PROJECT : MEHSANA-BATHINDA PIPELINE PROJECT- PHASE-II (Section-VI)

Weekly Progress Report


OWNER GSPL INDIA GASNET LTD (GIGL) Report Date 8-Sep-19
ENGINEERING CONSULTANT ENGINEERS INDIA LTD (EIL) Progress Date : From 01 Sep 2019 To: 07-Sep-2019
CONSTRUCTION SUPERVISION INTERTEK INDIA PRIVATE LIMITED

TPIA CERTIFICATION ENGINEERS INTERNATIONAL LTD.(CEIL)

CONTRACTOR CORRETECH INTERNATIONAL PRIVATE LIMITED

Weekly Progress Report No:

Annexure: MBPL-Phase-II (Section-VI)

Date Issued For Prepard BY (CIPL) Checked By Approved By (CS/GIGL)

Page 1 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE PRO
VI)

Weekly Progress Repo

OWNER GSPL INDIA GASNET LTD (GIGL)

ENGINEERING
ENGINEERS INDIA LTD (EIL)
CONSULTANT

CONSTRUCTION
INTERTEK INDIA PRIVATE LIMITED
SUPERVISION

TPIA CERTIFICATION ENGINEERS INTERNATIONAL LTD.(CE

CONTRACTOR CORRETECH INTERNATIONAL PRIVATE LIMITED

Inde

S.No. Description

1 Project Details

iProject Brief

2 HSE Status

Page 2 of 101
3 Doc./Drg. Deliverables

4 Procurement Status

5 Material Deliverable Status

6 %age Progress w.r.t weightage distributio

7 Construction Progress

8 Next Week Plan

9 Manpower status

10 Equipement Stauts

11 QC/QC Status

12 Project Critical Issues


For CIPL
Name

Signature

Date

Page 3 of 101
ELINE PROJECT- PHASE-II (Section-

ress Report

Report Date 8-Sep-2019

Progress Date 01 Sep To 07 Sep

AL LTD.(CEIL)

MITED

Index

scription Page No.

Page 4 of 101
5

distribution system 8

10

11

12

13

14
For CS For GIGL

Page 5 of 101
8-Sep-2019

Sep To 07 Sep

Page 6 of 101
For GIGL

Page 7 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE
PHASE-II (Section-VI)

Weekly Progress Report

OWNER GSPL INDIA GASNET LTD (GIGL)

ENGINEERING CONSULTANT ENGINEERS INDIA LTD (EIL)

CONSTRUCTION SUPERVISIONINTERTEK INDIA PRIVATE LIMITED

TPIA CERTIFICATION ENGI NEERS INTERNATIONAL LTD.(CEIL)

CONTRACTOR CORRETECH INTERNATIONAL PRIVATE LIMITED

PROJECT BRIEF

Project Name : MEHSANA-BATHINDA PIPELINE PROJECT- PHASE-II Section-V


Project No : A286-GIGLS-105000
PARTIES INVOLVED
Owner : GSPL INDIA GASNET LTD (GIGL)

ENGINEERING :ENGINEERS INDIA LTD (EIL)


CONSULTANT
TPIA :CERTIFICATION ENGI NEERS INTERNATIONAL LTD.(CEIL)
SECTION -VII
Pipeline Parameters
Rohtak Panipat Spurline : Ajitpura (Ch. 0.00 km) to 020-SVS- 020-SV-2001 (SARSANA
2004 (Ch.110.229 km)

Line size (OD) 18” (457 mm) 020-SV-2002(LADWA)


Length (km) 110.229 KM 020-SV-2003(KUNGAD)
WT (mm) 6.6/7.9/9.5/11.7 MM

Page 8 of 101
Pipe Material API 5L Gr. X-70, PSL-2
Pipe Type LSAW/ HSAW
Design Pressure 98 BAR

Max Operating Temp. (-) 20.0 to 60.0 Max / Min

Project Schdule
LOA Date

Contractual Mechanical Completion including Pre-Commissioning date

Contractual Commissioning date


Commissioning date as per Time Extension
For EPC For CS

Name

Signature

Date

Page 9 of 101
PELINE PROJECT-
I)

port

Report Date 8-Sep-2019

Progress Date 01 Sep To 07 Sep

Section-VI

EIL)

Station Details

SARSANA) CH.24.900KM

ADWA) CH.51.563KM
UNGAD) CH.80.590 KM

Page 10 of 101
:: 27-March-2019

:: 27-September-2020

:: 27-October-2020
:: NA
For GIGL

Page 11 of 101
PROJECT : MEHSANA-BATHINDA PIPELIN
(Section-VI)

Weekly Progress Rep

OWNER GSPL INDIA GASNET LTD (GIGL)

ENGINEERING CONSULTANT ENGINEERS INDIA LTD (EIL)

CONSTRUCTION SUPERVISION INTERTEK INDIA PRIVATE LIMITED

TPIA CERTIFICATION ENGINEERS INTERNATIONAL LTD.(CEIL)

CONTRACTOR CORRETECH INTERNATIONAL PRIVATE LIMITED

HSE Status
DETAIL-1

Up to Previous Week
SL.No Description Cummulative

1 Safe Manhours
DETAIL-2

SL.No Description Up to Previous Week


Cummulative

1 Near Mis 0
2 First Aid Case 0
2.1 Minor 0
2.2 Major 0
2.3 Environmental Case 0
3 Accident/Inccident 0
4 Fire 0
Page 12 of 101
5 Inspection/Audit/visit 0
6 Tool Box Talk/HSE Meeting 0
7 No. Awareness Programs 0
Manhours loss due to fire and
8 0
accidents

9 Induction Training Conduct on site 0

DETAIL-2
SL.No Description
1 Whether workmen compensation policy taken
2 Whether workmen compensation policy is valid
3 Compensation raised with insurance
4 Compensation cases resolved and paid to workmen
For EPC For CS

Name

Signature

Date

Page 13 of 101
PIPELINE PROJECT- PHASE-II
n-VI)

ess Report

Report Date 8-Sep-2019

Progress Date 01 Sep To 07 Sep

tatus
AIL-1

This Week Cummulative

AIL-2

This Week Cummulative

0 0
0 0
0 0
0 0
0 0
0 0
0 0
Page 14 of 101
0 0
0 0
0 0

0 0

0 0

AIL-2
Yes No Remark

For GIGL

Page 15 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE
PHASE-II (Section-VII)

Weekly Progress Report

OWNER GSPL INDIA GASNET LTD (GIGL)

ENGINEERING CONSULTANT ENGINEERS INDIA LTD (EIL)

CONSTRUCTION SUPERVISION

TPIA CERTIFICATION ENGI NEERS INTERNATIONAL LTD.(CEIL)

CONTRACTOR JSIW INFRASTRUCTURE PVT.LTD.

