HSE-CR Risk Assessment For Bhit Black Top Road From CP5 To D9 Repair Works

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 15

eni Pakistan Limited

HSE-CR Risk Assessment for


Bhit Black Top Road from CP5 to D9 Repair Works

H S E 9 9 - B H - I N - R A - 0 5 0 - 0 0

The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 2 of 15

Consequences

Consequences
Responsibility

Residual Risk
Frequency

Frequency
Legal

Target
S. & Overall

Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.

- Vehicles third party certification.


- LTV more than 6 years or
Mobilization/ travelled over 80,000 km old
1 Demobilization and HTV more than 10 Years or
activities. travelled over 200,000 km old
shall not be allowed (HSE-CR
Guidelines for MEIC Contracts
(Rev.01
- Trailer shall be equipped with
pneumatic brake system.
- 3rd party monitoring of all
emission sources e.g., power
Substandard vehicles AMCORP
generators, Site
& equipment
Ye - Only double axel truck/ trailers Manager /
Normal 2 B CI -
s allowed for hilly area. HSE TL
Trailer bed planks
- Routine inspection of vehicles.
damage
- Reporting of substandard
condition
- Ensure daily checks of vehicles
before move to site and
checklist to be filled &
maintained.
- All vehicles equipped with
emergency equipment like fire
extinguishers & first aid boxes
- Inspection of planks of trailer
bed before loading.

- Equipment should be 3rd party


certified. AMCORP
Ye - Carry out daily inspection of Site
Failure of Equipment Normal 2 B CI Incharge
s equipment & fill the checklist -
before start work.
- Preventive Maintenance system
should be followed.

The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 3 of 15

Consequences

Consequences
Responsibility

Residual Risk
Frequency

Frequency
Legal

Target
S. & Overall

Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.

- All heavy vehicles will be re-


inspected / rechecked
(especially brakes & secure
load) by competent mechanic
from GASCO prior to allow
movement up / down hill.
- On Bhit-top an escort vehicle
(light) will lead all heavy vehicles
moving between CP-4 to CP-5
and to site/camp (If required).
Uneven Terrain /
- All mobilization activities
Ye
Narrow road / Normal involving movement of HTV 2 B CI - AMCORP
s HSE
vehicles will be supervised
Steep Road / through the supervisor of
Hilly Terrain mobilization contractor/ GASCO

- Speed limits followed as defined


- Follow GASCO Parking
guidelines for vehicles in hilly
areas
- Contractor should ensure that
same precaution should be
taken by sub-contractor
-
- Ensure all operators / drivers
have well experience in driving /
operating in hilly areas.(Bhit-
Badhra) AMCORP
In competency of Ye In competency of drivers Site
Normal - Ensure all drivers (crane) have 2 B CI Manager /
drivers / operators s / operators
valid 3rd party defensive driving
certification according to field HSE TL
experience.
-

The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 4 of 15

Consequences

Consequences
Responsibility

Residual Risk
Frequency

Frequency
Legal

Target
S. & Overall

Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.

- Marked land/area for proper


offloading of equipment.
Offloading of EME - Proper ramp should be made as
Ye Offloading of EME near AMCORP
near trenches / down Normal per standard to offload 2 B CI Site
s trenches / down valleys
valleys machinery in safe manner. Supervisor /
- Apply hazards signage HSE
according to heavy machinery.

- Always park Vehicle / EME at


leveled & designated places.
- Use stopper/ chokes. AMCORP
- Apply Handbrakes Site In
charge
Improper Parking Normal No - Ensure frequent toolbox talk on 2 B CI /
safe parking is conducted with AMCORP
all drivers/ equipment operators HSE
- Designated places for re-fueling
vehicles/ equipment
-
Shifting of - Banks Man (Helper) should be
2 earth material deputed for during offloading of - Particular Tool Box
Personal Injury due materials. talk should be
to vehicular - Safe distance b/w dumper. conducted prior to
Abnormal

movement. - Close supervision. start activities & AMCORP


No - (Note: Vehicle & EME`s 2 B CI inform to equipment Site In 2 A CI
Vehicle accident movement precautions & operators & surveyors charge
requirements are discussed that they will work in
Dust emission above). SIMOPS condition
- Sprinkling should be in place
with normal frequency.

