DAM STABILITY AND STRUCTURAL ANALYSES

PROJECT: ABERAWAN SIP


LOCATION : El Nido, Palawan
DETAILS : Ogee Section

Date: January 14, 2012


Computed By:

Summary of Analyses Area of Dam Section = 8.2 sq. m


Dam Base Length = 5.6 m
Design Indicators Normal Condition Maximum Flood Condition Normal with Seismic Load
Dist. of resultant from toe 3.01 m 3.33 m 2.60 m
Eccentricity of Resultant -0.20 m 1.17 m 0.21 m
(OK - within middle third) (OK - within middle third) (OK - within middle third)
Foundation Reaction @ Toe 1.61 Tons/sqm 1.88 Tons/sqm 2.52 Tons/sqm
Foundation Reaction @ Heel 2.51 Tons/sqm 0.24 Tons/sqm 1.61 Tons/sqm
(OK for medium sand and gravel) (OK for medium sand and gravel) (OK for medium sand and gravel)
Safety Factor vs. Overturn 2.08 1.42 1.81
OK - Greater than 1.25 OK - Greater than 1.25 OK - Greater than 1.25
Sliding Factor 0.34 0.48 0.61
Greater than 0.3, widen cutoff wall Greater than 0.3, widen cutoff wall Greater than 0.3, widencutoffwall
Thickness at Middle Cutoff = 30.0 cm Thickness at Critical Toe Section = 100.0 cm
Required Thickness at Cutoff = 25.3 cm Required Thickness at Section = 41.2 cm
Thickness of Concrete @ Cut-off is OK Thickness of Concrete @ Toe is OK
DAM STABILITY AND STRUCTURAL ANALYSES

Project: ABERAWAN SIP Date : January 14, 2012


Location : El Nido, Palawan Computed by : 0
Details : Ogee Section

1) Dam Body Weights and Righting Moments


(Vertical Downward Force)

Horizontal Lever Counterclockwise


Body U/S height D/S height Width Weight arm @ toe Moment
m m m tons m m-tons

A 1.34 1.50 0.41 1.40 4.11 5.74


B 1.50 1.41 0.59 2.06 3.61 7.44
C 1.61 1.36 0.51 1.82 3.07 5.58
D 1.36 -0.07 1.50 2.32 2.34 5.43
E 0.23 0.00 0.71 0.20 1.07 0.21
F 1.00 1.00 2.30 5.52 4.47 24.67
G 0.00 1.50 1.50 2.70 1.81 4.89
H 1.20 1.20 1.31 3.77 0.66 2.47
Total 19.79 56.44
(Righting)

Center of Gravity For Horizontal Seismic Force


Vertical Lever Clockwise
Body U/S height D/S height Width Area arm @ toe Moment
(Sub-Area) m m m sq. m. m m-sq. m.

A1 0.00 0.16 0.41 0.03 3.09 0.10


A2 1.34 1.34 0.41 0.55 2.37 1.30
B1 0.09 0.00 0.59 0.03 3.14 0.08
B2 1.41 1.41 0.59 0.83 2.41 2.00
C1 0.25 0.00 0.51 0.06 2.94 0.19
C2 1.36 1.36 0.51 0.69 2.18 1.51
D1 1.43 0.00 1.50 1.07 1.91 2.04
D2 -0.07 -0.07 1.50 -0.11 1.47 -0.15
E 0.23 0.00 0.71 0.08 1.28 0.10
F 1.00 1.00 2.30 2.30 1.20 2.76
G 0.00 1.50 1.50 1.13 1.00 1.12
H 1.20 1.20 1.31 1.57 0.60 0.94
Total 8.24 12.01

Center of Gravity = (Moment/Area) = 1.46 m. (above the toe)

