Professional Documents
Culture Documents
Typikal Cross Drain
Typikal Cross Drain
0.7
℄
1:
1.50
Shotcrete Drainase
Wiremesh
Material Bahu Jalan Sama Dengan
Timbunan Badan Jalan
0
Laston Permukaan
0.7
AC - WC = 4 cm
1:
(TEBAL LPA )
(TEBAL LPB )
Laston Permukaan
AC - BC = 6 cm
0.10
0.10
0.30
0.14
4% 2% 2% 4%
Inlet
Slope -2.00%
Outlet
U-DITCH
Sirtu = 10 cm
Pasir = 10 cm Lapis Pondasi Bawah (LPB) Lapis Pondasi Atas (LPA)
Batu Pecah Kelas A = 20 cm
Batu Pecah Kelas B = 30 cm BAK KONTROL
LC = 10 cm BOX CULVERT
Beton K-225 Beton K-225
Beton K-125
1.00 1.50 3.50 3.50 1.50 1.00
7.00
10.00