3 Laying and Personal Injury due


Abnormal

- Banks man to be deputed for


spreading of to vehicular AMCORP
heavy machinery.
crush / chips movement. No 2 A CI Site In
- All personnel should in complete charge
PPEs
Dust emission

The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 5 of 15

Consequences

Consequences
Responsibility

Residual Risk
Frequency

Frequency
Legal

Target
S. & Overall

Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.

- Experienced and skilled


Personnel injury manpower in place
4 Heating of
Bitumen - Burn pit shall be properly
barricaded with hard barricading
and GI sheet.
- All flammable materials shall be
remove and 5m away from burn
pit.
- Appropriate fire extinguisher
Improper shall be in place near heating
AMCORP
containment works Site In
- Fire blankets in place near burn charge /
Abnormal

pit. HSE
- Proper containment shall be in
No 3 A CI
place for bitumen heating.

Improper handling / ill - Leather gloves, Gum Shoes &


health effect Apron should be used while
handling heated bitumen.
- Proper canes should be used
while shifting of heated bitumen
from one containment to other.

- Proper API standard mask in


AMCORP
health effect from place.
Site In
fumes - Rotational or change of worker charge
policy in place.

The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 6 of 15

Consequences

Consequences
Responsibility

Residual Risk
Frequency

Frequency
Legal

Target
S. & Overall

Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.

5
Bitumen - Bitumen should be stored in
storage & Ye safe and barricaded area.
shifting with Spill s - No smoking “sign at bitumen
Abnormal
Abnormal

Boom Truck storage area.


AMCORP
- Appropriate Fire Extinguishers.
2 B CI Site In
- Report any leakage from charge
containments.
- Provision of secondary
containment

- Entry of unauthorized person


High noise area should be restricted in work
area.
Abnormal

Movement of boom - Banks man should be deputed AMCORP


Ye
Truck surrounding for movement of boom truck 3 A CI Site In
s charge
work force. - Close supervision by site
supervisor
- Tool box talk
- Use of appropriate PPEs.

6 Surface - Manually operated Bitumen


dressing / Dum type trolley should be use
Abnormal

spray of for spraying of bitumen. AMCORP


bitumen Improper handling / ill - Proper Pump in place. Site In
No 3 A CI charge /
health effect - Prior inspection of equipment
use for spraying of bitumen. HSE
- Proper PPEs in place
- API standard mask in place.

The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 7 of 15

Consequences

Consequences
Responsibility

Residual Risk
Frequency

Frequency
Legal

Target
S. & Overall

Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.

- Equipment should be 3rd party


7 Grading / certified. .

Abnormal
Leveling - Preventive Maintenance system AMCORP
Ye should be followed. Site In
Failure of Equipment 2 B CI charge
s - Daily Inspection checklist to be -
filled by Operator & signed by
Supervisor while HSE Officer
will counter sign.
- Ensure specific Tool
talk will be shared with
all team members
- Ensure safe distance
of equipment from
Personnel may hit - Continuous supervision by excavated place.
with rotary/moving Contractor work site supervisor - Ensure risk
Abnormal

machinery throughout the activity. assessment to be AMCORP


Ye Site In
- Proper barricading & warning 3 B RRM discussed with all charge
2 A CI
s
signs displayed. involved personnel
- Rotary Parts should be guarded. prior to start any
critical activity.
- Before starting the
activity site supervisor
should insure
inspection of rotary
parts guards
- Secondary containment.
.8 Diesel - Toolbox talks to all workers and
Storage / drivers on safe diesel filling /
Abnormal

Refueling of decanting. - Ensure training of


EME/Vehicle. Ye - Oil spill kit available. personnel on spill AMCORP
Spillages 3 B RRM HSE
3 A CI
s - Diesel loading operational handling.
procedures displayed at site.
- Regular inspection of diesel
storage area by competent
authority

The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 8 of 15

Consequences

Consequences
Responsibility

Residual Risk
Frequency

Frequency
Legal

Target
S. & Overall

Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.

