WELL CONTROL WORK SHEET

PRE-RECORD INFORMATION

Original Mud Weight (OMW) : 10.4 True Vertical Depth (TVD) : 4,500 ft
Kill rate pressure (KRP) Measure Depth (MD) : 4,500 ft
Pump #1 (KRP#1) : 400 psi at 60 spm Casing Shoe (TVD) : 4,000 ft
Pump #2 (KRP#2) : 400 psi at 60 spm Casing Shoe (MD) : 4,000 ft
Pump #3 (KRP#2) : 400 psi at 60 spm Leak-off Test Mud Weight (LOT MW) : 9.0 ppg
Pump Output #1 (PO) : 0.0875 bbl/stroke Surface Test Pressure (Surf. TP) : 1,450 psi
Pump Output #2 (PO) : 0.0875 bbl/stroke Casing Internal Yield (Burst) : 3,850 psi
Pump Output #3 (PO) : 0.0875 bbl/stroke BOP Stack Rating : 5,000 psi
Drill Pipe Capacity (DPC) : 0.01719 bbl/ft
Annulus Capacity (AnC) : 0.04500 bbl/ft
Surface lines Capacity : 0 bbls

RECORD

1. Shut in Drill Pipe Pressure (SIDP) : 300 psi


2. Shut in Casing Pressure (SICP) : 450 psi
3. Pit volume Increase (Pit Gain) : 7 bbl

CALCULATION

1. Kill Mud Weight (KMW) = 300 psi : 4,500 ft : 0.052 + 10.4 ppg = 11.7 ppg
(SIDP) (TVD) (OMW)

2. Initial Circulating Pressure (ICP) = 400 psi + 300 psi = 700 psi
(KRP) (SIDP)

3. Final Circulating Pressure (FCP) = 400 psi x 11.7 ppg : 10.4 ppg = 449 psi
(KRP) (KMW) (OMW)

4. Surface to Bit Stroke (STB) = 0.01719 bbl/ft x 4,500 ft : 0.0875 bbl/strk = 884 strk
(DPC) (MD) (PO)

5. Bit to Surface Stroke (BTS) = 0.04500 bbl/ft x 4,500 ft : 0.0875 bbl/strk = 2314 strk
(AnC) (MD) (PO)

6. Total Stroke for One Circulation = 884 Strk + 2314 Strk = 3198 strk
(STB) (BTS)

7. Maximum Allowable MW (EMW) = 1,450 psi : 4,000 ft : 0.052 + 9.0 ppg = 16.0 ppg
(Max. AMW) (Surf. TP) (Shoe TVD) (LOT MW)

8. Maximum Allowable Surface Pressure = 16.0 ppg - 10.4 ppg x 4,000 ft x 0.052 = 1,159 psi
(Formation Limit*) (Max AMW) (OMW) (Shoe TVD)

9. Maximum Allowable Surface Pressure = 3,850 psi x 0.7 = 2,695 psi


(Casing Limit*) (Burst)

10. Maximum Allowable Surface Pressure = = 5,000 psi


(BOP Stack Rating*)

11. Bit to Shoe Stroke = 4,500 ft - 4,000 ft x 0.04500 bbl/ft : 0.0875 bbl/strk = 257 strk
(MD) (Shoe MD) (AnC) (PO)

12. Pressure drop/Stroke = 88 strk = 700 psi - 449 : 884 x 88 = 25 psi/(N) strk
(N) (ICP) (FCP) (STB) (N)

PUMP PRESSURE SCHEDULE

Strokes 0 88 177 265 354 442 530 619 707 796 884 StB
Pump Press. ICP 700 675 650 625 600 575 550 525 499 474 449 FCP
Time (min) 0 1.47 2.95 4.42 5.89 7.37 8.84 10.31 12 13 15
P u m p P re s s u re

Pump Pressure VS Pump Stroke Schedule

0 100 200 300 400 500 600 700 800 900


Pump Stroke
Pump Pressure VS Pump Stroke Linear (Pump Pressure VS Pump Stroke)
WELL CONTROL WORK SHEET
PRE-RECORD INFORMATION