By HTC-DSSA Program
ABERAWAN SIP
El Nido, Palawan
Ogee Section

2) Pressure @ Normal Operating Condition

Crest El. = 29.20 m


U/S Apron El. = 27.70 m
D/S Apron El. = 27.20 m

Diff. In Head = 2.00 m

Creep Length at D/S Apron = 14.20 m


Creep Length at U/S Apron = 10.87 m
Total Creep Length 25.07 m
(up to end of D/S apron)

Pressure Head Table


Units : Tons per sq. meters
Reference Pressure Creep Length Head Loss Net
Pts on Dam Head (m) (m) (m) Pressure

0 0.00 0.00
1 0.16 0.16
2 1.50 1.50
3 1.50 1.50
4 1.70 3.80 0.30 1.40
5 2.50 4.60 0.37 2.13
6 2.50 8.30 0.66 1.84
7 2.50 8.97 0.72 1.78
8 1.70 9.77 0.78 0.92
9 1.70 9.94 0.79 0.91
10 3.20 10.44 0.83 2.37
11 3.20 10.87 0.87 2.33

By HTC-DSSA Program
ABERAWAN SIP
El Nido, Palawan
Ogee Section

3) Pressure @ Maximum Flood Condition

Crest El. = 29.20 m


U/S Apron El. = 27.70 m
D/S Apron El. = 27.20 m
Afflux El. = 30.75 m
Tailwater El. = 30.40 m
Diff. In Head = 0.35 m

Creep Length at D/S Apron = 14.20 m


Creep Length at U/S Apron = 10.87 m
Total Creep = 25.07 m (up to end of D/S apron)

Pressure Head Table


Units : Tons per sq. meters
Reference Pressure Creep Length Head Loss Net
Points on Dam Head (m) (m) (m) Pressure

0 1.88 1.88
1 1.71 1.71
2 3.05 3.05
3 3.05 3.05
4 3.25 3.80 0.05 3.20
5 4.05 4.60 0.06 3.99
6 4.05 8.30 0.12 3.93
7 4.05 8.97 0.13 3.92
8 3.25 9.77 0.14 3.11
9 3.25 9.94 0.14 3.11
10 4.75 10.44 0.15 4.60
11 4.75 10.87 0.15 4.60
12 0.50 0.50
13 0.50 0.50
14 3.32 3.32
15 1.89 1.89
16 1.55 1.55

External Hydrostatic Pressure Head

Reference Pressure
Points on Dam Head

0 1.88
16 1.55
15 1.89
14 3.32
13 0.50
12 0.50

By HTC-DSSA Program
ABERAWAN SIP
El Nido, Palawan
Ogee Section

4) Stability Analyses under Normal Operating Condition

External Horizontal Forces


Pressures Moments
Points Top Bottom Height Force Lever Arm Righting Overturning
tons/sq.m. tons/sq.m. m tons m m-tons m-tons
0-1 0.00 0.16 0.16 0.01 3.09 0.04
1-2 0.16 1.50 1.34 1.11 2.19 2.44
Total 1.13 <(Downstream) 2.47

External Vertical Forces


Pressures Moments
Points Upstream Downstream Width Force Lever Arm Righting Overturning
tons/sq.m. tons/sq.m. m tons m m-tons m-tons
3-2 1.50 1.50 1.30 1.95 4.97 9.69
1-0 0.16 0.00 0.41 0.03 4.18 0.14
Total 1.98 <(Downward) 9.83

Internal Horizontal Forces


Pressures Moments
Points Top Bottom Height Force Lever Arm Righting Overturning
tons/sq.m. tons/sq.m. m tons m m-tons m-tons
4-5 1.40 2.13 0.80 1.41 1.07 1.51
8-7 0.92 1.78 0.80 1.08 1.06 1.14
9 - 10 0.91 2.37 1.50 2.46 0.64 1.57
Total 3.87 <(Downstream) 1.14 3.08
1.08 <(Upstream)

Internal Vertical Forces (Uplift)


