MC2 Progress Galian-Timbunan CGP
MC2 Progress Galian-Timbunan CGP
MC2 Progress Galian-Timbunan CGP
1 - 644.463 1,910.19
2 (5.928) 644.353 1,743.06 Sket :
3 (11.337) 644.217 1,479.38
648.000
4 (15.928) 644.114 1,485.70
5 (20.541) 644.108 1,981.30
6 (26.668) 643.322 334.98
7 (27.685) 642.730 (2,521.23) 646.000
8 (19.840) 642.742 (2,257.48)
9 (12.821) 642.921 (2,125.09)
10 (6.210) 642.908 (1,996.48)
644.000
11 - 642.990 (2,098.72)
12 6.528 643.109 (2,661.28)
13 14.804 643.080 (2,030.36)
14 21.119 643.101 426.09 642.000
15 19.815 643.752 2,636.22
16 11.625 643.750 2,785.67
17 2.965 643.446 955.42
640.000
18 - 644.463
(40.000) (30.000) (20.000) (10.000) - 10.000 20.000 30.000
19
Luas Penampang 39+600.00 47.36
1 - 644.362 1,627.01
2 (5.050) 644.314 1,858.58 Sket :
3 (10.818) 644.165 1,880.50
648.000
4 (16.656) 644.131 1,822.79
5 (22.316) 644.143 1,355.44 647.000
6 (26.516) 643.893 910.21
7 (29.286) 642.508 (2,073.39) 646.000
8 (22.834) 642.552 (2,203.82)
9 (15.978) 642.653 (2,322.68) 645.000
10 (8.751) 642.710 (2,812.31)
11 - 642.740 (1,963.57) 644.000
12 6.110 642.688 (2,691.92)
13 14.487 642.682 (2,344.57) 643.000
14 21.781 642.583 435.20
15 20.449 643.249 1,634.98 642.000
16 15.369 643.359 3,009.10
17 641.000
6.013 643.290 1,457.98
(40.000) (30.000) (20.000) (10.000) - 10.000 20.000 30.000
18 1.479 643.170 476.51
19 - 644.362
20
Lokasi : Underpass
Pekerjaan : Galian
No. Item : III.1
Item Pekerjaan : Galian Biasa untuk Timbunan di dalam Rumija Proyek
Lokasi : Frontage
Pekerjaan : Timbunan
No. Item : III.3
Item Pekerjaan : Borrow Material
Jumlah Volume B M3 - - -
C Total Timbunan
1 Badan Jalan Lokasi Jalan Utama M3 18,140.42 10,054.74 28,195.16
2 Underpass dan Frontage M3 - - -
D Borrow Material
1 Badan Jalan Lokasi Jalan Utama = C - (A x 0.9) M3 10,668.84 10,054.74 20,723.57
A. TOTAL TIMBUNAN
1. Jalan Utama
STA. 39+075 s.d. STA. 39+650 m3 28,195.16 Sertifikat 2