This flow chart outlines the process for manufacturing orders (M.O.) and route cards. It shows the key stages: planning and M.O. issue, routing through activities like fettling, CNC, final inspection, and packing, and closing the M.O. The stages are interconnected by routes (R) and outputs (O) with feedback loops to address reworks or corrections. The goal is to move the M.O. through production to final inspection/packing and ultimately invoice and dispatch.
This flow chart outlines the process for manufacturing orders (M.O.) and route cards. It shows the key stages: planning and M.O. issue, routing through activities like fettling, CNC, final inspection, and packing, and closing the M.O. The stages are interconnected by routes (R) and outputs (O) with feedback loops to address reworks or corrections. The goal is to move the M.O. through production to final inspection/packing and ultimately invoice and dispatch.
This flow chart outlines the process for manufacturing orders (M.O.) and route cards. It shows the key stages: planning and M.O. issue, routing through activities like fettling, CNC, final inspection, and packing, and closing the M.O. The stages are interconnected by routes (R) and outputs (O) with feedback loops to address reworks or corrections. The goal is to move the M.O. through production to final inspection/packing and ultimately invoice and dispatch.
S SUB T M.O.ISSUE CONTRACT O PLANNING / JOB R WORK E CLOSED M.O R S R R R O R O O CLOSED M.O M.O.ISSUE O CLOSED M.O O U U U TES U ST STE U T T PLANNING CT ST TE TC E AO E PLANNING O C OA F.G / M.O ISSUE PDC RR D FETTLING R C A CNC O RRA FINAL INSPECTION /PACKING R DR STORE C A /M.O CLOSE E ES R E R ED D S D S S S R T M.O.ISSUE CLOSED M.O M.O.ISSUE CLOSED M.O O INVOICE U O T RO R E FINAL UT E C PLANNING PLANNING A INSPECTION E S DISPATCH /PACKING CA R D RD S TOR OU S- Stores RT R- Routecard EE SAC R D