1. Page 3 of 44
Take out pressurized (12 ¼” Drilling has no pressure in annulus)
2. Page 4 of 44
Take out paragraph 5.1.3 (use only conventional method)
MPD system is not a well control equipment as per CR
3. Page 9 of 44
Take out pressurized (few times)
Take out associated annulus surface pressure
Take out bullheading
4. Page 11 of 44
Write the threshold values and time for Kick and loss
5. Pages 13 to 18 of 44
Clear procedure to drill out cement such as
o Dill out Float collar + 5 meters cement below FC with such
parameters
o Circulate hole until shakers clean
o Pick up 9 m off bottom
o Perform well control drill through rig choke
o Pull out 3 stands
o Pick up and install bearing assy in RCD housing
o Perform fingerprinting with both crews
During fingerprinting assess the minimum flow rates needed
to have PWD and other logging tools informations at surface
Note that this may change as mud weight increase
o Take out bearing assy
Comments on MPD Weatherford document operation procedure 19-SDS-WFT460403-ENG-004
14 August and 15 August 2019
o Perform SCR’s
o RIH & Drill out remaining shoe track + 3 meters formation
o Circulate hole until shakers clean
o Pull bit inside casing
o Perform the required FIT/LOT,
o Drilling to …… (MD/TVD be defined)
o At ….. m , circulate hole clean, pull out 3 stands
o Pick up and install bearing assy in RCD bearing
Keep in mind that the CBHP needs to start at least one day
prior really needed in order for both crews to be familiarized
with this system
6. Page 20 of 44
Wording is completnot rightely and has to be rewrited again
For tripping in and out simulations have to be done with the latest mud
rheogy, TMD & TVD
We need to consider 3 cases
7. Page 22 of 44
Tripping in
Here also we need to consider 3 cases
8. Page 28 to 32 of 44
Well control shall be CONVENTIONAL as MPD system is not a Well
Control Equipment
INFLUX DETECTION : Yes using EKD (check the threshold values)
DO NOT USE WEATHERFORD ‘’default’’ value of 15gpm/15sec
which is 57lpm/15sec.Coriolis will not detect a kick below 3m3/hour
Use 15lpm/15sec: If alarm goes too often, fine tune by increasing to
20lpm/15sec
9. Page 34 :
Paragraph 7.3 : PHM to decide at which percentage of gas, the mud has
to go through the Mud Gas separator
Paragraph 7.4 : Mud cooler to be used
10.Page 37
Paragraph 7.12 : add back up with Geolog
END