Ensure Awareness
- Always park vehicle at leveled &
session should be

Abnormal
Improper vehicle designated places.
conducted with all
parking during Ye - Applied Handbrake. AMCORP
3 B RRM drivers to ensure that HSE
2 B CI
refilling s - Use stopper/ chokes.
Vehicle parked
- Switch off vehicle.
properly during
- Toolbox talks
refueling activity.
- ”No smoking “sign at Diesel
storage area
- Use of proper PPEs when - Ensure no use of cell
handling diesel or flammable phones / radio set
Emergency

liquids. during filling /


Site
Ye - Appropriate Fire Extinguishers. decanting operation
Fire 4 A RRM manager/ 3 A CI
s - Proper earthen - No cell phone near AMCORP
- Area Barrication the storage facility. HSE
- Safety signs displayed - Close supervision &
monitoring
- Regular inspection of
Firefighting equipment at site
- Contractor restore the work site
9 Site Rubbish waste left and camp site at original
Restoration over position
- Construction waste will be - AMCORP HSE should
Abnormal

removed from site. ensure proper


AMCORP
- All wall burn pits shall be housekeeping in place
No 1 C CI HSETL CI
restored as per environmental prior to handover the Eni HSEC
aspects. asset.
- Leftover bitumen should be
retrieved from non-working and
working sites after completion of
work.

The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 9 of 15

Consequences

Consequences
Responsibility

Residual Risk
Frequency

Frequency
Legal

Target
S. & Overall

Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.

- Follow Initial Environmental - All work will be done


10 Environmenta Oil spills Examination (IEE), NOC as per SEPA
l Issues Emission guidelines. instructions in NOC.
Improper waste - Operational control - Oil spill control plan to
disposal - Secondary contamination for oil be developed by
Soil contamination tanks contractor and submit
Energy - Use of drip trays, layering with to Eni Pakistan
consumption pit liner - Oil spill drills should
- Oil spillages reported properly be conducted
- Waste Disposal Plan
Abnormal

Yes - Waste Segregation System in AMCORP


4 A RRM 3 A CI
(Ref. place HSE & Site
EPA) - All waste material generated In charge
needs to managed and
disposed off as per Eni
guidelines.
- Contractor must submit the data
for water consumed
- 3rd party emission monitoring
for emission sources needs to
be conducted and ensure that
emission are in compliance to
NEQS.
- Ensure close
11. Waste supervision by work
Management site supervisor.
- Ensure to conduct
- Waste segregation system in regular toolbox talk on
Abnormal

place waste Management. AMCORP


Improper Ye - Waste disposal plan in place - Waste should be HSE
3 B RRM &
3 A CI
waste management s - All waste material generated handed over to
managed as per Eni guidelines. Field.Dr
approved contractor
- End Restoration of
site on project
completion

The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 10 of 15

Consequences

Consequences
Responsibility

Residual Risk
Frequency

Frequency
Legal

Target
S. & Overall

Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.

- Demobilization as per de-mob - Ensure restoration AMCORP


plan HSE

Abnormal
plan should be in
Demobilization Ye - Close supervision by work site place.
3 B RRM eni FHSEC 3 A CI
without restoration s supervisor - Ensure inspection & CRO
- Restore site as close to original after final restoration
as possible.
- Proven two-way
- Mobile phones / V-Wireless
12. Communicati communication
provided/available with
ons mechanism to be
Abnormal

chargers.
ascertained prior to AMCORP
Ye - VHF radio set available Site
Loss of communication 3 B RRM start of any activity at Incharge 3 A CI
s - Presence of standby vehicle at
remote locations
site with effective
- Ensure regular
communication system (VHF
toolbox talks prior to
communication)
start activity
- Ensure appropriate
13. Emergency - Equipped ambulance with communication
Handling, competent medic at work site system
Crisis - Ensure all personnel
Emergency

- Eni Emergency Response


Management. Bridging Document available. are familiar with a Eni FHSEC
Poor emergency Ye
- Ensure all personnel are well 4 A RRM dedicated and & AMCORP 3 A CI
management s HSE
aware about ERBD & their roles alternate emergency
and responsibilities in case of assembly points.
emergency. - Keep close
coordination with Eni
site representative

The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 11 of 15

Consequences

Consequences
Responsibility

Residual Risk
Frequency

Frequency
Legal

Target
S. & Overall

Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.

