Section Approx.

Scope of Road
Reference Code Description
Name Chainage Contractor Diversion

UKB-UDP-001 UKB -3+300 Military access road C Yes


UKB-UBR-001 UKB -0+550 E11 crossing E
GMA-OBR-001 GMA 0+461 Military access road A Yes

GMA-OBR-002 GMA 5+292 Future road to railway facility B' No


Road crossing (7km maximum
GMA-UDP-003 GMA 13+800 D
interval)
GMA-OBR-004 GMA 22+167 Sand track A Yes

GMA-UDP-005 GMA 24+533 Camel underpass D


Road crossing (7km maximum
GMA-UDP-006 GMA 31+450 D
interval)
Road crossing (7km maximum
GMA-UDP-007 GMA 38+450 D
interval)
GMA-OBR-008 GMA 41+923 Sand track A Yes
Road crossing (7km maximum
GMA-UDP-009 GMA 48+900 D
interval)
GMA-UDP-010 GMA 52+580 Sand track C Yes

GMA-UDP-011 GMA 55+600 Enec Emergency Access Road D


Road crossing (7km maximum
GMA-UDP-012 GMA 62+530 D
interval)
Access for future interchange
GMA-UDP-014 GMA 68+000 D
connection
Road crossing (7km maximum
GMA-UDP-013 GMA 69+550 D
interval)
GMA-UDP-025 GMA 79+950 Road access to private land C Yes
GMA-UDP-015 GMA 81+600 Military access road D

GMA-UDP-016 GMA 82+100 Military access road D

GMA-UDP-017 GMA 82+600 Military access road D


GMA-UDP-018 GMA 83+100 Military access road D

GMA-UDP-019 GMA 83+600 Military access road D

GMA-UDP-020 GMA 84+100 Military access road D

GMA-OBR-021 GMA 86+029 Military access road A Yes

GMA-OBR-022 GMA 96+685 Umm Al Ishtan Road A Yes


Road crossing (7km maximum
GMA-UDP-023 GMA 103+250 D
interval)
Road crossing (7km maximum
GMA-UDP-024 GMA 110+800 D
interval)
GMA-OBR-025 GMA 117+850 Major sand track to fields A Yes
Road crossing (7km maximum
GMA-UDP-026 GMA 125+690 D
interval)
GMA-OBR-027 GMA 128+716 E15 Gayathi Road B Yes
Road crossing (7km maximum
GMA-UDP-028 GMB 1+500 D
interval)

SCOPE OF CONTRACTOR FOR ROADS AT OVERBRIDGES:


A: EXISTING PAVED OR UNPAVED LOCAL RURAL ROAD. CONTRACTOR TO BUILD TEMPORARY ROAD DIVERSION. CONTRACTOR TO BUILD
PERMANENT OVERBRIDGE AT LOCATION OF EXISTING ROAD. CONTRACTOR TO TIE-IN WITH EXISTING ROAD PAVEMENT.
B: EXISTING DOT ROAD. CONTRACTOR TO BUILD TEMPORARY ROAD DIVERSION WITH SAME STANDARD AS PERMANENT ROAD.
CONTRACTOR TO BUILD PERMANENT OVERBRIDGE AT LOCATION OF EXISTING ROAD. CONTRACTOR TO TIE-IN WITH EXISTING ROAD
PAVEMENT.
B: FUTURE ROAD CROSSING. CONTRACTOR TO BUILD ONLY PERMANENT OVERBRIDGE AT LOCATION OF FUTURE ROAD.

SCOPE OF CONTRACTOR FOR ROADS AT UNDERPASSES:


C: EXISTING ROAD. CONTRACTOR TO BUILD TEMPORARY ROAD DIVERSION. CONTRACTOR TO BUILD PERMANENT UNDERPASS AT LOCATION
OF EXISTING ROAD. CONTRACTOR TO REINSTATE EXISTING ROAD PAVEMENT JUST BEFORE AND AFTER UNDERPASS.
D: FUTURE ROAD CROSSING. CONTRACTOR TO BUILD ONLY PERMANENT UNDERPASS AT LOCATION OF FUTURE ROAD.

SCOPE OF CONTRACTOR FOR ROADS AT UNDERBRIDGE:


E: NO IMPACT ON EXISTING ROAD. CONTRACTOR TO BUILD RAILWAY BRIDGE WHILE WORKING OVER EXPRESSWAY WITH TEMPORARY
CLEARANCE OF 5.5M.

CONTRACTOR'S JOINT VENTURE : CONSULTANT : CLIENT: PROJECT : ETIHAD RAIL PROJECT STAGE 2 REV. R0

ETIHAD RAIL NETWORK PACKAGE A (CONTRACT NO.0303) BY DBI

CHK'D VDE

ROAD SCHEDULE APP'D KDA

DATE 17-10-2018
REV.
C0303-GMA-ALG-TD-02151 X
ORIGINAL SIZE : A1