Pressures Moments
Points Upstream Downstream Width Force Lever Arm Righting Overturning
tons/sq.m. tons/sq.m. m tons m m-tons m-tons
5-7 1.84 1.78 2.30 4.17 4.48 18.65
8-9 0.92 0.91 0.51 0.47 3.07 1.43
9 - 10 0.91 2.37 1.50 2.46 1.95 4.79
10 - 11 2.37 2.33 1.31 3.08 0.66 2.02
Total 10.17 <(Upward) 26.88

Sum (Horizontal Forces) = 3.91 Tons (Downstream)


Sum (Vertical Forces) = -8.18 Tons (Up)
Sum (Righting Moments) = 10.97 M-Tons
Sum (Overturning Moments) = 32.44 M-Tons
Sum (Moments) = -21.47 M-Tons (Overturning)

Summation (including Body Weights)


Sum (Horizontal Forces) = 3.91 Tons (Downstream)
Sum (Vertical Forces) = 11.60 Tons (Down)
Sum (Righting Moments) = 67.41 M-Tons
Sum (Overturning Moments) = 32.44 M-Tons
Sum (Moments) = 34.97 M-Tons (Righting)

Dist. of resultant from toe = 3.01 M. (OK - within middle third)


Eccentricity = -0.20 M.

Maximum Bearing Capacity = 15.00 Tons/Sq. M. for Medium sand and gravel
Foundation Reaction @ toe = 1.61 Tons/Sq. M. (OK for medium sand and gravel)
Foundation Reaction @ heel = 2.51 Tons/Sq. M. (OK for medium sand and gravel)

Safety Factor vs. Overturn = 2.08 OK - Greater than 1.25


Sliding Factor = 0.34 Greater than 0.3, widen cutoff wall

By HTC-DSSA Program
ABERAWAN SIP
El Nido, Palawan
Ogee Section

5) Stability Analyses under Maximum Flood Condition

External Horizontal Forces


Pressures Moments
Points Top Bottom Height Force Lever Arm Righting Overturning
tons/sq.m. tons/sq.m. m tons m m-tons m-tons
0-1 1.88 1.71 0.16 0.29 3.12 0.90
1-2 1.71 3.05 1.34 3.19 2.31 7.36
0 - 16 1.88 1.55 0.09 0.15 3.16 0.49
16 - 15 1.55 1.89 0.25 0.43 2.98 1.28
15 - 14 1.89 3.32 1.43 3.73 2.08 7.75
14 - 13 3.32 0.50 0.23 0.44 1.34 0.59
Total 3.48 <(Downstream) 10.11 8.25
4.75 <(Upstream)

External Vertical Forces


Pressures Moments
Points Upstream Downstream Width Force Lever Arm Righting Overturning
tons/sq.m. tons/sq.m. m tons m m-tons m-tons
3-2 3.05 3.05 1.30 3.97 4.97 19.71
1-0 1.71 1.88 0.41 0.74 4.11 3.03
0 - 16 1.88 1.55 0.59 1.01 3.62 3.67
16 - 15 1.55 1.89 0.51 0.88 3.06 2.68
15 - 14 1.89 3.32 1.50 3.91 1.99 7.78
14 - 13 3.32 0.50 0.71 1.36 1.04 1.41
13 - 12 0.50 0.50 0.60 0.30 0.30 0.09
Total 12.15 <(Downward) 38.37

Internal Horizontal Forces


Pressures Moments
Points Top Bottom Height Force Lever Arm Righting Overturning
tons/sq.m. tons/sq.m. m tons m m-tons m-tons
4-5 3.20 3.99 0.80 2.87 1.09 3.12
8-7 3.11 3.92 0.80 2.82 1.08 3.05
9 - 10 3.11 4.60 1.50 5.79 0.70 4.06
Total 8.66 <(Downstream) 3.05 7.18
2.82 <(Upstream)

Internal Vertical Forces (Uplift)


Pressures Moments
Points Upstream Downstream Width Force Lever Arm Righting Overturning
tons/sq.m. tons/sq.m. m tons m m-tons m-tons
6-7 3.93 3.92 2.30 9.04 4.47 40.40
8-9 3.11 3.11 0.51 1.59 3.07 4.87
9 - 10 3.11 4.60 1.50 5.79 2.01 11.64
10 - 11 4.60 4.60 1.31 6.03 0.66 3.95
Total 22.44 <(Upward) 60.86

Maximum Flood Condition (cont.)

