HSE-CR Risk Assessment For Bhit Black Top Road From CP5 To D9 Repair Works
HSE-CR Risk Assessment For Bhit Black Top Road From CP5 To D9 Repair Works
HSE-CR Risk Assessment For Bhit Black Top Road From CP5 To D9 Repair Works
H S E 9 9 - B H - I N - R A - 0 5 0 - 0 0
The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 2 of 15
Consequences
Consequences
Responsibility
Residual Risk
Frequency
Frequency
Legal
Target
S. & Overall
Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.
The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 3 of 15
Consequences
Consequences
Responsibility
Residual Risk
Frequency
Frequency
Legal
Target
S. & Overall
Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.
The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 4 of 15
Consequences
Consequences
Responsibility
Residual Risk
Frequency
Frequency
Legal
Target
S. & Overall
Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.
The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 5 of 15
Consequences
Consequences
Responsibility
Residual Risk
Frequency
Frequency
Legal
Target
S. & Overall
Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.
pit. HSE
- Proper containment shall be in
No 3 A CI
place for bitumen heating.
The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 6 of 15
Consequences
Consequences
Responsibility
Residual Risk
Frequency
Frequency
Legal
Target
S. & Overall
Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.
5
Bitumen - Bitumen should be stored in
storage & Ye safe and barricaded area.
shifting with Spill s - No smoking “sign at bitumen
Abnormal
Abnormal
The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 7 of 15
Consequences
Consequences
Responsibility
Residual Risk
Frequency
Frequency
Legal
Target
S. & Overall
Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.
Abnormal
Leveling - Preventive Maintenance system AMCORP
Ye should be followed. Site In
Failure of Equipment 2 B CI charge
s - Daily Inspection checklist to be -
filled by Operator & signed by
Supervisor while HSE Officer
will counter sign.
- Ensure specific Tool
talk will be shared with
all team members
- Ensure safe distance
of equipment from
Personnel may hit - Continuous supervision by excavated place.
with rotary/moving Contractor work site supervisor - Ensure risk
Abnormal
The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 8 of 15
Consequences
Consequences
Responsibility
Residual Risk
Frequency
Frequency
Legal
Target
S. & Overall
Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.
Ensure Awareness
- Always park vehicle at leveled &
session should be
Abnormal
Improper vehicle designated places.
conducted with all
parking during Ye - Applied Handbrake. AMCORP
3 B RRM drivers to ensure that HSE
2 B CI
refilling s - Use stopper/ chokes.
Vehicle parked
- Switch off vehicle.
properly during
- Toolbox talks
refueling activity.
- ”No smoking “sign at Diesel
storage area
- Use of proper PPEs when - Ensure no use of cell
handling diesel or flammable phones / radio set
Emergency
The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 9 of 15
Consequences
Consequences
Responsibility
Residual Risk
Frequency
Frequency
Legal
Target
S. & Overall
Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.
The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 10 of 15
Consequences
Consequences
Responsibility
Residual Risk
Frequency
Frequency
Legal
Target
S. & Overall
Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.
Abnormal
plan should be in
Demobilization Ye - Close supervision by work site place.
3 B RRM eni FHSEC 3 A CI
without restoration s supervisor - Ensure inspection & CRO
- Restore site as close to original after final restoration
as possible.
- Proven two-way
- Mobile phones / V-Wireless
12. Communicati communication
provided/available with
ons mechanism to be
Abnormal
chargers.
ascertained prior to AMCORP
Ye - VHF radio set available Site
Loss of communication 3 B RRM start of any activity at Incharge 3 A CI
s - Presence of standby vehicle at
remote locations
site with effective
- Ensure regular
communication system (VHF
toolbox talks prior to
communication)
start activity
- Ensure appropriate
13. Emergency - Equipped ambulance with communication
Handling, competent medic at work site system
Crisis - Ensure all personnel
Emergency
The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 11 of 15
Consequences
Consequences
Responsibility
Residual Risk
Frequency
Frequency
Legal
Target
S. & Overall
Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.
- Ensure work to be
stopped during rains,
- Sufficient drinking water heavy wind / heavy
fog / poor visibility and
available at work sites.
in extreme weather
Extreme weather - Toolbox talks with all concerned
conditions. AMCORP
Abnormal
- Ensure physical
examination & lab test
of all workers prior to
- Medical fitness certificate of all
their mobilization at
workers provided to eni doctor
Emergency
site. AMCORP
by the contractor site In
Heart attack / Ye - ECG and ETT reports SM
charge/doctor prior to their 4 B RRM 2 B CI
acute illness s as per HSE-CR Site Doctor
arrival at site (If required). & HSE TL
Guideline
- Competent staff (paramedic) at
- Ensure Inspection of
site.
ambulance through
proper checklist.
The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 12 of 15
Consequences
Consequences
Responsibility
Residual Risk
Frequency
Frequency
Legal
Target
S. & Overall
Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.
The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 13 of 15
Consequences
Consequences
Responsibility
Residual Risk
Frequency
Frequency
Legal
Target
S. & Overall
Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.
Note: Any other activities not identified in this risk assessment will be covered through a separate JSA
All work shall be carried out under eni PTW ( E&C)
The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 14 of 15
The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited
Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 15 of 15