Original Mud Weight (OMW) : True Vertical Depth (TVD) : ft


Kill rate pressure (KRP) Measure Depth (MD) : ft
Pump #1 (KRP#1) : psi at spm Casing Shoe (TVD) : ft
Pump #2 (KRP#2) : psi at spm Casing Shoe (MD) : ft
Pump #3 (KRP#2) : psi at spm Leak-off Test Mud Weight (LOT MW) : ppg
Pump Output #1 (PO) : bbl/stroke Surface Test Pressure (Surf. TP) : psi
Pump Output #2 (PO) : bbl/stroke Casing Internal Yield (Burst) : psi
Pump Output #3 (PO) : bbl/stroke BOP Stack Rating : psi
Drill Pipe Capacity (DPC) : bbl/ft
Annulus Capacity (AnC) : bbl/ft
Surface lines Capacity : bbls

RECORD

1. Shut in Drill Pipe Pressure (SIDP) : psi


2. Shut in Casing Pressure (SICP) : psi
3. Pit volume Increase (Pit Gain) : bbl

CALCULATION

1. Kill Mud Weight (KMW) = psi : ft : + ppg = ppg


(SIDP) (TVD) (OMW)

2. Initial Circulating Pressure (ICP) = psi + psi = psi


(KRP) (SIDP)

3. Final Circulating Pressure (FCP) = psi x ppg : ppg = psi


(KRP) (KMW) (OMW)

4. Surface to Bit Stroke (STB) = bbl/ft x ft : bbl/strk = strk


(DPC) (MD) (PO)

5. Bit to Surface Stroke (BTS) = bbl/ft x ft : bbl/strk = strk


(AnC) (MD) (PO)

6. Total Stroke for One Circulation = Strk + Strk = strk


(STB) (BTS)

7. Maximum Allowable MW (EMW) = psi : ft : + ppg = ppg


(Max. AMW) (Surf. TP) (Shoe TVD) (LOT MW)

8. Maximum Allowable Surface Pressure = ppg - ppg x ft x = psi


(Formation Limit*) (Max AMW) (OMW) (Shoe TVD)

9. Maximum Allowable Surface Pressure = psi x = psi


(Casing Limit*) (Burst)

10. Maximum Allowable Surface Pressure = = psi


(BOP Stack Rating*)

11. Bit to Shoe Stroke = ft - ft x bbl/ft : bbl/strk = strk


(MD) (Shoe MD) (AnC) (PO)

12. Pressure drop/Stroke = strk = psi - : x = psi/(N) strk


(N) (ICP) (FCP) (STB) (N)

PUMP PRESSURE SCHEDULE

Strokes
Pump Press. ICP
Time (min)
P u m p P re s s u re

Pump Pressure VS Pump Stroke Schedule

200

0
0 50 100 150 200 250 300 350
Pump Stroke
Pump Pressure VS Pump Stroke Linear (Pump Pressure VS Pump Stroke)
StB
FCP
Tubing Press 3250 PSI shut in press

Volume String SSD to surface : 52.15 bbls


Volume Ann Surface to SSD : 272.41 bbls
Annulus Fluid Reverse out :
8.5 PPG Displace FL Press
Schedule entry Drop WHP
0 0 0 3250
2.5 431.91 191 3059
5 863.81 382 2868
7.5 1295.72 573 2677
10 1727.62 764 2486
12.5 2159.53 955 2295
15 2591.43 1145 2105
17.5 3023.34 1336 1914
20 3455.24 1527 1723
2.875 inch EUE tbg 22.5 3887.15 1718 1532
2.441 inc ID 25 4319.05 1909 1341
27.5 4750.96 2100 1150
30 5182.86 2291 959
32.5 5614.77 2482 768
SSD at 9010 ft KB 35 6046.68 2673 577
37.5 6478.58 2864 386
at 9281 ft KB 40 6910.49 3054 196
42.5 7342.39 3245 5
45 7774.3 3436 -186
7" Casing shoe 47.5 8206.2 3627 -377
at 9599 ft KB 50 8638.11 3818 -568
ID 6.276 inch 52.2 9018.18 3986 -736
55 9501.92 4200 -950
2.375 inch tubing
1.992 inch ID

Liner Shoe 5 inch


ID 4.276 inch
at 9664 ft KB

OH-Packer set
at 9700

at 9897 ft KB
PBTD