Sum (Horizontal Forces) = 4.57 Tons (Downstream)


Sum (Vertical Forces) = -10.29 Tons (Up)
Sum (Righting Moments) = 51.53 M-Tons
Sum (Overturning Moments) = 76.29 M-Tons
Sum (Moments) = -24.77 M-Tons

Summation (including Body Weights)


Sum (Horizontal Forces) = 4.57 Tons (Downstream)
Sum (Vertical Forces) = 9.50 Tons (Down)
Sum (Righting Moments) = 107.96 M-Tons
Sum (Overturning Moments) = 76.29 M-Tons
Sum (Moments) = 31.67 M-Tons (Righting)

Dist. of resultant from toe = 3.33 M. (OK - within middle third)


Eccentricity = 1.17 M.

Maximum Bearing Capacity = 15.00 Tons/Sq. M. for Medium sand and gravel
Foundation Reaction @ toe= 1.88 Tons/Sq. M. (OK for medium sand and gravel)
Foundation Reaction@heel= 0.24 Tons/Sq. M. (OK for medium sand and gravel)

By HTC-DSSA Program
Safety Factor vs. Overturn = 1.42 OK - Greater than 1.25
Sliding Factor = 0.48 Greater than 0.3, widen cutoff wall

By HTC-DSSA Program
ABERAWAN SIP
El Nido, Palawan
Ogee Section

6) Normal Operating Condition (With Seismic Loading)

Earthquake accelleration = 0.15 g

Total Weight of Structure = 19.79 Tons


Lever Arm = 1.46 M.

Earthquake Force (Weight) = 2.97 Tons (Downstream)


Moment = 4.32 M-Tons (Overturning)

Hydrodynamic Force = 0.583 x Unit Weight of Water x (U/S Height) 2 x Earthquake Acceleration

Hydrodynamic Force = 0.20 Tons (Downstream)


Lever Arm @ toe = (0.40 X U/S Height) + (U/S elev.-elev@toe)
Lever Arm @ toe = 2.20 M.
Moment = 0.43 M-Tons (Overturning)

Sum (Horizontal Forces) = 7.08 Tons (Downstream)


Sum (Vertical Forces) = -8.18 Tons (Up)
Sum (Righting Moments) = 10.97 M-Tons
Sum (Overturning Moments) = 37.20 M-Tons
Sum (Moments) = -26.22 M-Tons (Overturning)

Summation (including Body Weights)


Sum (Horizontal Forces) = 7.08 Tons (Downstream)
Sum (Vertical Forces) = 11.60 Tons (Down)
Sum (Righting Moments) = 67.41 M-Tons
Sum (Overturning Moments) = 37.20 M-Tons
Sum (Moments) = 30.22 M-Tons (Righting)

Dist. of resultant from toe = 2.60 M. (OK - within middle third)


Eccentricity = 0.21 M.
Foundation Reaction @ toe = 2.52 Tons/Sq. M. (OK for medium sand and gravel)
Foundation Reaction @ heel = 1.61 Tons/Sq. M. (OK for medium sand and gravel)

Safety Factor vs. Overturn = 1.81 OK - Greater than 1.25


Sliding Factor = 0.61 Greater than 0.3, widencutoffwall

By HTC-DSSA Program
ABERAWAN SIP
El Nido, Palawan
Ogee Section

7) Stability Analyses @ Toe under Normal Operating Condition

External Horizontal Forces :