A286-GIGLS-105A00/MBPL-II/Section-VII/ WPR-1

Executive Summary
Major Highlights of the week
Sr. No Engineering

Sr. No Procurement

Sr. No Construction-Pipeline

Sr. No Construction-Station
Page 16 of 101
Page 17 of 101
IPELINE PROJECT-
II)

eport

Report Date 0

Progress Date 0

Status as of : 30-Dec-99

ry
week

Page 18 of 101
Page 19 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE PROJECT- PHASE-

Weekly Progress Report

OWNER GSPL INDIA GASNET LTD (GIGL)

ENGINEERING CONSULTANT ENGINEERS INDIA LTD (EIL)

CONSTRUCTION SUPERVISION INTERTEK INDIA PRIVATE LIMITED

TPIA CERTIFICATION ENGI NEERS INTERNATIONAL LTD.(CEIL)

CONTRACTOR CORRETECH INTERNATIONAL PRIVATE LIMITED

Document /Drawings Deliverable


A.Drawing
Scope Submission to
Client for
Sl.No Discipline No.of Drawing Review Code-4 (For
Code-1 Code-2 Code-3 INFO)

1 Pipeline
2 Station Piping
3 Civil
4 Electrical
5 Instrumentation
Page 20 of 101
6 CP System
B.Document
Approved by
Sl.No Description Total Nos. of Procedure Submitted to CS/GIGL TPIA/CS/GIGL
1 General (Including HSE) 7 0
2 Project Management 5 0
3 QA/QC 16 0
4 Pipeline 37 0
5 Station Piping 8 0
6 Mechanical 1 0
Electrode Qualification Test 4 0
7 Record for Pipeline/ Piping

8 WPS (Pipeline and piping ) 4 0


Procedure Qualification 12 0
9
Records
10 Civil & Structural 27 0
11 TCP 15 0
12 PCP 15 0
13 Electrical 16 0
14 Instrumentation 30 0
For EPC For CS

Name

Signature

Date
Page 21 of 101
HASE-II (Section-VI)

Report Date 8-Sep-2019

Progress Date 01 Sep To 07 Sep

Approval Status
Approved in code 1 Balance
Under Review Total RECD Remarks
&2 Submission

Page 22 of 101
Commented by Balance to be Submitted Remarks
TPIA/CS/GIGL
0 7
0 5
0 16
0 37
0 8
0 1
0 4

0 4
0 12

0 27
0 15
0 15
0 16
0 30
For GIGL

Page 23 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE PROJEC

Weekly Progress Repo


OWNER GSPL INDIA GASNET LTD (GIGL)

ENGINEERING CONSULTANT ENGINEERS INDIA LTD (EIL)

CONSTRUCTION SUPERVISION INTERTEK INDIA PRIVATE LIMITED


TPIA CERTIFICATION ENGINEERS INTERNATIONAL LTD.(CEIL)
CONTRACTOR CORRETECH INTERNATIONAL PRIVATE LIMITED

Procure
Ordered Quantity Check
SL No Items. UOM
Scope Qty Variance (If any)

MAINLINE

1 Line Pipe- 18 inches Mtrs. 0

2 Mainline Ball Valves Nos 0

Page 24 of 101
3 Casing Pipes Mtrs. 0

4 HFERW Black Steel Tube 168.3MM 6.4 API 5L B Mtrs. 0

5 Casing Insulators Nos 0


6 Casing End Seals Nos 0
7 Bentonite LS 0
8 FJC Sleeves Nos 0
9 LR Bends Nos -
10 Monolithic Insulating Joints- 18" Nos 0

11 Flow Tees Nos 0

12 Temporary Cathodic Protection LS 0


13 Permanent Cathodic Protection LS 0

14 Warning Tape Mtrs. 0

15 Pipeline Marker Nos -


16 Welding Electrodes Lot 0

17 HDPE Duct Mtrs. 0

18 HDPE Couplers Nos


Page 25 of 101
19 End Plaug Nos

20 OFC Cable Mtrs. 0

21 OFC Kit Nos


STATIONS
MECHANICAL

Page 26 of 101
1 Pig Launcher/ Receiver with Jib Crane & Pig Signaller Nos

2 Station Ball Valves(HOV-BALL VALVE-18") Nos

3 Manual-BALL VALVE-12" & Below Nos

3 Globe/ Check Valves Nos

4 Pipes- Assorted Sizes Mtrs.


5 Fittings Nos
6 Flanges Nos
7 Gaskets including IG Nos
8 Stud Bolts EA
9 CO2 & CAG System LS
10 Rainhood Flappers
11 Steel Structures
12 Paint - External
13 Paint - Internal
ELECTRICAL

Page 27 of 101
1 Transformer
2 LV Switchboard
3 AC-UPS
4 DG Set
5 Air Conditioner
6 Capacitor bank
7 VCB
8 Cable Glands
9 Light Fixture and accessories
10 Solar street Lights
11 Poles
12 Cable Trays
13 Wires
14 Cables
15 Earthing Material
16 Electrical Bulk
17 Battery Charger
INSTRUMENTATION
1 Local Control Panel

Page 28 of 101
2 Gas Detection System with detectors
3 Pressure/ Temperature Gauges
4 Pressure/ Temperature Transmitter
5 Temperature Elements
Non-Intrusive type pig signaller
6 Ultrasonic Type

7 PSV

Instrument Impulse Hook Up & Instrument Piping/


8 Tubing Work
9 Instrument Cable Trays
10 Cable Gland
11 MCT
12 Junction Box
13 Instrumentation Cables
14 Fire & Alarm System
For EPC For CS

Name

Signature

Date
Page 29 of 101
NE PROJECT- PHASE-II (Section-VI)

ess Report
Report Date 8-Sep-2019

Progress Date 01 Sep To 07 Sep

Procurement Status
Received
LOI / PO Qty
Vendor details LOI / PO number/Inv. No & date/Ref. Qantity At
(Latest Qty) Site

Ratnamani 1-Apr-2019

5-Jun-2019
NSSL-Italia Srl

Page 30 of 101
Advance Electronics
Systems 22-May-2019

Sawan Engineering 31-May-2019

Corrtech (In-house)

Corrtech (In-house)

8-Aug-2019
Sparco Multiplast

Lincoln

Veekay Plast 31-May-2019

Page 31 of 101
4-Jun-2019
Aksh Optifiber

Page 32 of 101
Control Plus Oil & Gas Solutions Pvt. 23-May-2019
Ltd.

5-Jun-2019
NSSL-Italia Srl

29-May-2019

Flowchem Industries

Page 33 of 101
Page 34 of 101
For GIGL

Page 35 of 101
Remarks

19KM of 7.9 mm thk Bare pipe &


coating completed.
Dispatch clearance requested on
04-Sep-19 for 231 pipes

Revised doc. under preparation


with supplier based on DEC
comments

Page 36 of 101
Order Under finalization

Order Under finalization

Submitted for GIGL approval

Code-2 doc. received on 04.09.19.


Revised doc. being prepared by
supplier

Submitted for GIGL


approval

Submitted for GIGL


approval

Page 37 of 101
Submitted for GIGL
approval

Page 38 of 101
Revised doc. under DEC
review. Shared on 03.09.19

Revised doc. under preparation


with supplier based on DEC
comments

Code-2 received on 10-Aug-19.


