PERHITUNGAN BALOK MALL BANYUWANGI

PERHITUNGAN BALOK

Penulangan Lentur Balok


Prosedur Perhitungan Tulangan Lentur
1. Diketahui : fy, fc, h, b, d, d’ dan Mu
2. Ambil nilai x
600  
d’  x  0,75 Xb , dimana Xb =  600  fy .d
 

0,85. fc ' 1.x.b


3. Hitung Asc =
fy

1 x
4. Hitung Mnc = Asc fy (d - )
2
Mu
Mn = 

 Mn – Mnc  0 (Tulangan Tunggal).


 Mn – Mnc  0 (Tulangan Rangkap).
5. Hitung :
 d' 
- jika fs’ = 1  .600  fy (Tidak Leleh) maka fs’  fy
 x

 d' 
- jika fs’ = 1  .600  fy (Leleh) maka fs’ = fy
 x
Mn  Mnc
6. Hitung : T2 = (d  d ' )

T2
7. Hitung As’ = (Tulangan Tekan)
( fs '0,85 fc)
T2
8. Hitung Ass =
fy

9. Hitung As = Asc + Ass (Tulangan Tarik)

Jika memakai Tulangan tunggal maka prosedurnya sebagai berikut :


1. Hitung momen nominal

26
PERHITUNGAN BALOK MALL BANYUWANGI

Mu
Mn = 

fy
2. Hitung m = 0,85 fc'

Mn
3. Hitung Rn =
bd 2
FLOW CHART
PERHITUNGAN PENULANGAN BALOK
1 2.m.Rn 
4. Hitung  = 1  1  
START m  fy 

5. Check :
Diketahui : Mu, 1
fc’,
,4 fy, h, b, d, d’, Ambil
0,85. nilai
fc' x : 600 
min = fy , maks = 0,75 b = 0,75 d’fy x 10,75 Xb 
 600  fy 
Xb =
min    maks
Mnc
6. As = Asc
perlu = pakai fy
b d(d -
Mn =
7. Aspasang  Asperlu. Asc =

tida
Mn – Mnc  0 k Tulangan Tunggal

y
a
Tulangan Rangkap

fs’ =  fy

tida y
k a
Tidak Leleh Leleh

fs’  fy fs’ = fy

As’ =
T2 =
Ass =

As = Asc + Ass
27

STOP
PERHITUNGAN BALOK MALL BANYUWANGI

Sebagai contoh perhitungan diambil balok memanjang lantai dua (SB3)


Untuk Tumpuan
Diketahui : Mu = 243612326 Nmm. (Output SAP 2000).
fc’ = 20 Mpa.

28
PERHITUNGAN BALOK MALL BANYUWANGI

fy = 320 Mpa.
h = 600 mm.
b = 300 mm.
d = 540 mm.
d’ = 60 mm.
Mencari momen nominal
Mu 243612326
Mn =   = 304515408 Nmm.
0,8

Asumsikan nilai x
xmin  d’ = 60 mm.
xmaks  0,75 xb
 600   600 
xb =  .d   540  352,17 mm.
 600  fy   600  320 

xmaks = 0,75 x 352,17 = 264 mm.


diambil nilai x = 89 mm.
0,85.1. fc '.b.x
Asc =
fy

0,85.0,85.20.300.89
Asc =  1205,67 mm2.
320
1. x
Mnc = Asc fy (d - )
2
0,85.89
= 1205,67. 320 (540 - )
2
Mnc = 193746647,63 Nmm.
Mn – Mnc = 304515408 – 193746647,63 = 110768759,88 Nmm.
Mn – Mnc  0 (memakai tulangan ganda).

Cek tulangan leleh atau tidak leleh


 d' 
fs’ = 1  .600 > fy
 x

 60 
= 1  .600 = 195,51 Mpa < 320 Mpa (tulangan tidak leleh)
 89 

29
PERHITUNGAN BALOK MALL BANYUWANGI

Mn  Mnc
T2 =
(d  d ' )
110768759 ,88
= = 230768,25 N
(540  60)

Kebutuhan tulangan tekan


T2
As’ =
( fs '0,85 fc )
230768,25
As’ = = 1292,8 mm2.
(195,51  0,85.20)

Kebutuhan tulangan tarik


T2 230768,25
Ass = = = 721,15 mm2.
fy 320
As = Asc + Ass
= 1205,67 + 721,15 = 1926,82 mm2.
Dipasang 7D19 (Aspasang = 1983,70 mm2)
Dipasang 5D19 (As’pasang = 1416,93 mm2)

7D19
Kontrol jarak tulangan.
300 – 80 – 16 – (5x19) = 300 – 191 = 109mm
109/4 =27,25mm....Ok!