Pressures Moments @ Pt. 9
Points Top Bottom Height Force Lever Arm Clockwise Co-clockwise
tons/sq.m. tons/sq.m. m tons m m-tons m-tons

Total 0.00 0.00 0.00

External Vertical Forces


Pressures Moments @ Pt. 9
Points Downstream Upstream Width Force Lever Arm Clockwise Co-clockwise
tons/sq.m. tons/sq.m. m tons m m-tons m-tons

Total 0.00 0.00 0.00

Internal Horizontal Forces


Pressures Moments @ Pt. 9
Points Bottom Top Height Force Lever Arm Clockwise Co-clockwise
tons/sq.m. tons/sq.m. m tons m m-tons m-tons
10 - 9 2.37 0.91 1.50 2.46 0.64 1.57
Total 2.46 1.57

Internal Vertical Forces (Uplift)


Pressures Moments @ Pt. 9
Points Downstream Upstream Width Force Lever Arm Clockwise Co-clockwise
tons/sq.m. tons/sq.m. m tons m m-tons m-tons
11 - 10 2.33 2.37 1.31 3.08 2.15 6.63
10 - 9 2.37 0.91 1.50 2.46 0.86 2.12
Total 5.53 8.75

Body Weights
Dam Pressures Moments @ Pt. 9
Body D/S height U/S height Width Weight Lever Arm Clockwise Co-clockwise
tons/sq.m. tons/sq.m. m tons m m-tons m-tons
E 0.00 0.23 0.71 0.20 1.74 0.34
Part of D 1.43 0.00 1.50 2.57 1.00 2.57
G 1.50 0.00 1.50 2.70 1.00 2.70
H 1.20 1.20 1.31 3.77 2.16 8.13
Total 9.24 13.74

Foundation Reaction
Pressures Moments @ Pt. 9
Points Downstream Upstream Width Force Lever Arm Clockwise Co-clockwise
tons/sq.m. tons/sq.m. m tons m m-tons m-tons
11 - 10 1.61 1.82 1.31 2.25 2.14 4.82
10 - 9 1.82 2.06 1.50 2.92 0.73 2.14
Total 5.17 6.96

M= -3.53 M-Tons / M.
= -7,773.95 ft-# / ft.
(Co-clockwise - Reinforcements at toe required)

By HTC-DSSA Program
ABERAWAN SIP
El Nido, Palawan
Ogee Section

8) Stability Analyses @ Toe under Maximum Flood Condition

External Horizontal Forces


Pressures Moments @ Pt. 9
Points Top Bottom Height Force Lever Arm Clockwise Co-clockwise
tons/sq.m. tons/sq.m. m tons m m-tons m-tons
14 - 13 1.89 0.50 1.66 1.98 1.19 2.36

Total 1.98 2.36 0.00

External Vertical Forces


Pressures Moments @ Pt. 9
Points Downstream Upstream Width Force Lever Arm Clockwise Co-clockwise
tons/sq.m. tons/sq.m. m tons m m-tons m-tons
14 - 13 1.89 0.50 1.50 1.79 2.40 4.29
13 - 12 0.50 0.50 1.50 0.75 2.96 2.22
Total 2.54 6.51

Internal Horizontal Forces


Pressures Moments @ Pt. 9
Points Bottom Top Height Force Lever Arm Clockwise Co-clockwise
tons/sq.m. tons/sq.m. m tons m m-tons m-tons
10 - 9 4.60 3.11 1.50 5.79 0.80 4.62
Total 5.79 4.62

Internal Vertical Forces (Uplift)


Pressures Moments @ Pt. 9
Points Downstream Upstream Width Force Lever Arm Clockwise Co-clockwise
tons/sq.m. tons/sq.m. m tons m m-tons m-tons
10 - 9 4.60 3.11 1.50 5.79 0.80 4.62
11 - 10 4.60 4.60 1.31 6.03 2.15 12.99
Total 11.81 17.61