Revised doc. under
preparation.
Raw material inspection in
progress.

Page 39 of 101
Page 40 of 101
Page 41 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE P

Weekly Progress

OWNER GSPL INDIA GASNET LTD (GIGL)

ENGINEERING CONSULTANT ENGINEERS INDIA LTD (EIL)

CONSTRUCTION SUPERVISION INTERTEK INDIA PRIVATE LIMITED

TPIA CERTIFICATION ENGINEERS INTERNATIONAL LTD.(CEIL)

CONTRACTOR CORRETECH INTERNATIONAL PRIVATE LIMITED

Materials Delive

Sl.No Materials Description

1 Line Pipes

Page 42 of 101
8

10

11

12
For EPC

Name

Signature

Date

Page 43 of 101
HINDA PIPELINE PROJECT- PHASE-II (Section-VI)

ekly Progress Report

Report Date 8-Sep-2019

Progress Date 01 Sep To 07 Sep

ONAL LTD.(CEIL)

IMITED

Materials Deliverable

Previous
UOM Scope This Week
Week

KM 110.229

Page 44 of 101
For CS For GIGL

Page 45 of 101
-Sep-2019

ep To 07 Sep

Cumm.

Page 46 of 101
IGL

Page 47 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE PROJECT- PHASE-

Weekly Progress Report

OWNER GSPL INDIA GASNET LTD (GIGL)

ENGINEERING CONSULTANT ENGINEERS INDIA LTD (EIL)

CONSTRUCTION SUPERVISION INTERTEK INDIA PRIVATE LIMITED

TPIA CERTIFICATION ENGI NEERS INTERNATIONAL LTD.(CEIL)

CONTRACTOR CORRETECH INTERNATIONAL PRIVATE LIMITED

%age Progress w.r.t weightage distribution sys


Cummulative upto this
This Week Progress %
Sl. No. Discipline % Weightage week %
Plan Actual Plan Actual
Engineering
Engineering 0.00% 0.00% 0.00% 0.00% 0.00%

1 Pipeline Detailed Engineering 0.00% 0.00% 0.00% 0.00% 0.00%

2 Station Engineeirng 0.00% 0.00% 0.00% 0.00% 0.00%


Page 48 of 101
Procurement
Procurement 0.00% 0.00% 0.00% 0.00% 0.00%

1 Line Pipe 0.00% 0.00% 0.00% 0.00% 0.00%

2 Other Mainline Project Items 0.00% 0.00% 0.00% 0.00% 0.00%

3 Station Electrical 0.00% 0.00% 0.00% 0.00% 0.00%

4 Station Instrumentation 0.00% 0.00% 0.00% 0.00% 0.00%

Construction

Construction 0.00% 0.00% 0.00% 0.00% 0.00%

1 Camp Facilities 0.00% 0.00% 0.00% 0.00% 0.00%

3 Pipeline SP-2 0.00% 0.00% 0.00% 0.00% 0.00%

4 Station Works 0.00% 0.00% 0.00% 0.00% 0.00%

4.1 Civil 0.00% 0.00% 0.00% 0.00% 0.00%

4.2 Mechanical 0.00% 0.00% 0.00% 0.00% 0.00%

4.3 Electrical 0.00% 0.00% 0.00% 0.00% 0.00%

4.4 Instrumentation 0.00% 0.00% 0.00% 0.00% 0.00%

5 Hydro testing works 0.00% 0.00% 0.00% 0.00% 0.00%

6 Mechanical Compliation 0.00% 0.00% 0.00% 0.00% 0.00%

7 Pre Commissioning 0.00% 0.00% 0.00% 0.00% 0.00%

8 Commissioning 0.00% 0.00% 0.00% 0.00% 0.00%

9 Project Closeout 0.00% 0.00% 0.00% 0.00% 0.00%

Page 49 of 101
TOTAL 0.00% 0.00% 0.00% 0.00% 0.00%

For EPC For CS

Name

Signature

Date

Page 50 of 101
CT- PHASE-II (Section-VI)

rt

Report Date 8-Sep-2019

Progress Date 01 Sep To 07 Sep

bution system
Difference for the Remarks
week

0.00%

0.00%

0.00%
Page 51 of 101
0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Page 52 of 101
0.00%

For GIGL

Page 53 of 101
PROJECT : MEHSANA-BAT

We

OWNER GSPL INDIA GASNET LTD (GIGL)

ENGINEERING CONSULTANT ENGINEERS INDIA LTD (EIL)

CONSTRUCTION SUPERVISION INTERTEK INDIA PRIVATE LIMITED

TPIA CERTIFICATION ENGI NEERS INTERNATIONAL LTD.(CEIL)

CONTRACTOR CORRETECH INTERNATIONAL PRIVATE LIMITED

Co
A.Pipeline

Sr. No Description of Activity UOM Scope

1 Route Survey (Walk Over survey) Mtrs. 110229

2 ROW Cleaning and Grading Mtrs. 110229

3 Trenching Mtrs. 110229

4 Stringing Mtrs. 110229

5 Mainline Welding Nos.


9185
6 Tie-In Nos.
2755
7 NDT Cleared Nos.
9185
8 Joint Coating Nos.
9185
9 Lowering Mtrs. 110229

Page 54 of 101
10 HDPE Laying Mtrs. 110229

11 Backfilling Mtrs. 110229

12 OFC Blowing Mtrs. 110229

13 Cased Crossing Nos. 39

14 HDD Crossings Nos. 2

Highlights:-

B.Station

Excavation(Cum)
Sl No. Station For the week
Scope
Plan Achived

1 020-SV-2001

2 020-SV-2002

3 020-SV-2003
Backfilling(Cum)
For the week
Scope
Plan
1 020-SV-2001

2 020-SV-2002

3 020-SV-2003
Water proffing(Sq Mtr)
For the week
Scope
Plan
1 020-SV-2001

2 020-SV-2002
Page 55 of 101
3 020-SV-2003
Highlights:-

For EPC

Name

Signature

Date

Page 56 of 101
EHSANA-BATHINDA PIPELINE PROJECT- PHASE-II (Section-VI)

Weekly Progress Report

Report Date

Progress Date

TD.(CEIL)

Construction Progress Status

For the Week

Pervious This Cumulative

Plan Achived Plan Achived Plan Achived


110229 110229 110229 110229

Page 57 of 101
Activity Description
PCC(Cum) RCC(Cum)
ek For the week For the week
Scope Scope
chived Plan Achived Plan

um) Brick Work(Cum) Plastering(Sq M


ek For the week For the
Scope Scope
Achived Plan Achived Plan

ng(Sq Mtr)
ek
Achived

Page 58 of 101
For CS

Page 59 of 101
)

8-Sep-2019

01 Sep To 07 Sep

Remarks
hived
10229 Completed

Page 60 of 101
CC(Cum)
week

Achived

ering(Sq Mtr)
For the week
Plan Achived

Page 61 of 101
For GIGL

Page 62 of 101
PROJECT : MEHSANA-BATHINDA P

Weekly P

OWNER GSPL INDIA GASNET LTD (GIGL)

ENGINEERING CONSULTANT ENGINEERS INDIA LTD (EIL)

CONSTRUCTION SUPERVISION INTERTEK INDIA PRIVATE LIMITED

TPIA CERTIFICATION ENGI NEERS INTERNATIONAL LTD.(CEIL)

CONTRACTOR CORRETECH INTERNATIONAL PRIVATE LIMITED

Nex
A.Pipeline

Sr. No Description of Activity UOM

1 ROW Cleaning and Grading Mtrs.

2 Trenching Mtrs.

3 Stringing Mtrs.

4 Mainline Welding Nos.

5 Tie-In Nos.

6 NDT Cleared Nos.

7 Joint Coating Nos.

8 Lowering Mtrs.

9 HDPE Laying Mtrs.

Page 63 of 101
10 Backfilling Mtrs.

