PES-IMS-SF-QC-02-1

DAILY TANK INSPECTION STANDARD FORM


REPORT PES-QC-DTIR-ALE-190804

NAME & DESIG DATE 04.08.19 TIME 09:00


Rehan Monis, Construction Engineer
PROJECT
Aden Power Plant Phase-1
st nd
LCO Treated Storage Tanks Tank 28C Circular seam fit-up inspection between 1 & 2 shell
th
WORKING PART course. Tank 28E 4 shell course LS seam fit-up & Circumference check, Sump to bottom weld
MPI, Bottom plate review of radiography films.
TODAY'S ACTIVITIES

REF ACTIVITIES COMMENTS

1 Tank 28B pipe support marking on tank shell.

st nd
Tank 28C Circular seam fit-up inspection between 1 and 2 shell
2 course carried out and found satisfactory .Lifting trunnion RF pad
installation in progress.

st
3 Tank 28C Circular seam welding in progress for 1 shell course.

4 Tank 28C Stiffener ring installation in progress.

Tank 28D Marking and installation of pad plates to shell.


5

th
Tank 28E 4 shell course LS seam fit-up and circumference
6
Check carried out found to be satisfactory.

Tank 28E MPI carried out for Sump to bottom plate welds.
7
Observations were satisfactory.

Tank 28E bottom plate review of radiography films for repair joints
8
& Extension joints. Acceptable.

SUPPORTING □ SD: Shop Drawing □ SM: Sample □ MS: Method Statement □ CS: Compliance Statement □ PX: Pictures
DOCUMENTS
ATTACHED: □ MD: Technical Data Sheet □ TT: Test Results □ OT: Other
TOMORROW PLANNED ACTIVITIES

REPORT REVIEW
PREPARED BY COMMENTS:

Rehan Monis
REVIEWED BY
Ahmed lofty
DATE SIGNATURE:

04.08.19
PES-IMS-SF-QC-02-1
DAILY TANK INSPECTION STANDARD FORM
REPORT PES-QC-DTIR-ALE-190804
PICTURES

Circular seam fit-up inspection Tank 28C Lifting trunnion RF pad installation in progress.

th
Tank 28E 4 shell course LS seam fit-up and circumference
Marking and installation of pad plates to shell
check

MPI carried out for Sump to bottom plate welds. MPI carried out for Sump to bottom plate welds.
PES-IMS-SF-QC-02-1
DAILY TANK INSPECTION STANDARD FORM
REPORT PES-QC-DTIR-ALE-190804
PICTURES

Review of radiography films for repair & Extension joints Review of radiography films for repair & Extension joints

th
Tank 28E 4 shell course LS seam fit-up inspection Installation of pad plates to shell.

You might also like