DATA SHEET FOR TANK H2SO4

Rev.
Date Status PREP'D CHECK'D APPR'D CHECK'D APPR'D
No.
0 26-Aug-19 Issued for Bid TDS RPA TFN
DOC. NO.
DATA SHEET FOR TANK H2SO4

GENERAL INFORMATION

Client : PT Pertamina Patra Niaga Quantity : 2 No's


Project : Pemanfaatan Asam Sulfat Model :
Service : Asam Sulfat (H2SO4) Vendor :

Applicable to : Proposal Purchase As-Built


To be completed by : Purchaser Manufacturer Purchaser and Manufacturer

DESIGN INFORMATION
Tank Capacity Nominal (m3) : Net Working Capacity (m )
3
: 3,000
Product Stored : Asam Sulfat (H2SO4) Specific Gravity : 1.84
Operating Pressure (kg/cm2g) : ATM Test Pressure(kg/cm2g) : (Note 2)
o 3
Operating Temperature ( C) : 50 Rates Filling (m /hr) : -
Design Int. Press. (kg/cm2g) : Full of Water + 0.2 Empty Filling (m3/hr) : -
o
Design Temperature ( C) : 80 :
Shell Thickness, Course : 1st 20 mm 2nd 18 mm 3rd 16 mm 4th 14 mm
th
(Note 1) 5 12 mm 6th 12 mm 7th 10 mm 8th 8 mm
th
9 mm 10th mm 11th mm 12
th
mm
Roof Thickness (Note 1) : 8 mm
Roof type : Flat Umbrella / dome Supported Self-Supporting Slope 2/12
Cone roof
Bottom Thickness (Note 1) : 10 mm
Bottom type : Flat Slope Inward Slope Outward Slope
Corrosion Allowance : Bottom 3 mm Shell 3 mm
Roof 3 mm Supported member 3 mm (on all exposure surfaces)
Wind Velocity (mph) : (Note 5)
Earthquake Zone : (Note 5)
Standard : API 650
FABRICATION / CONSTRUCTION DETAILS
Tank Size : Inside Dia. : 18 m Height : 13.5 m
Frangible Roof Joint : Yes No
Top Angle Turned : Out In
Foundation Type : Concrete Ringwall Earth Concrete with piles At Stand
Access Type : Ladder Free Standing Stair Spiral Stairway with Platform
Heating Coil : No Yes, Surface Area: ft2
Material Specifications : (Note 6)
Shell : A516 Gr.70 Nozzle Pipe : A106 Gr.B Earth Boss : SS316L
Roof : A516 Gr.70 Nozzle Plate : A516 Gr.70 Bolt : A 193 Gr. B7
Structure : - Flange : A105 Nut : A 194 Gr. 2H
Bottom Plate : A516 Gr.70 Gasket : Spiral Wound 304 SS Anchor Bolt : A 307 B
Coating System : (Note 7) WEIGHT (Note 1)
Stress Relieving : No Yes Empty : 153 Ton
Radiography : Full Operating : 6500 Ton
Magnetic Particle : Yes Test : 3600 Ton
Personal Protection : No Yes
Insulation : No Yes
Other Test (as per Code) : Hydrotest, Vacuum Test, Penetrant Test, Pneumatic Test
Certification : Yes, Required (Migas or Depnaker)
DOC. NO.
DATA SHEET FOR TANK H2SO4

TANK SKETCH DRAWING

Handrail M1 N7 N5
N8

8th (1.5m width) Rafter


Top Angle
Stairaway L100x100x10
7th (1.5m width)

N1 Center
6th (1.5m width) Wind girder
Column (if required)
N10 (NPS 12")
N3
5th (1.8m width)
13.5m H

N4
4th (1.8m width)

3rd (1.8m width)


N6
N9
2nd (1.8m
COD M2

1st (1.8m width)


1:120 N2 N11

Draw Off
18m ID Sump
CONNECTION SCHEDULE (Note 10)
Mark No. NPS Rating Function
Facing Remarks
No. Req'd (in) (#) Description
N1 1 6 150 RF Inlet Connection
N2 1 6 150 RF Outlet Connection
N3 1 4 150 RF Recycle Connection
N4 1 2 150 RF LT Connection DP Type
N5 1 2 150 RF LT Connection Float Type
N6 1 2 150 RF LI Connection DP Type
N7 1 2 150 RF Vent Connection c/w Flame Arrestor
N8 1 2 150 RF Utility Connection c/w Blind Cover
N9 1 2 150 RF TI/TW Connection
N10 1 2 150 RF Overflow Connection
N11 1 2 150 RF Drain Connection
M1 1 24 As per API 650 Roof Manhole c/w Emergency Vent
M2 1 24 As per API 650 Shell Manhole c/w Cover & Davit
COD 1 8"x16" As per API 650 Shell Manhole c/w Cover
NOTES
1. Vendor to advise (VTA) & shall update, fill out and include this Data Sheet along with their offer.
2. As per Code.
3. All data to be finalized during detail design engineering phase.
4. The Design Life of equipment shall be 20 years.
5. Vendor responsibility to provide all strength (thickness) calculation
Thickness (shell, roof and bottom) are proposed values, Vendor shall check and guarantee the strengths.
6. Surface internal tank shall use phenolic lining system appropriate with H2SO4 service.
7. Net working capacity of the storage tank is between HHLL and LLLL.
8. Insect/ dust screen for vent nozzle is required.
9. Vendor shall consider Foam Injection Connection for safety system around the Tank.
10. All nozzle connection with preliminary size and will be finalized on the next stage.