11 OFC Blowing Mtrs.

12 Cased Crossing Nos.

13 HDD Crossings Nos.

B. Station Civil
Sl No. Station UOM
Site levelling, boundary wa
1 020-SV-2001 (SARSANA) up.
2 020-SV-2002(LADWA)
3 020-SV-2003(KUNGAD)
4

5
C.Other Works
1

For EPC

Name

Signature

Date

Page 64 of 101
INDA PIPELINE PROJECT- PHASE-II (Section-VI)

ekly Progress Report

Report Date

Progress Date

Next Week Plan

Next Week Plan Remarks

Page 65 of 101
Activities Remarks
dary wall point marking,soil filling,store room and water tank set

For CS For GIGL

Page 66 of 101
8-Sep-2019

01 Sep To 07 Sep

Remarks

Page 67 of 101
Remarks

For GIGL

Page 68 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE
VI)

Weekly Progress R

OWNER GSPL INDIA GASNET LTD (GIGL)

ENGINEERING CONSULTANT ENGINEERS INDIA LTD (EIL)

CONSTRUCTION SUPERVISION INTERTEK INDIA PRIVATE LIMITED

TPIA CERTIFICATION ENGINEERS INTERNATIONAL LTD.(CEIL)

CONTRACTOR CORRETECH INTERNATIONAL PRIVATE LIMITED

Manpower Deploymen
SL No. EQUIPMENT DETAIL

1
RESIDENT CONSTRUCTION MANAGER /SECTION
INCHARGE (NOTE- 5)
2 LEAD PLANNING ENGINEER/MANAGER (NOTE- 5)

3 LEAD QA/ QC ENGINEER/MANAGER (NOTE- 5)

4 LOGISTIC MANAGER (NOTE- 5)

5 LEAD SAFETY OFFICER/MANAGER (NOTE- 5)

6 WAREHOUSE IN-CHARGE/MANAGER (NOTE- 5)

7 SPREAD INCHARGE (NOTE- 5)

8 QUANTITY SURVEYOR

9 PLANNING ENGINEER

10 QA/QC ENGINEER

Page 69 of 101
11 LEAD WELDING/ NDT ENGINEER

DISCIPLINE ENGINEER's (Civil/ Mech/ Welding/ Elec/


12 Instrn.) {For Front End Activities CIVIL &WELDING-2
No each }

13
FOREMAN / SUPERVISOR {For Front End Activities 4
nos}

14 DRAFTSMAN / SURVEYOR

15 DOCUMENT CONTROLLER

16 STORE KEEPER

17 WELDER

18 FITTER

19 GRINDER

20 MACHINE OPERATOR

21 BLAST CLEANING CREW

22 ELECTRICIAN / MACHINE MECHANIC

23 RIGGER

24 DRIVERS

25 PIPE BENDING CREW

26 SAFETY SUPERVISOR

27 ROCK BREAKER CREW/BLASTING CREW

28 THRUST/ HOR. AUGER BORING CREW

29
PAY WELDER CREW ( M/L WELDING, TIE-INS &
CROSSINGS)
30 X-RAY CREW

31
AUT CREW (M/C WITH 2 OPERATORS)- AS
APPLICABLE

Page 70 of 101
32 HYDROTESTING CREW

33 FIELD JOINT COATING CREW

34 HOLIDAY TESTING CREW

35 HDD CREW

36 OFC JOINTING CREW

37 CP CREW

38 GPS CREW

39
OTHER SKILLED / SEMISKILLED / UNSKILLED
WORKERS

Other Supporting Manpower


1 Admin /HR

For EPC

Name

Signature

Date

Page 71 of 101
HINDA PIPELINE PROJECT- PHASE-II (Section-
VI)

ekly Progress Report

Report Date 8-Sep-2019

Progress Date 01 Sep To 07 Sep

ONAL LTD.(CEIL)

IMITED

power Deployment Status


Minimum
Mobilised Remarks
Requirement Variance
1 1
0

1 0
1

1 1
0

1
0 1

1
1 0

1 1
0

2
1 1

2
1 1

2 1
1

2
1 1

Page 72 of 101
2
1 1

36(10/10/8/4/4) 7

29

36
4 32

8
1 7

4
1 3

4
2 2

30
4 26

16
1 15

24
4 20

62
5 57

12
0 12

24
1 23

60
14 46

50 5
45

4
0 4

As Req.
1

As Req.
0

As Req.
0

28
0 28

2
0 2

2
0 2

Page 73 of 101
4
0 4

6
0 6

6
0 6

As Req.
0 0

2
0 2

2
0 2

2
0 2

140
11 129

For CS For GIGL

Page 74 of 101
8-Sep-2019

Sep To 07 Sep

arks

Page 75 of 101
Page 76 of 101
GIGL

Page 77 of 101
PROJECT : MEHSANA-BATHINDA PIPELI
(Section-VI)

Weekly Progress Re

OWNER GSPL INDIA GASNET LTD (GIGL)

ENGINEERING CONSULTANT ENGINEERS INDIA LTD (EIL)

CONSTRUCTION SUPERVISION INTERTEK INDIA PRIVATE LIMITED

TPIA CERTIFICATION ENGINEERS INTERNATIONAL LIMITED.