600 8-8
d

5D19

d' = 60
300

Untuk Lapangan
Diketahui : Mu = 136617564 Nmm. (Output SAP 2000).
fc’ = 20 Mpa.
fy = 320 Mpa.
h = 600 mm.
b = 300 mm.

30
PERHITUNGAN BALOK MALL BANYUWANGI

d = 540 mm.
d’ = 60 mm.
Mencari momen nominal
Mu 136617564
Mn =   = 170771955 Nmm.
0,8

Asumsikan nilai x
xmin  d’ = 60 mm.
xmaks  0,75 xb
 600   600 
xb =  .d   540  352,17 mm.
 600  fy   600  320 

xmaks = 0,75 x 352,17 = 264 mm.


diambil nilai x = 75 mm.
0,85.1. fc '.b.x
Asc =
fy

0,85.0,85.20.300.75
Asc =  1016,02 mm2.
320
1. x
Mnc = Asc fy (d - )
2
0,85.75
= 1016,02. 320 (540 - )
2
Mnc = 165204140,63 Nmm.
Mn – Mnc = 170771955 – 165204140,63 = 5567814,38 Nmm.
Mn – Mnc  0 (memakai tulangan ganda).

Cek tulangan leleh atau tidak leleh


 d' 
fs’ = 1  .600 > fy
 x

 60 
= 1  .600 = 120 Mpa < 320 Mpa (tulangan tidak leleh)
 75 
Mn  Mnc
T2 =
(d  d ' )

31
PERHITUNGAN BALOK MALL BANYUWANGI

5567814,38
= = 11599,613 N
(540  60)

Kebutuhan tulangan tekan


T2
As’ =
( fs '0,85 fc )
11599,613
As’ = = 112,62 mm2.
(120  0,85.20)

Kebutuhan tulangan tarik


T2 11599,613
Ass = = = 36,25 mm2.
fy 320
As = Asc + Ass
= 1016,02 + 36,25 = 1052,26 mm2.
Dipasang 3D19 (Aspasang = 850,16 mm2)
Dipasang 2D19 (As’pasang = 566,77 mm2)

Kontrol jarak tulangan.


3D19
300 – 80 – 16 – (5x19) = 300 – 191 = 109mm
109/4 =27,25mm....Ok!

600 8-15
d

5D19

d' = 60
300

Penulangan Geser Balok


Prosedur Perhitungan Tulangan Lentur
1. Diketahui bidang D akibat beban terfaktor (Vu)
2. Cek dimensi
5
- Jika Vu   fc '.bw.d (dimensi Ok!)
6
5
- Jika Vu   fc '.bw.d (dimensi diperbesar)
6

32
PERHITUNGAN BALOK MALL BANYUWANGI

3. Menghitung kuat sumbangan beton (Vc)


1
- Vc  fc'bwd
6
4. Beberapa persyaratan untuk perencanaan geser
a. Kondisi Vu  0,5  Vc ; tidak perlu tulangan geser
b. Kondisi 0,5  Vc  Vu   Vc ; tulangan geser minimum
1 bw.S
Av 
3 fy

jarak sengkang max  0,5d atau 600mm.


c. Kondisi  Vc  Vu   (Vc + Vsmin) ; tulangan geser minimum
1
Vs min  .bw.d
3
1 bw.S
Av 
3 fy

jarak sengkang max  0,5d atau 600mm.


1
d. Kondisi  (Vc + Vsmin)  Vu   (Vc + fc'bwd ); perlu tulangan
3
geser.
Vu Av . fy.d
Vs   Vc ; Vs 
 S
Av . fy.d
jarak sengkang (S) =
Vs
jarak sengkang max  0,5d atau 600mm.

1 2
e. Kondisi  (Vc + fc'bwd ) Vu   (Vc + fc'bwd ); perlu tul.
3 3
geser.
Vu Av . fy.d
Vs   Vc ; Vs 
 S
Av . fy.d
jarak sengkang (S) =
Vs
jarak sengkang max  0,5d atau 600mm.

Untuk penulangan balok lainnya lihat pada tabel penulangan balok.

33