QTTY UNITS ( PRICE/RATE)
Project Engineers 4 Person
Resident Engineers 8 Person
Office Engineers 4 Person
Quality Control Engineers 8 Person
Materials Engineers 4 Person
Geodetic Engineers 2 Person
Engineering Attendant/Aid 4 Person
Quality Control Technician 8 Person
Cad Operators (Draftsman) 4 Person
Liaison Officer 4 Person
Surveyors 4 Person
Information Attendant 1 Person
Secretariats 6 Person
Utility Personnel 5 Person
Service Drivers 2 Person
Foremens 3 Person
Hardhat
> White 60 Pieces
> Green 500 Pieces
> Yellow 200 Pieces
> Red 150 Pieces
> Brown 150 Pieces
> Safety Vest 600 Pieces
> Safety Goggles 600 Pieces
> Safety Shoes 800 Pieces
> Safety Boots 800 Pieces
> Medicine Kit 10 Set
> Caution Tape 60 Rolls
> Laminated Sack 100 Rolls
> BP apparatus 5 Rolls
Note : Sir.. mao rani akong ma I recommend nga mabudgetan for now this is only partial naa pay additional ani if depend sa
nmber of project nga mag start to operate.. ikaw nay bahala sa price og sa rate sa faculty sir kay wala kayo koy idea ani nga
matter. And kung naa kay gusto ibutang or kulangan sa akong proposal sir then it will be okay for me.. thank you.