CONTRACTOR CORRETECH INTERNATIONAL PRIVATE LIMITED

Equipment Deploymen
SL No. EQUIPMENT DETAIL

CATEGORY - 1

PIPE LAYER / SIDE BOOM - 60T & above CAPACITY


1
PIPE LAYER / SIDE BOOM - 40T & above CAPACITY
2
PIPE BENDING MACHINE 18"DIA
3
DOZER -D7/D6 OR EQUIVALENT
4
DOZER WITH RIPPER - D8 OR EQUIVALENT
5
EXCAVATOR / BACK HOE Series--Ex 200 or Equivalent
6
CATEGORY - 2

1 PIPE LAYER / SIDE BOOM - 60T & above CAPACITY

2 PIPE LAYER / SIDE BOOM - 40T & above CAPACITY

3 HORIZANTAL AUGER BORING MACHINE (Refer Note **)

4 PIPE CLAMP (PNEUMATIC/hydraulic)- INTERNAL 18"DIA

Page 78 of 101
AUTOMETIC WELDING SET for 18" (1+5 welding units per set Including
5 Pipe Facing M/c and Internal Clamp) See note xx

SEMI AUTO WELDING M/C / PAY WELDER EACH SET (FOR MAINLINE, TIE-
6 INS & CROSSINGS) AS APPLICABLE

7 AUT MACHINE WITH 2 OPERATORS

8 DOZER - D7/ D6 OR EQUIVALENT

9 GRADER

10 EXCAVATOR / BACK HOE Series--200 & above @

11 HYDRA (8 TO 14 T)

12 TYRE MOUNTED CRANES (75 T and Above)

13 AIR COMPRESSOR - (300 CFM)

14 AIR COMPRESSOR - (450/600/800 CFM)

15 D.G.SETS :62.5 KVA TO 200KVA

16 DG WELDING MACHINES (SMAW) RECTIFIER

17 BLAST CLEANING MACHINE Set

18 UT MACHINE (MANUAL)

X- RAY M/C (RADIOGARAPHY SET)- INTERNAL IN CASE OF MANUAL


19 WELDING suitable for 18"

20 X- RAY M/C (RADIOGARAPHY SET)- EXTERNAL

21 GAMMA RAY M/C (RADIOGARAPHY SET)

22 BEVEL CUTTING MACHINE 18"DIA

23 PIPE CLAMP - EXTERNAL 18"DIA

24 DEWATERING PUMP

25 HOLIDAY DETECTOR UNIT 18" RING

26 DOZING PUMP

27 PIPE LOCATOR

28 DEAD WT TESTER

29 MOBILE WORKSHOP

30 DUMPER/TRIPPER

Page 79 of 101
CONCRETE MIXER M/C with Digital Weigh Batching system / Self Loading
31 Concrete Mixer(Argo 2500 or eq)

32 GUNITING M/C

33 TOTAL STATION

34 THEODOLITE/ AUTO LEVEL

35 AUGAR SET FOR SOIL INVESTIGATION

36 SOIL RESISTIVITY METER

37 INDUCTION / RESISTANCE HEATING EQUIPMENT (If requd by WPS)

38 ROCK BREAKER ATTACHEMENT ^^

MONO DRILL CRAWLER MOUNTED /HAND DRILL (Pneumatic) for


39 Rockblasting #

40 WATER LIFTING PUMPS (400 M3/HR AND ABOVE)

41 FILLING PUMPS (400 TO 1000 M3/HR)

42 PRESSURIZATION PUMP -MOTORIZED

HDD RIG WITH ALL EQUIPMENTS & ACCESSORIES-++(See Comment


43 below)

44 GPS WITH RECIEVER AND TRANSMITTER

45 F.B./ SEMI LOW BED TRAILER FOR COATED LINEPIPES(FB)

For EPC

Name

Signature

Date

Page 80 of 101
BATHINDA PIPELINE PROJECT- PHASE-II
(Section-VI)

kly Progress Report

Report Date 8-Sep-2019

Progress Date 01 Sep To 07 Sep

L LIMITED.

IMITED

pment Deployment Status


Minimum
Mobilised Variance Remarks
Requirement

8 8
0
4 3
1
2 2
0
2 2
0
2 2
0
12 12
0
0

10 10
0
4 4
0
2 0
0
2 2
0

Page 81 of 101
2 2
0

28 28
0
2 2
0
4 4
0
2 1
1
20 15
5
4 4
0
3 3
0
6 6
0
4 4
0
6 3
0
24 14
10
6 5
1
2 1
1
2 2
0
2 2
0
2 2
0
8 8
0
6 1
5
As Req. 0
0
6 4
2
2 2
0
2 2
0
2 2
0
2 2
0
4 4
0

Page 82 of 101
4 4
0
As Req. 0
0
2 1
1
4 4
0
As Req. 0
0
4 4
0
4 4
0
10 10
0
4/32 4/32
0
4 4
0
2 0
0
2 1
1
As Req. 0
0
2 2
0
28 28
0
For CS For GIGL

Page 83 of 101
-Sep-2019

ep To 07 Sep

marks

Page 84 of 101
Page 85 of 101
GIGL

Page 86 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE PROJECT- PHASE-I

Weekly Progress Report

OWNER GSPL INDIA GASNET LTD (GIGL)

ENGINEERING CONSULTANT ENGINEERS INDIA LTD (EIL)

CONSTRUCTION SUPERVISION INTERTEK INDIA PRIVATE LIMITED

TPIA CERTIFICATION ENGI NEERS INTERNATIONAL LTD.(CEIL)

CONTRACTOR CORRETECH INTERNATIONAL PRIVATE LIMITED

QA/QC Satus
FOR SER

S.I. Discipline Resolution


Issued Closed Raised Received

1 HSE 0 0 - -
2 Civil 0 0 - -
3 Mechanical 0 0 - -
4 Electrical - - - -
5 Instrumentation - - - -
6 QA - - - -
Page 87 of 101
Total 0 0 0 0
Abbreviation: FOR - Field Observation Report, SER - Site Engineer Request, NCR - Non Conformance Report, MDR - Material Discrepancy Report, C

Welding Joint Report

S.I. Description Weekly Cumulative


NDT
(Total
1 0 0
accepted
Radiography
2 joints) 0 0
Taken
3 Interpreted 0 0
4 Accepted 0 0
5 Repair 0 0
6 RT/RS 0 0
7 Cut-out 0 0
Repair
8 0 0
Accepted
RT/RS
9 0 0
Accepted
Repair Percentage #DIV/0! #DIV/0!

For EPC For CS

Name

Signature

Date

Page 88 of 101
PHASE-II (Section-VI)

Report Date 8-Sep-2019

Progress Date 01 Sep To 07 Sep

NCR MDR CAR


Resolutio REMARKS
Issued Closed Raised n Raised Closed
Received

0 0 - - 0 0
0 0 - - 0 0
0 0 - - 0 0
0 0 - - 0 0
- - - - - -
- - - - - -
Page 89 of 101
0 0 0 0 0 0
ncy Report, CAR - Corrective Action Report

CS For GIGL

Page 90 of 101
PROJECT : MEHSANA-BATHINDA PIPELINE PROJECT- PHASE-I

Weekly Progress Report

OWNER GSPL INDIA GASNET LTD (GIGL)

ENGINEERING CONSULTANT ENGINEERS INDIA LTD (EIL)

CONSTRUCTION SUPERVISION INTERTEK INDIA PRIVATE LIMITED

TPIA CERTIFICATION ENGI NEERS INTERNATIONAL LTD.(CEIL)

CONTRACTOR CORRETECH INTERNATIONAL PRIVATE LIMITED

Areas of Concern / Critical Issues


WBDS Pendency in
S.I. Description Affected Area Affected Activity Affected Since
Element days

Page 91 of 101
2

For EPC For CS

Name

Signature

Date

Page 92 of 101
PHASE-II (Section-VI)

