STANDART OPERATION PROCEDURE

CARGO OPERATION OF MT, ORIENT 1 – BG. TIMUR 1

LOADING FROM : HARIYAMA CPO MILL DATE : 12 SEPT 2019 VOYAGE : 29/2019
TIME P.I.C ORDER OF ASSIGNMENT Y N
09.00 CH. Off RECEIVED WELL THE LOADING PLAN FROM OFFICE FOR THE QUANTITY OF CARGOES TO BE
LOADED INTO BARGE TIMUR 1.
Tank Quantity Sequence Load from

√󠇯 󠇯
1 600 3 Maujaya
2 1000 1 Hariyama
3 1000 5 Lassa
4 1000 4 Lassa
5 1000 2 Hariyama
TOTAL 4600

10.20 CH. Off RE-CONFIRM TO CPO MILL STAFF AS OFFICE REPRESENTATIVE FOR LOADING THE CARGOES

√󠇯 󠇯
CARGO INFORMATION FROM CPO MILL : 2000 MT , TEMPERATURE INFORMATION : 50°
LOADING TANK NUMBER 2W AND 5W

10.30 CH. Off BRIEFING TO ORIENT 1 AND TIMUR 1 CREW FOR WHICH TANK TO BE LOADED AND HOW
MUCH THE CARGOES WILL BE RECEIVED √󠇯 󠇯
10.40 CH. Off HOSE CONNECTED AS WELL, MAKE SURE HOSES TIGHT PROPERLY AND NO LEAKING
√󠇯 󠇯
√󠇯 󠇯
11.00 CH. Off DEALING WITH CPO MILL STAFF FOR LOADING OPERATION BE STARTED

24 ALL ALL CREW DIVIDED INTO 3 TEAM STANDBY ON DECK, PATROL FOR EACH TANK AND HOSES PER
HOUR CREW 4 HOURS.
TEAM 1 TEAM 2 TEAM 3
(11.00-15.00)
- NAWIR
(15.00-19.00)
- JACKLIN
(19.00-23.00)
- KOMO
√󠇯 󠇯
- ANDIKA - RAJU - BENJAMIN
- HADI
24 CH. Off OFFICER DO KEEP PROPER LOOK OUT WHILE OPERATION IN PROGRESS
HOUR √󠇯 󠇯
CH. Off ALL TANK IS FULLY LOADED AS PER LOADING PLAN
󠇯 󠇯
CH. Off OFFICER INSTRUCT CREWS TO DISCONNECTED THE HOSES, PUT BACK INTO STORES AS WELL
󠇯 󠇯
CH. Off ALL HATCH COVER TANK CLOSED
󠇯 󠇯
CH. Off OFFICER DO DEEPING THE CARGOES FOR EACH TANK WITH SURVEYOR
󠇯 󠇯
CH. Off SENDING ALL DOCUMENTS REPORT WHICH IS SIGNED BY BOTH OF OFFICER AND SURVEYOR
ALSO VERIFIED BY CAPTAIN DUE TO CARGO OPERATION TO OFFICE 󠇯 󠇯
CH. Off SEALED ALL THE TANK PROPERLY AND READY TO DELIVERED TO BINTULU PORT ON BEHALF
󠇯 󠇯

PREPARED BY, ACKNOWLEDGE BY,

CHIEF OFFICER MASTER