Body Weights
Pressures Moments @ Pt. 9
Body D/S height U/S height Width Weight Lever Arm Clockwise Co-clockwise
tons/sq.m. tons/sq.m. m tons m m-tons m-tons
E 0.00 0.23 0.71 0.20 1.74 0.34
Part of D 1.43 0.00 1.50 2.57 1.00 2.57
G 1.50 0.00 1.50 2.70 1.00 2.70
H 1.20 1.20 1.31 3.77 2.16 8.13
Total 9.24 13.74

Foundation Reaction
Pressures Moments
Points Downstream Upstream Width Force Lever Arm Clockwise Co-clockwise
tons/sq.m. tons/sq.m. m tons m m-tons m-tons
11 - 10 1.88 1.49 1.31 2.21 2.18 4.81
10 - 9 1.49 1.06 1.50 1.91 0.79 1.52
Total 4.12 6.33

M= -1.31 M-Tons / M.
= -2,892.87 ft-# / ft.
(clockwise - Reinforcements at toe required)

By HTC-DSSA Program
ABERAWAN SIP
El Nido, Palawan
Ogee Section

9) Design of Critical Toe Section @ Maximum Flood Condition

Consider per meter-strip of dam,


Concrete Thickness @ Toe = 1 m
Bending Moment @ toe = 3.53 Ton-m
= 353361 Kg-cm

Concrete Design

For concrete binder of rubble masonry,

fc' = 70 Kg/cm^2 n= 15
fc = 28 Kg/cm^2 k= 0.25
fs = 1268 Kg/cm^2 j= 0.917

Required Depth :

R = 1/2 (fc) (k) (j) = 3.21 Kg/cm^2

Assumed Unit Width, 100 cm


Critical Thickness @ Toe, t= 100 cm
supplied d = t - 7 - 1/2(2) = 92 cm

required depth at toe, d = (M / Rb)1/2


d= 33.18 cm
t= 41.18
Thickness of Concrete @ Toe is OK

Reinforcement using 20 mm Rebar

As = M / (fs x j x d) = 3.30 cm
2

Bars Spacing per meter-strip = b x 314.2 / As = 95.12 cm

Use : 20 mm dia rebars spaced @ 95.00 cm on center


for concrete slab beneath the rubble masonry

or 16 mm dia rebars spaced @ 60.00 cm on center

By HTC-DSSA Program
ABERAWAN SIP
El Nido, Palawan
Ogee Section

10) Design of Cut-off @ Normal Operating Condition with Seismic Load

Summation of horizontal forces, FH = 7.08 Tons


Summation of vertical forces, FV = 11.60 Tons
Coef. of Friction bet. dam and foundation, m = 0.40 (Assumed for Sand & Gravel Material)
Excess horizontal force, F = FH - mF V = P = 2.43 Tons

Length of Cut-off Wall, L = 1.80 m


Max.Thickness of Cut-off Wall at Support = 0.30 m
Max. Bending Moment at Support = P x L = 4382.7881 kg-m
438278.81 kg-cm

Concrete Design

For concrete binder of rubble masonry,

fc' = 211 Kg/cm^2 n = 11


fc = 84 Kg/cm^2 k = 0.40
fs = 1400 Kg/cm^2 j = 0.87

Required Depth :

R = 1/2 (fc) (k) (j) = 14.69 Kg/cm^2

Assumed Unit Width, 100 cm


Critical Thickness @ Toe, t= 30 cm
supplied d = t - 7 - 1/2(2) 22 cm

required depth at toe, d = (M / Rb)1/2


d= 17.28 cm
t= 25.28 cm
Thickness of Concrete @ Cut-off is OK

Reinforcement using 16 mm Rebar


As = M / (fs x j x d) = 16.36 cm
2

Bars Spacing per meter-strip = b x 201.1 / As = 12.30 cm

Use : 16 mm dia rebars spaced @ 12.00 cm on center


for concrete slab beneath the rubble masonry