Daily Tank Inspection: PES-QC-DTIR-ALE-190804 04.08.19
Daily Tank Inspection: PES-QC-DTIR-ALE-190804 04.08.19
st nd
Tank 28C Circular seam fit-up inspection between 1 and 2 shell
2 course carried out and found satisfactory .Lifting trunnion RF pad
installation in progress.
st
3 Tank 28C Circular seam welding in progress for 1 shell course.
th
Tank 28E 4 shell course LS seam fit-up and circumference
6
Check carried out found to be satisfactory.
Tank 28E MPI carried out for Sump to bottom plate welds.
7
Observations were satisfactory.
Tank 28E bottom plate review of radiography films for repair joints
8
& Extension joints. Acceptable.
SUPPORTING □ SD: Shop Drawing □ SM: Sample □ MS: Method Statement □ CS: Compliance Statement □ PX: Pictures
DOCUMENTS
ATTACHED: □ MD: Technical Data Sheet □ TT: Test Results □ OT: Other
TOMORROW PLANNED ACTIVITIES
REPORT REVIEW
PREPARED BY COMMENTS:
Rehan Monis
REVIEWED BY
Ahmed lofty
DATE SIGNATURE:
04.08.19
PES-IMS-SF-QC-02-1
DAILY TANK INSPECTION STANDARD FORM
REPORT PES-QC-DTIR-ALE-190804
PICTURES
Circular seam fit-up inspection Tank 28C Lifting trunnion RF pad installation in progress.
th
Tank 28E 4 shell course LS seam fit-up and circumference
Marking and installation of pad plates to shell
check
MPI carried out for Sump to bottom plate welds. MPI carried out for Sump to bottom plate welds.
PES-IMS-SF-QC-02-1
DAILY TANK INSPECTION STANDARD FORM
REPORT PES-QC-DTIR-ALE-190804
PICTURES
Review of radiography films for repair & Extension joints Review of radiography films for repair & Extension joints
th
Tank 28E 4 shell course LS seam fit-up inspection Installation of pad plates to shell.