- Ensure work to be
stopped during rains,
- Sufficient drinking water heavy wind / heavy
fog / poor visibility and
available at work sites.
in extreme weather
Extreme weather - Toolbox talks with all concerned
conditions. AMCORP
Abnormal

Conditions on Heavy rain and its


(hot, cold, rains, Ye precautions. - Ensure close Site
4 A RRM monitoring by Incharge & 3 A CI
wind storm, dust s - Heating or cooling facility for HSE
AMCORP Dedicated
storm, heavy Fog accommodation according to
poor visibility, etc) weather condition HSE Officers
- Provision of PPE according to - FA/Medic present
weather. according POB at
work site.

- Ensure physical
examination & lab test
of all workers prior to
- Medical fitness certificate of all
their mobilization at
workers provided to eni doctor
Emergency

site. AMCORP
by the contractor site In
Heart attack / Ye - ECG and ETT reports SM
charge/doctor prior to their 4 B RRM 2 B CI
acute illness s as per HSE-CR Site Doctor
arrival at site (If required). & HSE TL
Guideline
- Competent staff (paramedic) at
- Ensure Inspection of
site.
ambulance through
proper checklist.

- Close supervision / monitoring


Physical - Ensure Rota cycle 45
Abnormal

by work site supervisor.


fatigue due to days on and 15 days AMCORP
Ye - Regular toolbox talk
work and 3 B RRM off to be followed by Site 3 A CI
s - Working hours not exceeds Manager
domestic the contractor/ sub
more than 12 hrs including rest/
sickness contractor
meal breaks.
Raising the - Utmost care are taken not to - Ensure One Face One AMCORP
14. Community expectations of the Ye raise community expectations Message CRO
Normal 3 C RRM &
1 C CI
Relations locals and s - Local labor hire through - Local labors &
government officials NOTEABLE. material management eni Field

The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 12 of 15

Consequences

Consequences
Responsibility

Residual Risk
Frequency

Frequency
Legal

Target
S. & Overall

Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.

will be Contractor’s CRO


responsibility.
- No unnecessary movements of
vehicles. - Ensure maintain at AMCORP
- No horn sounding during night least 500 meters Site
traveling distance as per HSE Manager &
Disturbance to local Ye - Use of tape recorders inside
Normal 4 B RRM CR Guideline from CRO 2 B CI
community s vehicles / machinery prohibited local community
in day / night dwellings / villages / eni Field
- Regular tool box before homes. CRO
commencement of any activity.
Religious, linguistic - Ensure such
and cultural rifts of - Staff is restricted not to interact behavioral gesture to
Ye AMCORP
the staff among Normal unnecessary with the 3 B RRM be avoided which is CRO
3 A CI
s
themselves and with community likely to harm local
the community culture & tradition.
- Ensure speed must be
- Watering / spraying to minimize reduced to avoid dust
Ye dust emission emission. AMCORP
Dust emission Normal - Speed control awareness given 3 B RRM 2 A CI
s - Ensure regular CRO & HSE
to all employees. Toolbox talk prior to
start any activity.
- Ensure drivers to be
instructed to follow the
speed limit/ follow Eni
Driving Policy.
- Follow Eni HSE & CR - Ensure tape recorders
Mishaps and
Guidelines. should not be used in
accidents affecting
Ye - Daily Toolbox talks prior to start the vehicles while AMCORP
community, passing Normal 3 C RRM 1 C CI
s any activity. passing the villages / HSE & RCO
by cattle’s, goats
- Follow the speed limit residence of local
and other animals.
instructions communities.
- Ensure staff should
not wash vehicles
from local water
storage area.

The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 13 of 15

Consequences

Consequences
Responsibility

Residual Risk
Frequency

Frequency
Legal

Target
S. & Overall

Date
Activity Hazard Condition Existing Control New Controls Required
# Other Risk
Req.

Note: Any other activities not identified in this risk assessment will be covered through a separate JSA
All work shall be carried out under eni PTW ( E&C)

The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 14 of 15

The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document
eni Pakistan Limited
Bhit Black Top Road Repair Works
Date of Release: August 2016
Page 15 of 15

The copy, once printed out, becomes an uncontrolled document; before using it, please verify the revision status of the document

You might also like