Checklist for : Subbases / Bases ( Non-Bituminous ) Laying
No.

Location : CH __________ to CH __________ Other Information:

Item Description CON CON SC Remarks


Yes No Y N

1 Pre-laying Check For Subbases


a) For Subbase Works
i) Subgrade Field Density test in order?
ii) Subgrade level in order?
iii) Any free standing water on subgrade?
iv) Wet / damaged materials removed?

b) For Base Works


i) Segregation of subbase in underlying
layer rectified, if any?
ii) Subbase Field Density test in order?
iii) Subbase level in order?
iv) Any free standing water on subbase?
v) Wet / damaged materials removed?

2 Level Control And Alignment Check


a) Dipping pegs checked?
b) Laying thickness and width check?
c) Alignment markers checked?

3 Equipment Check (to be checked by


Site Foreman )
a) Grader, paver and compactor hydraulics
checked?
b) Screed extensions set (for paver)?
c) Vibration and tamping system checked?
d) Compactor vibration checked?
e) Fuel and lubrication checked?

4 Post-laying Check
a) Alignment checked?
b) Level checked?
c) Trenches for surface runoff required?
d) Free of segregation?

5 FINAL INSPECTION P F Date.


(with comments)

Signed for Contractor Designation : Date :

Signed for SC Designation : Date :

Please  off where appropriate