Report Date 8-Sep-2019

Progress Date 01 Sep To 07 Sep

l Issues
Target Forecast
Action Required Resp. date date

Page 93 of 101
For GIGL

Page 94 of 101
PALANPUR PALI PIPELINE PROJECT
Progress Measurement System
Wtg% Planned
Activity ID Description UOM Scope Qty. Wtg%

Overall Cummulative Plan


Overall Monthly Plan
1 Engineering 5.00%
1.1 Pipeline Detailed Engineering 1.75% 35% 35%
1.1.1 Revalidation Survey- Alignment Sheets LS 1 0.35% 20%
1.1.2 Casing Pipe Thickness Calculation LS 1 0.26% 15%
1.1.3 Profile Drawing for River Crossings LS 1 0.35% 20%
1.1.4 HDD Crossing Drawings LS 1 0.35% 20%
1.1.5 Seismic Analysis & Report Submission LS 1 0.44% 25%
1.2 Station Detailed Engineering 3.25% 65%
1.2.1 Civil 2.11% 65%
1.2.1.1 Topography Survey LS 1 0.42% 20%
1.2.1.2 Geotech Survey LS 1 0.63% 30%
1.2.1.3 Plot Plan LS 1 0.42% 20%
1.2.1.4 Boundary Wall Drawings LS 1 0.21% 10%
1.2.1.5 Foundation Drawings for Buildings LS 1 0.32% 15%
1.2.1.6 Misc. Foundation Drawings LS 1 0.11% 5%
1.2.2 Mechanical 0.49% 15%
1.2.2.1 Piping GAD LS 1 0.20% 40%
1.2.2.2 Piping Stress Analysis LS 1 0.15% 30%
1.2.2.3 Piping Isometrics LS 1 0.10% 20%
1.2.2.4 Piping Support Drawings LS 1 0.05% 10%
1.2.3 Electrical 0.33% 10%
1.2.3.1 Single Line Diagrams LS 1 0.10% 30%
1.2.3.2 Cable Routing Layout LS 1 0.07% 20%
1.2.3.3 Cable Schedule LS 1 0.03% 10%
1.2.3.4 Indoor & Outdoor Lighting Layout LS 1 0.07% 20%
1.2.3.5 Earthing Layout LS 1 0.07% 20%
1.2.4 Instrumentation 0.33% 10%
1.2.4.1 I/O List LS 1 0.11% 35%
1.2.4.2 Cable Routing Layout LS 1 0.08% 25%
1.2.4.3 Cable Schedule LS 1 0.07% 20%
1.2.4.4 F&G Layout LS 1 0.07% 20%
2 Procurement 50.00%
2.1 Line Pipe 29.50% 59%
2.1.1 Placement of PO/ LOI mtrs. 161,328 1.48% 5%
2.1.2 Submission & Approval of QAP mtrs. 161,328 4.43% 15%
2.1.3 Receipt of Plates/ Coils mtrs. 161,328 7.38% 25%
2.1.4 Dispatch & Receipt at site mtrs. 161,328 16.23% 55%
2.2 Actuated Ball Valves 2.50% 0% 5%
2.2.1 Placement of PO/ LOI Nos. 23 0.13% 5%
2.2.2 Approval of Valve GAD, QAP/ITP Nos. 23 0.38% 15%
2.2.3 Manufacturing of Valves Nos. 23 0.63% 25%
2.2.4 Dispatch & Receipt at site Nos. 23 1.38% 55%

For LTHE For SPPL For GIGL


PALANPUR PALI PIPELINE PROJECT
Progress Measurement System
Wtg% Planned
Activity ID Description UOM Scope Qty. Wtg%

Overall Cummulative Plan


Overall Monthly Plan
2.3 Hot Induction Bends 1.00% 0% 2%
2.3.1 Placement of PO/ LOI Nos. 111 0.10% 10%
2.3.2 Approval of QAP/ITP Nos. 111 0.15% 15%
2.3.3 Manufacturing of Bends Nos. 111 0.20% 20%
2.3.4 Dispatch & Receipt at site Nos. 111 0.55% 55%
2.4 HDPE Duct 0.50% 0% 1%
2.4.1 Placement of PO/ LOI mtrs. 178,000 0.05% 10%
2.4.2 Approval of QAP/ITP mtrs. 178,000 0.08% 15%
2.4.3 Manufacturing of Ducts mtrs. 178,000 0.10% 20%
2.4.4 Dispatch & Receipt at site mtrs. 178,000 0.28% 55%
2.5 OFC 0.50% 0% 1%
2.5.1 Placement of PO/ LOI mtrs. 169,000 0.05% 10%
2.5.2 Approval of QAP/ITP mtrs. 169,000 0.08% 15%
2.5.3 Manufacturing of cable mtrs. 169,000 0.10% 20%
2.5.4 Dispatch & Receipt at site mtrs. 169,000 0.28% 55%
2.6 Insulating Joints 1.00% 0% 2%
2.6.1 Placement of PO/ LOI Nos. 4 0.10% 10%
2.6.2 Approval of QAP/ITP Nos. 4 0.15% 15%
2.6.3 Manufacturing of IJ Nos. 4 0.20% 20%
2.6.4 Dispatch & Receipt at site Nos. 4 0.55% 55%
2.7 Station Piping 3.00% 0% 6%
2.7.1 Pipes 0.21% 0% 7%
2.7.1.1 Placement of PO/ LOI mtrs. 1,178 0.02% 10%
2.7.1.2 Approval of QAP/ITP mtrs. 1,178 0.03% 15%
2.7.1.3 Manufacturing of Pipes mtrs. 1,178 0.04% 20%
2.7.1.4 Dispatch & Receipt at site mtrs. 1,178 0.12% 55%
2.7.2 Manual Ball Valves 1.05% 0% 35%
2.7.2.1 Placement of PO/ LOI Nos. 213 0.11% 10%
2.7.2.2 Approval of Valve GAD, QAP/ITP Nos. 213 0.16% 15%
2.7.2.3 Manufacturing of Valves Nos. 213 0.21% 20%
2.7.2.4 Dispatch & Receipt at site Nos. 213 0.58% 55%
2.7.3 Globe/ Check Valves 0.75% 0% 25%
2.7.3.1 Placement of PO/ LOI Nos. 31 0.08% 10%
2.7.3.2 Approval of Valve GAD, QAP/ITP Nos. 31 0.11% 15%
2.7.3.3 Manufacturing of Valves Nos. 31 0.15% 20%
2.7.3.4 Dispatch & Receipt at site Nos. 31 0.41% 55%
2.7.4 Flow Tees 0.99% 0% 33%
2.7.4.1 Placement of PO/ LOI Nos. 16 0.05% 5%
2.7.4.2 Approval of QAP/ITP Nos. 16 0.15% 15%
2.7.4.3 Manufacturing of flow tees Nos. 16 0.25% 25%
2.7.4.4 Dispatch & Receipt at site Nos. 16 0.54% 55%
2.80 Pig Launcher/ Receiver with Jib Crane & Pig Signaller 1.00% 0% 2%

