83 of 101
-Sep-2019
ep To 07 Sep
marks
Page 84 of 101
Page 85 of 101
GIGL
Page 86 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE PROJECT- PHASE-I
QA/QC Satus
FOR SER
1 HSE 0 0 - -
2 Civil 0 0 - -
3 Mechanical 0 0 - -
4 Electrical - - - -
5 Instrumentation - - - -
6 QA - - - -
Page 87 of 101
Total 0 0 0 0
Abbreviation: FOR - Field Observation Report, SER - Site Engineer Request, NCR - Non Conformance Report, MDR - Material Discrepancy Report, C
Name
Signature
Date
Page 88 of 101
PHASE-II (Section-VI)
0 0 - - 0 0
0 0 - - 0 0
0 0 - - 0 0
0 0 - - 0 0
- - - - - -
- - - - - -
Page 89 of 101
0 0 0 0 0 0
ncy Report, CAR - Corrective Action Report
CS For GIGL
Page 90 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE PROJECT- PHASE-I
Page 91 of 101
2
Name
Signature
Date
Page 92 of 101
PHASE-II (Section-VI)
l Issues
Target Forecast
Action Required Resp. date date
Page 93 of 101
For GIGL
Page 94 of 101
PALANPUR PALI PIPELINE PROJECT
Progress Measurement System
Wtg% Planned
Activity ID Description UOM Scope Qty. Wtg%