For LTHE For SPPL For GIGL


PALANPUR PALI PIPELINE PROJECT
Progress Measurement System
Wtg% Planned
Activity ID Description UOM Scope Qty. Wtg%

Overall Cummulative Plan


Overall Monthly Plan
2.8.1 Placement of PO/ LOI Nos. 4 0.05% 5%
2.8.2 Approval of QAP/ITP Nos. 4 0.15% 15%
2.8.3 Manufacturing of Pig Launcher/Receiver Nos. 4 0.25% 25%
2.8.4 Dispatch & Receipt at site Nos. 4 0.55% 55%
2.9 Cathodic Protection 1.00% 0% 2%
2.9.1 Placement of PO/ LOI LS 1 0.10% 10%
2.9.2 Approval of design LS 1 0.15% 15%
2.9.3 Receipt of TCP Material LS 1 0.20% 20%
2.9.4 Receipt of PCP Material LS 1 0.55% 55%
2.12 Electrical 5.50% 0% 11%
2.12.1 LV Switchboard 2.59% 0% 47%
2.12.1.1 Placement of PO/ LOI Nos. 42 0.26% 10%
2.12.1.2 Approval of QAP/ITP Nos. 42 0.39% 15%
2.12.1.3 Manufacturing of Switchboard Nos. 42 0.52% 20%
2.12.1.4 Dispatch & Receipt at site Nos. 42 1.42% 55%
2.12.2 UPS- DC/ AC 0.22% 0% 4%
2.12.2.1 Placement of PO/ LOI Nos. 8 0.02% 10%
2.12.2.2 Approval of QAP/ITP Nos. 8 0.03% 15%
2.12.2.3 Manufacturing of UPS Nos. 8 0.04% 20%
2.12.2.4 Dispatch & Receipt at site Nos. 8 0.12% 55%
2.12.3 DG Set 1.32% 0% 24%
2.12.3.1 Placement of PO/ LOI Nos. 7 0.13% 10%
2.12.3.2 Approval of QAP/ITP Nos. 7 0.20% 15%
2.12.3.3 Manufacturing of DG Set Nos. 7 0.26% 20%
2.12.3.4 Dispatch & Receipt at site Nos. 7 0.73% 55%
2.12.4 Air Conditioners 0.22% 0% 4%
2.12.4.1 Placement of PO/ LOI Nos. 29 0.02% 10%
2.12.4.2 Approval of QAP/ITP Nos. 29 0.03% 15%
2.12.4.3 Manufacturing of Air Conditioners Nos. 29 0.04% 20%
2.12.4.4 Dispatch & Receipt at site Nos. 29 0.12% 55%
2.12.5 Solar Street Lights 0.33% 0% 6%
2.12.5.1 Placement of PO/ LOI Nos. 25 0.03% 10%
2.12.5.2 Approval of QAP/ITP Nos. 25 0.05% 15%
2.12.5.3 Manufacturing of lights Nos. 25 0.07% 20%
2.12.5.4 Dispatch & Receipt at site Nos. 25 0.18% 55%
2.12.6 Light Fixture & Accessories 0.28% 0% 5%
2.12.6.1 Placement of PO/ LOI Nos. 2,072 0.03% 10%
2.12.6.2 Approval of QAP/ITP Nos. 2,072 0.04% 15%
2.12.6.3 Manufacturing of lights Nos. 2,072 0.06% 20%
2.12.6.4 Dispatch & Receipt at site Nos. 2,072 0.15% 55%
2.12.7 Transformer 0.22% 4%
2.12.7.1 Placement of PO/ LOI Nos. 2 0.02% 10%

For LTHE For SPPL For GIGL


PALANPUR PALI PIPELINE PROJECT
Progress Measurement System
Wtg% Planned
Activity ID Description UOM Scope Qty. Wtg%

Overall Cummulative Plan


Overall Monthly Plan
2.12.7.2 Approval of QAP/ITP Nos. 2 0.03% 15%
2.12.7.3 Manufacturing of Transformer Nos. 2 0.04% 20%
2.12.7.4 Dispatch & Receipt at site Nos. 2 0.12% 55%
2.12.7 Electrical Cables 0.33% 0% 6%
2.12.7.1 Placement of PO/ LOI mtrs. 24,121 0.03% 10%
2.12.7.2 Approval of QAP/ITP mtrs. 24,121 0.05% 15%
2.12.7.3 Manufacturing of cables mtrs. 24,121 0.07% 20%
2.12.7.4 Dispatch & Receipt at site mtrs. 24,121 0.18% 55%
2.13 Instrumentation 4.50% 0% 9%
2.13.1 Local Control Panels 0.72% 0% 16%
2.13.1.1 Placement of PO Nos. 8 0.07% 10%
2.13.1.2 Submission & Approval of QAP Nos. 8 0.11% 15%
2.13.1.3 Manufacturing of Panels Nos. 8 0.14% 20%
2.13.1.4 Dispatch & Receipt at site Nos. 8 0.40% 55%
2.13.2 Gas Detection System 2.03% 0% 45%
2.13.2.1 Placement of PO LS 1 0.10% 5%
2.13.2.2 Submission & Approval of QAP LS 1 0.30% 15%
2.13.2.3 Manufacturing of system LS 1 0.51% 25%
2.13.2.4 Dispatch & Receipt at site LS 1 1.11% 55%
2.13.3 Instrumentation Tagged Items (PG, TT, PT, PB) 0.59% 0% 13%
2.13.3.1 Placement of PO Nos. 69 0.06% 10%
2.13.3.2 Submission & Approval of QAP Nos. 69 0.12% 20%
2.13.3.3 Dispatch & Receipt at site Nos. 69 0.41% 70%
2.13.4 Fire & Alarm System 0.50% 11%
2.13.4.1 Placement of PO LS 1 0.05% 10%
2.13.4.2 Submission & Approval of QAP LS 1 0.07% 15%
2.13.4.3 Manufacturing of system LS 1 0.10% 20%
2.13.4.4 Dispatch & Receipt at site LS 1 0.27% 55%
2.13.5 Junction Boxes 0.36% 0% 8%
2.13.5.1 Placement of PO Nos. 11 0.04% 10%
2.13.5.2 Submission & Approval of QAP Nos. 11 0.05% 15%
2.13.5.3 Manufacturing of JBs Nos. 11 0.07% 20%
2.13.5.4 Dispatch & Receipt at site Nos. 11 0.20% 55%
2.13.6 Instrument Cables 0.32% 0% 7%
2.13.6.1 Placement of PO mtrs. 4,165 0.03% 10%
2.13.6.2 Submission & Approval of QAP mtrs. 4,165 0.05% 15%
2.13.6.3 Manufacturing of Cables mtrs. 4,165 0.06% 20%
2.13.6.4 Dispatch & Receipt at site mtrs. 4,165 0.17% 55%
3 Construction 45.00% 0%
a Camp Facilities 0 0.36% 0.80%
i Site Office finalization LS 1 0.18% 50%
ii Furnitures LS 1 0.11% 30%

For LTHE For SPPL For GIGL


PALANPUR PALI PIPELINE PROJECT
Progress Measurement System
Wtg% Planned
Activity ID Description UOM Scope Qty. Wtg%

Overall Cummulative Plan


Overall Monthly Plan
iii IT Setup LS 1 0.07% 20%
3.1 Spread 1 (CH 00 to CH 80) 11.45% 50.00% 25.45%
3.1.1 Mainline Works excl. Crossings 9.16% 80%
3.1.1.1 ROW Marking ,Clearing & Grading mtrs. 80,000 0.46% 5%
3.1.1.2 Line Pipe Stringing mtrs. 80,000 0.46% 5%
3.1.1.3 Main Line Welding & NDT Clearance joints 6,667 2.29% 25%
3.1.1.4 Trenching including Pre-Padding mtrs. 80,000 1.37% 15%
3.1.1.5 Lowering including Duct Laying & TCP mtrs. 80,000 1.83% 20%
3.1.1.6 Backfilling including Post Padding mtrs. 80,000 1.83% 20%
3.1.1.7 OFC Blowing, Splicing & Testing mtrs. 80,000 0.46% 5%
3.1.1.8 Restoration & Installation of Markers mtrs. 80,000 0.46% 5%
3.1.2 Crossings Works 2.29% 20%
3.1.2.1 Cased Crossing Works Nos. 9 0.57% 25%
3.1.2.2 HDD Crossings Nos. 4 1.72% 75%
3.2 Spread 2 (CH 80 to CH 160) 11.45% 50.00% 25.45%
3.2.1 Mainline Works (excl. crossings) 9.16% 80%
3.2.1.1 ROW Marking ,Clearing & Grading mtrs. 80,000 0.46% 5%
3.2.1.2 Line Pipe Stringing mtrs. 80,000 0.46% 5%
3.2.1.3 Main Line Welding & NDT Clearance joints 6,667 2.29% 25%
3.2.1.4 Trenching including Pre Padding mtrs. 80,000 1.37% 15%
3.2.1.5 Lowering including Duct Laying & TCP mtrs. 80,000 1.83% 20%
3.2.1.6 Backfilling including Post Padding mtrs. 80,000 1.83% 20%
3.2.1.7 OFC Blowing, Splicing & Testing mtrs. 80,000 0.46% 5%
3.2.1.8 Restoration & Installation of Markers mtrs. 80,000 0.46% 5%
3.2.2 Crossing Works 2.29% 20%
3.2.2.1 Cased Crossing Works Nos. 15 0.92% 40%
3.2.2.3 HDD Crossing Nos. 10 1.37% 60%
3.3 Station Works 19.35% 0% 43.00%
3.3.1 Civil 12.58% 0% 65%
3.3.1.1 Excavation cum 8,079 0.94% 7.500%
3.3.1.2 PCC cum 377 1.89% 15.000%
3.3.1.3 RCC & RCC Pavement cum 3,022 1.57% 12.500%
3.3.1.4 Backfilling cum 5,937 1.26% 10.000%
3.3.1.5 Brickwork cum 1,417 0.63% 5.000%
3.3.1.6 Plumbing RM 88 0.94% 7.500%
3.3.1.7 Plastering sqm 12,057 0.63% 5.000%
3.3.1.8 Water proofing sqm 1,015 0.63% 5.000%
3.3.1.9 Flooring sqm 1,617 0.63% 5.000%
3.3.1.10 False ceiling sqm 730 0.94% 7.500%
3.3.1.11 Doors & Windows Installation Nos. 257 0.63% 5.000%
3.3.1.12 Painting sqm 7,481 0.94% 7.500%
3.3.1.13 Road Works RM 347 0.94% 7.500%

For LTHE For SPPL For GIGL


PALANPUR PALI PIPELINE PROJECT
Progress Measurement System
Wtg% Planned
Activity ID Description UOM Scope Qty. Wtg%

Overall Cummulative Plan


Overall Monthly Plan
3.3.2 Mechanical 2.90% 0% 15%
3.3.2.1 Pipe Fabrication (ID) ID 9,996 0.44% 15%
3.3.2.2 Pipe Erection (IM) IM 15,099 0.44% 15%
3.3.2.3 Piping Final painting sqm 1,246 0.15% 5%
3.3.2.5 Valves Installation Nos. 8 0.73% 25%
3.3.2.6 Nitrogen Testing cum 256 0.29% 10%
3.3.2.7 Installation of Transformer Nos. 2 0.44% 15%
3.3.2.8 Installation of pig launcher Nos. 4 0.44% 15%
3.3.3 Electrical 1.94% 0% 10%
3.3.3.1 Cable trays mtrs. 642 0.19% 10%
3.3.3.2 Wiring inside building mtrs. 24,362 0.19% 10%
3.3.3.3 Installation of LV Switchboard Nos. 42 0.19% 10%
3.3.3.4 Installation of Capacitor Bank Nos. 7 0.19% 10%
3.3.3.5 Cable Laying mtrs. 24,121 0.19% 10%
3.3.3.6 Installation of UPS & Invertor Nos. 8 0.19% 10%
3.3.3.7 Installation of Light Poles and fixtures with Ea Nos. 2,072 0.19% 10%
3.3.3.8 Installation of Solar street lights Nos. 25 0.19% 10%
3.3.3.9 Installation of AC Nos. 29 0.19% 10%
3.3.3.10 Installation of DG Set Nos. 7 0.19% 10%

For LTHE For SPPL For GIGL


PALANPUR PALI PIPELINE PROJECT
Progress Measurement System
Wtg% Planned
Activity ID Description UOM Scope Qty. Wtg%

Overall Cummulative Plan


Overall Monthly Plan
3.3.4 Instrumentation 1.94% 0% 10%
3.3.4.1 Installation of JB Nos. 11 0.19% 10%
3.3.4.2 Installation of MCT frame Nos. 8 0.19% 10%
3.3.4.3 Installation of LCP Nos. 8 0.29% 15%
3.3.4.4 Fire alarm and fire fighting - CO2 & CAG flood LS 1 0.29% 15%
3.3.4.5 Cable Laying mtrs. 4,165 0.19% 10%
3.3.4.6 Installation of Field Instruments and terminat Nos. 69 0.29% 15%
3.3.4.7 F&G Detection LS 1 0.29% 15%
3.3.4.8 Installation of Impulse lines LS 1 0.19% 10%
3.4 Hydro Testing Works mtrs. 160,000 0.94% 0% 2.08%
3.5 Mechanical Completion mtrs. 160,000 0.18% 0% 0.40%
3.6 Pre Commissioning 0.05% 0% 0.10%
3.6.1 Nitrogen Purging mtrs. 160,000 0.05% 100%
3.7 Commissioning 0.75% 0% 1.67%
3.7.1 Intelligent Pigging mtrs. 160,000 0.75% 100%
3.9 Project Closeout 0.47% 0% 1.05%
3.9.1 Submission of As Built Drawings LS 1 0.47% 100%

For LTHE For SPPL For GIGL